Paradise Creek Restoration Paradise Creek Restoration September 14, 2006 September 14, 2006 Hampton Roads Green Infrastructure Workshop Hampton Roads Green Infrastructure Workshop
Transcript
Page 1: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Paradise Creek RestorationParadise Creek Restoration

September 14, 2006September 14, 2006

Hampton Roads Green Infrastructure WorkshopHampton Roads Green Infrastructure Workshop

Page 2: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

PortsmouthChesapeake

Virginia Beach

Elizabeth River Watershed LocationElizabeth River Watershed Location

Page 3: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Early 1990s: Elizabeth River Early 1990s: Elizabeth River perceived as perceived as ““deaddead””

Liver cancer,bottom-dwelling fishUrban legends –six shots if you fall in!

Page 4: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Elizabeth River Project: Elizabeth River Project: First discussions 1991First discussions 1991

Four citizens around a kitchen tableWould the community support a cleaner river?Non-finger pointing approach

Page 5: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

15 years later: 15 years later: National modelNational model for for partnerships that achieve real results.partnerships that achieve real results.

“If you’re looking for an example ofthe success of partnerships, Elizabeth River Project is the model.”

- EPA’s former national headChristie Todd Whitman, 02

Page 6: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

The Elizabeth River Project:The Elizabeth River Project:

Among 1st environmental groups to succeed with the positive power of partnerships

Today: 2,000 members, 55 industries, four cities, state and federal government, many others, achieving environmental results - together.

How did we get there?

Page 7: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

19921992--96: Building consensus96: Building consensus

Listening and learning across diverse interestsConsensus 1996Action plan that is affordable, effective and acceptable to the community.

Page 8: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Watershed Action Plan Watershed Action Plan –– Our GuideOur Guide

Developed by 120 volunteers

• Citizen/Industry• Government• Scientific/Technical

Page 9: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Restoration and ConservationRestoration and Conservation

Set restoration goals for the river’s top priority needs.Included 14 priority actions

Page 10: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Priority Action: Restore, conserve Priority Action: Restore, conserve buffers, wetlands, forestsbuffers, wetlands, forests..

2020: Create 10 miles of restored river corridor2020: Create 10 miles of restored river corridor

Page 11: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Progress:Progress: More than a More than a dozen wetland dozen wetland restorationsrestorations & the & the most oyster reefsmost oyster reefs restored per restored per

acreacre of any river on the bay!of any river on the bay!

Giving Wetlands Back to the RiverGiving Wetlands Back to the River

Page 12: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

2007 Goal: Restore Paradise 2007 Goal: Restore Paradise Creek as a modelCreek as a model

Sub-watershed plan, 2002– Community

team– Facilitated

consensus– $10 million +

underway!

Page 13: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Rain Garden in the Rain Garden in the Cradock NeighborhoodCradock Neighborhood

Page 14: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks
Page 15: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Paradise Creek PlanParadise Creek PlanCornerstone – a park to provide the only public access to Creek and foster appreciation.

Page 16: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks
Page 17: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Paradise Creek Nature ParkParadise Creek Nature Park40-acre proposed nature park

ERP raising $1.4 million for purchase of land

Partnership with Virginia Port Authority (wetlands) and City of Portsmouth (park)

Page 18: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Master Plan Master Plan –– Summary GraphicSummary Graphic

Page 19: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Elements of Final Design ConceptElements of Final Design Concept

••10 acres of restored wetlands (9 shown, tenth to be added)10 acres of restored wetlands (9 shown, tenth to be added)

••Perimeter trail and overlooks, with boardwalks and Perimeter trail and overlooks, with boardwalks and walkways into the tree canopywalkways into the tree canopy

••Canoe/kayak launch at park entry Canoe/kayak launch at park entry

••Interpretive “tidal garden”Interpretive “tidal garden”

••““TimescapeTimescape” mound, puts visitors 50 feet in air for ” mound, puts visitors 50 feet in air for viewscapeviewscape of creek and surroundsof creek and surrounds

••Frisbee golf in 20 acres of conserved forest, plus bike trail Frisbee golf in 20 acres of conserved forest, plus bike trail along Victoryalong Victory

Page 20: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

““TimescapeTimescape” Mound” Mound

Page 21: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Tidal GardenTidal Garden

Page 22: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Walkway into Tree Canopy Walkway into Tree Canopy

Page 23: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Other Elements of Final DesignOther Elements of Final Design

••“Victory Pavilion” celebrating repair of river“Victory Pavilion” celebrating repair of river

••7575--100 person Primary Picnic pavilion overlooks launch100 person Primary Picnic pavilion overlooks launch

••Children’s play areaChildren’s play area

••Terraced learning area (amphitheater)Terraced learning area (amphitheater)

••Interpretive Station building (exhibits, possible future Interpretive Station building (exhibits, possible future home of ERP Office)home of ERP Office)

••Research station, SE cornerResearch station, SE corner

••Roundabout entry with rain garden in medianRoundabout entry with rain garden in median

Page 24: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Industries Get InvolvedIndustries Get Involved

Outreach program to businesses in the watershedFacilities voluntarily conduct pollution prevention initiatives and habitat enhancement projects above complianceKey components to Paradise Creek restoration

Page 25: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Site 1- New Gosport

Site 3- Paradise Creek Landfill

Norfolk Naval Shipyard and Norfolk Naval Shipyard and Naval Station NorfolkNaval Station Norfolk

Site 2- Scotts Center Landfill

Page 26: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

GiantGiant CementCement

Page 27: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks
Page 28: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks
Page 29: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

SPSASPSA

Page 30: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Peck Iron & MetalPeck Iron & Metal

Page 31: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Evidence of SuccessEvidence of Success

Page 32: Paradise Creek Restoration 7... · Elements of Final Design Concept •10 acres of restored wetlands (9 shown, tenth to be added) •Perimeter trail and overlooks, with boardwalks

Questions?Questions?