    and construction o! segmental concrete bridges The success!ul

    bid !or the bridge structures was & percent below the lowest 

    steel alternate and the pro*ect was completed 1" months

    earlier than the speci,ed contract time o! years

    Since "a# of $%%&' motorists tra(eling t)e nort) eastern

    corridor of Interstate %* t)ro+g) Ne! England )a(e en,o#ed t)e

    m+c) needed l++r# of t)e additional tra(el lanes -ro(ided b#

    t)e com-letion of t)e Ra#mond E. Bald!in Bridge in

    Connectic+t /see Fig. $0. T)e ne! str+ct+res t)at s-an t)e

    mo+t) of t)e -ristine Connectic+t Ri(er' bet!een t)e to!ns of 

    Old Sa#broo1 and Old 2#me' )a(e relie(ed some of t)e tra3c

    congestion t)at -lag+es t)is tra(el !a#' es-eciall# in t)e-o-+lar s+mmer and colorf+l fall mont)s.

    In 4an+ar# of $%%5' t)e Connectic+t 6e-artment of 

     Trans-ortation a!arded t)e contract to b+ild t)e ne! Bald!in

    Bridge to t)e 4oint 7ent+re of PeriniPC28O9:. T)e 4oint 7ent+re

    -ro(ided a lo! bid of ;%&.< million to b+ild t)e concrete

    alternate= a -recast concrete segmental s+-erstr+ct+re

    s+--orted on cast8in8-lace concrete -iers. T)e 4oint 7ent+re

    !as t)e onl# bidder to -ro(ide a -rice for t)e concrete

    alternate. All ot)er bidders s+bmitted a -rice for t)e s+--osedl#

    more -o-+lar and economical steel girder alternate /see Table

    $0.T)e bridge b+ilding ind+str#' along !it) t)e Connectic+t

    6e-artment of Trans-ortation' !as (er# s+r-rised at t)e

    o+tcome of t)e bid. In addition' t)e 6e-artment !as a little

    a--re)ensi(e abo+t )a(ing a -recast segmental concrete

    str+ct+re b+ilt in t)eir state since' at t)e time' segmental

    str+ct+res !ere recei(ing mied re(ie!s from trade maga>ines

    and sce-tical contractors.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    3/43

      Fig.$ O(erall (ie! of Ra#mond E. Bald!in Bridge nearing

    com-letion

     

     Table $ Bids for t)e Bald!in Bridge -ro,ect

     To assist t)e 6e-artment in managing t)e constr+ction of t)is

    state8of8t)e8art str+ct+re' t)e# a!arded a constr+ction

    engineering and ins-ection contract to a ,oint (ent+re of 

    Parsons Brinc1er)o? Constr+ction Ser(ices' Herndon' 7irginia'

    and a local engineering and s+r(e# @rm' 28C 9 Associates. T)e

    6e-artment also retained t)e bridge designer' Parsons

    Brinc1er)o? +ade and 6o+glas' Hartford' Connectic+t' for

    -ost8design ser(ices and on8site tec)nical assistance.

     PROJECT DETAILS

    Soon after notice to -roceed )ad been gi(en' t)e 4oint 7ent+re

    informed t)e o!ner of t)eir intention to s+bmit an earl#

    com-letion sc)ed+le and @nis) t)e -ro,ect $ mont)s a)ead of 

    t)e contracted d+ration of < mont)s. T)is accelerated

  • 8/19/2019 Parsons Brinckerhoff Consruction

    4/43

    constr+ction sc)ed+le !as to be s+--orted and made -ossible

    b# a modi@cation to t)e erection met)od s)o!n in t)e contract

    -lans.

    Fig. Pro@le of Bald!in Bridge

  • 8/19/2019 Parsons Brinckerhoff Consruction

    5/43

    Fig. & T#-ical -iers !it) t)e dec1 segments in -lace

     T)e -ro-osed modi@cation called for t)e balanced cantile(er

    erection to be -erformed +sing a f+ll# a+tomated o(er)ead

    erection tr+ss to -lace t)e -recast concrete segments' instead

    of t)e modi@ed beam and !inc) met)od s)o!n in t)e contract

    doc+ments. T)e o(er)ead erection tr+ss !o+ld erect t)e

    !estbo+nd str+ct+re @rst and t)en it !o+ld be trans-orted bac1

    o(er t)e com-leted bridge and +sed again to erect t)e

    eastbo+nd str+ct+re.

    Eac) bridge is an $$8s-an' contin+o+s +nit consisting of

    constant de-t) -recast concrete bo girder segments. T#-ical

    s-an lengt)s are * ft /D* m0 non8t#-ical s-ans range from

    $DD ft in. /* m0 at t)e !est ab+tment to D* ft /ed t)e n+mber of di?erent t#-es of 

    segments to fo+r= -ier /50' ab+tment /0' T#-e GBG /%0' T#-e

    GAG /&D*0. T)e T#-e GBG segments are erected ad,acent to t)e

    -ier and ab+tment segments. All dra-ed cantile(er tendons

    -ass t)ro+g) t)e -ier segment dia-)ragms and anc)or in t)e

    tendon de(iation bloc1s at t)e lo!er comer of t)e T#-e GBG

  • 8/19/2019 Parsons Brinckerhoff Consruction

    6/43

    segments /see Fig. &0. T)e remainder of t)e cantile(ers

    com-rise (ar#ing n+mbers of T#-e GAG segments. T)ese

    segments are connected to t)e cantile(ers !it) to- slab

    cantile(er tendons and !it) to- and bottom slab contin+it#

    tendons.

    Box Girder Segments

     T)e -recast road!a# segments for t)e Bald!in Bridge are t)e

    second largest single cell bo girder segments cast in t)e

    United States. T)e tra-e>oidal cross section of t)e segment is

    sti?ened trans(ersel# b# inclined -recast concrete str+ts. T)e

    designer c)ose to +se t)e inclined str+ts instead of m+lti-le(ertical !eb !alls beca+se it !as considered more str+ct+rall#

    e3cient and made t)e segment lig)ter and less di3c+lt to

    fabricate.

    Eac) segment is $$ ft. < &< in. /&. m0 in )eig)t and D ft < in.

    /.< m0 in !idt) for t)e eastbo+nd bridge and

  • 8/19/2019 Parsons Brinckerhoff Consruction

    7/43

    "+lti-le s)ear 1e#s are +tili>ed on t)e !eb !all face along !it)

    indi(id+al s)ear and alignment 1e#s along t)e to- and bottom

    slabs. T)e !eb t)ic1ness is a constant & in. /*

  • 8/19/2019 Parsons Brinckerhoff Consruction

    8/43

    Fig. T#-ical cross section of t)e s+-erstr+ct+re

    Fig. * casting #ard la#o+t

     T)e to- slabs of all segments are -ost8tensioned in t)e

    trans(erse direction !it) fo+r8strand tendons. T)ese tendons

    !ere stressed at a minim+m concrete strengt) of *55 -si /$D

    "Pa0. Beca+se of t)is' and d+e to t)e )ig) b+rsting stresses at

    t)e anc)orage location' -recast concrete  edge beams !ere

    +sed at eac) end of t)e to- slab to -ro(ide **55 -si /&< "Pa0

    concrete strengt) in t)is area. T)is feat+re !as also +sed

  • 8/19/2019 Parsons Brinckerhoff Consruction

    9/43

    s+ccessf+ll# in t)e S+n s)ine S1#!a# Bridge o(er Tam-a Ba#'

    Florida.

     T#-icall#' fo+r8strand loo- tendons !ere +sed to -ost8tension

    t)e !eb and bottom slab areas. 6+e to t)e etreme c+r(at+reof t)ese tendons' t)e# !ere stressed sim+ltaneo+sl# from bot)

    ends. T)e bottom slab !as additionall# -ost8tensioned along its

    centerline !it) a single m+lti8strand tendon. A trans(erse rib

    !as -ro(ided on t)e bottom slab to s+--l# s-ace for t)is

    tendon. T)e dia-)ragm section and str+ts of t)e -ier and

    ab+tment +nits are also -osttensioned in t)e trans(erse

    direction !it) m+lti-le m+lti8strand tendons.

    All -ost8tensioning tendons consisted of 5.* in /$& mm0

    diameter' D5 -si /$

  • 8/19/2019 Parsons Brinckerhoff Consruction

    10/43

    Beca+se t)ere !ere t)ree t#-es of segments to fabricate' t)e

    contractor +sed t)ree segment assembl# lines. T)e assembl#

    lines !ere set +- ad,acent to one anot)er in a nort)8so+t)

    orientation. Eac) -rod+ction line com-rised one set of c+stom

    made forms s+--orted b# t!o reinforcing steel ,igsassembl#

    frames.

    Fig. S)ort8line matc) casting of segments

  • 8/19/2019 Parsons Brinckerhoff Consruction

    11/43

  • 8/19/2019 Parsons Brinckerhoff Consruction

    12/43

    Fig. % t#-ical reinforcing steel la#o+t ,ig

  • 8/19/2019 Parsons Brinckerhoff Consruction

    13/43

    Fig. $5 Prefabricated steel cage being lifted into casting mac)ine

    Sit+ated bet!een t)e casting beds and t)e reinforcing steel

    fabrication area !as a mobile' rail8mo+nted to!er crane. T)iscrane -ro(ided s+--ort to all t)ree -rod+ction lines. It !as +sed

    to )andle all materials' install t)e -refabricated reinforcing

    steel cages' and relocate t)e segment so3t forms in eac)

    casting bed. T)e to!er crane co+ld )andle a maim+m load of 

    $* tons /$ t0 o-erating on a $55 ft /&5m0 radi+s.

    As segments !ere -rod+ced b# t)e s)ort8line casting met)od'

    t)e# !ere rolled to t)e end of t)e -rod+ction line and )a+led

    into storage /see Fig. 0. T)e original storage area -ro(ided

    eno+g) ca-acit# to store $&5 segments /see Fig. D0.

     T)e contractor )eld a *8acre /.5 )a0 section of t)e #ard in

    reser(e in case t)ere !ere dela#s in t)e erection -rocess. T)is

    -ro(ed to be a (er# -r+dent -lan on t)e contractors -art. In

     4+l# of $%%$' t)e initial storage area !as f+ll and t)e erection

    -rocess )ad not #et beg+n. T)e contractor t)en c)ose to

    eercise )is o-tion and clear t)e remainder of t)e a(ailableland' !)ic) -ro(ided storage ca-acit# for *5 additional

  • 8/19/2019 Parsons Brinckerhoff Consruction

    14/43

    segments. If it !ere not for t)is additional storage area' t)e

    -rod+ction of segments !o+ld )a(e been discontin+ed +ntil t)e

    erection -rocess began' & mont)s later.

    Segments !ere mo(ed from casting bed to casting bed and)a+led into storage !it) a c+stom made &558ton /D t0 S)+ttle

    2ift tra(el crane /see Fig. ed for segment storage rat)er t)an for access r+n!a#s.

    Prod!tion Area

    All reinforcing steel and -osttensioning d+cts for eac) T#-e GAG

    and T#-e GBG segment !ere installed in -refabrication ,igs /see

    Fig. %0. Beca+se t)e reinforcing steel and -ost8tensioning items

    !ere tied in t)e form!or1 for t)e -ier and ab+tment segments'

    t)ree ,igs !ere initiall# a(ailable for +se for t)e T#-e GAG and T#-e GBG segments. Once all t)e -ier and ab+tment segments

    )ad been cast' t)e casting form !as con(erted to -rod+ce T#-e

    GAG segments' !it) eac) form t)en being s+--orted b# t!o ,igs.

     T)e +se of m+lti-le ,igs too1 fabrication of t)e reinforcing steel

    cages o? t)e critical -at) and -ro(ided for a small amo+nt of 

    lag time bet!een t)e fabrication of t)e cage and t)e need to

    install it in t)e form!or1. T)is lag allo!ed for m+c) needed

    contingenc# time for -rod+ction related -roblems' s+c) as steel

    fabrication errors and material deli(er# dela#s.

    Eac) ,ig !as made of (ario+s standard steel s)a-es' !it)

    -l#!ood faces to acc+ratel# sim+late t)e eterior dimensions

    and cross section of a segment. A !ooden b+l1)ead sim+lated

    t)e segment cross section and !as mar1ed acc+ratel# !it) t)e

    t#-ical locations of longit+dinal -ost8tensioning anc)orages and

    d+ct locations. T)is allo!ed t)e re+ired embedded items to be

  • 8/19/2019 Parsons Brinckerhoff Consruction

    15/43

    acc+ratel# -laced in t)e ,ig !it)in acce-table @eld tolerances. It

    !as im-erati(e t)at as m+c) !or1 as -ossible be done in t)e

    -refabrication area so t)at critical -rod+ction time in t)e

    form!or1 area co+ld be +sed strictl# for form !or1 and

    segment set+-.

     T)e -recast concrete str+ts and edge beams !ere t)e @rst

    items to be -laced in t)e ,igs. A cre! of t!o car-enters -laced

    t)ese items' and set t)e re+ired -ost8tensioning anc)orages

    and -re-ared t)e ,ig area for t)e steel t#ing cre!. T#-icall#' a

    cre! of si iron!or1ers tied D555 to $'555 lbs /5

  • 8/19/2019 Parsons Brinckerhoff Consruction

    16/43

    b# Concrete Forms Cons+ltants' Ha!le#' Penns#l(ania' and !as

    fabricated b# Transfab' H+ntington' Jest 7irginia. Eac) set of 

    forms consisted of t)ree mo(able so3ts' a @ed b+l1)ead'

    ad,+stable !ing forms' and a retractable inner core form.

     T)e contractor -roc+red t)ree so3t forms in order to ta1e t)e

    remo(al of cast segments to storage o? t)e critical -at) of 

    -rod+ction. Eac) so3t !as f+ll# e+i--ed !it) )#dra+lic ,ac1s

    to s+--ort and mani-+late t)e matc)8cast segment to its

    -ro-er orientation in t)e casting bed. T)e so3t forms !ere

    s+--orted on rail8mo+nted Hillman rollers for smoot) and

    sim-li@ed mo(ement. A front end loader -+lled t)e segment in

    and o+t of its matc)cast -osition.

     T)e steel b+l1)ead !as rigidl# s+--orted and @ed to a

    concrete fo+ndation. After t)e initial set+-' no ad,+stments to

    t)e b+l1)ead !ere necessar#. T)e segment !ing forms !ere

    -inned at t)e bottom' near t)e so3t area' and !ere made

    ad,+stable at t)e rear b# +se of )#dra+lic ,ac1s. Onl# (ertical

    mo(ement of t)e side forms !as necessar# for stri--ing of t)e

    +nit. T)e inner form !as s+--orted in cantile(er b# a mo(able

    steel s+--ort frame.

     T)e s+--ort frame !as also mo+nted on Hillman rollers and

    !as o+t@tted !it) )#dra+lic ,ac1s to raise and lo!er t)e inner

    core form -rior to installing or retracting t)e assembl#. 6+e to

    s-ace limitations' t)e inner core s+--ort frame !as

    mani-+lated into -osition b# a )#dra+lic -+s)8-+ll c#linder

    mo+nted +nder t)e assembl# frame !it) t)e -iston rod

    anc)ored to t)e concrete fo+ndation. T)is -ro(ed to be a (er#e?ecti(e and economical !a# to mo(e t)e inner core s#stem in

    and o+t of t)e casting -osition.

     T)e inner core forms !ere also o+t@tted !it) )#dra+lic ,ac1s to

    f+ll# a+tomate t)e -lacement and stri--ing o-erations. All

    form!or1 )#dra+lics !as o-erated from a centrall# located

    control +nit. "iscellaneo+s form!or1 for t)e bottom slab

    trans(erse rib and local areas aro+nd t)e -recast str+t

  • 8/19/2019 Parsons Brinckerhoff Consruction

    17/43

    connections' at t)e to- slab and at de(iation bloc1 areas' !as

    -laced b# )and.

     T)e s-eed of form!or1 mani-+lation ,+sti@ed t)e additional

    e-ense for t)e etensi(e )#dra+lic -ac1ages. A t#-ical -recastsegment !as stri--ed and -+lled o+t of t)e casting -osition

    !it)in a 8)o+r -eriod' +s+all# bet!een =&5 a.m. and

  • 8/19/2019 Parsons Brinckerhoff Consruction

    18/43

     T)e GBG segments !ere -rod+ced on a and &8 da# c#cle' and

    t)e GAG segments !ere -rod+ced on a dail# basis. Jor1ing a *8

    da# !or1 !ee1' t)e contractor ro+tinel# -rod+ced 5 GAG

    segments' < GBG segments' and -ier segments' for a total of 

    &5 segments -er mont).

    Fig. $$ Setting forms for t)e matc)8casting o-eration.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    19/43

    Fig. $ Concrete -lacement !it) a mobile -+m-ing +nit c+ring blan1ets

    -ro(ide steam c+ring enclos+re.

     T)e contractor started casting segments in No(ember $%%5'

    d+ring !)at local Connectic+t residents called a mild !inter. T)e -rod+ction Glearning c+r(eG lasted a--roimatel# !ee1s'

    !)ic) !ere fairl# s)ort for casting large segments !it) t)is

    t#-e of cross section. T)e s)ort d+ration of t)e learning c+r(e

    !as attrib+table to an e-erienced s+-er(isor# sta?' +ic1

    learning b# local +nion trades' and a -rod+ction s#stem t)at

    !as laid o+t !ell and -ro(ided for maim+m e3cienc#.

    Con!rete P&a!ement

    Concrete !as deli(ered to t)e casting #ard in I 5 c+ #d. /D .

    m&0 front disc)arge read# mi tr+c1s b# t)e local concrete

    -rod+cer. After re(ie!ing t)eir o-tions' t)e contractor c)ose to

    -+m- concrete instead of setting +- a con(e#or s#stem t)at

    !o+ld )a(e ser(ed all t)ree casting beds. All concrete !as

    -laced !it) a Sc)!ing -+m- tr+c1 /see Fig. $0.Concrete !as @rst -laced in t)e lo!er corner of a segment and

    t)e str+t bloc1 area /tendon de(iation bloc10' follo!ed b# t)e

    bottom slab and trans(erse rib. At t)is time' t)e se(en8man

    concrete cre! mo(ed on to- of t)e segment to -o+r bot) !eb

    !alls.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    20/43

    Fig. $& Precast concrete segment loaded on %8!)eel trailer for trans-ort

    to site.

     T)is se+ence allo!ed t)e bottom slab and lo!er !eb !alls to

    set+- slig)tl# and )el-s s+--ort t)e concrete -+m-ed into t)e

    !eb !alls t)at !ere on a D*8degree incline. Once t)e !eb !alls

    !ere to--ed o+t' t)e dec1 !as -laced from one end to t)e

    ot)er. T)e dec1 s+rface !as le(elled o? !it) a man+all#

    o-erated longit+dinal screed. T)e dec1 t)en recei(ed a b+ll

    Loat @nis).

    A smoot) s+rface @nis) !as s-eci@ed beca+se t)e s+rface

    o(erla# began !it) a membrane t#-e as-)alt liner t)at

    re+ired a smoot) +nderl#ing s+rface. All concrete !as

    consolidated !it) man+all# o-erated internal (ibrators no

    eternal (ibration !as necessar#. From start to @nis)' t)econcrete -lacement !as accom-lis)ed in a M to &8)o+r

    -eriod.

     T)e concrete mi design consisted of D5* lbs /$< 1g0 of T#-e I

    cement' $. /5.$ litres0 of air entrainment'

    $. o>. /5.& litres0 of set retarder and $5 o>. /& .$& litres0 of JR6A $% )ig) range !ater red+cer. All admit+res !ere

  • 8/19/2019 Parsons Brinckerhoff Consruction

    21/43

    introd+ced into t)e mi at t)e batc) -lant. T)e target sl+m- for

    t)is mi !as .* in. $.* in. /$* mm &< mm0. T)e +se of t)e

    )ig) range !ater red+cer allo!ed for ease of -lacement' less

    (ibration d+ring consolidation' and lo!er !ater8cement ratio to

    )el- ens+re a )ig) earl# strengt) concrete.

     T)e concrete !as c+red !it) lo! -ress+re steam to g+arantee

    minim+m *55 -si /$D "Pa0 strengt) at =&5 a.m.' t)e morning

    follo!ing t)e -o+r. Concrete strengt)s of &D55 -si /*.* "Pa0

    !ere act+all# ac)ie(ed after a relati(el# s)ort steam c#cle t)at

    incl+ded a &8)o+r -re)eat -eriod to ac)ie(e initial set' follo!ed

    b# a grad+al rise to a maim+m tem-erat+re of $55 to l5F

    /&ing.No crac1ing from Gt)ermal s)oc1G !as e-erienced on t)ese

    segments. T)is !as most li1el# d+e to t)e relati(el# small

    t)ic1nesses of t)e concrete sections on t)e t#-ical GAG and GBG

    segments. Beca+se of t)eir t)ic1 dia-)ragm sections' -ier and

    ab+tment segments remained -artiall# co(ered !it) concrete

    c+ring blan1ets for to & da#s. T)is -ro(ided t)e necessar#

    -rotection to t)e ft. /$. m0 t)ic1 dia-)ragms and )el-ed

    minimi>e an# crac1ing d+e to large tem-erat+re di?erentials.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    22/43

    TRANSPORTATION AND ERECTION

    Segment Trans'ort T)e &558ton /D t0 S)+ttle 2ift !as +sed to load t)e segments

    on a s-ecial $8ale' %8!)eel )#dra+lic trailer c)osen b# t)e

     4oint 7ent+re to trans-ort t)e segments from t)e casting #ard

    to t)e erection site /see Fig. $&0.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    23/43

    Fig. $ /a0 2a+nc)ing gantr# for -lacing segmental boes /b0 to /d0 Ste-s

    to mo(e gantr# to cantile(er erection -osition

  • 8/19/2019 Parsons Brinckerhoff Consruction

    24/43

    Fig. $ /cont.0 2a+nc)ing gantr# for -lacing segmental boes /e0 to /)0

    Ste-s to mo(e gantr# to cantile(er erection -osition

  • 8/19/2019 Parsons Brinckerhoff Consruction

    25/43

    Fig. $* T)e *5ft /$&D m0 la+nc)ing gantr#

    Fig. $ Segment attac)ed to t)e gantr# lifting beam.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    26/43

    Some of t)e feat+res of t)e trailer !ere=

    $. A )#dra+lic s#stem t)at -ro(ided distrib+tion of t)e $5 ton

    /$D t0 segment !eig)t to a Gstreet legal load'G -ermitting

    tra(el o(er cit# streets.

    . T)e ca-abilit# to maintain t)e segment in a le(el -lane e(en

    on +ne(en terrain.

    &. An Gall !)eels steeringG s#stem' !)ere all t)e !)eels on t)e

    trailer !ere s#nc)roni>ed to steer as a +nit' greatl# im-ro(ing

    t)e manoe+(rabilit# of t)e trailer.

    . T)e abilit# to be connected to t)e -+lling tractor from eit)er

    end.

     T)e trailer !as -+lled b# a D* )- /&* 1J0 tractor from t)e

    casting #ard and escorted b# a -ic18+- tr+c1' (ia cit# streets' to

    t)e -ro,ect site. T)ere' t)e con(o# tra(elled o(er a )a+l road

    s-eciall# b+ilt to accommodate t)e la+nc)ing gantr# erection

    sc)eme. Once be)ind t)e !est ab+tment' t)e tractor !as

    disconnected' t+rned aro+nd' and reconnected to t)e ot)er end

    of t)e trailer. T)is manoe+(re allo!ed t)e segment to bebac1ed +- on to t)e bridge dec1 and +nder t)e la+nc)ing

    gantr#.

    Lan!(ing Gantr)

     T)e contract dra!ings detailed a beam and !inc) erection

    sc)eme. After anal#sing t)e site conditions' Perini8PC28O9:

    decided to e-lore alternate erection met)ods. T)e most

    -romising sc)eme !as de(elo-ed !it) t)e assistance of Finle#

    "cNar# Engineers and consisted of a self8la+nc)ing o(er)ead

    gantr#. T)is alternate met)od -resented se(eral ad(antages=

    $. It minimi>ed t)e amo+nt of !or1 to be done from t)e

    !ater. T)e beam and !inc) met)od !o+ld )a(e re+ired

    se(eral marine acti(ities' s+c) as segment trans-orting

    facilities' material barges' and se(eral large barge

    mo+nted cranes and t+g boats. T)is !o+ld )a(e

  • 8/19/2019 Parsons Brinckerhoff Consruction

    27/43

    congested t)e ri(er and a?ected t)e recreational and

    commercial boating tra3c. T)e la+nc)ing gantr# met)od

    re+ired t)e s+--ort of onl# one barge8mo+nted *8ton

    /*% t0 :ro(e crane and $$5 ft. /& m0 "anlift.

     . It s)ortened t)e -ro,ect d+ration. T)e +se of an o(er)ead

    la+nc)ing gantr# allo!ed Perini8PC28O9: to c+t

    a--roimatel# one #ear o? t)e constr+ction sc)ed+le b#

    -ro(iding a faster s+-erstr+ct+re erection o-eration t)at !as

    also less de-endent on t)e ri(er conditions' es-eciall# d+ring

    t)e frigid Ne! England !inter mont)s.

     T)e la+nc)ing gantr# !as designed b# Fre#ssinet International

    in France and b+ilt b# Canron6o+gall in Canada. Otter

    Engineering -ro(ided t)e fabrication ins-ection and (ario+s

    engineering tas1s. Finle# "cNar# Engineers de(elo-ed t)e

    erection sc)eme' coordinated and s+-er(ised t)e gantr# design

    and fabrication' and -ro(ided constr+ction engineering ser(ices

    t)ro+g)o+t t)e -ro,ect.

     T)e gantr# !as abo+t *5ft /$&Dm0 long and !eig)ed

    a--roimatel# 55 tons /* t0 /see Figs. $a and $*0. One of t)e c)aracteristics of t)e gantr# !as t)e +se of a )#dra+lic

    c#linder to lift t)e segments instead of a !ire ro-e !inc). T)is

    feat+re !as (er# +sef+l in setting t)e segments as it allo!ed

    t)e o-erator to control t)e transfer of t)e load to t)e str+ct+re.

    Pier Co&mn Pre'aration

    Se(eral o-erations )ad to be com-leted -rior to t)e start8+- of

    t)e s+-erstr+ct+re erection on a gi(en cantile(er s-an. T)ese

    o-erations !ere s+--orted b# t)e barge8mo+nted crane. T)ese

    tas1s incl+ded=

    $. Erecting t)e -ier corbels. T!o -airs of brac1ets !ere

    attac)ed and stressed to t)e to- of eac) -ier /see Fig. $D0. Eac)

    brac1et s+--orted a )#dra+lic ,ac1. T)ese corbels !ere +sed to

    s+--ort t)e gantr# in t)e -ier segment erection -osition' and to

  • 8/19/2019 Parsons Brinckerhoff Consruction

    28/43

    )el- balance t)e cantile(er d+ring t)e initial constr+ction

    stages. T)e corbels also ser(ed as a s+--ort for t)e -latform

    aro+nd t)e -ier to-.

    . Stressing t)e -ier ca-s. T)is ste- !as re+ired b# t)ebridge design to minimi>e t)e si>e of t)e ca-s and to s+stain

    t)e )ig) b+rsting forces from t)e bridge !eig)t.

    &. Setting and gro+ting t)e bridge bearings. To s-eed +-

    t)e segment erection -rocess' t)e 4oint 7ent+re decided to set

    and gro+t t)e bearings a)ead of segment erection in order to

    remo(e t)ese acti(ities from t)e critical -at). An acc+rate Gasb+iltG s+r(e# of t)e embedded -lates in t)e -ier segment !as

    +sed to calc+late t)e coordinates of t)e bearings on to- of t)e

    -ier.

    Lan!(ing t(e Gantr) to t(e Next Pier

    A detailed ste-8b#8ste- -roced+re and c)ec1list !erede(elo-ed for e(er# stage of t)e la+nc)ing o-erations. T)ese

    Gc)ec1s and balancesG !ere +sed to ens+re t)at no ste-s !ere

    omitted and to record all t)e -ertinent data d+ring t)e

    la+nc)ing o-eration' incl+ding )#dra+lic -ress+res' ,ac1

    etensions' and ot)er detail. 2a+nc)ing to t)e -ier !as

    accom-lis)ed in @(e ma,or ste-s=

    Ste' * 8 "o(ing t)e rear leg to t)e center leg /Fig. $b0.

     T)e rear leg anc)ors to t)e dec1 !ere detensioned and s)ims

    !ere -laced +nder t)e tr+sses at t)e center leg. T)e a+iliar#

    s+--ort !as acti(ated and etended +ntil t)e tail of t)e gantr#

    !as lifted )ig) eno+g) so t)e rear leg !as )anging +nder t)e

    tr+sses from its rollers. At t)at time' it !as la+nc)ed for!ard

    +sing t)e la+nc)ing !inc)es. J)en t)e rear leg reac)ed t)e

    segment be)ind t)e center leg' it !as le(elled abo+t $< in. /*D

    mm0 from t)e dec1 and t)e a+iliar# s+--ort !as retracted

    +ntil t)e gantr# tr+sses rested on t)e rear leg. T)is leg !as

  • 8/19/2019 Parsons Brinckerhoff Consruction

    29/43

    anc)ored do!n to t)e dec1 !it) eig)t !renc) tig)t $&s in. /&*

    mm0 6#!idag bars.

    Ste' + 8 "o(ing t)e center leg for!ard /Fig. $c0. S)ims

    !ere -laced +nder t)e tr+sses at t)e rear leg. T)e center leganc)ors !ere t)en detensioned. T)e a+iliar# leg !as retracted

    +ntil t)e tr+sses started to -i(ot aro+nd t)e rear leg. T)e

    tr+sses !ere -i(oted +ntil t)e center leg !as s+s-ended from

    its rollers. At t)at time' it !as mo(ed for!ard to its -osition and

    le(elled at $< in. /*D mm0 from t)e dec1. T)e a+iliar# leg !as

    etended +ntil t)e tr+sses rested on t)e center leg' !)ic) !as

    anc)ored do!n to t)e dec1 !it) eig)t !renc) tig)t $&s in. /&*

    mm0 6#!idag bars.

    Ste' ,  8 "o(ing t)e rear leg to its -osition /Fig. $d0.

    S)ims !ere -laced +nder t)e tr+sses at t)e center leg. T)e rear

    leg anc)ors !ere loosened. T)e a+iliar# leg !as etended +ntil

    t)e tr+sses started to -i(ot aro+nd t)e center leg. T)e tr+sses

    !ere -i(oted +ntil t)e rear leg !as s+s-ended from its roller. At

    t)at time' it !as mo(ed bac1 to its -osition and le(elled at $in. /&* mm0 from t)e dec1. T)e a+iliar# leg !as retracted

    +ntil t)e tr+sses rested on t)e center leg' !)ic) !as also

    anc)ored do!n to t)e dec1 !it) eig)t $&s in. /&* mm0

    6#!idag bars stressed to $55 1i-s /* 1N0 eac).

    Ste' - 8 2a+nc)ing t)e gantr# to 

    t)e -ier /Fig. $e0. T)e

    a+iliar# leg !as com-letel# retracted. T)e s)ims !ere

    remo(ed from +nder t)e tr+sses and t)e tr+sses !ere set onrollers. T)e gantr# !as la+nc)ed for!ard to!ard t)e net -ier.

    Ste' * 8 Acti(ating t)e front leg. J)en t)e front leg !as

    on to- of t)e +- station corbel of t)e -ier' it !as etended and

    loc1ed to t)e corbel. T)e -ress+re in t)e front leg ,ac1s !as

    incrementall# increased +ntil abo+t $55 1i-s /* 1N0 !ere

    transferred to t)e corbels. At t)at stage' t)e ,ac1s !ere sec+red

    and s)ims +nder t)e tr+sses !ere installed at t)e rear leg. For

  • 8/19/2019 Parsons Brinckerhoff Consruction

    30/43

    s-ans s)orter t)an 5 ft. /D& m0' in Ste- $ t)e rear leg !as

    mo(ed to its @nal -osition and Ste-s and & !ere omitted.

    Fig. $D Pier corbels and -ier ca- are read# to recei(e t)e )ea(# -ier

    segment.

    Fig. $< Second segment at -ier

  • 8/19/2019 Parsons Brinckerhoff Consruction

    31/43

     

    Fig. $% connecting t)e erection -osttensioning bars

    Fig. 5 A--l#ing e-o# ad)esi(e to t)e ,oints bet!een segments

  • 8/19/2019 Parsons Brinckerhoff Consruction

    32/43

    Fig. $ Second segment -ost8tensioned to -ier segment.

    Ere!ting t(e "irst T#o Segments .T(e Pier

    Ta/&e0

    After -ositioning t)e -ier segment +nder t)e tail of t)e gantr#'

    t)e segment !as connected to t)e lifting beam b# eig)t $&s in.

    /&* mm0 6#!idag bars /see Fig. $0. T)e bars -assed t)ro+g)

    slotted )oles in t)e lifting beam and t)e longit+dinal slo-e of 

    t)e segment !as -reset b# (ar#ing t)e -osition of t)e bars in

    t)e slotted )oles. T)e segment !as t)en lifted and trans(ersel#

    le(elled +sing t)e trans(erse le(elling ,ac1 on t)e lifting beam.

     T)e segment !as raised and carried to t)e -ier !)ere it !as

    rotated %5 degrees and lo!ered on to- of t)e bearings /see Fig.

    $D0. A s+r(e# cre! !as +sed to g+ide and (erif# t)e -osition of 

    t)e segment. T)e bearings !ere bolted to t)e embedded -late

    in t)e -ier segment.

    After com-letel# transferring t)e load to t)e bearing' t)e -ier

    segment !as stressed do!n to t)e -ier and t)e lifting trolle#!as disconnected and tra(elled bac1 to t)e tail of t)e gantr# to

  • 8/19/2019 Parsons Brinckerhoff Consruction

    33/43

    -ic1 +- t)e net segment. T)e second segment !as bro+g)t in'

    lo!ered and -ositioned abo+t ft. /$5 mm0 from its @nal

    -osition on t)e do!nstation side of t)e -ier /see Fig. $

  • 8/19/2019 Parsons Brinckerhoff Consruction

    34/43

    t)e -ro-er clos+re of t)e ,oint. A si>able bead of e-o#

    s+ee>ed o+t all aro+nd t)e ,oint' indicating t)at t)e ,oint !as

    -ro-erl# sealed.

    After t)e erection -ost8tensioning bars !ere loc1ed in -lace anda random lift8o? c)ec1 !as -erformed' t)e ,ac1s bet!een t)e

    segment and t)e corbels !ere etended to to+c) t)e bottom of 

    t)e segment and -ress+ri>ed to *55 -si /&. "Pa0 /see Fig. $0.

    At t)is -oint' t)e gantr# o-erator started to release t)e load

    incrementall#. After a @nal c)ec1 of t)e ,oint' t)e erection -ost8

    tensioning ,ac1s !ere remo(ed.

    Immediatel# after disconnecting t)e lifting beam' all t)e em-t#

    -ermanent -ost8tensioning d+cts !ere s!abbed in order to

    clean and Latten t)e bead of e-o# t)at formed inside t)e d+ct

    /see Fig. 0. If not cleaned' t)is bead !o+ld )a(e red+ced t)e

    e?ecti(e diameter of t)e d+ct and ca+sed serio+s -roblems

    d+ring installation of t)e tendons and -ossible tendon bloc1age

    d+ring t)e gro+ting o-erations.

    Fig. & s)o!s a -ier !it) t)e -ier segment and ad,acent

    segments in -lace' and t)e net segment being mo(edlongit+dinall# o(er t)e co+nter!eig)t. After a n+mber of 

    segments !ere -laced' t)e gantr# !as -re-ared for la+nc)ing

    to t)e cantile(er erection -osition from !)ic) t)e remainder of 

    t)e s-an !as erected.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    35/43

    Fig. cleaning o+t -ost8tensioning d+cts

    Lan!(ing t(e Gantr) to t(e Canti&e1er Ere!tion

    Position

    2a+nc)ing t)e gantr# to t)e cantile(er erection -osition !as

    accom-lis)ed in t)ree ma,or ste-s=

    Ste' 2 8 "o(ing t)e rear  leg to t)e center leg /Fig. $f0. T)e

    rear leg !as mo(ed for!ard as described in Ste- $ and

    anc)ored to t)e dec1 b# stressing t)e 6#!idag bars.

    Ste' D 8 "o(ing t)e center leg to t)e -ier segment /Fig. $g0.

     T)e center leg anc)ors !ere loosened. T)e front leg !as

    acti(ated and etended +ntil t)e tr+sses started to -i(ot on t)e

    rear leg and t)e center leg became s+s-ended from t)e

    tr+sses. At t)at time' it !as mo(ed for!ard to t)e -ier segment

    and le(elled $ in. /&5* mm0 from t)e dec1. T)e front leg !as

    retracted +ntil t)e tr+sses rested on t)e center leg' !)ic) !as

    anc)ored do!n to t)e dec1 b# stressing t)e 6#!idag bars.

    Ste' 3 8 2a+nc)ing t)e tr+sses to t)e cantile(er -osition /Fig.

    $)0. T)e s)ims !ere remo(ed from +nder t)e tr+sses at t)e

    rear leg and t)e tr+sses !ere set on rollers. T)e tr+sses !erela+nc)ed for!ard +ntil t)e 1ing -ost !as abo(e t)e center leg.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    36/43

    S-ecial s)ims !ere installed +nder t)e tr+sses at t)e center leg

    and t)e gantr# !as read# to erect t)e remaining segments in

    t)e cantile(er.

    Fig. & Pier table com-lete and segments for cantile(ers mo(ing o+t from

    -ier

    T)'i!a& Ba&an!ed Canti&e1er Segment Ere!tion

     T)e @rst segment +- station of t)e -ier !as bro+g)t in and

    erected in t)e same manner as t)e do!nstation segment. T)e

  • 8/19/2019 Parsons Brinckerhoff Consruction

    37/43

    -ermanent -ost8tensioning tendons' !)ic) !ere -refabricated

    on t)e bridge dec1' !ere -+lled into t)e d+ct /see Fig. 0. T)e

    7S2 -osttensioning s#stem !as +sed to stress t)e m+lti8strand

    tendons.

     T)e segment erection contin+ed /Fig.*0 b# alternating t)e

    segments bet!een t)e do!nstation and +- station of t)e -ier

    !it) some (ariations' s+c) as=

    $. A $*8ton /$$& t0 co+nter!eig)t !as -laced on t)e dec1

    after erection of t)e t)ird segment. T)is co+nter!eig)t !as

    +sed to )el- balance t)e dec1 in t)e +nbalanced stages. T)eco+nter!eig)t !as mo(ed t)ree times to (ar#ing locations

    d+ring a t#-ical s-an constr+ction.

    Fig. inserting -ermanent -ost8tensioning tendons into d+cts

  • 8/19/2019 Parsons Brinckerhoff Consruction

    38/43

    Fig. * Cantile(er erection b# alternatel# -lacing segments left and rig)t

    of t)e -ier

    Fig. :antr# stabili>ers are connected to t)e dec1.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    39/43

    Fig. D. Final ad,+stments at t)e clos+re ga-.

    . After erecting t!o segments on eit)er side of t)e -ier' t)e

    la+nc)ing gantr# stabili>ers !ere connected to t)e dec1 to

    stabili>e t)e s+-erstr+ct+re d+ring t)e +nbalanced constr+ction

    stages /see Fig. 0. T)e ,ac1s on t)e corbels !ere released at

    t)at time. T)e stabili>ers !ere mo(ed se(eral times d+ring at#-ical s-an constr+ction.

    &. In addition to t)e to- slab cantile(er tendons' some of t)e

    longer s-ans re+ired t)e installation and stressing of dra-ed

    tendons. T)ese tendons !ere anc)ored in t)e str+t bloc1s and

    !ere de(iated in t)e -ier segment dia-)ragm.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    40/43

    Fig.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    41/43

    bearings on t)e net -ier ca-. :ro+ting o-erations started after

    t)e gantr# !as la+nc)ed /see Fig.

  • 8/19/2019 Parsons Brinckerhoff Consruction

    42/43

    -ro(iding e-erienced engineers and s+-er(ision to t)e -ro,ect

    sta? and to ac+iring t)e necessar# o+tside engineering

    assistance to meet t)e tec)nical c)allenges of t)e -ro,ect.

    Fig. &5. Ra#mond E. Bald!in Bridge nearing com-letion

     T)e 4oint 7ent+re contracted !it) t)e engineering @rm of Finle#

    "cNar# Engineers' 6en(er' Colorado' to -ro(ide constr+ction

    engineering ser(ices for t)is -ro,ect. T)is @rm !as c)osen

    beca+se of its s-eciali>ed tec)nical ca-abilities' )ig)l# regarded

    re-+tation !it)in t)e segmental bridge ind+str#' and

    commitment to t)e -ro,ect.

     T)e @rm -rod+ced t)e necessar# integrated s)o- dra!ings for

    eac) of t)e

  • 8/19/2019 Parsons Brinckerhoff Consruction

    43/43

    integrated s)o- dra!ings for eac) segment is (er# bene@cial to

    t)e -rod+ction of +alit# com-onents.

    Finle# "cNar# Engineers also -ro(ided t)e contractor !it) a

    geometr# control -ac1age to assist t)em in acc+ratel# casting

    t)e segments to t)e -ro-er )ori>ontal and (ertical alignment.

     T)e# +sed t)eir in8)o+se com-+ter -rogram to calc+late before

    casting set+- ele(ations for eac) segment. After casting'

    ele(ations !ere t)en in-+t into t)e -rogram to -rod+ce as8cast

    geometr# and t)en set+- ele(ations for t)e net segment to be

    cast. T)e @nal as8cast information for eac) cantile(er !as t)en

    in-+t into t)e -rogram to -rod+ce constr+ction ele(ations for

    balanced cantile(er segment erection.

     T)e s+ccess of most -recast concrete segmental str+ct+res

    relies on t)e timel# -rod+ction of +alit# -recast bo girder

    segments. No matter )o! a+tomated and e3cientl# carried o+t

    t)e erection is' t)e o(erall +alit# of a segmental str+ct+re

    de-ends on t)e -rod+ction of )ig) +alit# -recast elements

    fabricated to t)e -ro-er bridge geometr#. PC2' Edmonton'Canada' bro+g)t t)e re+ired segmental e-erience to t)e

    -ro,ect team t)at !as necessar# to ac)ie(e s+ccess.

    In t)e $%