+ All Categories
Home > Documents > Parametrisation of PRISM Ring and Design Options J. Pasternak Imperial College London/RAL STFC

Parametrisation of PRISM Ring and Design Options J. Pasternak Imperial College London/RAL STFC

Date post: 13-Jan-2016
Category:
Upload: laken
View: 27 times
Download: 0 times
Share this document with a friend
Description:
Parametrisation of PRISM Ring and Design Options J. Pasternak Imperial College London/RAL STFC. PRISM-FFAG Task Force phone meeting, 10.09.2009. Outline. Introduction and motivation Current PRISM design Possible strategy Basic parametrisation and constrains Ring design options - PowerPoint PPT Presentation
Popular Tags:
12
Parametrisation of PRISM Ring and Design Options J. Pasternak Imperial College London/RAL STFC PRISM-FFAG Task Force phone meeting, 10.09.2009
Transcript
Page 1: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

Parametrisation of PRISM Ring and Design Options

J. PasternakImperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

Page 2: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

Outline

• Introduction and motivation

• Current PRISM design

• Possible strategy

• Basic parametrisation and constrains

• Ring design options

• Summary

Page 3: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

• As charge lepton flavor violation (cLFV) is strongly suppressed in the Standard Model, its detection would be a clear signal for new physics!• Search for cLFV is complementary to LHC.• The - + N(A,Z)→e- + N(A,Z) seems to be the best laboratory for cLFV.• The background is dominated by beam, which can be improved.• The COMET and Mu2e were proposed.• The PRISM-FFAG ring was proposed for a next generation experiment in order to: -reduce the muon beam energy spread by phase rotation, -purify the muon beam in the storage ring.

Search for cLFV and motivations for PRISM

Page 4: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

• The PRISM-FFAG Task Force was proposed and discussed during the last PRISM-FFAG workshop at IC (1-2 July’09).• The aim of the PRISM-FFAG Task Force is to address the technological challenges in realising an FFAG based muon-to-electron conversion experiment, but also to strengthen the R&D for muon accelerators in the context of the Neutrino Factory and future muon physics experiments. • It was proposed to achieve a conceptual design of the PRISM machine at the end of 2010/beginning 2011.• The following key areas of activity were identified and proposed to be covered within the Task Force:- the physics of muon to electron conversion,- proton source,- pion capture,- muon beam transport,- injection and extraction for PRISM-FFAG ring,- FFAG ring design including the search for a new improved version,- FFAG hardware R&D for RF system and injection/extraction kicker and septum magnets.•The Task Force will use phone conferences and next PRISM-FFAG workshops were proposed.

The PRISM-FFAG Task Force Initiative

Please join! [email protected]

Page 5: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

V per turn ~2-3 MVΔp/p at injection = ± 20%Δ p/p at extraction = ± 2% (after 6 turns ~ 1.5 us)h=1

Current Design Parameters – A. Sato

Page 6: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

Possible PRISM Task Force Design Strategy

Option 1:Adopt current design and work out injection/extraction,and hardware

Option 2: Find new design

They should be evaluated in parallel andfinaly confronted with the figure of merit (FOM) (number of muons delivered to target/cost).We may also need to have a common FOMwith COMET (muons at target/background ??)

Page 7: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

Requirements for a new design

• High transverse acceptance (at least 38h/5.7v [Pi mm] or more).

• High momentum acceptance (at least ± 20% or more).

• Small orbit excursion.

• Compact ring size (this needs to be discussed).

• Relaxed or at least conserved the level of technical difficulties. for hardware (kickers, RF) with respect to the current design.

Page 8: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

Basic constraints

E

VheTQ stS 22

cos

Eh

VeT

E

E t

2

• Energy acceptance depends on RF voltage and harmonic number. Observation: if we want to go for h=2, we need a factor of 2 more RF!• Synchrotron tune tells us about number of turns needed for phase rotation. Observation: for h=2 phase rotation is twice as fast (3turns).• If we want to change the central momentum (keeping momentum acceptance), RF voltage goes down!• Changing central momentum increases revolution time. This is good for kickers, but you need to be within the frequency range of MA cavities.

C. Ohmori

Page 9: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

Preliminary scaling

Current design:p0 = 68 MeV/ch=1Δ p/p at injection = ± 20%V = 2.3 MVRF frequency = 3.55 MHzTrev= 280 nsTrise for the kicker=80 nsN of turns = 6

Option 1:p0 = 68 MeV/ch=2Δ p/p at injection = ± 20%V = 4.6 MVRF frequency = 7.1 MHz too large?Trev= 280 nsTrise for the kicker~ 140 ns!N of turns = 3

Option 1a:p0 = 68 MeV/ch=2Δ p/p at injection = ± 20%V = 4.6 MVRF frequency = 3.55 MHz Trev= 560 nsTrise for the kicker~ 280 ns!N of turns = 3

RF is expensive!

Page 10: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

Preliminary scaling (2)

Current design:p0 = 68 MeV/ch=1Δ p/p at injection = ± 20%V = 2.3 MVRF frequency = 3.55 MHzTrev= 280 nsTrise for the kicker=80 nsN of turns = 6

Option 2:p0 = 40 MeV/ch=1Δ p/p at injection = ± 20%V = 1.15 MV (??) It needs be to check!RF frequency = 2.3 MHz too low?Trev= 430 nsTrise for the kicker~ 123 ns!N of turns <5

Option 2a:p0 = 40 MeV/ch=2Δ p/p at injection = ± 20%V = 2.3 MV (?)RF frequency = 4.6 MHz Trev= 430 nsTrise for the kicker~ 215 ns!N of turns <3

Page 11: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

RRing Design Options

Scaling FFAG

Options:• standard lattice,• periodic with extended cell (for example 5 magnets per cell),• superperiodic (see Shinji’s talk)• advanced (Y. Mori)

Non-Scaling FFAG

Problems to be addressed:• confirmation of a large DA• currently no insertion scheme,• very difficult injection• TOF with amplitude

Page 12: Parametrisation of PRISM Ring  and Design Options J. Pasternak Imperial College London/RAL STFC

PRISM-FFAG Task Forcephone meeting, 10.09.2009

Summary

• PRISM-FFAG Task Force was created.

• We need to discuss the strategy for the ring design.

• The ring design is constrained mostly by RF voltage, frequency and central momentum.

• There exist a variety of choices for the ring structure and optics.


Recommended