Draft Minutes of the
Park-Euclid Water Quality Assurance Revolving Fund (WQARF) Site Community Advisory Board (CAB) Meeting – 38th meeting
January 16, 2013, 6:30 - 8:30 p.m.
State of Arizona Regional Complex 400 W. Congress, North Building, Conference Room 158
Tucson, Arizona 85701
CAB Members Present: Mark Marikos, Jacky Turchick, Steve Turner, Freya Eddy, Bill Richards CAB Members Absent: Keith Bagwell, Justin Berkompas, Richard Byrd, Jonathan Salvatierra, Menachem Turchick, ADEQ Staff Present: Bob Wallin, Project Manager; William Ellett, Superfund Programs Unit Manager, Southern Regional Office; Marvel Encinas, Southern Regional Office; Delfina Olivarez, ADEQ Community Involvement Coordinator. Members of the Public Present: Harlan Agnew, Pima County; Janet Workman, URS Corp.; Larry Robinson, Pima County Flood Control; Robert Boudra, URS Corp.; Joe Drazek, Quarles & Brady LLP; Don Moore, Mission Linen
The meeting began at 6:45 p.m. 1. Call to Order/Introductions Co-chair Mark Marikos conducted introductions of CAB members and public participants. 2. CAB Recommencement Ms. Delfina Olivarez explained a majority or quorum of the CAB members were not present, therefore no business could be conducted; and if a quorum is present at the next CAB meeting business would be conducted. Ms. Olivarez handed out the Charter and Open Meeting Law/Quorum information and asked the CAB to review, she added if a quorum was reached at the next meeting they could make any desired changes to the Charter. 3. Nomination of Co-Chair(s) No quorum, not discussed. 4. Approval of 2/18/09 meeting minutes
Minutes of the 1-16-13 Park-Euclid CAB Meeting Page 2
No quorum, not discussed. 5. WQARF Program Update Mr. Bill Ellett gave an update on site work. The Remedial Investigation was completed in November 2011. Potential Responsible Parties, The Haskells and Mission Linen signed a work agreement with ADEQ, July 2010. This agreement allowed for resuming groundwater monitoring, start up of the multiphase extraction system, and to move forward with the Feasibility Study. 6. Site Update Mr. Robert Boudra of URS continued with details. See below presentation.
7. Arroyo Chico Project Update Mr. Larry Robison of Pima County Flood Control District gave an update on the Arroyo Chico Flood Control Project. Using poster size graphics of before and after Mr. Robinson explained how Basin 1, the last phase of the project is almost completed. 8. CAB Outreach Reports None. 9. Call to Public Achieving a quorum was discussed. 10. Next meeting date/agenda discussion A meeting in Spring was discussed. 11. Adjournment The meeting was adjourned at 8:20 p.m. This meeting was recorded on a digital device as a record of the proceedings. To listen to a recording, or for additional documents mentioned in these minutes, contact ADEQ, Delfina Olivarez at 602-771-4710.
Minutes prepared by: Delfina Olivarez 4/18/13 J:WPD\Planning\OU\Park Euclid\PE FS & May 23, 2013 CAB
Park Euclid WQARF Site
Mission Plant
² Source of base topographic data: TOPO!2,000 0 2,0001,000
Scale in Feet
ARIZONA
Tucson
Phoenix
Flagstaff
Project Area
§̈¦8
§̈¦10
§̈¦40
§̈¦15
§̈¦17
§̈¦19
§̈¦40
§̈¦10
Project Name: Park-Euclid WQARF Site
Job No: 22241866 Date: January 2013 Y:/GIS/Projects/Mission/Park_Euclid/Proj13/FS_Final/Fig1_SiteLocation.mxd
SITE LOCATIONPARK-EUCLID WQARF SITE301 SOUTH PARK AVENUETUCSON, ARIZONA
Figure 1
0 500 1,000
Scale in Feet
³
Explanation!> Perched Aquifer Well
!< Regional Aquifer Well
!H University of Arizona Production Well
Mission Plant
University of Arizona
Project Name: Park-Euclid WQARF Site
Job No: 22241866 Date: January 2013 Y:/GIS/Projects/Mission/Park_Euclid/Proj13/FS_Final/Fig2_Wells.mxd
WELL LOCATIONSPARK-EUCLID WQARF SITE301 SOUTH PARK AVENUETUCSON, ARIZONA
Figure 2Source: Bing Maps aerial imagery web mapping service,(c) 2009 Microsoft Corporation and its data suppliers.
See Figure 3 for Mission Plant Area
1
1
10
100
1000
S. Pa
rk Av
e.
S. Fr
emon
t Ave
.
E. Manlove St.S.
Frem
ont A
ve.
E. 13th St.
VW-05-55: 55
VW-02-55: 0.4 VW-04-55: 2.8
VW-01-55: 1.4
VW-03-55: 0.09
VW-07-55: 2100
VW-06-55: 0.13
1
1
10
100
1000
S. Pa
rk Av
e.
S. Fr
emon
t Ave
.
E. Manlove St.S.
Frem
ont A
ve.
E. 13th St.
VW-05-55: 55
VW-02-55: 0.4 VW-04-55: 2.8
VW-01-55: 1.4
VW-03-55: 0.09
VW-07-55: 2100
VW-06-55: 0.13
0 100 200
Scale in Feet
³Note:
Aerial Imagery Source: Orthophoto provided by Pima Association ofGovernments, Pima County, Arizona, 2010
Explanation
Soil Vapor Sampling LocationPCE Concentration (ppmv)
1101001000Mission Plant
Project Name: Park-Euclid WQARF SiteJob No: 22241866 Date: October 2012 P-E/Semi_Annual_July2012/maps/Fig6_SV_PCE_55ft_July2012.mxd
PCE DISTRIBUTION IN SOIL GAS AT 55 FEET BGSJULY 2012PARK-EUCLID WQARF SITETUCSON, ARIZONA
Figure 6
VW-07: 2100 ID: PCE Concentration (ppmv)
!>
!?
!>
!>
!>
!>
!>
!>
!>
!>
#_!?#_!?#_
!?
!>
!>
!> !>
!?!?
!?
!>
??
?
?
?
Upgradient extent of product is not well defined
MLS-5: 2.40
MPE-6: 2.50
MLS-4: 4.10
*SVE-101: 3.29
PEP-9: 1.20
MPM-1: 4.77MPE-1: 4.37
MPE-5: 3.91PEP-8: 2.38
MLS-12: 2.36
MLS-13: 2.28
PEP-24: 1.98
WR-347A: 2.29SVE-104: 1.23
SVE-103: 0.03
MPE-3: 3.29
MPE-4: 3.34
MPE-2
WR-345A
S. Euclid Ave.
S. Pa
rk Av
e.
S. Fre
mont
Ave.
S. Sta
r Ave
.
E. Barraza Aviation Pkwy
E. 15th St.
E. 14th St.
E. Manlove St.
E. 13th St.
S. Sa
nta R
ita A
ve.
E. Miles St.
E. 12th St.
E. Broadway Blvd.
E. 10th St.
S. Pa
rk Av
e.
E. McKey St.
E. 12th St.
S. Fre
mont
Ave.
E. 13th St.
E. Miles St.
PEP-18
ADOT-1
PEP-10
PEP-19
PEP-11
!>
!?
!>
!>
!>
!>
!>
!>
!>
!>
#_!?#_!?#_
!?
!>
!>
!> !>
!?!?
!?
!>
??
?
?
?
Upgradient extent of product is not well defined
MLS-5: 2.40
MPE-6: 2.50
MLS-4: 4.10
*SVE-101: 3.29
PEP-9: 1.20
MPM-1: 4.77MPE-1: 4.37
MPE-5: 3.91PEP-8: 2.38
MLS-12: 2.36
MLS-13: 2.28
PEP-24: 1.98
WR-347A: 2.29SVE-104: 1.23
SVE-103: 0.03
MPE-3: 3.29
MPE-4: 3.34
MPE-2
WR-345A
S. Euclid Ave.
S. Pa
rk Av
e.
S. Fre
mont
Ave.
S. Sta
r Ave
.
E. Barraza Aviation Pkwy
E. 15th St.
E. 14th St.
E. Manlove St.
E. 13th St.
S. Sa
nta R
ita A
ve.
E. Miles St.
E. 12th St.
E. Broadway Blvd.
E. 10th St.
S. Pa
rk Av
e.
E. McKey St.
E. 12th St.
S. Fre
mont
Ave.
E. 13th St.
E. Miles St.
PEP-18
ADOT-1
PEP-10
PEP-19
PEP-11
0 200 400
Scale in Feet
³
Project Name: Park-Euclid WQARF SiteJob No: 22241866 Date: October 2012 M.../P-E/P12/Semi_Ann_July2012/maps/PD_thickness_PA_July2012.mxd
PRODUCT THICKNESS AND DISTRIBUTIONJULY 2012PARK-EUCLID WQARF SITETUCSON, ARIZONA
Figure 8
Note:* Groundwater was not present at SVE-101 as product occupied the well casing to bottom of well, resulting in a thickness of 3.29 feet.
Aerial Imagery Source: Orthophoto provided by Pima Association of Governments, Pima County, Arizona, 2010
Explanation
!> Perched Aquifer Well!( Production Well!? Multi-Phase Extraction Well#_ Vapor Extraction Well
Approximate Extent of LNAPL, dashed where inferredMission Plant
MLS-13: 2.28 Perched Aquifer Monitoring Well ID:Product Thickness (feet)
!>
#_#_
!>
!>!>
!>!>
!>
!?!?!?
!?!?!?
!>
!>
!>
!>
!>
!>
!>
#_
!>
1
10
100MPE-6: 72
MPE-2: 69
MPE-4: 160
WR-347A: 1.8
MLS-6: < 1
MLS-5: < 1
PEP-9: < 20
PEP-8: < 20
PEP-24: < 1
PEP-19: < 1
PEP-18: < 1
PEP-11: < 1
PEP-10: < 1
MLS-13: < 1 MLS-12: < 1
ADOT-1: < 1
MPE-3: 590
SVE-103: 23
MLS-4: < 1
WR-345A: NS
MPE-1: < 10
SVE-101: NS
SVE-104: 27
E. Barraza Aviation Pkwy
S. Fre
mont
Ave.
E. 15th St.
S. Sta
r Ave
.
E. 14th St.
S. Pa
rk Av
e.
S. Euclid Ave.E. Manlove St.
E. 13th St.
E. Miles St.
E. 12th St.
E. 10th St.
E. Broadway Blvd.
E. McKey St.
E. 12th St.
E. Miles St.
E. 13th St.
S. Fre
mont
Ave.
S. Pa
rk Av
e. !>
#_#_
!>
!>!>
!>!>
!>
!?!?!?
!?!?!?
!>
!>
!>
!>
!>
!>
!>
#_
!>
1
10
100MPE-6: 72
MPE-2: 69
MPE-4: 160
WR-347A: 1.8
MLS-6: < 1
MLS-5: < 1
PEP-9: < 20
PEP-8: < 20
PEP-24: < 1
PEP-19: < 1
PEP-18: < 1
PEP-11: < 1
PEP-10: < 1
MLS-13: < 1 MLS-12: < 1
ADOT-1: < 1
MPE-3: 590
SVE-103: 23
MLS-4: < 1
WR-345A: NS
MPE-1: < 10
SVE-101: NS
SVE-104: 27
E. Barraza Aviation Pkwy
S. Fre
mont
Ave.
E. 15th St.
S. Sta
r Ave
.
E. 14th St.
S. Pa
rk Av
e.
S. Euclid Ave.E. Manlove St.
E. 13th St.
E. Miles St.
E. 12th St.
E. 10th St.
E. Broadway Blvd.
E. McKey St.
E. 12th St.
E. Miles St.
E. 13th St.
S. Fre
mont
Ave.
S. Pa
rk Av
e.
0 200 400
Scale in Feet
³Project Name: Park-Euclid WQARF SiteJob No: 22241866 Date: October 2012 Mission.../P-E/Semi_Annual_July12/maps/Fig10_PA_PCE_July2012.mxd
PCE DISTRIBUTION IN PERCHED GROUNDWATER, JULY 2012PARK-EUCLID WQARF SITETUCSON, ARIZONA
Figure 10
Note:
Aerial Imagery Source: Orthophoto provided by Pima Association of Governments, Pima County, Arizona, 2010
Explanation
!> Perched Aquifer Well!? Multi-Phase Extraction Well#_ Vapor Extraction Well
Groundwater Flow DirectionPCE Concentrations in Perched Aquifer (µg/L)
1 - 1010 - 100>100Mission Plant
PEP-24: <1 Perched Aquifer Monitoring Well ID:PCE Result (ug/L)
< Result is less than the Reporting LimitNS Not Sampled
!<
!<
!<
!<
!<
!<
!<!<
!<!<!<
!<!<
!<!<
!<
!<!<
!<
!<
1
10
100
100
10
1
100
10
PBR-10: 2
MLR-7: 20
UAM-2: 2.2
PER-23: 21
PER-15: 39
PER-26: 130
PER-25: 6.4
UAM-3: < 1UAM-1: < 1
MLR-2: < 1
MLR-1: < 1
PER-27: < 1
MLR-3: 8.2
PER-22: 7.6
PER-21: 8.1
PER-14A: 190
UAM-2B: < 1
PER-14: < 1
WR-347B: < 1
WR-345B: NS
E. 7th St.
E. 8th St.
N. Pa
rk Av
e.
E. 9th St.
N. M
ounta
in Av
e.
N. Sa
nta R
ita A
ve.
N. Vi
ne A
ve.
E. 10th St.
E. Broadway Blvd.
E. 12th St.
E. Miles St.
E. 13th St.
S. Vin
e Av
e.
S. Sa
nta R
ita A
ve.
S. Pa
rk Av
e.E. McKey St.
E. 12th St.
E. Manlove St.
E. 14th St.
E. 15th St.
S. Sta
r Ave
.
S. Sa
nta R
ita A
ve.
S. Fre
mont
Ave.
S. Pa
rk Av
e.
S. Euclid Ave.
E. Barraza Aviation Pkwy
!<
!<
!<
!<
!<
!<
!<!<
!<!<!<
!<!<
!<!<
!<
!<!<
!<
!<
1
10
100
100
10
1
100
10
PBR-10: 2
MLR-7: 20
UAM-2: 2.2
PER-23: 21
PER-15: 39
PER-26: 130
PER-25: 6.4
UAM-3: < 1UAM-1: < 1
MLR-2: < 1
MLR-1: < 1
PER-27: < 1
MLR-3: 8.2
PER-22: 7.6
PER-21: 8.1
PER-14A: 190
UAM-2B: < 1
PER-14: < 1
WR-347B: < 1
WR-345B: NS
E. 7th St.
E. 8th St.
N. Pa
rk Av
e.
E. 9th St.
N. M
ounta
in Av
e.
N. Sa
nta R
ita A
ve.
N. Vi
ne A
ve.
E. 10th St.
E. Broadway Blvd.
E. 12th St.
E. Miles St.
E. 13th St.
S. Vin
e Av
e.
S. Sa
nta R
ita A
ve.
S. Pa
rk Av
e.E. McKey St.
E. 12th St.
E. Manlove St.
E. 14th St.
E. 15th St.
S. Sta
r Ave
.
S. Sa
nta R
ita A
ve.
S. Fre
mont
Ave.
S. Pa
rk Av
e.
S. Euclid Ave.
E. Barraza Aviation Pkwy
0 300 600
Scale in Feet
³
Project Name: Park-Euclid WQARF SiteJob No: 22241866 Date: October 2012 P-E/Semi_Annual_July2012/maps/Fig14_RA_PCE_July2012.mxd
PCE DISTRIBUTION IN REGIONAL GROUNDWATER, JULY 2012PARK-EUCLID WQARF SITETUCSON, ARIZONA
Figure 14
Note:NS - Not Sampled, WR-345B could not be accessed due to nearbyconstruction activities.
Aerial Imagery Source: Orthophoto provided by Pima Association of Governments, Pima County, Arizona, 2010
Explanation
!< Regional Aquifer Well!( Production Well
Groundwater Flow DirectionPCE Concentrations in Regional Aquifer (µg/L)
1 - 1010 - 100>100
Mission PlantUniversity of Arizona
PER-27: <1 Regional Aquifer Monitoring Well ID:PCE Result (ug/L)
< Result is less than the Reporting Limit
TetrachloroetheneUAM-26
5
4
3
2
1
0
mic
rogr
ams
per l
iter
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 20120
1
2
3
4
5
6
Time-Series GraphsUAM-2Park - Euclid WQARF SiteTucson, ArizonaProject Name: Park - Euclid WQARF Site
Job No: 22241866 Date: January 2013
- Detected Concentration- Not Detected (Shown as RL)
EXPLANATION
2-carbonTreatment Filters
2-carbonTreatment Filters
3-carbonTreatment Filters Treated Air Out
to Atmosphere
Waste Treatment and Discharge to Sewer
Clean Water to Plant Operations
Waste Hauler for Recycling
MPEWells
Washer (Commercial Laundry)Washer (Commercial Laundry)
Diesel/PCE Product LayerDiesel/PCE Product Layer
Perched GroundwaterPerched Groundwater
Vacuum BlowerVacuum Blower
3-carbonTreatment Filters
Vapor/Product/Water MixtureVapor/Product/Water Mixture
Treated Air Out to Atmosphere
Zeolite FilterZeolite Filter
Oil/WaterSeparator
ProductStorage Tank
Clay FilterClay Filter
Waste Treatment and Discharge to Sewer
Contaminated Air/Water
Clean Air/Water
Clean Water to Plant Operations
VaporVapor
WaterWater
Water/P
rodu
ct
Water/P
rodu
ct
Unsaturated SoilUnsaturated Soil
ProductProduct
1
10
100
1000
10
1
E. 14th St.
S. F
rem
ont
Ave.
E. Barraza Aviation Pkwy
S. P
ark
Ave
.
S. Euclid Ave.E. Manlove St.
S. S
tar
Ave
.
E. 15th St.
S. S
anta
Rita
Ave
.
E. 13th St.
E. Miles St.
S. S
anta
Rita
Ave
.
E. McKey St.
E. 12th St.
S. P
ark
Ave
.
E. Broadway Blvd.
E. 12th St.
E. 10th St.
N. F
rem
ont
Ave.
N. S
anta
Rita
Ave
.
S. F
rem
ont
Ave.
E. Miles St.
N. P
ark
Ave
.
N. T
ynda
ll A
ve.
VW-05-05VW-01-05
VW-03-05
VW-06-05
VW-07-05
VW-02-05 VW-04-05
1
10
100
1000
10
1
E. 14th St.
S. F
rem
ont
Ave.
E. Barraza Aviation Pkwy
S. P
ark
Ave
.
S. Euclid Ave.E. Manlove St.
S. S
tar
Ave
.
E. 15th St.
S. S
anta
Rita
Ave
.
E. 13th St.
E. Miles St.
S. S
anta
Rita
Ave
.
E. McKey St.
E. 12th St.
S. P
ark
Ave
.
E. Broadway Blvd.
E. 12th St.
E. 10th St.
N. F
rem
ont
Ave.
N. S
anta
Rita
Ave
.
S. F
rem
ont
Ave.
E. Miles St.
N. P
ark
Ave
.
N. T
ynda
ll A
ve.
VW-05-05VW-01-05
VW-03-05
VW-06-05
VW-07-05
VW-02-05 VW-04-05
0 200 400
Scale in Feet
³
Project Name: Park-Euclid WQARF Site
Job No: 22241866 Date: January 2013 P-E/Proj13/FS_Final/Fig_prop_SG_pnts_SV_PCE_5ft_July2012.mxd
PROPOSED SOIL GAS MONITORING POINTSVAPOR INTRUSION INVESTIGATIONPARK-EUCLID WQARF SITETUCSON, ARIZONA
Figure 7
Note:
Aerial Imagery Source: Orthophoto provided by Pima Associationof Governments, Pima County, Arizona, 2010
Explanation
Existing Soil Vapor Monitoring Well
Proposed Soil Gas Monitoring Point
Mission Plant
Interpreted PCE Concentration (ppmv)1
10
100
1000
VW-02
!<
!<
!<
!<
!<
!<
!<!<
!<!<!<
!<!<
!<!<
!<
!<!<
!<
!<
1010
0
1
10
100
100
10
1
E. Barraza Aviation Pkwy
S. P
ark
Ave
.
S. F
rem
ont
Ave
.
S. S
anta
Rita
Ave
.
S. S
tar
Ave.
E. 15th St.
E. 14th St.
E. Manlove St.
E. 12th St.
E. McKey St.
S. P
ark
Ave
.
S. S
anta
Rita
Ave
.
S. V
ine
Ave
.
E. 13th St.
E. Miles St.
E. 12th St.
E. Broadway Blvd.
E. 10th St.
N. V
ine
Ave
.
N. S
anta
Rita
Ave
.
N. M
ount
ain
Ave
.
E. 9th St.
N. P
ark
Ave
.
E. 8th St.
E. 7th St.
WR-345B: NS
WR-347B: < 1
PER-14: < 1
UAM-2B: < 1
PER-14A: 190
PER-21: 8.1
PER-22: 7.6
MLR-3: 8.2
PER-27: < 1
MLR-1: < 1
MLR-2: < 1
UAM-1: < 1 UAM-3: < 1
PER-25: 6.4
PER-26: 130
PER-15: 39
PER-23: 21
UAM-2: 2.2
MLR-7: 20
PBR-10: 2
!<
!<
!<
!<
!<
!<
!<!<
!<!<!<
!<!<
!<!<
!<
!<!<
!<
!<
1010
0
1
10
100
100
10
1
E. Barraza Aviation Pkwy
S. P
ark
Ave
.
S. F
rem
ont
Ave
.
S. S
anta
Rita
Ave
.
S. S
tar
Ave.
E. 15th St.
E. 14th St.
E. Manlove St.
E. 12th St.
E. McKey St.
S. P
ark
Ave
.
S. S
anta
Rita
Ave
.
S. V
ine
Ave
.
E. 13th St.
E. Miles St.
E. 12th St.
E. Broadway Blvd.
E. 10th St.
N. V
ine
Ave
.
N. S
anta
Rita
Ave
.
N. M
ount
ain
Ave
.
E. 9th St.
N. P
ark
Ave
.
E. 8th St.
E. 7th St.
WR-345B: NS
WR-347B: < 1
PER-14: < 1
UAM-2B: < 1
PER-14A: 190
PER-21: 8.1
PER-22: 7.6
MLR-3: 8.2
PER-27: < 1
MLR-1: < 1
MLR-2: < 1
UAM-1: < 1 UAM-3: < 1
PER-25: 6.4
PER-26: 130
PER-15: 39
PER-23: 21
UAM-2: 2.2
MLR-7: 20
PBR-10: 2
0 300 600
Scale in Feet
³
Project Name: Park-Euclid WQARF Site
Job No: 22241866 Date: January 2013 Mission.../P-E/Proj13/FS_Final/Fig5_RA_PCE_July2012.mxd
PCE DISTRIBUTION IN REGIONAL GROUNDWATER,JULY 2012PARK-EUCLID WQARF SITETUCSON, ARIZONA
Figure 5
Note:NS - Not Sampled, WR-345B could not be accessed due to nearbyconstruction activities.
Aerial Imagery Source: Orthophoto provided by Pima Associationof Governments, Pima County, Arizona, 2010
Explanation
!< Regional Aquifer Well
!( Production Well
Groundwater Flow Direction
PCE Concentrations in Regional Aquifer (µg/L)1 - 10
10 - 100
>100
Mission Plant
University of Arizona
PER-27: <1 Regional Aquifer Monitoring Well ID:PCE Result (ug/L)
< Result is less than the Reporting Limit
Proposed Regional Aquifer Monitoring Well
Site Activities UpdateSite Activities Update Park Park –– Euclid RP GroupEuclid RP Group
Community Advisory Board MeetingCommunity Advisory Board Meeting January 16, 2013January 16, 2013
WQARF Site ActivitiesWQARF Site Activities
ADEQ Completed Remedial Investigation ADEQ Completed Remedial Investigation (November 2011)(November 2011)
Long Term Monitoring ProgramLong Term Monitoring Program
Early Response Action (MPE)Early Response Action (MPE)
Feasibility StudyFeasibility Study
22
Long Term MonitoringLong Term Monitoring
Work Plan (October 2010)Work Plan (October 2010)
Baseline Sampling July 2011Baseline Sampling July 2011
Monthly, Quarterly, and SemiMonthly, Quarterly, and Semi--Annual SamplingAnnual Sampling
Soil Vapor (upper and lower vadose zone)Soil Vapor (upper and lower vadose zone)
Petroleum Product (Perched)Petroleum Product (Perched)
WaterWater--Level and Product Thickness Measurements Level and Product Thickness Measurements (Perched and Regional)(Perched and Regional)
Groundwater Sampling (Perched and Regional)Groundwater Sampling (Perched and Regional)
Baseline and SemiBaseline and Semi--Annual Reports (December Annual Reports (December 2011, July 2012, December 2012)2011, July 2012, December 2012)
33
Early Response ActionEarly Response Action
MultiMulti--Phase Extraction System Construction Phase Extraction System Construction 2007 and 20082007 and 2008
Diesel Product (dissolved CVOCs)Diesel Product (dissolved CVOCs)
Soil VaporSoil Vapor
GroundwaterGroundwater
Pilot Phase Operation April 2008 to June 2009Pilot Phase Operation April 2008 to June 2009
Pilot Phase Operational Report (November Pilot Phase Operational Report (November 2009)2009)
44
Early Response ActionEarly Response Action
Full Scale ERA Workplan (October 2010)Full Scale ERA Workplan (October 2010)
Year 1 Operation (October 2011 Year 1 Operation (October 2011 –– September September 2012)2012)
Year 2 Operation (Started January 2013)Year 2 Operation (Started January 2013)
MPE Mass removalMPE Mass removal
CVOC = Chlorinated Volatile Organic CompoundsCVOC = Chlorinated Volatile Organic Compounds
55
Pilot Phase Since Re-StartMass of CVOCs Removed - Vapor (pounds) ~ 1,400 ~ 1,500Mass of CVOCs Removed - Dissolved in Water (pounds)
0.44 0.59
Mass of CVOCs Removed - Dissolved in Diesel (pounds)
1.5 9.6
Volume of Diesel Product Removed (gallons) ~ 750 ~ 1,600 Water Discharged to Sewer (gallons) ~ 38,900 ~20, 700
Feasibility Study and Associated Feasibility Study and Associated ActivitiesActivities
Feasibility Study Work Plan (January 2013)Feasibility Study Work Plan (January 2013)
Regional Aquifer Monitoring Well InstallationRegional Aquifer Monitoring Well Installation
Regional Groundwater Model DevelopmentRegional Groundwater Model Development
Lower Vadose Zone Soil Vapor Extraction Pilot Lower Vadose Zone Soil Vapor Extraction Pilot TestingTesting
Vapor Intrusion Risk AssessmentVapor Intrusion Risk Assessment
Feasibility StudyFeasibility Study
66
Remedial Objectives (RI)Remedial Objectives (RI)
To restore soil conditions to the remediation standards for non-residential use specified in A.A.C. R18-7-203 (specifically background remediation standards prescribed in R18-7-204, predetermined remediation standards prescribed by R18-7-205, or site-specific remediation standards prescribed by R18-7-206 that are applicable to the hazardous substances identified (tetrachloroethene (PCE), trichloroethene (TCE), cis-1,2-dichloroethene (cis-1,2-DCE) and trans-1,2-dichloroethene (trans-1,2-DCE), and vinyl chloride).
To protect for the use of the groundwater supply by the University of Arizona (UA) near the Park-Euclid WQARF site from contamination from the site. This action is needed for the present time and for as long as the UA wells are used for potable purposes, the resource remains available, and their use is threatened as a result of contamination from the Park-Euclid WQARF site. This action is also needed to protect potential future use of the groundwater supply for the City of Tucson, which is not expected within the next five to ten years.
77
Feasibility Study RequirementsFeasibility Study Requirements
Development of a reference remedy and two Development of a reference remedy and two alternative remedies capable of meeting the alternative remedies capable of meeting the remedial objectives.remedial objectives.
Each remedy may contain multiple components Each remedy may contain multiple components to address the various hydrogeologic units.to address the various hydrogeologic units.
One alternative remedy will be more aggressive One alternative remedy will be more aggressive and one alternative less aggressive than the and one alternative less aggressive than the reference remedy.reference remedy.
Perform comparative analysis of the reference Perform comparative analysis of the reference and alternative remedies.and alternative remedies.
A Feasibility Study Report will be prepared that A Feasibility Study Report will be prepared that will present the Proposed Remedy.will present the Proposed Remedy.88
Proposed ScheduleProposed Schedule
Regional Monitoring Well (March Regional Monitoring Well (March –– October, October, 2013)2013)
LVZ Pilot Testing (April LVZ Pilot Testing (April –– August, 2013)August, 2013)
Groundwater Modeling (May 2013 Groundwater Modeling (May 2013 –– May 2014)May 2014)
Vapor Intrusion Risk Assessment (March Vapor Intrusion Risk Assessment (March –– October, 2013October, 2013
Feasibility Study (March 2013 Feasibility Study (March 2013 –– October 2014)October 2014)
99