Part 2 – Reference – Drawing Register
Number Description
R1 Pole Bolt Details
R2-1 Bonding, Intermediate
R2-2 Running disc angle 11, 22 and 33 kV – 3 Phase Superposition
R3-1 Insulators
R3-2 Insulator Ties
R3-3 Armour Rods
R4 Insulator Pin and Bolt Details
R5-1 Eyebolt Details
R5-2 Eyebolt, Conductor Terminations
R6 Earthing
R7-1 Cable cleat – Guard and Pole Top Switch – Anti Climbing Guard Detail
R7-2 Service Cable Cleat, Guard Fixing Details
R8-1 ABC Taps for Transformer, and Cable Termination
R8-2 Lugs and Connectors, Transformer and Cable
R8-3 PG Clamps Installation Instruction
R8-4 Lugs and Connectors, Insulation Piercing Clamps
R10-1 Dropout Fuse Mounting, Details
R10-2 Dropout Fuse Mounting, Boric Acid and Fault Tamer Details
R11 Flowline Fuse Mounting and Service Termination
R11-1 LV Supply to Pole-Mounted Equipment
R12-1 Transformer LV, Isolation Details
R12-2 Transformer LV, Isolation Details
R12-3 Transformer LV, Isolation Details
© Horizon Power Corporation
Number Description
R13-1 Pole Embedment Depth, Danger Plate
R13-2 Steel Distribution Pole Belling of Base C and D Areas
R14-1 Ground Stay
R14-2 Outrigger Stay, HV and LV Tee Off
R14-3 Outrigger Stay, HV or LV Termination only, HV and LV Intermediate only
R14-4 Outrigger Stay, Running Disc Angle, 12.5 m Pole
R14-5 Aerial Stay
R14-6 Outrigger Stay Pole
R14-7 Double Ground Stay for Running Disc Angle with Underslung or Overhead Earth Wire
R16 Screw In Anchor, Flow Chart
R17 Transformer Kiosk (Non MPS), 160-1000 kVA Installation Guide
R18 Transformer Kiosk (MPS), 160-630 kVA Installation Guide
R19-1 Kiosk, 25-50 kVA Spud Transformer Installation Guide
R19-2 Transformer Kiosk (MPS) 63 kVA (HUB2 on a culvert) Installation Guide
R20-1 Schneider RM6 Outdoor Switchgear – 4 Way Installation Guide
R20-2 Schneider RM6 Outdoor Switchgear – 4 Way Installation Guide
R20-3 Schneider RM6 Extensible Switchgear Installation Guide
R21 Transformer Kiosk (Non MPS), 160-315-630-1000 kVA, Cable Arrangements
R22 MPS Substation, Up to 630 kVA
R24 LV Switchgear Kiosk, General Arrangement
R26-1 Street Light Cutout, Single Phase Supply
R26-2 Street Light Cutout, Single Phase Supply for Class II Luminaries
© Horizon Power Corporation
Number Description
R26-3 Street Light Cutout Connection Arrangement for Electrical Attachment
R27 Fusing Arrangement for Street Light Columns
R29 25kVA Padmount Trfr 240V Street Feeder/Consumer Mains Terminal Block
R30 25kVA Padmount Trfr 480V Street Feeder/Consumer Mains Terminal Block
R31 Mini Pillar Additional Neutral
R32 Mini Pillar Terminal Block
R33 Mini Pillar XLPE Working End
R35 Mini Pillar SPUDS 240V
R36 Nulec PMB Control Box Connection Detail
R37 Nulec PMB Solar Connection Detail (WITHDRAWN)
R38 Overhead Fault Indicator Solar Connection Detail
R39 Installer Identification Tag
R40 Installation of Above Ground Cable Marker
R42 Earth Bonding of Meter Guard
R50 Sample Operational Label
R51 Placement of Duct Beneath Road Crossings
R52 Cable and Duct Placement on Truncations
R53 Cross Section Details of Cable Easement
R54 Placement of Duct Beneath Open Drain
R55 Cable Trench Layout (Green Field Site) Two Layers (1 Tx and 5 LV Cables)
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
POLE BOLT
DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
R1
200
'A'
ROUND WASHER
76 x 76 x 5 SQUARE WASHER
COIL SPRING M14 TO M24
51 x 51 x 3 SQUARE WASHER
POLE SIDE
CUT EXCESS THREAD TO WITHIN 10mm OF NUT
DIMENSION A
PB1 = 300mm
PB2 = 400mm
PB3 = 550mm
DIAMETER OF POLE BOLTS
12mm 16mm 20mm
12mm 16mm 20mm
12mm 16mm 20mm
BOLT DIMENSIONS
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
BONDING
INTERMEDIATE
REVISION DATE
DRAWING No.
B JUNE 2011
R2-1
100
PURPOSES
HOLE FOR EARTHING
50mm OF M12 THREADED
FOR EARTHING PURPOSES
50mm OF M12 THREADED HOLE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
RUNNING DISC ANGLE
11kV, 22kV & 33kV (3 PHASE)
PHASE SUPERPOSITION
REVISION DATE
DRAWING No.
C MARCH 14
R2-2
VIEWED FROM THIS END
RIGHT-HAND ANGLE WHEN
ON TOP
WHITE PHASE
VIEWED FROM THIS END
LEFT-HAND ANGLE WHEN
IN ALL CASES MARK THE PHASE COLOURS ON THE VERTICAL/ANGLE STRAIN POLES.1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
INSULATORS
REVISION DATE
DRAWING No.
B JUNE 2011
R3-1
STRAIN INSULATOR
RUNNING DISC ANGLE
INTERMEDIATE TERMINATION
20mm BAND-IT STRAP TYPE
TERMINATION INTERMEDIATE
TO 20 DEG
ANGLE UP
OR ANGLE 20-45 DEG
INLINE STRAIN
POST INSULATOR
HIGH POLLUTION
HIGH VOLTAGE (33,22,11,6.6kV)
LOW VOLTAGE
SWITCH WIRE AND RUNNING EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
INSULATOR TIES
REVISION DATE
DRAWING No.
C JUNE 2011
R3-2
H) TURN ENDS OF TIE DOWN AGAINST THE CONDUCTOR.
G) THREE TURNS.
F) ONE OPEN TURN.
E) FIVE TURNS.
D) ONE OPEN TURN.
AND AROUND CONDUCTOR FOR SIX TURNS.
C) CROSS TIE AT THE BACK OF INSULATOR AND CONTINUE UNDER
AND AROUND CONDUCTOR FOR ONE TURN.
B) CROSS TIE AT THE FRONT OF INSULATOR AND CONTINUE UNDER
CONDUCTOR FOR ONE TURN.
A) TAKE HALF TURN AROUND INSULATOR, UNDER AND AROUND
HALVE TIE. START WITH MIDDLE OF TIE AT BACK OF INSULATOR.
SEQUENCE OF OPERATIONS
SEQUENCE OF OPERATIONS FOR HV & LV
TOP TIE
HIGH VOLTAGE
SIDE TIE
HIGH VOLTASGE
TOP TIE
LOW VOLTAGE
TOP TIE
95 & 150 mm2 ABC
CENTRE OF INSULATOR
BARE ABC 300mm OVER
300
L) TURN ENDS OF TIE DOWN AGAINST CONDUCTOR.
K) THREE TURNS.
J) ONE OPEN TURN.
H) FIVE TURNS.
G) ONE OPEN TURN.
F) TAKE FIVE TURNS AROUND CONDUCTOR.
CARRYING EACH END TO BOTTOM OF CONDUCTOR.
E) PASS ENDS OVER AND ACROSS IN FRONT OF INSULATOR
D) TAKE ONE TURN AROUND CONDUCTOR ON EACH SIDE OF INSULATOR
BOTTOM OF CONDUCTOR ON EACH SIDE.
C) CROSS ENDS AROUND BACK OF INSULATOR AND RETURN TO
EACH SIDE OF INSULATOR.
B) TAKE ONE AND HALF TURNS AROUND CONDUCTOR ON
CONDUCTOR ON EACH SIDE.
A) TAKE HALF TURN AROUND INSULATOR AND UNDER
HALVE TIE. START WITH MIDDLE OF TIE AT BACK OF INSULATOR.
SIDE TIE
HIGH VOLTAGE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
ARMOUR RODS
REVISION DATE
DRAWING No.
B JUNE 2011
R3-3
ARMOUR ROD
ARMOUR RODS ARE TO BE USED ON ALL BAYS OVER 80m (WAS 100 m.)
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
INSULATOR PIN AND BOLT DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
R4
HV INSULATOR BOLT
LV INSULATOR PIN
190
80
100
260
160
503
50mm SQUARE WASHER
M16 HEX. NUT
M16 THREAD
'B' HEAD, LEAD
TO SPINDLE
40 mm SQUARE WASHER WELDEDWASHER
75 mm SQUARE
COIL SPRING
SPRING WASHER75 x 75 x 5 WASHER
24mm THREAD
(WOOD CROSSARM)
(STEEL CROSSARM)
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
EYEBOLT DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
R5-1
POLE
POLE
20mm EYEBOLT FOR STAY
16mm EYEBOLT FOR CROSSARM
AND RUNNING DISC ANGLE
16mm EYEBOLT FOR CENTRE PHASE
ROPE THIMBLE
CROSSARM
HELICAL TERMINATION
AGAINST POLE OR WASHER
EYE RETURN TO BE HARD
(N/A FOR STEEL POLES)
76 x 76 x 5 SQUARE WASHER
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CONDUCTOR TERMINATIONS
REVISION DATE
DRAWING No.
C MARCH 14
R5-2
CLEVIS THIMBLE
ALUMINIUM
CLEVIS THIMBLE
MALLEABLE CAST IRON
TERMINATION
HELICAL
STEEL CONDUCTOR (SCAC)
OR
ALUMINIUM CONDUCTOR (AAC & AAAC)
COPPER CONDUCTOR (CU)
OR
STEEL CONDUCTOR (SCGZ)
TERMINATION
HELICAL
TERMINATION
HELICAL
FOR PTS ARRANGEMENT
SUPPLIED WITH PTS
STRAP AND CLAMPS
NOTES:
R7 - STANDARD CABLE GUARD
EARTH MAT
MAT
EARTH
600 SQ.
R6
450
ROADSIDE
MINIM
UM
HEIG
HT
ROD GUIDE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
EARTHING
REVISION DATE
DRAWING No.
C JUNE 2011
R6
SPEAR
EARTH
2070
720
450
150
EARTHWIREEARTH ROD
20
MINIM
UM
CLAMP
TO POLE
30 OHMS
R = LESS THAN
SECURED WITH BAND-IT STRAPS
(POSITION TO SUIT)
3 EXTRA ROD GUIDES REQUIRED
EARTH PIT
EARTH ROD
SEE NOTE 1
BAND-IT STRAPS TO SUIT EQUIPMENT
SEE NOTE 2
STRAP 150 ABOVE G.L.
FIRST 12mm BANDIT
STEEL POLE
100 ABOVE G.L.
EARTH POINT M.E.N.
COMBINED
INDIVIDUAL
<1 ohm
<30 ohm
EARTH
WITH OVERHEAD
ISOLATED H.V.
OVERHEAD EARTH
WITH NO
ISOLATED H.V.
<30 ohm <30 ohm
<10 ohm <30 ohm
INSTALLED EARTHING RESISTANCE REQUIREMENTSTABLE
RESISTANCE
REFER EARTHING
SEE NOTE 3
BAND-IT STRAPS FOR EARTHING
SPACE APPROXIMATELY 500mm APART
TO FIX EQUIPMENT DOWN EARTHS TO POLE. TO BE
3. 12mm WIDE BAND-IT STRAPS FITTED WITH SADDLES
FRAME
BOND THE OPERATING HANDLE TO THE HANDLE
2. AN APPROVED EARTHING BRAID MUST BE FITTED TO
GUARDS.
BRACKET. 12mm WIDE BAND-IT STRAPS ON CABLE
POLE ROD GUIDES AND LV ANGLE INSULATOR
1. 20mm WIDE BAND-IT STRAPS ON RAYCHEM BRACKET,
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CABLE CLEAT / GUARD AND
POLE TOP SWITCH
ANTI CLIMBING GUARD DETAIL
REVISION DATE
DRAWING No.
C MARCH 14
R7-1
CA
BLE CLE
AT SP
ACIN
G
SEE NOTE 2
SURGE ARRESTOR
BI-LUG PLATE
EARTH SCREEN
XLPE TYPE
STRAP
12mm BAND-IT
EARTH POINT
SEE NOTE 3
SWITCH
TO POLE TOP
1500
740
2000
1500
1500
2070
150
ROD GUIDE
NOTE 4
CONNECTION.
AS HIGH UP AS POSSIBLE TO THE SIDE OF THE
POLE AND PROPERTY BOUNDARY) THEN ROLLED
BE INSTALLED ON THE FOOTPATH SIDE (BETWEEN
- FOR POLE TOP SWITCH POLES THE CABLE MUST
CONNECTION.
AND PROPERTY BOUNDARY) UP TO THE
POLE ON THE FOOTPATH SIDE (BETWEEN POLE
THEN THE CABLE MUST BE ROLLED AROUND THE
ON THE OPPOSITE SIDE OF THE INSTALLED CABLE,
- IF THE CONNECTION POINT AT THE POLE TOP IS
SIDE. (BETWEEN POLE AND PROPERTY BOUNDARY)
CABLES MAY BE INSTALLED ON THE FOOTPATH
- SHOULD POINT ABOVE BE IMPRACTICAL, THE
TRAFFIC.
OPPOSITE SIDE OF THE POLE TO ONCOMING
- ALL CABLES SHALL BE INSTALLED ON THE
FOR THE CABLE INSTALLATION.
URD CABLES ON THEM THE FOLLOWING WILL APPLY
IN ALL SECTIONS WHERE POLES ARE DRAWN WITH 5.
STRAPS MIN 2 REQUIRED.
ANTICLIMBING GUARD SECURED WITH 12mm BANDIT 4.
BETWEEN F.G.L. AND GUARD SHALL BE MAINTAINED.
MINIMUM OF 2 REQUIRED. MINIMUM GAP POSSIBLE
CABLE GUARD SECURED WITH 12mm BANDIT STRAPS 3.
STRAPS MINIMUM OF 2 REQUIRED.
CABLE CLEATS SECURED WITH 12mm BANDIT 2.
FOR NTEC'S BAND STRAP OVER ONLY 1 CHANNEL.1.
NOTES:
NOTE:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
SERVICE CABLE CLEAT / GUARD
FIXING DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
R7-2
150
150
150
150
SHRINK GLOVE
SHRINK GLOVE
TOP BAND-IT STRAP
FIRST BAND-IT STRAP
SEE NOTE 1
1000mm MAX SPACING
EQUI-SPACED BETWEEN
MINIMUM OF 3 BAND-IT STRAPS
EQUI-SPACED
3 BAND-IT STRAPS
4m CONDUIT
AS POSSIBLE TO THE SIDE OF THE CONNECTION.
AND PROPERTY BOUNDARY) THEN ROLLED AS HIGH UP
INSTALLED ON THE FOOTPATH SIDE (BETWEEN POLE
- FOR POLE TOP SWITCH POLES THE CABLE MUST BE
BOUNDARY) UP TO THE CONNECTION.
THE FOOTPATH SIDE (BETWEEN POLE AND PROPERTY
THE CABLE MUST BE ROLLED AROUND THE POLE ON
THE OPPOSITE SIDE OF THE INSTALLED CABLE, THEN
- IF THE CONNECTION POINT AT THE POLE TOP IS ON
(BETWEEN POLE AND PROPERTY BOUNDARY)
MAY BE INSTALLED ON THE FOOTPATH SIDE.
- SHOULD POINT ABOVE BE IMPRACTICAL, THE CABLES
SIDE OF THE POLE TO ONCOMING TRAFFIC.
- ALL CABLES SHALL BE INSTALLED ON THE OPPOSITE
FOR THE CABLE INSTALLATION.
URD CABLES ON THEM THE FOLLOWING WILL APPLY
2. IN ALL SECTIONS WHERE POLES ARE DRAWN WITH
SHALL BE MAINTAINED.
MINIMUM GAP POSSIBLE BETWEEN F.G.L. AND GUARD
MINIMUM OF 2 REQUIRED.
1. CABLE GUARD SECURED WITH 12mm BANDIT STRAPS
150
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
ABC TAPS FOR TRANSFORMER
AND CABLE TERMINATION
REVISION DATE
DRAWING No.
B JUNE 2011
R8-1
INSULATED CRIMP
95 ABC
95 ABC
P.G CLAMP
TO D.O.F.
C. DROPOUT FUSE TO CABLE SURGE ARRESTORS
B. DROPOUT FUSE TO TRANSFORMER WITH SURGE ARRESTER
A. LINE TAPS TO DROPOUT FUSE or CABLE SURGE ARRESTOR
WITH 12mm HOLE
INSULATED LUG
SURGE ARRESTOR END
WITH 12mm HOLE
INSULATED LUG
CONDUCTIVE GREASE
CONTACT AFTER APPLY
ENSURE GOOD ELECTRICAL
PAINT CLEANED OFF TOSEE NOTE 2
D.O.F. END
WITH 12mm HOLE
INSULATED LUG
TO INSULATOR
HALF CLAMP
TINNED BRASS
SURGE ARRESTOR END
WITH 12mm HOLE
INSULATED LUG
D.O.F. END
WITH 12mm HOLE
INSULATED LUG
NOTE:
3. ALTERNATIVELY USE "C" FROM D.O.F. TO TRANSFORMER OR TRANSFORMER TO SURGE ARRESTOR
2. REMOVE INSULATION FOR BRASS HALF CLAMP AND MOISTURE DRAIN (20mm)
SEE R8/2 FOR PG CLAMP APPLICATION
INSULATION MUST BE REMOVED BEHIND THE INSULATED LUG TO ALLOW MOISTURE TO DRAIN.
1. WHERE THE INSULATED SPLICE CRIMP IS NOT USED FOR TRANSFORMER OR LINE TAPS A 20mm LENGTH OF
CLAMPS
SPLICE TO SUIT MAINS USING PG
CONNECT COPPER OR ALUMINIUM
SEE NOTE 1
SEE NOTE 2
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
LUGS AND CONNECTORS
TRANSFORMER AND CABLE
REVISION DATE
DRAWING No.
D JUNE 2011
R8-2
UTIL
UX
FT94
AAustralia
20-23.5
mm dia.
38-283
AL
HE
X
DIE
O.D. 35.0
mma.
AA
C,
AA
AC
CRIMP MARK
EARTH PHASE
BRAID
(CABLE CONNECTIONS)
Q TYPE LUG
CABLE CRIMP
LUG BI-METAL
TRANSFORMER & EARTH LUGS ABC TO AERIAL
S/S BOLT & NUT
12 DIAMETER
S/S FLAT WASHER
S/S SPRING WASHER
ABC LUG
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
PG CLAMPS
INSTALLATION INSTRUCTION
REVISION DATE
DRAWING No.
D JUNE 2011
R8-3
INCLUDING Cu DOWN EARTH JOINS
UP TO 70mm sq COPPER CONDUCTOR
SMALL COPPER PG CLAMP FOR
ALUMINIUM OR COPPER
ALUMINIUM
STOCK No. PG 0002
IMMEDIATELY APPLY ALUMINIUM JOINTING COMPOUND.
WIRE BRUSH SURFACE OF CONDUCTOR AND JAWS OF CLAMP. THEN
THE COPPER
IF COPPER TO ALUMINIUM THEN ALUMINIUM CONDUCTOR TO BE ABOVE
FIT CLAMP AND TIGHTEN BOLTS SECURELY.
STEP 1
PARALLEL GROOVE CLAMPS
STEP 2
STEP 3
REUSE OF PG CLAMPS
TO EXCLUDE ALL MOISTURE - STOCK No K10020
INADEQUATE, THEN APPLY 510 DENSO TAPE OVER GREASE AND JOINT
IN EXTREMELY CORROSIVE ENVIRONMENTS WHERE THIS HAS PROVEN
USE SHELL MP2 - STOCK No PG0125.
APPLY GREASE TO COVER ALL PARTS OF JOINT.
(TYPICALLY WITHIN 5 Kms OF COAST)
IN AREAS OF HIGH POLLUTION
ENVIRONMENTAL PROTECTION AT THE INTERFACE
APPLY CONTACT PROTECTION GREASE TO REINSTATE
CONDITION
THOROUGHLY CLEANED TO BRING THE SURFACE BACK TO "AS NEW"
CONTACT GROOVES OF THE PG CONDUCTOR INTERFACE MUST BE
HEAVY FAULT CONDITIONS AND EXCESSIVE CORROSION
DO NOT REUSE PG CLAMPS WHICH HAVE BEEN SUBJECTED TO
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
LUGS AND CONNECTORS
INSULATION PIERCING CLAMPS
REVISION DATE
DRAWING No.
B JUNE 2011
R8-4
LV MAINS IPC - ABC TO ABC
ABC TO SERVICE 95/35 & 150/35
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
DROPOUT FUSE MOUNTING
DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
R10-1
STANDOFF INSULATOR
HIGH POLLUTION NORMAL POLLUTION
DROPOUT FUSE FITTED TO TERMINATION POLE TOP SWITCH WITH CABLE
NOMINATED HIGH FAULT CURRENT AREAS
HIGH POLUTION ALL AREAS EXCEPT METRO 11kV
NORMAL POLLUTION INCLUDING 11kV AREAS
11kV METRO ONLY,NOMINATED LOCATIONS
BRACKET FOR ANGLE
HOLES IN OFFSET CROSSARM
M12 BOLTS THROUGH PREDRILLED
HOLES IN OFFSET CROSSARM
M12 BOLTS THROUGH PREDRILLED
HOLES IN OFFSET CROSSARM
M12 BOLTS THROUGH PREDRILLED
THROUGH INSULATOR
2 M12 BOLTS
ANGLE BRACKET
M16 BOLTS THROUGH ANGLE
HOLES IN OFFSET CROSSARM
M12 BOLTS THROUGH PREDRILLED
22kV ONLY
FAULT TAMER
STRAIN EYE OF PTS
M16 BOLT
M12 BOLT
M16 BOLT
M12 BOLT
ANGLE BRACKET
OF PTS
STRAIN EYE
M16 BOLT
ANGLE BRACKET
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
DROPOUT FUSE MOUNTING
BORIC ACID AND FAULT TAMER
DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
R10-2
RADII
XARM MOUNTED
XARM TYPES
POLE MOUNTED
STANDARD MOUNTING
XARM TYPES
STANDARD DOF's UP TO 33kV
FIRE RISK AREAS AND HIGHER FAULT RATINGS
BORIC ACID FUSES FOR
260
1146
SWING CLEARANCE
FOR FITTING & BARREL
ON EXISTING STRUCTURES
POSSIBLE MOUNTING VARIATIONS
3/05/2017 1:26:11 PM ___H:\00 - Temp - 00\HP\AB\R11\R11.dgn___GIS900526___mleroux
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
LV SUPPLY
TO POLE MOUNTED EQUIPMENT
REVISION DATE
DRAWING No.
A 27-03-15
R11-1
LV UNDERGROUND CONNECTION SIDE VIEW
LV TRANSFORMER CONNECTION SIDE VIEW
U23-1
CB (5 AMP)
LV ABC CONNECTION SIDE VIEW
R8-4
ABC IPC
R12-2
LV AERIAL CONNECTION SIDE VIEW
R-11
INTO CLAMP
BEFORE PUTTING
DOUBLED OVER
MUST BE
CB (5 AMP)
CB (5 AMP)
CB (5 AMP)
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
TRANSFORMER LV
ISOLATION DETAILS
REVISION DATE
DRAWING No.
D MARCH 14
R12-1
NEUTRAL
NEUTRAL
100 AND 200kVA TO BARE CONDUCTOR
25 AND 63kVA TO BARE CONDUCTOR
ABC LUGS
ABC HARNESS 95sqmm
BOLTED TO HARNESS BRACKET
ABC SUSPENSION CLAMPS
TO ABC
LENGTH AND CRIMPED
ABC SPLICE CUT TO
COPPER DOWN EARTH
70sqmm PVC COVERED
QUICK LUGS TO DOWN EARTH
AND PUT INTO PG CLAMP
ABC SPLICE CRIMPED TO ABC
ABC LUGS
BOLTED TO HARNESS BRACKET
ABC SUSPENSION CLAMPS
AND PUT INTO PG CLAMP
ABC SPLICE CRIMPED TO ABC
QUICK LUGS TO DOWN EARTH
COPPER DOWN EARTH
70sqmm PVC COVEREDABC HARNESS 150sqmm FOR 200kVA
ABC HARNESS 95sqmm FOR 100kVA
ABC LUG CRIMPED TO ABC
TO INSULATOR PIN
400AMP LV ISOLATOR BOLTED
100 AMP FUSE HOLDER
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
TRANSFORMER LV
ISOLATION DETAILS
REVISION DATE
DRAWING No.
D MARCH 14
R12-2
5000
a2
a1
a3
a4
1000
BOTTOM OF FUSE SWITCH
SINGLE PHASE 10 AND 25kVA
100 and 200kVA TO ABC
FOR 200kVA
150sqmm ABC
PFISTERE FUSE UNIT
95sqmm ABC FOR
KRONE - FOR 200kVA
100kVA AND BELOW
PFISTERE - FOR
315kVA TO ABC
FOR OPTIONS
REFER TO R12 SHEET 3
NEUTRAL
SERVICE
16sqmm TAP
100 AMP FUSE HOLDER
25sqmm PVC COVERED COPPER
TERMINAL BLOCK
POINT
TO EARTH
EARTH
DOWN
NOTES:
CABLE CLEARANCE CANNOT BE OBTAINED
1. ALTERNATIVE POSITION FOR BRACKET IF
BRACKET
TOP OF
SEE NOTE 1
DOWN EARTH
QUICK LUGS TO 25sqmm
ER
TO RUNNING EARTH
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
TRANSFORMER LV
ISOLATION DETAILS
REVISION DATE
DRAWING No.
B JUNE 2011
R12-3
N
OPTION 1
OPTION 2
OPTION 3
OPTION 4
SHOWN FOR CLARITY
1 PHASE ONLY
SINGLE LINE REPRESENTATION
PG
GS0062
LV AERIAL
SUPPLY
FROM TX
FUSES
KRONE
SUPPLY
FROM TX
GS0062
LV AERIALPG PG
GS0062
LV AERIALPG
FUSES
KRONE
N
FUSES
KRONE
SUPPLY
FROM TX
PGLV AERIAL
FUSES
KRONE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
POLE EMBEDMENT DEPTH
AND DANGER PLATE
REVISION DATE
DRAWING No.
B JUNE 2011
R13-1
WHEN SUPPLIED FOR FITTING
DANGER PLATE LOCATION
1400
E
PL
G.L.
EXAMPLE 9.5m POLE
POLE LENGTH EMBEDMENT DEPTH
9.5m 1.55m
1.70m
1.85m
2.00m
11.0m
12.5m
14.0m
NOTE:
PL = POLE LENGTH
TO BE DETERMINED BY DESIGNER
FOR CYCLONIC AREAS BURIAL DEPTH
E = EMBEDMENT DEPTH
POLE BURIAL DEPTHS
= 1.55m
= (15.5) / 10
= (9.5 + 6.0) / 10
E = (PL + 6.0) / 10
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
STEEL DISTRIBUTION POLE
BELLING OF BASE
C AND D AREAS
REVISION DATE
DRAWING No.
B JUNE 2011
R13-2
G.L.
600 TO 900
600
100
CONCRETE BASE
SA
ND
Y
SOIL
S
UP
TO 14
000
BU
RIA
L
DEP
TH
TO
BE
DET
ER
MIN
ED
BY
EN
GIN
EER
(MARK ON FACE)
GROUND LINE INDICATOR
NOTE:
APPROPRIATELY PRODDED TO REMOVE TRAPPED AIR POCKETS
1 PART OF WATER
3 PARTS OF 20mm AGGREGATE
2 PART OF CLEAN SAND
1 PART OF CEMENT
THE REQUIRED MEASURE IS:
WITH NO ADDITIVES REQUIRED
20mm AGGREGATE, SLUMP OF 80mm, CONCRETE GRADE OF N20
CONCRETE MIXED ON SITE WILL HAVE
MASS FOR EACH BASE PLATE WILL BE APPROXIMATELY 60Kg
CONCRETE DIA. FOR SANDY SOILS 600mm
SLEEVE AROUND THE COLUMN FOR THE FULL BURIAL DEPTH.
COLUMNS SHALL BE SUPPORTED WITH A N20 CONCRETE
FOR CYCLONIC AREAS (AS1170.2-CAT2-REGION "D") 6.5M
FEATURE
ABSORBENT
IMPACT
9.5M, 11M & 12.5M POLES 219, 1 x 48 CHS GRADE 350
NOTE:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
GROUND STAY
REVISION DATE
DRAWING No.
A JUNE 2011
R14-1
ROPE GRIP
ROPE THIMBLE TERMINATION
HELICAL
3000
ROPE THIMBLE
TERMINATION
HELICAL
TERMINATION
HELICALINSULATOR
GROUND LEVEL
R5
AND COVERED IN INSULATING MATERIAL
L.V. MAINS MUST BE CONSTRUCTED ON A 2100mm CROSSARM
1. IF THE STAY WIRE PASSES THROUGH L.V. MAINS THEN THE
A
BC
a
b
c
90
(DEGREES)
ANGLE a
(DEGREES)
ANGLE b
60
(DEGREES)
ANGLE c
30
90
90
45
30
45
60
B
(LENGTH)
C=
Bx1.73
(LENGTH)
A=
Bx0.57
Bx2
Bx1.41
Bx1.15
(TENSION)
C
SUM OF LINE LOAD x 1.41
INSTALLATION ANGLES AND TENSIONS OF STAYS
C = LENGTH OF STAY WIRE
B = HEIGHT OF STAY ATTACHMENT ABOVE GROUND
A = POSITION OF STAY ROD FROM BASE OF POLE
PVC CONDUIT
25mm UV STABILISED
19/2.00
19/2.00
(SEE FLOW CHART - R16)
GROUNDSCREW
SUM OF LINE LOAD x 1.15
SUM OF LINE LOAD x 2
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
OUTRIGGER STAY
HV AND LV TEE-OFF
REVISION DATE
DRAWING No.
B MARCH 14
R14-2
ROPE GRIP
ROPE THIMBLE TERMINATION
HELICAL
ROPE THIMBLE
TERMINATION
HELICAL
TERMINATION
HELICAL
INSULATOR
GROUND LEVEL
R5
PVC CONDUIT
25mm UV STABILISED
3600
ROPE THIMBLE
157
4950
2700
TERMINATION
HELICAL
(SEE FLOW CHART - R16)
GROUNDSCREW
19/2.00
19/2.0
0
2700
(MINIM
UM)
EQUIPMENT (NOTE 2)
BANDIT STRAPS TO SUIT
32mm WIDE BANDIT STRAP ON OUTRIGGER.2.
AND COVERED IN INSULATING MATERIAL
CONSTRUCTED ON A 2100mm CROSSARM
MAINS THEN THE L.V. MAINS MUST BE
IF THE STAY WIRE PASSES THROUGH L.V. 1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
OUTRIGGER STAY
HV OR LV TERMINATION ONLY
HV AND LV INTERMEDIATE ONLY
REVISION DATE
DRAWING No.
B MARCH 14
R14-3
ROPE GRIP
ROPE THIMBLE TERMINATION
HELICAL
ROPE THIMBLE
TERMINATION
HELICAL
TERMINATION
HELICAL
INSULATOR
GROUND LEVEL
R5
PVC CONDUIT
25mm UV STABILISED
ROPE THIMBLE
2700
TERMINATION
HELICAL
(SEE FLOW CHART - R16)
GROUNDSCREW
19/2.00
19/2.0
0
2700
(MINIM
UM)
4400
HV
3000 L
V
3600
EQUIPMENT. (NOTE 2)
BANDIT STRAP TO SUIT
32mm WIDE BANDIT STRAPS ON OUTRIGGER.2.
AND COVERED IN INSULATING MATERIAL
CONSTRUCTED ON A 2100mm CROSSARM
MAINS THEN THE L.V. MAINS MUST BE
IF THE STAY WIRE PASSES THROUGH L.V. 1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
OUTRIGGER STAY
RUNNING DISC ANGLE
12.5m POLE
REVISION DATE
DRAWING No.
B MARCH 14
R14-4
ROPE GRIP
ROPE THIMBLE TERMINATION
HELICAL
ROPE THIMBLE
TERMINATION
HELICAL
TERMINATION
HELICAL
INSULATOR
GROUND LEVEL
PVC CONDUIT
25mm UV STABILISED
ROPE THIMBLE
2700
TERMINATION
HELICAL
(SEE FLOW CHART - R16)
GROUNDSCREW
19/2.0
0
2700
(MINIM
UM)
4950
410
0
19/2.00
R5 (NOTE 2)
EQUIPMENT (NOTE 3)
BANDIT STRAPS TO SUIT
RIGGER.
32mm WIRE BANDIT STRAPS ON OUT3.
LOCATIONS.
STANDARD H6 FOR STAY EYEBOLT
REFER TO RDA CONSTRUCTION 2.
MATERIAL.
CROSSARM AND COVERED IN INSULATING
BE CONSTRUCTED ON A 2100mm
L.V. MAINS THEN THE L.V. MAINS MUST
IF THE STAY WIRE PASSES THROUGH 1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
AERIAL STAY
REVISION DATE
DRAWING No.
A JUNE 2011
R14-5
TERMINATION
HELICAL
INSULATOR
R5
ROPE THIMBLE
3000
TERMINATION
HELICAL
ROPE THIMBLETERMINATION
HELICAL
19/2.00 19/2.00
OVER CONDUCTOR AT BOTH ENDS.
POLE. STAY MAY REQUIRE TWO INSULATORS IF
STAY INSULATOR/S MUST BE FITTED 3.0m FROM 1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
OUTRIGGER STAY POLE
REVISION DATE
DRAWING No.
A JUNE 2011
R14-6
ROPE GRIP
ROPE THIMBLE TERMINATION
HELICAL
ROPE THIMBLE
TERMINATION
HELICAL
TERMINATION
HELICAL
INSULATOR
GROUND LEVEL
R5
PVC CONDUIT
25mm UV STABILISED
ROPE THIMBLE
2700
TERMINATION
HELICAL
(SEE FLOW CHART - R16)
GROUNDSCREW
19/2.00
19/2.0
0
2700
(MINIM
UM)
xx
xx
TERMINATION
HELICAL
3000
INSULATOR
19/2.00
THIMBLE
ROPE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
DOUBLE GROUND STAY FOR
RUNNING DISC ANGLE WITH UNDERSLUNG
OR OVERHEAD EARTH WIRE
REVISION DATE
DRAWING No.
A JUNE 2011
R14-7
(SEE FLOW CHART - R16)
GROUNDSCREW
3000
3000
GROUND LEVEL
PVC CONDUIT
25mm UV STABILISED
ROPE GRIP
TERMINATION
HELICAL
ROPE THIMBLE
19/2.00
TERMINATION
HELICALINSULATOR
19/2.00
TERMINATION
HELICAL
ROPE THIMBLE
A
BC
a
b
c
90
(DEGREES)
ANGLE a
(DEGREES)
ANGLE b
60
(DEGREES)
ANGLE c
30
90
90
45
30
45
60
B
(LENGTH)
C=
Bx1.73
(LENGTH)
A=
Bx0.57
Bx2
Bx1.41
Bx1.15
(TENSION)
C
SUM OF LINE LOAD x 1.41
INSTALLATION ANGLES AND TENSIONS OF STAYS
C = LENGTH OF STAY WIRE
B = HEIGHT OF STAY ATTACHMENT ABOVE GROUND
A = POSITION OF STAY ROD FROM BASE OF POLE
19/2.00
19/2.00
NOTE:
SUM OF LINE LOAD x 1.15
SUM OF LINE LOAD x 2
FOR STAYS EYEBOLT LOCATIONS.
2. REFER TO RDA CONSTRUCTION STANDARD H7
AND COVERED IN INSULATING MATERIAL
CONSTRUCTED ON A 2100mm CROSSARM
MAINS THEN THE L.V. MAINS MUST BE
1. IF THE STAY WIRE PASSES THROUGH L.V.
R5 (NOTE 2)
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
SCREW IN ANCHOR
FLOW CHART
REVISION DATE
DRAWING No.
B JUNE 2011
R16
REMAINS EXPOSED
UNTIL 300mm OF ROD
ATTEMPT TO DRIVE ANCHOR
LOAD WITH 4 PINSREMAINS EXPOSED
UNTIL 300mm OF ROD
ATTEMPT TO DRIVE ANCHOR
FIT EXTENSION ROD
EXPOSED
300mm OF ROD
WITH MORE THAN
BEFORE REACHING
PINS SHEAR
NO
PINS SHEAR YES
SCREW ANCHOR
TRY 300mm
START AGAIN
200mm SCREW ANCHOR
TOO SOFT FOR
CONDITIONS
SOIL
NO
REMAINS EXPOSED
UNTIL 300mm OF ROD
ATTEMPT TO DRIVE ANCHOR
LOAD WITH 10 PINS
YES
STALLS
AUGER MOTOR
OR
PINS SHEAR
YES
NO
NO
FITTED
ALREADY BEEN
EXTENSION ROD
HAS AN
YES
REMAINS EXPOSED
UNTIL 100mm OF ROD
ATTEMPT TO DRIVE ANCHOR
REMOVE 6 PINS
THAN 300mm
EXPOSED LESS
LENGTH OF ROD
IS
PINS SHEAR NO
ACHIEVED
INSTALLATION
ANCHOR
SATISFACTORY
FINISH
YES
YES
SCREW ANCHOR
200mm
START USE
23/08/2016 9:08:55 AM ___pw:\\OCA-PW-701.ghdnet.internal:PWV8iSS4ProdHP\Documents\Projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R17.dgn___GIS900526___mleroux
23/08/2016 9:13:39 AM ___pw:\\OCA-PW-701.ghdnet.internal:PWV8iSS4ProdHP\Documents\Projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R18.dgn___GIS900526___mleroux
23/08/2016 9:15:26 AM ___pw:\\OCA-PW-701.ghdnet.internal:PWV8iSS4ProdHP\Documents\Projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R19-1.dgn___GIS900526___mleroux
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
TRANSFORMER KIOSK (MPS)
63kVA (HUB2 ON A CULVERT)
INSTALLATION GUIDE
REVISION DATE
DRAWING No.
C MARCH 14
R19-2
A8
A8
B8
B8
C8
C8
LV
NOT TO SCALENOT TO SCALE
VOID FILLCOMPACTED BACKFILL
COMPACTED & LEVELLED SUBGRADE
FGL
FRONT VIEWSIDE VIEW
FGL
CABLE ENTRY
OVERHANG LIMITED TO
LV CABLE ACCESS CULVERT
BASE
577
1000
FI4.4
REFER TO
TYPICAL
LIMIT OF EXCAVATION500 500500500
600
NOTES:
DSM - 4 - 02
DSM - 3 - 26
DSM - 3 - 01 SHEETS 1&2
SITE DESIGN & INSTALLATION DETAILS ETC. REFER TO
FOR OTHER INFORMATION ON
EQUIPMENT WEIGHTNOTE:
LV
LV
MV
MV
MVLV
CONNECTIONS
FUTURE MPS
TRANSFORMER
WHEN CONNECTION IS MADE TO 63kVA
ALLOW FOR FUTURE MPS INSTALLATION
CABLE LENGTH AND ALIGNMENT TO
LIFTING POINTS
MV CABLE ACCESS
MV
THIS DRAWING TO BE READ IN CONJUNCTION WITH THE SUBSTATION INSTALLATION REQUIREMENTS - HPC-9DJ-23-0001-2012
63kVA = 720kgTRANSFORMERS:
BASE = 384kg
CROWN = 948kgBOX CULVERT:
63kVA CONNECTIONS
�»¿
23/08/2016 9:38:47 AM ___pw:\\OCA-PW-701.ghdnet.internal:PWV8iSS4ProdHP\Documents\Projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R20-1.dgn___GIS900526___mleroux
23/08/2016 9:39:54 AM ___pw:\\OCA-PW-701.ghdnet.internal:PWV8iSS4ProdHP\Documents\Projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R20-2.dgn___GIS900526___mleroux
23/08/2016 9:41:19 AM ___pw:\\OCA-PW-701.ghdnet.internal:PWV8iSS4ProdHP\Documents\Projects\61\31539 NIS Business Urgent Works\08_0 DRAFTING\8_3 DRAWINGS\R20-3.dgn___GIS900526___mleroux
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
TRANSFORMER KIOSK (NON MPS)
160/315/630/1000 kVA
CABLE ARRANGEMENTS
REVISION DATE
DRAWING No.
C 02/04/14
R21
N R W B
LV LV
LV LV
MANUFACTURER
TO BUSHING BY
EXTENSION PALM FITTED
N R W B
315 AND 630kVA 33kV TRANSFORMER
18 DIAMETER HOLE
120
30
50
1130
1030
1100
1200
1230
1200
1130
1320
1250
6.6/11kV & 22kV TRANSFORMER LV
315 AND 630kVA
33kV TRANSFORMER LV
315, 630kVA
6.6/11kV, 22 & 33kV TRANSFORMER LV
1000kVA
6.6/11kV AND 22kV TRANSFORMER
1000kVA
6.6/11kV AND 22kV TRANSFORMER
315 AND 630kVA
1000kVA 33kV TRANSFORMER
AND NUMBER OF 1 X 630mm� PER PHASE.
CUSTOMER LV CABLES CONNECTED TO A SOLE USE 160 kVA TRANSFORMER CAN BE A MAXIMUM SIZE 5.
MAXIMUM SIZE AND NUMBER OF 2 X 630mm� PER PHASE.
CUSTOMER LV CABLES CONNECTED TO A SOLE USE 315 AND 630kVA TRANSFORMER CAN BE A 4.
AND NUMBER OF 3 X 630 sq mm PER PHASE.
CUSTOMER LV CABLES CONNECTED TO A SOLE USE 1000kVA TRANSFORMER CAN BE A MAXIMUM SIZE 3.
PER PHASE AND 1 PER NEUTRAL.
ALL LV CABLES INSTALLED FOR NON MPS DISTRICT SUBSTATION ARRANGEMENTS TO BE 630mm� Al, 2 2.
BUSHINGS.
SLACK FOR POSSIBLE 1000kVA TRANSFORMER UPGRADE SEE ABOVE FOR HEIGHTS OF LV AND MV
MV AND LV CABLES INSTALLED FOR 315 AND 630kVA NON MPS TRANSFORMERS MUST ALLOW 500 mm 1.
NOTES:
MV
MV MV
MV
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
MPS SUBSTATION
UP TO 630 kVA
REVISION DATE
DRAWING No.
B JUNE 2011
R22
1 2 3 4 5
(REF R25)
CABLE TO FUSE SWITCH
630 AMP COVER WITH 600 AMP LINKS - OPTIONAL
5 x 400 AMP COVERS SUPPLIED WITH MPS
1200 AMP ARRANGEMENT - OPTIONAL
600 AMP LINKS
2 X 630 COVERS FIXED TOGETHER WITH
600
HEATSHRINK
BW
R
STRIP
N
R
W
B
NOTES:
630 kVA
2. CABLE SUPPLIED WITH MPS TRANSFORMER RANGE - 160, 315 AND
INCLUDING 630 AMP BASES.
1. MPS COMES COMPLETE WITH TRANSFORMER AND 5 x LV SWITCHES
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
LV SWITCHGEAR
KIOSK
GENERAL ARRANGEMENT
REVISION DATE
DRAWING No.
C MARCH 14
R24
LV KIOSK TYPE 1 - FEEDER PILLAR
LV KIOSK TYPE 2 - DISTRICT SUBSTATION
LV KIOSK TYPE 3 - DISTRICT SUBSTATION
IN 2HR FIRE RATED SUBSTATION
IN 2HR FIRE RATED SUBSTATION
RECESSED IN WALL FREESTANDING
FREESTANDING
FREESTANDING
1000
1025
1500
1025
1400
900
FGL FGL
FGL
FGL
THIS AREA TO BE
FREE OF FOOTINGS
DIMENSIONS SHOWN
RECESS BUILT TO
400 DEEP400 DEEP
(500 x 200 x 25 THICK)
CONCRETE SLABS
SUBSTATION
FLOOR OF
400 DEEP
1m DEEP TRENCH
1m DEEP TRENCH
THRU REINFORCED SECTIONS
DRILL 4-HOLES 12 DIAMETER
1300
1025
1600
(500 x 200 x 25 THICK)
CONCRETE SLABS
220010
25
1600
THRU REINFORCED SECTIONS
DRILL 6-HOLES 12 DIAMETER
SUBSTATION
FLOOR OF
APPROXIMATE MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS = 240kg2.
RAWLNUTS AND 4 x 10mm BOLTS x 75 LONG.
KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH 4 x 10mm 1.
NOTES:
(500 x 200 x 25 THICK)
CONCRETE SLABS
400 DEEP
APPROXIMATE MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS = 350kg2.
RAWLNUTS AND 6 x 10mm BOLTS x 75 LONG.
KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH 6 x 10mm 1.
NOTES:
APPROXIMATE MAXIMUM WEIGHT WITH 6 FUSEWAYS = 160kg.2.
TO BE RECESSED IN THE WALL.
THE CUSTOMER IS RESPONSIBLE FOR THE INSTALLATION OF THE HP SUPPLIED FEEDER PILLAR, 1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
STREET LIGHT CUTOUT
SINGLE PHASE SUPPLY
REVISION DATE
DRAWING No.
C MARCH 14
R26-1
N E
SUPERSEDED TYPE 1 REQUIREMENTS
PLUG
E
A N A N
E
LOOPED SERVICE SUPPLYSINGLE SERVICE SUPPLY
ENAA N E
TYPE 2
CAT No. 8DE 54715-04
CUTOUT
STREET LIGHTING SERVICE
GEC HENLEY
TO MOUNTING BRACKET FROM EARTH BLOCKS
CONNECT 6mm EARTH WIRE (EE1364)
TO BE 6mm Cu PVC INSULATED.
LOOP BETWEEN NEUTRAL AND EARTH BLOCKS
THESE LINKS MUST BE INSTALLED.
'WITH THE MEN LOOP INSTALLED' & 'EARTH LEAD TO MOUNTING BRACKET'
TO THE NUMBER OF THIS TYPE STILL IN USE TYPE 1 MUST BE CONNECTED AS SHOWN
BY THE TYPE 2 CUTOUT WITH A COMMON EARTH/NEUTRAL TERMINAL HOWEVER, DUE
THIS CUTOUT, WITH SEPARATE EARTH/NEUTRAL TERMINALS, WAS SUPERSEDED
NOTE:
FRONT COVER TYPE 2
VIEW ON INSIDE OF
OR FUSE
LINK
TO EACH LUMINAIRE
A DOUBLE INSULATED CABLE
TO EACH LUMINAIRE
A DOUBLE INSULATED CABLE
UNIT
TO ENTER
(SHEATHING)
INSULATION
DOUBLE
UNIT
TO ENTER
(SHEATHING)
INSULATION
DOUBLE
USING M4 SCREW
MOUNTING BRACKET
FIX TO
BLOCK(MEN)
EARTH/NEUTRAL
OR TAPE
WITH HEAT SHRINK
TO BE INSULATED
EARTH/NEUTRALOR TAPE
WITH HEAT SHRINK
TO BE INSULATED
EARTH/NEUTRAL
WOUND NEUTRAL SCREEN CABLE
INSULATED, RED CORE INSULATION, HELICAL
10mm (EE1420) OR 16mm (EE1421) XLPE
SUPERSEDED TYPE 2 UNIT SEE R26/2 FOR REPLACEMENT
SCREW.
LUG AND M6
TERMINAL
USING
BRACKET
TO MOUNTING
EARTH WIRE
CONNECT
M6 SCREW.
BRACKET USING TERMINAL LUG AND
CONNECT EARTH WIRE TO MOUNTING
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
STREET LIGHT CUTOUT
SINGLE PHASE SUPPLY
FOR CLASS II LUMINIARES
REVISION DATE
DRAWING No.
C MARCH 14
R26-2
A N NE E
A
N
A
VIEW ON INSIDE OF FRONT COVER
SINGLE PHASE LOOPED SERVICESINGLE PHASE
STOCK No: HZ0128
A N E A N E A N E
TO EACH LUMINAIRE
A DOUBLE INSULATED CABLE
WOUND NEUTRAL SCREEN CABLE
INSULATED, RED CORE INSULATION, HELICAL
10mm (EE1420) OR 16mm (EE1421) XLPE
PLATE AND SCREWS
BRACKET USING
FIX TO MOUNTING
PLATE AND SCREWS
BRACKET USING
FIX TO MOUNTING
A A A
LED INSTALLATIONS.
GF1300) MUST BE INSTALLED FOR
LST 10A FUSE (STOCK CODE: 1.
NOTE:
LST 10A FUSE
N
WITHDRAW
N
REFER TO R26
-3
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
STREET LIGHT CUTOUT
SINGLE PHASE SUPPLY
FOR LUMINIARES
REVISION DATE
DRAWING No.
A APRIL 14
R26-3
A N NE E
A
N
A
VIEW ON INSIDE OF FRONT COVER
STOCK No: HZ0128
A N E A N E A N E
TO EACH LUMINAIRE
A DOUBLE INSULATED CABLE
WOUND NEUTRAL SCREEN CABLE
INSULATED, RED CORE INSULATION, HELICAL
10mm (EE1420) OR 16mm (EE1421) XLPE
PLATE AND SCREWS
BRACKET USING
FIX TO MOUNTING
PLATE AND SCREWS
BRACKET USING
FIX TO MOUNTING
A A A
LST 10A FUSE
N
SUPPLY FUSE 32A
SINGLE PHASE
SUPPLY FUSE 32A
SINGLE PHASE LOOPED SERVICE
NOTE 4
NOTE 3
NOTE 2
WIRE (EE1364) LOOP.
MEN BRIDGE OR 6mm EARTH 4.
FROM EARTH TERMINAL.
(EE1364) TO MOUNTING BRACKET
CONNECT 6mm EARTH WIRE 3.
SCREW (AB2820).
TERMINAL LUG (FL0163) AND M6
MOUNTING BRACKET USING
CONNECT EARTH WIRE TO 2.
ALL INSTALLATIONS.
GF1300) MUST BE INSTALLED FOR
LST 10A FUSE (STOCK CODE: 1.
NOTE:
NOTE 4
NOTE 3
NOTE 2
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
FUSING ARRANGEMENTS FOR
STREET LIGHT COLUMNS
REVISION DATE
DRAWING No.
B JUNE 2011
R27
FROM A LOOPED SERVICE
FROM A MINI PILLAR
TO OTHER STREET LIG
HTS
G.L.
TERMINATING BLOCKS
NOTES FOR PILLAR CONNECTIONS.
G.L.
G.L. G.L.
BEYOND SECOND NUT.
SCREW THREAD PROTRUDING
CUTOFF ANY PORTION OF
2 C0RE 10sqmm
CABLE (EE1420)
R26
(W/LINK)
R26
(W/FUSE)
STREET LIG
HT OR PIL
LA
R.
SUPPLY FRO
M PREVIO
US
STREET LIGHT FUSE
HOLDER (SEE NOTE 2)
FITTED ON OPPOSITE
SIDE OF TERMINALS
BY FITTING TERMINAL
FIXING SCREW AS
SHOWN.
USE WITH 10A NIT TYPE FUSE (GF0915)
2. GEC REDSPOT TYPE RS20H FUSE HOLDER (GF0121),
WITHIN THE DEVELOPMENT.
1. DISTRIBUTE LIGHTING LOAD ACROSS THE PHASES
ALSO REFER TO DETAILS IN DRG R26 SERIES
MOUNTING
BOARD
MINI
PILLAR
TOP VIEW
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
REFERENCE DRAWING
25kVA PADMOUNT Tx LV DISTR. BOARD
240V STREET FEEDER/CONSUMER MAINS
TERMINAL BLOCK
REVISION DATE
DRAWING No.
C FEB 2013
R29
RED
BLACK
RED
WHITE
70 mm sq GREEN/ YELLOW
TO TRANSFORMER HV EARTH BAR
MAXIMUM 5 CABLES
MAXIMUM 35mm� Cu XLPE 3C LV
FROM
FUSE HOLDER
FROM
TRANSFORMER
BUSHING (a2)
M.E.N.
SCREEN
BLUE
LUG SEPERATE
USE COMMON BOLT
RED
WHITE
NEUTRAL
EARTH
PERSPEX COVER
BLACK HEAT SHRINK OR
TAPE OVER SCREEN AND
BLUE PHASE
NOTES:
1. SEE R35 FOR MINI PILLAR ARRANGEMENT.
2. SETUP FOR A 12.7kV OR 19.1kV 25kVA 240/480V TRANSFORMER
240V CONFIGURATION SHOWN, SEE R30 FOR 480V CONFIGURATION.
DISTRIBUTION CONSTRUCTION
STANDARDS
OPERATIONS
REFERENCE DRAWING
25kVA PADMOUNT Tx LV DISTR. BOARD
480V STREET FEEDER/CONSUMER MAINS
TERMINAL BLOCK
REVISION DATE
DRAWING No.
B FEB 2013
R30
RED
BLACK
RED
WHITE
70 mm sq GREEN/ YELLOW
TO TRANSFORMER HV EARTH BAR
MAXIMUM 5 CABLES
MAXIMUM 35mm� Cu XLPE 3C LV
FROM
FUSE HOLDER
FROM
TRANSFORMER
BUSHING (a2)
M.E.N.
SCREEN
BLUE
LUG SEPERATE
USE COMMON BOLT
RED
WHITE
NEUTRAL
EARTH
PERSPEX COVER
BLACK HEAT SHRINK OR
TAPE OVER SCREEN AND
BLUE PHASE
NOTES:
WHITE
1. SEE R35A FOR MINI PILLAR ARRANGEMENT.
2. SETUP FOR A 12.7kV OR 19.1kV 25kVA 240/480V TRANSFORMER
480V CONFIGURATION SHOWN. SEE R29 FOR 240V CONFIGURATION.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
MINI PILLAR
ADDITIONAL NEUTRAL
FITTING REQUIREMENTS
REVISION DATE
DRAWING No.
B JUNE 2011
R31
N
VIEW FROM BACK OF BOARD
STOCK No. HC1299
R W B N
COVER
CONNECTION LINK
STOCK No HC1299
ADDITIONAL M.E.N LINK
TERMINAL
EARTH WIRE
TO OLD
NEUTRAL
M.E.N LINK
EXISTING
EARTH ROD
TO EXISTING
EARTH WIRE
THE ADDITIONAL LINK.
5. THEN CONNECT EXTRA NEUTRALS TO
THE ADDITIONAL M.E.N LINK.
AND BOTTOM CENTRE TERMINAL IN
EARTH TERMINAL IN EXISTING LINK
CONDUCTOR (BLACK) BETWEEN OLD
4. CONNECT A 25/35MM NEUTRAL
THE ADDITIONAL LINK.
TO BOTTOM R/HAND TERMINAL OF
3. CONNECT REMOVED EARTH CABLE END
TO CONFIRM NO POTENTIAL DIFFERENCE.
M.E.N LINK AND REMOVED CABLE END
FROM M.E.N LINK AND TEST BETWEEN
REMOVE EARTH STAKE CONDUCTOR
2. USING INSULATED GLOVES AND TOOLS
PANEL BEHIND EXISTING M.E.N LINK.
1. FIX EXTRA NEUTRAL LINK TO BACK OF
INSTALLATION PROCEDURE:
NOTES:
1. IF POTENTIAL EXISTS BETWEEN CUT ENDS NOTIFY HORIZON POWER.
ON BACK
CONDUCTOR TO LOOP TO M.E.N.
ADDITIONAL 25/35mm BLACK
BOARD
MOUNTING
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
MINI / UNIVERSAL PILLAR
TERMINATION BLOCK
REVISION DATE
DRAWING No.
B JUNE 2011
R32
R W B N
VIEW FROM STREET
VIEW FROM SIDE
NEUTRAL
STREET LIGHT
TERMINAL BLOCKS
COVER
BOARD
MOUNTING
(TO EARTH ROD)
EARTH
CROSSING
TO ROAD
CROSSING
TO ROAD
M.E.N. LINK
TO STREET LIGHT/S
FROM TEE JOINT
25mm� SERVICE
CONNECTION LINKS
RED SPOT FUSE
TO STREET LIGHT
LIGHT FUSE
SUPPLY TO STREET
WHERE REQUIRED
STREET LIGHT FUSE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
MINI PILLAR
XLPE WORKING END
REVISION DATE
DRAWING No.
B JUNE 2011
R33
NEUTRAL BLOCK
SPLIT SCREEN
G.L. BA
CK 300
mm
CA
BLE T
O
BE S
TRIP
PE
D
200
160
120
HEATSHRINK
XLPE
(GLOVE)
PVC POULTICE AREA
NOTES:
1. MINI PILLAR ENCLOSED WORKING END, LID OF PILLAR TO BE PAINTED WHITE
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
SPUDS MINI PILLAR
240V SUPPLY FROM R29
ARRANGEMENT
REVISION DATE
DRAWING No.
B JUNE 2011
R35
R W B N
ACTIVE NEUTRAL
HEATSHRINK
TAPE
GL
SEE R29
OVER BLUE PHASE
BLACK HEATSHRINK
R W B N
EARTH ROD
240V OUT
240V IN
240V 1 PHASE SUPPLY ARRANGEMENT
PROPERTY
ROAD
N
ACTIVE
1 PHASE CUSTOMER
ACTIVE
N
1 PHASE CUSTOMER
NOTES:
1. MAXIMUM CABLE SIZE 35mm�
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
NULEC N-SERIES RECLOSER CONTROL BOX
CONNECTION DETAIL
REVISION DATE
DRAWING No.
D MARCH 14
R36
1 2 3 4 5 6 7
A
ANTENNA
EQUIPMENT
P1 P2
240V SUPPLY
MCB
BATTERY
SURGE ARRESTOR
BEHIND THE EQUIPMENT PANEL
TO ALLOW SUPPLY CABLE TO BE RUN
FIXING POINTS TO BE LOOSENED
MODEM
RADIO
LEAD
PATCH
EARTH
CONTROL CABLE
CORRUGATED CONDUIT
GLAND
SUPPLY CABLE
LV MAINS
MOUNT SURGE ARRESTOR
MODULAR DIN RAIL
REARE
20mm LV MAINS ENTRY M10 EARTH STUD
MAINS ENTRY
20mm LV
FRONT
16mm SPARE
(TO SWITCHGEAR)
CONTROL CABLE ENTRY
TOP VIEW
PATCH LEAD
INSTALLATION DETAIL
ANTENNA SURGE ARRESTOR
"O" RING
RETAINING NUT
COAXIAL CABLE
CONDUIT
1 2 3 4 5 6 7
AN
E
EN
L
BETWEEN TERMINALS 6 & 7
REMOVE MCB AND FIT LINK
E
AN
E
E
N E
SUPPLY
240V AC
ARRESTOR
SURGE
USING NAMEPLATE FIXING
RADIO MODEM TO BE FITTED
LIVE
NEUTRAL
NOTE 2
PVC 240V
2C+E 2.5sqmm
STUD
EARTH
SUPPLY CABLE
LV MAINS
FOR ARRESTOR
OF VERMIN PROOFING
DRILL OUT CORNER
EA
RT
H
- POLE MOUNTED RECLOSER/ISOLATOR
REFER TO DISTRIBUTION COMMISSIONING TEST SHEET2.
LEAD IS REQUIRED FOR THE SURGE ARRESTOR.
FOR DOUBLE SKIN OR PAINTED ENCLOSURES AN EARTH 1.
NOTES:
2/09/2016 11:30:38 AM ___H:\00 - Temp - 00\HP\AB\R37_B.dgn___GIS900526___mleroux
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
OVERHEAD FAULT INDICATOR
SOLAR CONNECTION
REVISION DATE
DRAWING No.
B JUNE 2011
R38
20W SOLAR PANEL
++- -
-
+
TX
BATTERY SPACE
TRANSFORMER
(IC)
RADIO MODEM
+-
PHOTOVOLTAIC CONTROLLER
CHARGING DISCONNECT
LOAD
6.0A LOAD
6.5A SOLAR
12 VOLTS
SELECT
FLOODED
OR
SEALED
+ + +- - - BATTERY
FLOODED
WIRE FOR
JUMPER
REMOVE
TEMP. SENSE
3
1 6 53 24
SOLAR BATTERY LOAD
MORNINGSTAR
SUNSAVER-6
CHARGER
uP CONTROLLED
NOTE 3
NOTE 1
NOTE 2
NOTE 4 & 5
SOLAR CONTROLLER
BATTERY
RTU
RADIO MODEM
ENCLOSURE
BATTERY
MODEM
NOTES:
(TOP VIEW)
CONTROLLER
SOLAR
NOTE 6
NOTE 7
REQUIRES LARGER VERSION OF ENCLOSURE
8. CONSTRUCTION USING 2 x 7Ah BATTERIES
7. LINK REQUIRED FOR SEALED LEAD ACID BATTERY.
LOAD DISCONNECT.
6. DO NOT USE LOAD TERMINALS FOR CONTROLLERS WITH
OR REGULATOR.
5. FOR 2 x 10W SOLAR PANELS REQUIRED AT SOLAR PANEL
4. SOLAR PANEL MAY BE PROVIDED WITH FLEXIBLE CABLE TAIL.
3. PROVIDE LOOP AT BATTERY AND SOLAR TERMINALS.
2. REMOVE TRANSFORMER CONNECTION.
1. REMOVE BATTERY AND TAILS. (ALLOW FOR RETERMINATING)
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
INSTALLER IDENTIFICATION TAG
REVISION DATE
DRAWING No.
B JUNE 2011
R39
X X X X XX M M Y Y
STAINLESS STEEL TAG 80 x 20 x 0.5
ADJACENT THE JOINT/TERMINATION
USE SCREEN WIRE TO FIX TAG TO CABLE
PAY OR CONTRACTOR NUMBER
eg 03.08
(MONTH, YEAR)
DATE OF INSTALLATION
2. ONE TAG IS REQUIRED WHERE A 3 PHASE SET IS INSTALLED
1. INSTALLER TO MARK TAG AS DETAILED WITH SUITABLE PUNCH SET
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
INSTALLATION OF
ABOVE GROUND CABLE MARKER
REVISION DATE
DRAWING No.
B JUNE 2011
R40
DIAL 1100BEFORE YOU DIG
DANGER
THE VICINITY
CABLES IN
ELECTRICAL
UNDERGROUND
DIAL 1100BEFORE YOU DIG
DANGER
THE VICINITY
CABLES IN
ELECTRICAL
UNDERGROUND
EQ
UIP
ME
NT P
RO
TECTIO
N
1200CA
BLES IN
VICINIT
Y
1000
1600
FRONT VIEW BACK VIEW
STOCK CODE CR0327
INSTALLATION TOOL
STOCK CODE CR 0328
REMOVAL TOOL
DANGER LABEL
NOTES:
1. REMOVAL TOOL TO BE ORDERED FROM SUPPLIER AS NEEDED
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
EARTH BONDING OF METER GUARD
REVISION DATE
DRAWING No.
C MARCH 14
R42
ELECTROCARD METER
DISPLAY
SETTINGS
CREDIT
EMERGENCY
INSERT CARD STRIPE ON TOP
SERIAL NUMBER
212
170
WASHER
STAR
NUT
2 NUTS
WASHERS
2 FLAT
FLAT WASHER
BOLT
BOLT
97
METER BOARD
METER COVER
METER
FIXING POINT
REMOVED AROUND
PAINT TO BE
SEE NOTE 4
CRIMP LUG
SPLAYED
1, 2, 3 & 4
SEE NOTES
STOCK No. JW0152 (COVER)
6 DIAMETER x 20 LG GHH BOLT, FLAT WASHER AND NUT AS SHOWN.
GHH BOLT, 1 STAR WASHER, 2 FLAT WASHERS & 2 NUTS AS SHOWN. REMAINING FIXINGS TO BE DONE WITH
SPLAYED LUG TO BE SECURED TO EARTH COVER ON REAR OF METER BOARD WITH 6 DIAMETER x 20 LG 4.
EARTH WIRE TO BE FITTED BY LICENSED ELECTRICIAN3.
ALL METER GUARDS ARE TO BE BONDED TO CONSUMERS METAL ENCLOSURE EARTHING POINT OR M.E.N.2.
BOND EARTH WIRE TO BE SAME AS INCOMING SUPPLY NEUTRAL.1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
SAMPLE OPERATIONAL LABEL
REVISION DATE
DRAWING No.
A 21/08/15
R50
LABEL SPECIFICATIONS
EQUIPMENT IS OPERATIONAL
TREAT AS ENERGISED
DANGER!!
- DO NOT ENERGISE
- DANGER : OTHER END NOT TERMINATED
OTHER TAGS AVAILABLE:�
FRONT DOOR OF SUBSTATION.
MOUNTED IN PROMINENT POSITION ON EQUIPMENT E.G. SIDE OF MINI AND UNIVERSAL PILLAR OR �
"DANGER" TO APPEAR IN RED, OTHER TEXT IN BLACK.�
DIMENSIONS : 100mm (WIDTH) x 80mm (DEPTH).�
ALUMINIUM, SELF ADHESIVE, WEATHERPROOF.�
NOTES:
KERB LINE
CABLE
PROTECT CABLES BETWEEN EDGE OF ALIGNMENT AND END OF CONDUIT WITH PROTECTION SLABS
RO
AD
WA
Y
RO
AD
WA
Y
CONDUIT INSTALLATION REQUIREMENTS FOR HV & LV CABLES
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
PLACEMENT OF DUCT
BENEATH ROAD CROSSINGS
REVISION DATE
DRAWING No.
A 21/08/15
R51
BOUNDARY LINE
PROPERTY
PAST KERB1.0m MIN
CABLE
POWER ALIGNMENTUNDERGROUND
POWER ALIGNMENTUNDERGROUND
CONDUIT INSTALLATION REQUIREMENTS FOR SERVICE & STREET LIGHT CABLES
CONDUIT SHALL BE INSTALLED TO EDGE OF CABLE ALIGNMENT
KERB LINE
CABLE
RO
AD
WA
Y
RO
AD
WA
Y
BOUNDARY LINE
PROPERTYCABLE
POWER ALIGNMENTUNDERGROUND
POWER ALIGNMENTUNDERGROUND
PAST KERB1.0m MIN
MANUAL FOR SPECIFIC REQUIREMENTS.
REFER TO HORIZON POWER UNDERGROUND CABLE INSTALLATION 1.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CABLE AND DUCT PLACEMENTS
ON TRUNCATIONS
REVISION DATE
DRAWING No.
A 21/08/15
R52
ROADWAY
ROADWAY
ROADWAY
ROADWAY
500
NOTE:
PROPERTY BOUNDARY
PROPERTY BOUNDARY
0-500mm ALIGNMENT
HORIZON POWER
CARRIAGEWAY
EDGE OF
DUCT
500
THE DUCT SHALL BE INSTALLED FROM EDGE TO EDGE OF THE CABLE ALIGNMENT.
0-500mm ALIGNMENT
HORIZON POWER
NOTES:
T
3 & 4)
(NOTES
1000
MARKER TAPE
500
(NOTES 3 & 4)
T
�
EASEMENT
CONDUIT NOMINAL DIAMETER, WHICHEVER IS SMALLER.
ENCASEMENT THICKNESS "T" SHALL BE AT MOST 150mm OR 200% OF THE LARGEST 4.
CONDUIT NOMINAL DIAMETER, WHICHEVER IS GREATER.
ENCASEMENT THICKNESS "T" SHALL BE AT LEAST 75mm OR 75% OF THE LARGEST 3.
CONDUITS SHALL BE CENTRED IN EASEMENT.2.
(AS DEFINED BY AS/NZS 3000 WIRING RULES), CONCRETE ENCASEMENT IS NOT REQUIRED.
WHERE DUCT IS HEAVY DUTY AND MEETS THE RQUIREMENT OF CATEGORY A 1.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CROSS SECTION DETAILS OF CABLE EASEMENT
REVISION DATE
DRAWING No.
A 21/08/15
R53
(INDICATIVE)2 x �100 DUCTS
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
PLACEMENT OF DUCT BENEATH
OPEN DRAIN
REVISION DATE
DRAWING No.
A 21/08/15
R54
PUBLIC OPEN SPACE
OPEN DRAIN
PUBLIC OPEN SPACE
CABLE
ROADWAY
ROADWAY
4 & 5)
(NOTES
(NOTES 4 & 5)
DUCT
CONCRETE ENCASEMENT DETAIL
LOT
T
T
LOT
CROSSES OPEN DRAINS
DUCT WHERE CABLE
POWER ALIGNMENTUNDERGROUND
DIAMETER, WHICHEVER IS SMALLER.
ENCASEMENT THICKNESS "T" SHALL BE AT MOST 150mm OR 200% OF THE LARGEST CONDUIT NOMINAL 5.
DIAMETER, WHICHEVER IS GREATER.
ENCASEMENT THICKNESS "T" SHALL BE AT LEAST 75mm OR 75% OF THE LARGEST CONDUIT NOMINAL 4.
900mm AND 1500mm AND DUCTS SHALL EXTEND 1500mm BEYOND EXTENT OF WATER COURSE EACH SIDE.
WHERE DIRECTIONAL DRILLING IS USED, CONCRETE ENCASEMENT IS NOT REQUIRED, DEPTH SHALL BE BETWEEN3.
DUCTS SHALL EXTEND TO THE PROPERTY BOUNDARY EITHER SIDE OF THE WATER COURSE OR OPEN DRAIN.2.
WATER COURSE OR OPEN DRAIN.
DUCTS SHALL BE CONCRETE ENCASED AND HAVE A MINIMUM COVER OF 850mm BELOW THE BOTTOM OF 1.
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CABLE TRENCH LAYOUT
GREEN FIELD SITE
TWO LAYERS (1 Tx AND 5 LV CABLES)
REVISION DATE
DRAWING No.
A 24/08/15
R55
DEPTH OF COVER.
CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSARY
THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL 6.
LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH.5.
LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS.4.
LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. 3.
LV CABLE JOINTS ARE APPROXIMATELY �170mm. 2.
LV CABLES SHALL BE ON THE TOP LAYER WITH THIS LAYER CONSISTING OF A MAXIMUM OF 5 LV CABLES.1.
LV CABLE
35mm� OR 50mm� HV CABLE (TRANSFORMER)
CABLE TRENCH
ROAD RESERVE
500
425
850
25
25 25
200
150
MARKER TAPE LEVEL
25
HV CABLE (TRANSFORMER)
100
PROPERTY BOUNDARY
BEDDING
NOTES:
LV CABLE
35mm� OR 50mm� HV CABLE (TRANSFORMER)
CABLE TRENCH
ROAD RESERVEPROPERTY BOUNDARY
500
425
850
200
150
MARKER TAPE LEVEL
100
HV CABLE (FEEDER)
25
HV CABLE (FEEDER)
SERVICE CABLES.
INCLUDING STREET LIGHT AND
TRANSFORMER AND LV CABLES
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CABLE TRENCH LAYOUT
GREEN FIELD SITE TWO LAYERS (1 HV FEEDER, 1 Tx & LV CABLES)
REVISION DATE
DRAWING No.
A 24/08/15
R56
DEPTH OF COVER.
CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSARY
THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL 6.
LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH.5.
LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS.4.
LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. 3.
LV CABLE JOINTS ARE APPROXIMATELY �170mm. 2.
AND 1 X 35mm� HV CABLE.
LV CABLES SHALL BE ON THE TOP LAYER WITH THIS LAYER CONSISTING OF NO MORE THAN 2 LV CABLES 1.
BEDDING
NOTES:
LV CABLE
35mm� OR 50mm� HV CABLE (TRANSFORMER)
CABLE TRENCH
ROAD RESERVE
500
425
850
200
150
MARKER TAPE LEVEL
100
HV CABLE (FEEDER)
25
100
SERVICE CABLES.
STREET LIGHT AND
LV CABLES INCLUDING
TRANSFORMER CABLE
HV FEEDER CABLE AND
DEPTH OF COVER.
CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSARY
THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL 5.
IF THE 35mm� HV CABLE IS NOT ON THE BOTTOM LAYER IT SHALL BE NEAREST TO THE ROADSIDE.4.
LAYOUT OF THE HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH. 3.
LV CABLE JOINTS ARE APPROXIMATELY �170mm. 2.
LV CABLES SHALL BE ON THE TOP LAYER WITH THIS LAYER CONSISTING OF NO MORE THAN 2 LV CABLES.1.
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CABLE TRENCH LAYOUT
GREEN FIELD SITE TWO LAYERS (1 HV FEEDER, 1 Tx & 2 LV CABLES)
REVISION DATE
DRAWING No.
A 24/08/15
R57
PROPERTY BOUNDARY
BEDDING
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CABLE TRENCH LAYOUT
GREEN FIELD SITE
ONE LAYER (1 Tx AND 3 LV CABLES)
REVISION DATE
DRAWING No.
A 24/08/15
R58
LV CABLE
35mm� OR 50mm� HV CABLE (TRANSFORMER)
CABLE TRENCH
ROAD RESERVE
500
425
850
150
MARKER TAPE LEVEL
100
25
25
AND SERVICE CABLES
INCLUDING STREET LIGHT
TRANSFORMER AND LV CABLES
DEPTH OF COVER.
CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSARY
THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL 6.
LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH.5.
LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS.4.
LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. 3.
LV CABLE JOINTS ARE APPROXIMATELY �170mm. 2.
1 X 35mm� HV CABLE CAN BE INSTALLED.
FOR A ONE LAYER CABLE TRENCH NO MORE THAN 4 X 185mm� OR 3 X 240mm� LV CABLES AND 1.
PROPERTY BOUNDARY
BEDDING
NOTES:
STANDARDS
DISTRIBUTION CONSTRUCTION
OPERATIONS
REFERENCE DRAWING
CABLE TRENCH LAYOUT
GREEN FIELD SITE
ONE LAYER (1 HV FEEDER AND LV CABLES)
REVISION DATE
DRAWING No.
A 24/08/15
R59
LV CABLE
CABLE TRENCH
ROAD RESERVE
500
425
850
150
MARKER TAPE LEVEL
100
HV CABLE (FEEDER)
SERVICE CABLES
STREET LIGHT AND
CABLES INCLUDING
HV FEEDER AND LV
PROPERTY BOUNDARY
BEDDING
DEPTH OF COVER.
CABLE ALIGNMENT SHALL BE INCREASED AS REQUIRED SO THAT THE CABLE JOINTS ALSO HAVE THE NECESSARY
THE MINIMUM DEPTH OF COVER OF CABLES SHALL BE 850mm. THE DEPTH OF COVER OF CABLES IN A NOMINAL 5.
LAYOUT OF HV CABLES SHALL START FROM THE ROAD SIDE OF THE TRENCH.4.
LV CABLE JOINTS SHALL BE INSTALLED AT STAGGERED LOCATIONS.3.
LV CABLE JOINTS SHALL BE INSTALLED ABOVE OTHER LV CABLES. 2.
LV CABLE JOINTS ARE APPROXIMATELY �170mm. 1.