TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION) NO. FS-SP-0307 G.A. LEVEL II TITLE: SHOTCRETE DIVISION 3 - CONCRETE SUBDIVISION - CAST IN PLACE CONCRETE APPROVED BY APPROVED BY APPROVED BY DATE 12-1-R-9 DATE - -- `-- 8 DATE /?.-- 7- REVISION DESCRIPTION Revised to add Table of __ Revised to add Table of Contents and D.R.L. 12 & 6 /t _I ECT 0 SECT . B APPROVED BY NO. R . DATE SET ABOIV 1 i -E I FENIX & SCISSON, INC. Form LV-313B (9-88, i
Transcript
Page 1: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO. FS-SP-0307

G.A. LEVEL II

TITLE: SHOTCRETE DIVISION 3 - CONCRETE SUBDIVISION - CAST IN PLACE CONCRETE

APPROVED BY

APPROVED BY

APPROVED BY

DATE 12-1-R-9

DATE - --`-- 8

DATE /?.-- 7-

REVISION DESCRIPTIONRevised to add Table of __

Revised to add Table of Contents and D.R.L. 12 & 6 /t

_I ECT 0

SECT .B APPROVED BY NO. R . DATE

SET ABOIV 1 i

-E I

FENIX & SCISSON, INC.

Form LV-313B (9-88,i

Page 2: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

GROUT, MATERIALS AND PLACEMENT

PART 1 - GENERAL

1.1 1.2 1.3 1.4

PART 2 - PROD

2.1

Work Included Referenced Publications System Description Quality Assurance

)UCTS

Materials

PART 3 - EXECUTION

Mixing Del i very Pl acement Reinforcement Curing Sampling Inspection an Acceptance

I Acceptance

DATA REQUIREMENTS LIST

FORM LV-314A (7-88)

PAGE

3 3 4 4

5

3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8

5 5 5 5 5 5 5 5

6

SHEET OF WBS NUMBER DOCUMENT NO. REV.

2 6 1.2.6.3.2 FS-SP-0307 I

Page 3: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 03XXX SHOTCRETE

PART 1 - GENERAL

1.1 WORK INCLUDED

The work under this specification includes providing initial support to excavation walls by pneumatically applying a low slump concrete at high velocity onto a prepared rock surface, and for creating fireproof ventilation barriers in underground openings.

1.2 REFERENCED PUBLICATIONS

The publication listed below form a part of this specificatibn.

1.2.1 U.S. Department of Commerce, National Bureau of Standards (NBS)

o Handbook Specifications, Tolerances and Other Technical No. 44 Requirements for Commercial Weighing and Measuring

Devices

1.2.2 American Concrete Institute (ACI)

o 506.3R

0

0

0

201.2R

506

506.2

o 301

1.2.3 American Soc

0

0

C33

C42

o C87

0 C94

Guide to Certification of Shotcrete Nozzlemen

Guide to Durable Concrete

Recommended Practice for Shotcreting

Specification for Materials, Proportioning, and Application to Shotcrete

Specification for Structural Concrete for Buildings

iety for Testing and Materials (ASTM)

Specification for Concrete Aggregates

Method of Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

Test Method for Effect of Organic Impurities in Fine Aggregate on Strength of Mortar

Standard Specification for Ready-Mixed Concrete

EORM LV-314A (7-88)

F_

Page 4: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 03XXX SHOTCRETE

C150

C231

o C260

o C309

o C330

o C484

o C595

0 C618

o C666

o- C685

o C989

0

0

1.3 SYSTEM DESCRIPTION

1.3.1 Furnish, place and cure shotcrete for the following:

a. Initial protection and support for the excavated shaft walls.

b. Protection and support of underground excavation surface where deemed necessary.

c. Creation of fireproof ventilation barriers at selected locations in the underground openings.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Shotcrete is II.

1.4.2 The Vendor shall have an approved Quality Assurance Program.

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

4 6 1.2.6.3.2 FS-SP-0307 I

FORM LV-314A (7-88)

Standard Specification for Portland Cement

Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

Specification for Air-Entraining Admixtures for Concrete

Specification for Liquid Membrane-Forming Compounds I for Curing Concrete

Standard Specification for Lightweight Aggregates for Structural Concrete

Specification for Chemical Admixtures for Concrete

Specification for Blended Hydraulic Cements I

Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use s a Mineral Admixture in Portland Cement Concrete

Test Method for Resistance of Concrete to Rapid Freezing and Thawing

Standard Specification for Concrete Made by Volumetric Batching and Continuous Mixing

Standard Specification for Ground Iron Blast-Furnace Slag for Use in Concrete and Mortars

lr

Page 5: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 03XXX SHOTCRETE

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Portland Cement ASTM-C150

2.1.2 Concrete Aggregates ASTM-C33

2.1.3 Air Entraining Admixtures ASTM-C260

2.1.4 Chemical Admixtures ASTM-C494

2.1.5 Liquid Membrane Forming Compounds for Curing Concrete'ASTM-C309

PART 3 - EXECUTION

3.1 MIXING

3.2 DELIVERY

3.3 PLACEMENT

3.4 REINFORCEMENT

3.5 CURING

3.6 SAMPLING

3.7 INSPECTION AND TESTING

3.8 ACCEPTANCE

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

5 6 1.2.6.3.2 FS-SP-0307 1

FORM LV-314A (7-88)|II I -

Page 6: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

-EOUIRED _REQUIRED

NO DATA REQUIREMENTS REQUIREP FOR THIS OUTLINE SPEýIFICATION.

"AC" - AS COMPLETED 'BFR' - BEFORE FABRICATION RELEASE

"BC'- BEFORE CONTRACT CAN BE AWARDED "PS" - PRIOR TO SHIPMENT "BU - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "RE C" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 6 6 1.2.6.3.2 FS-SP-0307 I

Form LV-315A

Page 7: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-0501 NO.

Q.A. LEVEL TT

STRUCTURAL STEEL DIVISION 5 - METALS SUBDIVISION STRUCTURAL METAL FRAMING

APPROVED BY

APPROVED BY

APPROVED BY

(½_/L DATE

DATE

DATE

Form

TITLE:

Page 8: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

STRUCTURAL STEEL

PAGE PART 1 - GENERAL

1.1 Work Included 3 1.2 Referenced Publications 3 1.3 System Description 4 1.4 Quality Assurance 5

PART 2 - PRODUCTS

2.1 Steel 5 2.2 Bolts, Nuts and Washers 5 2.3 Accessories 5 2.4 Fabrication 5 2.5 Shop Painting 6

PART 3 - EXECUTION

3.1 Erection 6 3.2 Tests and Inspections 6

DATA REQUIREMENTS LIST 7

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 7 1.2.6.4.2 FS-SP-0501 I

FORM LV-314A (7-88)

Page 9: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION O5XXX

SECTION 05XXX STRUCTURAL STEEL

PART 1 - GENERAL

1.1 WORK INCLUDED

The work of this section includes the furnishing, detailing of shop drawings, fabrication, and delivery of structural steel used in the shafts, stations, muck pocket and headframes as shown on the Contract Drawings. Shop painting and necessary field touch-up of structural steel is also included.

1.2 REFERENCED PUBLICATIONS .

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o Title 30, Part 57, Safety and Health Standards for Underground Metal and Nonmetal Mines

1.2.2 California Administrative Code (CAC)

o Title 8, Subchapter 17, Mine Safety Orders

1.2.3 American Institute of Steel Construction (AISC)

o Moll Manual of Steel Construction,

0

0

1.2.4 Amer

8th Edition

S326 Specification for the Design, Fabrication and

Erection of Structural Steel for Buildings

M013 Detailing for Steel Construction

ican Society for Testina and Materials (ASTM)

o A36 Standard Specification for Structural Steel

o A307 Standard Specification for Carbon Steel Bolts an Studs, 60,000, psi.Tensile Strength

o A325 Standard Specification for High-Strength Bolts ft Structural Steel Joints

o A449 Standard Specification for Quenched and Tempered Steel Bolts and Studs

o A501 Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing

FENIX & SCISSON, INC.SHEET

3

OF WBS NUMBER DOCUMENT NO.

7 1.2.6.4.2 FS-SP-0501

FORM LV-314A (7.88)

d

or

REV.

1

I

[ I

Page 10: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX STRUCTURAL STEEL

o A563 Specification for Carbon and Alloy Steel Nuts

o F436 Standard Specification for Hardened Steel Washers

0 E165 Practice for Liquid Penetrant Inspection Method

o E709 Practice for Magnetic Particle Examination

o E94 Guide for Radiographic Testing

o E142 Method for Controlling Quality of Radiographic Testing

1.2.5 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

o A2.4 Standard Symbols for Welding, Brazing and Nondestructive Examination

1.2.6 Federal Specification (Fed. Spec.)

o TT-C-490B Cleaning Methods and Pretreatment of Ferrous Surfaces for Organic Coatings

o TT-P-645A Primer, Paint, Zinc Chromate, Alkyd Type

1.2.7 Military Specifications (Mil. Spec.)

o DOD-P-15328D(1) Primer (Wash), Pretreatment, (Formula No. 117 for Metals) (Metric)

1.2.8 Steel Structures Painting Council (SSPC)

o SSPC SP3 Power Tool Cleaning

o SSPC SP6 Commercial Blast Cleaning

1.3 SYSTEM DESCRIPTION

The structural steel specified in this section shall include buntons, beams, columns, stub columns, bracings, guides, brackets, and attachments (i.e., uaseplates, cap plates, stiffeners, gusset plates, clip angles); and connectors (i.e., bolts, nuts, washers, stud anchors). Miscellaneous steel is specified in FS-SP-0502.

FEI &SISO,. N. SHEET OF JWBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 7 1.2.6.4.2 FS-SP-0501 I

FORM LV-314A (7-88)

Page 11: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX

STRUCTURAL STEEL

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Structural Steel is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 STEEL

2.1.1 Structural Steel (ASTM A36)

2.1.2 Structural Steel Tubing (ASTM A501)

2.2 BOLTS, NUTS AND WASHERS

2.2.1 Common Bolts and Nuts (ASTM A307)

2.2.2 High-Strength Steel Bolts (ASTM A325, Type 1 or 2)

2.2.3 Collar Bolts (ASTM A325)

2.2.4 Washers (ASTM F436)

2.2.5 Washers for High-Strength Bolts (ASTM A325 or ASTM A449)

2.2.6 Carbon and Alloy Steel Nuts (ASTM A563)

2.3 ACCESSORIES

2.3.1 Welding Electrodes (AWS Code D1-1)

2.4 FABRICATION

2.4.1 Fabrication shall be in accordance with approved shop drawings, AISC "Specification for the Design, Fabrication and Erection of Structural Steel for Buildings", AISC Manual of Steel Construction, AWS Structural Welding Code - Steel, and this Specification.

SHEET OF WBS NUMBEOR DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 7 1.2.6.4.2 FS-SP-0501

FORM LV-314A (7-88)

Page 12: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX STRUCTURAL STEEL

2.5 SHOP PAINTING

2.5.1 Surface Cleaning (SSPC SP6) (SSPC SP3)

2.5.2 Pretreatment (Mil. Spec. DOD-P-15328) or (Fed. Spec. TT-C-490)

2.5.3 Priming (Fed. Spec. TT-P-645)

2.5.4 Factory Applied Finish Coating: for all structural steel for underground and shaft below collar

PART 3 - EXECUTION

3.1 ERECTION

3.3.1 Structural Steel shall be erected by the Contractor in accordance with AISC "Specification for the Design Fabrication and Erection of Structural Steel for Buildings", AWS Structural Welding Code-Steel and this specification.

3.2 TESTS AND INSPECTIONS

3.2.1 Visual Inspection Welds (AWS D1.1, Part 6)

3.2.2 Nondestructive Testing (AWS D1.1 Radiographic, Ultrasonic, Magnetic Particle, Dye Penetrant) as directed

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 6 7 1.2.6.4.2 FS-SP-0501 1

Page 13: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

TWHEN OFREQUIRED EI RNUMBER OF DESCRIPTION REANRE COPIES REFERENCE FEOURE

REOURED REQUIREDFO

NO DATA REQUIREMENTS REQUIRE} FOR THISIOUTLINE SPEýIFICATION

"AC' - AS COMPLETED "BFR - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED "PS - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

Form LV-315A

SHEET OF WBS NUMBER DOCUMENT NO. R EV.

FENIX & SCISSON, INC. 7 7 12642 F-P00

Page 14: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO. FS-SP-0502

Q.A. LEVEL IT

TITLE: MISCELLANEOUS STEEL DIVISION 5 - METALS SUBDIVISION - METAL FABRICATIONS

APPROVED BY

APPROVED BY

APPROVED BY

/DA/E 4 DATE

DATE 7DATE _- -

Form LV-313B (9-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 1 8 1.2.6.7.3 FS-SP-0502 1

Page 15: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

MISCELLANEOUS STEEL

PART I - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

Steel Bolts, Nuts and Washers Accessories Fabrication Shop Painting

PART 3 - EXECUTION

3.1 Erection 3.2 Inspection

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2

OF

8

WBS NUMBER DOCUMENT NO. REV.

1.2.6.7.3 FS-SP-0502 1

FORM LV-314A (7-88)

PAGE

3 3

5

2.1 2.2 2.3 2.4 2.5

6 6 6 6 7

7 7

8

I i

EORM LV-314A (7-88)

Page 16: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX MISCELLANEOUS STEEL

PART 1 - GENERAL

1.1 WORK INCLUDED

The work of this section includes the furnishing, detailing of shop drawings, fabrication, and delivery of miscellaneous steel items as shown on the Contract Drawings. Shop painting and necessary field touch-up of miscellaneous steel is also included. Miscellaneous steel items are comprised of:

o Chain Link Fence Fabric for-Barriers and Rock Support

o Ladder Hatches and Gates for Brattice

o Expanded Metal for Ladderway Enclosures

o Steel Grating

o Bars and Plates

o Checkered Pl ate

o Handrails

o Stair Treads

o Kick Plates

o Ladders

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o Title 30, Part 57, Safety and Health Standards for Underground Metal and Nonmetal Mines

1.2.2 California Administrative Code (CAC)

o Title 8, Subchapter 17, Mine Safety Orders

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 8 1.2.6.7.3 FS-SP-0502 I

FORM LV-314A (7-88)

Page 17: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX MISCELLANEOUS STEEL

1.2.3 American Institute of Steel Construction (AISCI

o M011 Manual of Steel Construction, 8th Edition

o S326 Specification for the Design, Fabrication and Erection of Structural Steel for Buildings

o M013 Detailing for Steel Construction

1.2.4 American Society for Testing and Materials (ASTM)

o A36 Standard Specification for Structural Steel

o A53 Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless

o A307 Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

o A392 Specification for Zinc-Coated Steel Chain-Link Fence Fabric

o A501 Standard Specification for Hot-Formed Welded

and Seamless Carbon Steel Structural Tubing

o A563 Specification for Carbon and Alloy Steel Nuts

o A641 Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire

o F436 Standard Specification for Hardened Steel Washers

0 F669 Specification for Strength Requirements of Metal Posts and Rails for Industrial Chain Link Fence

1.2.5 American Welding Society (AWS)

0 D1.1 Structural Welding Code, Steel

FENIX & SCISSON, INC. 4 8 1.2.6.7.3 FS-SP-0502 R

EORM LV-314A (7-88)

Page 18: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX MISCELLANEOUS STEEL

1.2.6 Federal Specification (Fed Spec)

o RR-G-661 Grating, Metal Bar Type (Floor, Except for Naval Vessels)

o TT-C-490 Cleaning Methods and Pretreatment of Ferrous Surfaces for Organic Coatings

o TT-P-645 Primer, Paint, Zinc-Chromate, Alkyd Type

1.2.7 Military Specification (Mil Spec)

o MIL-M-17194 Metal, Expanded, Steel

o DOD-P-15328 Primer (Wash), Pretreatment, (Formula No. 117 for Metals)

1.2.8 Steel Structures Painting Council (SSPC)

o SSPC SP3 Power Tool Cleaning

o SSPC SP6 Commercial Blast Cleaning

1.3 SYSTEM DESCRIPTION

The Miscellaneous Steel for this section shall be used in the shafts, headframes, stations, galloway stage and formwork. Structural steel is specified in FS-SP-0501.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Miscellaneous Steel is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management control relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 8 1.2.6.7.3 FS-SP-0502 1

Page 19: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX MISCELLANEOUS STEEL

PART 2 - PRODUC

2.1 STEEL

2.1.1

2.1.2

2.1.3

2.1.4

2.1.5

2.1.6

2.1.7

2.1.8

2.2

2.3

2.4

BOLTS,

2.2.1

2.2.2

2.2.3

:TS

Fence Fabric (ASTM A392)

Safety Gates and Handrails (A36) and (A53)

Ladder Hatches and Gates for Brattice (A36), (A53) and (A501)

Bars and Plates (A36)

Tie Wire (ASTM A641)

Expanded Metal (Mil-M-17194)

Steel Grating (Fed. Spec RR-G-661)

Checkered Plate, Stair Treads, Kick Plates, Ladders (A36)

NUTS AND WASHERS

Bolts (ASTM A307)

Nuts (ASTM A563)

Washers (ASTM F436)

ACCESSORIES

2.3.1 Welding Electrodes (AWS Code D1.1)

FABRICATIO

2.4.1

N

Fabrication shall be in accordance with approved shop drawings, AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings, AISC Manual of Steel Construction, AWS Structural Welding Code - Steel and this specification.

FENIX & SCISSON, INC.SHEET OF

6 8

WBS NUMBER DOCUMENT NO. REV.

11.2.6.7.3 1FS-SP-0502 1

FORM LV-314A (7-88)iI

Page 20: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX MISCELLANEOUS STEEL

2.5 SHOP PAINTING

2.5.1 Surface Cleaning (SSPC SP6) (SSPC SP3)

2.5.2 Pretreatment (Mil Spec DOD-P-15328) or (Fed. Spec. TT-C-490)

2.5.3 Priming (Fed. Spec. TT-P-645)

2.5.4 Factory Applied Finish Coating: For all miscellaneous steel for underground and shaft below collar.

PART 3 - EXECUTION

3.1 ERECTION

3.1.1 Contractor shall erect miscellaneous steel in accordance with AISC Manual of Steel Construction and AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings, AWS Structural Welding Code - Steel and this specification.

3.2 INSPECTION

3.2.1 Visual Inspection Welds (AWS D1.1, Part 6)

FORM LV-314A (7-88)

FSHEET OF WBS NUMBER DOCUM ENT NO. REV.

FENIX & SCISSON, INC. 8 1.2.6.7.3 FS-SP-0502 1

Page 21: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

* NUMBER OF WHEN NMEOFREQUIRED

DESCRIPTION REN COPIES REFERENCE FOR

REQUIRED REQUIRED

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPE' 'IFICATION

"AC - AS COMPLETED "BFR' - BEFORE FABRICATION RELEASE

"*BC - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM" - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 8 8 1.2.6.7.3 FS-SP-0502 1

Form LV-315A

Page 22: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO. FS-SP-0801

Q.A. LEVEL TT

TITLE: UNDERGROUND FIRE DOORS DIVISION 8 - DOORS AND WINDOWS SUBDIVISION - SPECIAL DOORS

APPROVED BY /c�a�w�7

APPROVED BY

APPROVED BY

-313B (9-88)

DATE

DATE Z--7-620

DATE - -

Page 23: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

UNDERGROUND FIRE DOORS

PAGEPART I - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Materials 2.2 Fabrication

PART 3 - EXECUTION

Installation Concrete Placement Installment Test Support Before and After Concrete Placement

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2

0F 7

WBS NUMBER DOCUMENT NO. REV.

1.2.6.6.0 FS-SP-0801 1

FORM LV-314A (7-88)

3 3 4. 4

3.1 3.2 3.3 3.4

4 5

5 6 6 6

7

Page 24: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 08XXX UNDERGROUND FIRE DOORS

PART 1 - GENERAL

1.1 WORK INCLUDED

The work under this section consists of furnishing underground fire doors and related accessories, including frameworks, anchors, air cylinders and control devices. The work requires furnishing all materials and services for fabrication, painting, and delivery of the fire doors for underground installation in accordance with this specification and the Contract Drawings.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards for Underground Metal and Non-metal Mines

1.2.2 State of California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17 (Article 7058), Mine Safety Orders.

1.2.3 American Institute of Steel Construction (AISC)

o M013 Detailing for Steel Construction

1.2.4 American National Standards Institute (ANSI)

o A10.13 Safety Requirements for Steel Erection

1.2.5 American Society for Testing and Materials (ASTM)

o A36 Standard Specification for Structural Steel

o A307 Standard Specification for Carbon Steel Bolts and studs, 60,000 psi Tensile Strength.

1.2.6 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 3 7 11.2.6.6.0 FS-SP-0801 1 .

EORM LV-314A (7-88)

Page 25: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 08XXX UNDERGROUND FIRE DOORS

1.2.7 National Fire Protection Association (NFPA)

o 70 National Electrical Code

o 80 Fire Doors and Windows

o 251 Standard Methods of Fire Tests of Building Construction and Materials

o 252 Standard Methods of Fire Tests of Door Assemblies

1.3 SYSTEM DESCRIPTION

The underground fire doors are reinforced steel doors and will be located near the shaft stations as life safety barriers to isolate the shaft from the testing and operating areas when needed. Door locations are shown in the Contract Drawings. The underground fire doors will be pneumatically operated either locally or from the surface by remote control.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Underground Fire Doors is II.

1.4.2 The vendor shall furnish for approval, the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Frameworks and Anchors

2.1.2 Bottom Metal Runners

2.1.3 Fire Door Assembly

EORM LV-314A (7-88)

SSHEET OF WBS DNUMBERDOCUMENT NO. R FENIX & SCISSON,, INC. 4 7 1.2.6.6.0 FS-SP-0801 1

Page 26: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 08XXX UNDERGROUND FIRE DOORS

o Fire Rating and Type

o Door Frame

o Metal Plates

o Hinges

o Latches

o Air Cylinder

o Personnel By-Pass Door

o Paint Coatings

2.1.4 Control and Monitor

o Local and Remote Controllers

o Solenoid Valves and By-Pass

o Electrical System

o Lighting and Alarm

2.1.5 Seals

o Gaskets

2.2 FABRICATION

2.2.1 Fabrication of the fire door assemblies shall be in accordance with approved shop drawings, the Contract Drawings and this specification.

PART 3 - EXECUTION

3.1 INSTALLATION

Installation by Contractor per recommended sequence.

3.1.1 Drift Size Excavation

FENIX & SCISSON, INC. 5 7 F 1.2.6.6.0 FS-SP-0801

FORM LV-314A (7-88)

Page 27: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

l ES-1 SECTION 02XXX AND ES-2 COLLAR INSTALLATION

Test Support Prior to Concrete Placement

0

0

0

Geologic Mapping

Location Markers

Radial Borehole Test

CONCRETE PLACEMENT (Refer to FS-SP-0308, "Shaft Liner Concrete")

o Forming

o Reinforcing

o Embedded Metal

o Block-Outs

INSTALLATION

o Embedments

o Fences and Gates

SUPPORT BEFORE AND AFTER CONCRETE PLACEMENT

Radial Bore Hole Tests

FENIX & SCISSON, INC.SHEET OF -WBS NUMBER DOCUMENT NO. REV.

6 7 SS_11.2.6.3.2 =FS-SP-02001 1

EORM LV-314A (7-88)

3.1.6

3.2

3.3

3.4 TEST

0

ES-1

I

Page 28: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF f * WHEN REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE R FOR

DESCRIPTIO REQUIRED FOR

NO DATA REQUIREMENTS REQUIREI) FOR THISIOUTLINE SPEPIFICATION

•AC" - AS COMPLETED 'BFR - BEFORE FABRICATION RELEASE

"*BC ;- BEFORE CONTRACT CAN BE AWARDED 'PS - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. 7 7 1.2.6.3.2 FS-SP-0201 1

Form LV-315A

Page 29: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICAITON)

FS-SP-0802 NO.

O.A. LEVEL IT

TITLE: STOPPINGS, BULKHEADS AND REGULATORS DIVISION 8 - DOORS AND WINDOWS SUBDIVISION SPECIAL DOORS

DATE /2-12-88APPROVED BY

DATE 12---LAPPROVED BY

DATE 2--APPROVED BY

REVISION DESCRIPTION

Revised to add Table of

(9-88)

J

Form

Page 30: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

STOPPINGS, BULKHEADS AND REGULATORS

PAGEPART 1 - GENERAL

Work Included Referenced Publications System Description Quality Assurance

PART 2 - PRODUCTS

2.1 Materials 2.2 Fabrication

PART 3 - EXECUTION

3.1 Installation 3.2 Inspection

DATA REQUIREMENTS LIST

1.1 1.2 1.3 1.4

3 3 4' 4

4 4

4 5

6

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 6 1.2.6.6.0 FS-SP-0802 1

FORM LV-314A (7-88)

Page 31: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 08XXX STOPPINGS, BULKHEADS AND REGULATORS

PART 1 - GENERAL

1.1 WORK INCLUDED

The work under this specification includes the construction and installation of ventilation stoppings, bulkheads and air regulators to serve the underground ventilation system.

1.2 REFERENCED PUBLICATIONS

1.2.1 Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards - Underground Metal and Nonmetal Mines

Sub-Part G&T

1.2.2 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders, Article 31

1.2.3 American Concrete Institute (ACI)

o 506.3R Guide to Certification of Shotcrete Nozzlemen

o 506 Recommended Practice for Shotcreting

o 506.2 Specification for Materials, Proportioning, and Application to Shotcrete

1.2.4 American Society for Testing and Materials (ASTM)

o C33 Specification for Concrete Aggregates

o C260 Specification for Air-Entraining Admixtures for Concrete

o C494 Specification for Chemical Admixtures for Concrete I

o C595 Specification for Blended Hydraulic Cements

o E162 Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source

SKEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 6 1.2.6.6.0 FS-SP-0802 I

FORM LV-314A (7-88)

Page 32: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 08XXX STOPPINGS, BULKHEADS AND REGULATORS

1.3 SYSTEM DESCRIPTION

The structures covered by this specification will serve to control underground ventilation air flows as shown in the Contract Drawings.

o The bulkheads and stoppings will be equipped with personnel doors and, in certain locations, with vehicle doors to permit passage of equipment.

o Penetrations will be provided for ducting to pass through the stopping where necessary.

o Air regulators, where used, shall consist of a sliding plate shutter to adjust the cross-section of the opening in the stopping.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Stopping and Bulkheads is II.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Framework and Anchors

2.1.2 Weldmesh reinforcing wire

2.1.3 Shotcrete

2.2 FABRICATION

2.2.1 Fabrication of the framework for openings in the stopping shall be in accordance with the Contract Drawings.

PART 3 - EXECUTION

3.1 INSTALLATION

3.1.1 Location preparation

3.1.2 Temporary backing for shotcrete placement

EORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT 110. REV.

FENIX & CISSON, INC. 4 6 1.2.6.6.0 FS-SP-0802 1

Page 33: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 08XXX STOPPINGS, BULKHEADS AND REGULATORS

3.1.3 Installation of framework for openings as shown in the Contract Drawings

3.1.4 Shotcrete application

3.2 INSPECTION

3.2.1 Field inspection

3.2.2 Acceptance

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

5 6 1.2.6.6.0 FS-SP-0802 1

FORM LV-314A (7-88)

Page 34: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

I WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQIRED__ _ REQUIRED

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPE :IFICATION

"AC' - AS COMPLETED "BFR' - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS" - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC.

6 6 1.2.6.6.0 FS-SP-0802 1Form LV-315A

Page 35: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1103 NO. Q.A. LEVEL IIl

TITLE: SUBSURFACE MAINTENANCE SHOP DIVISION 11 - EQUIPMENT SUBDIVISION - MAINTENANCE EQUIPMENT

APPROVED BY

APPROVED BY

APPROVED BY

DATE

DATE Lt- o

DATE

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. 8REV.

1 6 1.2.6.8.1 FS-SP-1103 1

Form LV-313B (9-88)

Page 36: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

SUBSURFACE MAINTENANCE SHOP

PAGE PART 1 - GENERAL

1.1 Work Included 3 1.2 Referenced Publications 3 1.3 System Description 4" 1.4 Quality Assurance 4

PART 2 - PRODUCTS

2.1 Material and Equipment 4

PART 3 - EXECUTION

3.1 Installation 5 3.2 Inspection 5

DATA REQUIREMENTS LIST 6

FORM LV-314A (7-88)

SHEET OF jWBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 6 11.2.6.8.1 FS-SP-1103 1

Page 37: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

F _ SECTION 11XXX SUBSURFACE MAINTENANCE SHOP

PART I - GENERAL

1.1 WORK INCLUDED

This section covers the general requirements for a subsurface maintenance shop intended to be used for the servicing of mine vehicles and miscellaneous construction equipment.

1.2 REFERENCED PUBLICATIONS

The publications listed below foFm a part of this specific~ation:

1.2.1 American National Standards Institute (ANSI)

o B15.1 Safety Standard for Mechanical Power Transmission Apparatus

o S1.13 Methods for Measurement of Sound Pressure

Levels

1.2.2 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders

o Title 8, Chapter 4, Subchapter 20, Tunnel Safety Orders

1.2.3 Code Federal Regulations (CFR)

o 30 CFR 32 Mobile Diesel-Powered Equipment for Non-coal Mines

o 30 CFR 57 Safety and Health Standards - Underground Metal and Non-metal Mines

1.2.4 National Fire Protection Association (NFPA)

o 17 Dry Chemical Extinguishing Systems

o 70 National Electrical Code

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 6 1.2.6.8.1 FS-SP-1103I

FORM LV-314A (7-88)

Page 38: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX SUBSURFACE MAINTENANCE SHOP

1.2.5 American Conference of Governmental Industrial Hygienists (ACGIH)

o Industrial Ventilation Manual of Recommended Practice

1.3 SYSTEM DESCRIPTION

The subsurface vehicle and construction equipment shop shall have the following features:

o Fume and dust exhaust removal hoods

o 480V and 115V electrical service __ kVA capacity

o Water supply _ gal/min capability at _ psig

o Waste water removal capability

o A concrete floor with drain, capable of supporting mining vehicles

o Lighting in conformance to standards

o Fire Door access between shop and ES-2 shaft

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the subsurface maintenance shop is III.

PART 2 - PRODUCTS

2.1 MATERIAL AND EQUIPMENT

o Sheet Metal exhaust hoods

o 3000 psi compressive strength concrete

o Fluorescent lighting fixtures

o Water and Waste water piping

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 4 6 1.2.6.8.1 FS-SP-11031

EORM LV-314A (7-88)

I

Page 39: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

0

0

5 ton capacity electric remote control trolley mounted hoist

Fire Door in compliance with 30 CFR 57.4760 Table C-3 and FS-SP-0801

PART 3 - EXECUTION

3.1 INSTALLATION

3.1.1 Wiring Requirements

3.1.2 Piping Requirements

3.1.3 Concrete Requirements

3.1.4 Ducting Requirements

3.1.5 Ground Support Requirements

3.2 INSPECTION

3.1.1 Construction Inspection

3.2.2 Safety Inspection

FENIX & SCISSON, INC.SHEET

50F 6

WBS NUMBER DOCUMENT NO. R EV.

1.2.6.8.1 FS-SP-1103 1

FORM LV-314A (7-88)

SECTION 11XXX SUBSURFACE MAINTENANCE SHOP

Page 40: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPEIFICATION

"AC' - AS COMPLETED "BFR" - BEFORE FABRICATION RELEASE "BC; - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM" - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISS0N, INC. 6 6 1.2.6.8.1 FS-SP-1103 1 Form LV-315A

Page 41: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION )

FS-SP-1105 NO.

O.A. LEVEL --- I

DRILL JUMBO (LEASE) DIVISION 11 - EQUIPMENT SUBDIVISION - MAINTENANCE EQUIPMENT

APPROVED BY

APPROVED BY

APPROVED BY

DATE 12-/-g

DATE L ' -

DATE 7-

SECT. DR R EV. IDATE REVISION DESCRIPTION PAGES IREV ByS APPROVED BY NO I V

Revised to add Table of j ,-I

Contents and D.R.L. 12& 6 I('& SEABOVý 4 I21-

I I I I J

SHEET OF IWBS NUMBER' DOCUMENT NO. REV.

FENIX & SCISSON, INC. 6 1.2.6.6.0 FS-SP-1105 1

Form LV-313B (9-88)

TITLE:

Page 42: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

DRILL JUMBO (LEASE)

PAGE PART 1 - GENERAL

1.1 Work Included 3 .1.2 Referenced Publications 3 1.3 System Description 3 1.4 Quality Assurance 3

PART 2 - PRODUCTS

2.1 Jumbo (Drill Carriage) 4 2.2 Engine 4 2.3 Drive 4 2.4 Steering 4 2.5 Brakes 4 2.6 Tank Capacities 4 2.7 Hydraulic Systems 5 2.8 Booms, Slides and Feeds 5 2.9 Drills 5

PART 3 - EXECUTION

Not Applicable

DATA REQUIREMENTS LIST 6

FORM LV-314A (7-88)

FSHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 6 1.2.6.6.0 FS-SP-1105 1

Page 43: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX DRILL JUMBO (LEASE)

PART 1 - GENERAL

WORK INCLUDED

This performance specification defines the functional requirements of a self propelled rubber tired jumbo for drilling blast holes in a rock face.

REFERENCED PUBLICATIONS

1.2.1

1.2.2

1.2.3

Code of Federal Regulations

o 30 CFR 32 Mobile Diesel Powered Equipment for Non-coal Mines

o 30 CFR 57.5050 Safety and Health Standards Underground Metal and Non-metal Mines (Exposure Limits for Noise)

State of California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders

American National Standards Institute (ANSI)

0 B15.1 Safety Standards for Mechanical Power Transmission Apparatus

SYSTEM DESCRIPTION

The system consists of a diesel propelled rubber tired drill carriage with electro-hydraulic or pneumatic drill positioning booms, drill feed slides and feeds, and rock drills.

QUALITY ASSURANCE

The Quality Assurance Level Assignment for the Drill Jumbo is III.

FENIX & SCISSON, INC.SHEET

3

OF WBS NUMBER DOCUMENT NO. REV.

6 1.2.6.6.0 FS-SP-1105 1

EORM LV-314A (7-88)

1.1

1.2

1.3

1.4

Page 44: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX .DRILL JUMBO (LEASE)

PART 2 - PRODUCTS

2.1 JUMBO (DRILL CARRIAGE)

o Number of Booms

o Size

o Maximum Disassembled Dimensions

o Maneuverability through openings

2.2 ENGINE

o Diesel Type

o Size

o Ventilation Requirements

o Exhaust Scrubbing System

2.3 DRIVE

o Transmission

o Axles, Wheels, and Tires

2.4 STEERING

2.5 BRAKES

o Service

o Parking and Emergency

2.6 TANK CAPACITIES

o Fuel

o Hydraulic Oil

SHEET OF WBS NUMBER DOCUMENT NO. REV.1

FENIX & SCISSON, INC. 4 6 1.2.6.6.0 FS-SP-11051

EORM LV-314A (7-88)

Page 45: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX DRILL JUMBO (LEASE)

HYDRAULIC SYSTEMS

BOOMS, SLIDES AND FEEDS

o Number

o Feed Length

o Face Coverage

DRILLS

Type

Size

Performance Characteristics

PART 3 - EXECUTION

Not Applicable

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

5 6 1.2.6.6.0 FS-SP-1105 1

FORM LV-314A (7-88)

I2.7

2.8

2.9

0

0

0

|

Page 46: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REI REQUIRED

DESCRIPTION REQUIRED CPE REFERENCE FO

-. REQUI~RED COIRESD O

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPECIFICATION

"AC' - AS COMPLETED 'BFR' - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. R EV.

FEI CSSN N. 6 6 1.2.6.6.0 FS-SP-11051Form LV-315A

Page 47: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO. FS-SP-1106

Q.A. LEVEL III

TITLE: LHD VEHICLES (LEASE) DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - MATERIAL HANDLING SYSTEMS

DATE 12-1- -APPROVED BY

DATE2128APPROVED BY

DATE /L---7- '--"APPROVED BY

Page 48: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

LHD VEHICLES

PART 1 - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Materials (N/A) 2.2 Equipment

PART 3 - EXECUTION

3.1 Surface Check 3.2 Disassembly for Transfer Down Shaft 3.3 Transport to MTL 3.4 Reassembly 3.5 Inspection

DATA REQUIREMENTS LIST

PAGE

3 3 4" 4

4 4

5 5 5 5 5

6

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 6 1.2.6.6.0 FS-SP-1106

iORM LV-314A (7-88)

Page 49: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX LHD VEHICLES (LEASE)

PART 1 - GENERAL

1.1 WORK INCLUDED

This performance specification defines the functional requirements of a rubber tired load haul dump (LHD) unit with an articulated frame equipped with a TBD yard (minimum) bucket.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 American National Standards Institute (ANSI)

o B15.1 Safety Standards for Mechanical Power Transmission Apparatus

o S1.13 Methods for Measurement of Sound Pressure Levels

1.2.2 American Society for Testing and Materials (ASTM)

o D975 Specification for Diesel Fuel Oils

1.2.3 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

1.2.4 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders

o Title 8, Chapter 4, Subchapter 20, Tunnel Safety Orders

1.2.5 Code of Federal Regulations (CFR)

o 30 CFR 32 Mobile Diesel Powered Equipment for Non-coal Mines

o 30 CFR 57 Safety and Health Standards Underground Metal and Non-metal Mines

ISHEET OF CIWS NUMBER DOCUMENT NO.FRE0.

FENIX & SCISSON, INC. 3 6 1l.2.6.6.0 FS-SP-11061

FORM LV-314A (7-88)

Page 50: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX LHD VEHICLES (LEASE)

1.2.6 National Fire Protection Association (NFPA)

o NFPA 17P Dry Chemical Extinguishing Systems

1.2.7 Society of Automotive Engineers (SAE)

o J726 Recommended Practice, Air Cleaner Test Code

o J818 Rated Operating Load for Loaders

o J1165 Recommended Practice,Reporting Cleanlihess Levels of Hydraulic Fluids

1.3 SYSTEM DESCRIPTION

The system will be used for removing rock from the mine face to the skip loading system. The equipment will pick up load in the bucket, transport the load, traversing some sharp corners, and dump its load in the storage bin at the mucking shaft.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the LHD is III.

PART 2 - PRODUCTS

2.1 MATERIALS (N/A)

2.2 EQUIPMENT

2.2.1 Self Propelled Load, Haul and Dump Vehicle

o Engine

o Maximum Dimensions

o Maximum Disassembled Dimensions

o Standard Cab Controls

o Transmission

o Hydraulic Requirements

o Canopy Requirements

FORM LV-314A (7-88)

SHEET OF -WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 4 6 1.2.6.6.0 FS-SP-1106 1

Page 51: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX LHD VEHICLES (LEASE)

o Fire Suppression System

o Tires

o Lights

o Bucket Requirements

o Bucket Hydraulics - Safety Check Valve

o Exhaust Requirements - Exhaust Scrubbing System

o Personnel Protection Requirements - Heat and Moving Parts

o Maintenance Requirements

o Data Requirements

o Identification Requirements

o Painting Requirements

PART 3 - EXECUTION

3.1 Perform surface check of all system components.

3.2 Disassemble LHD for transfer down shaft.

3.3 Transport to Main Test Level.

3.4 Reassemble LHD and service unit per manufacturer's operations and maintenance instructions.

3.5 Inspect LHD To satisfy all performance and safety requirements per applicable codes and standards.

SHEET OF CWISON NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 6 1.2.6.6.0 FS-SP-11061

FORM LV-314A (7-88)

Page 52: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED

DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED _REQUIRED FOR

NO DATA REQUIREMENTS FOR THIS OUTLINE SPECIFICTION.

"AC - AS COMPLETED "BFR' - BEFORE FABRICATION RELEASE

"BC - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS° - WITH SHIPMENT

"ACM'i - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUM1BER DOCUMENT NO. R EV. FENIX & SCISSON, INC.

6 6 1.2.6.6.0 FS-SP-11061

Form LV-315A

Page 53: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

I TECHNICAL SPECIFICATION(OUTLINE SPECIFICATION)

FS-SP-1107 NO.

O.A. LEVEL TBD

TITLE: MINE SERVICE VEHICLE DIVISION 14.- CONVEYING SYSTEMS SUBDIVISION - MATERIAL HANDLING

APPROVED BY

APPROVED BY

APPROVED BY

DATE

DATE --

DATE

FE2NIX & SCISSO.N, INC.SHEET OF WBS NUMBER DOCUMENT 1 REV.

1 6 1.2.6.6.01 FS-SP-1107 1

Form LV-31 3B (9-88)

Page 54: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

NINE SERVICE VEHICLE

PAGEPART 1 - GENERAL

1.1 1.2 1.3 1.4

Work Included Referenced Publications System Description Quality Assurance

3 3 4" 4

4 5

PART 2 - PRODUCTS

2.1 Materials and Equipment 2.2 Fabrication

PART 3 - EXECUTION

3.1 3.2 3.3 3.4 3.5

Surface Startup and Inspection Teardown for Lowering in Shaft Subsurface Reassembly Preparation for Operation Final Inspection

5 5 5 5 5

6DATA REQUIREMENTS LIST

SHEET OF WBS NUMBER' DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 6 11.2.6.6.0 FS-SP-1107 1

EORM LV-314A (7-88)

Page 55: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX MINE SERVICE VEHICLE

PART 1 - GENERAL

1.1 WORK INCLUDED

This section covers the performance and dimensions required for a subsurface service vehicle.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 American National Standards Institute (ANSI)

o B15.1

o S1.13

American

o D975

American

o' DI.1

(aliforni

Safety Standards for Mechanical Power Transmission

Apparatus

Methods for Measurement of Sound Pressure Levels

Society for Testing and Materials (ASTM)

Specification for Diesel Fuel Oils

Welding Society (AWS)

Structural Welding Code, Steel

a Administrative Code (CAC)

o Title 8, Chapter and Subchapter 17, Mine Safety Orders

o Title 8, Chapter and Subchapter 20, Tunnel Safety Orders

Code of Federal Regulations (CFR)

o Title 30, Part 32, Engine Exhaust Systems (except for 32.4(e)(1) and 32.5(a)(4))

o Title 30, Part 57, Health and Safety Standards, Metal and Non-metal Underground Mines

National Fire Protection Association (NFPA)

o NFPA 17P Dry Chemical Extinguishing Systems

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

3 6 11.2.6.6.0 FS-SP-1107 1

FORM LV-314A (7-88)

1.2.2

1.2.3

1.2.4

1.2.5

1.2.(

Cal i forni

I

Page 56: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX MINE SERVICE VEHICLE

1.3 SYSTEM DESCRIPTION

The mine service vehicle shall be capable of the following:

o Passing through an 11' wide x 8'-6" high opening.

o Making a 900 turn in from a 14' wide opening into a 14' wide opening.

o Carrying a payload of lbs.

o Transporting _ persons including the driver.

o Operating on a minimum grade of + % while fully loaded.

o A minimum speed on the level of _ mph.

o Maximum component cross sectional dimension inches.

o Maximum component weight _ lbs.

o Fuel tank capacity of _ gallons.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the Mine Service Vehicle is to be determined.

PART 2 - PRODUCTS

2.1 MATERIALS AND EQUIPMENT

o Air Cooled (Water Cooled) Diesel Power System

o Articulation

o Driven Wheels (2 wheel drive/4 wheel drive)

o Power Takeoffs, Lift Gates, etc.

o Lights, Steering, Horn, Tow Bars, Bumpers, etc.

o Hydraulic System

SHCO.6 OF 2WBS.NU. FS-SP-1107 REV.

FENIX & SCISSON, .INC. 4HE OF 1 .26..0R1 DOCUMENT0 NO

EORM LV-314A (7-88)

I

Page 57: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

F SECTION 14XXX MINE SERVICE VEHICLE

o Falling Object Protection and other Safety Features

o Operational Warning Lights, Signs and Labels

o Exhaust Muffler

o Operational Warning Lights, Signs and Labels

o Catalytic Converter and Other Exhaust Conditioning Equipment

o Frame and Decking Materials

o Fire Suppression System

FABRICATION

2.2.1 Welding and Fastening Requirements

2.2.2 Tolerances

2.2.3 Shop Fit Up

PART 3 - EXECUTION

3.1 SURFACE STARTUP AND INSPECTION

3.2 TEARDOWN FOR LOWERING IN SHAFT

3.3 SUBSURFACE REASSEMBLY

3.4 PREPARATION FOR OPERATION

3.5 FINAL INSPECTION

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

5 6 1.2.6.6.0 FS-SP-1107 1

EORM LV-314A (7-88)

2.2

I

I

Page 58: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

DESCRIPTION WHEN NUMBER OF REQUIRED REQUIRED COPIES REFERENCE FOR

__________________________________________ __________ REQUIRED ___________ ________

NO DATA REQUIREMENTS REQUIREO FOR THISI OUTLINE SPEOIFICATION

"AC' - AS COMPLETED "BFR - BEFORE FABRICATION RELEASE "BC; - BEFORE CONTRACT CAN BE AWARDED 'PS - PRIOR TO SHIPMENT "BU - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS - WITH SHIPMENT

"ACM° - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. R EV. FENIX & SOISSON, INC. 6 6 1.2.6.6.0 FS-SP-1107 1

Form LV-315A

I

Page 59: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

i TECHNICAL SPECIFICATION

(OUTLINE SPECIFICATION)

NO.FS-SP-1109

Q.A. LEVEL I1,,

TITLE: MOBILE DUST COLLECTION UNITS DIVISION 11 - EQUIPMENT SUBDIVISION - INDUSTRIAL AND PROCESS EQUIPMENT

APPROVED BY

APPROVED BY

APPROVED BY

DATE

DATE

DATE

PECTS RE B'I APPROVED BY RE DEV. REVISION DESCRIPTION | GES !REV. BY,, A DATE

Revised to add Table of 1 z -7.4 Contents and D.R.L. 2 & 7 , •PF AROE 1 2 1 88 1

IA 12.. i j

FENIX & SCISSON, INC.OF WBS NUMBER' DOCUMENT NO.

7 1.2.6.6.0 . FS-SP-1109

Form LV-313B (9-B8)

SHEET

IREV.

1

Page 60: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

MOBILE DUST COLLECTION UNITS

PART 1 - GENERAL

1.1 1.2 1.3 1.4

Work Included Referenced Publications System Description Quality Assurance

PART 2 - PRODUCTS

2.1 Materials and Equipment 2.2 Performance Criteria

PART 3 - EXECUTION

3.1 Installation 3.2 Inspection and Testing

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2OF

7

EORM LV-314A (7-88)

PAGE

3 3 4. 4

4 5

5 5

7

WBS NUMBER DOCUMENT NO.

1.2.6.6.0 FS-SP-1109

REV.

1 1-- i

|

Page 61: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX

MOBILE DUST COLLECTION UNITS

PART 1 - GENERAL

1.1 WORK INCLUDED

The work under this section defines the performance requirements for the procurement and delivery of mobile dust collection units (3 and 1 spare) to be furnished and tested complete with all components required for operation. The machine type units will be mobile, mounted on non-flat tires and equipped with a towing bar for transporting to any active area for dust entrapment and collection. Units shall be capable of processing dust laden air an estimated quantity of up to 10,000 CFM. Units shall be MSHA approved, mine proven and capable of quiet operation, not to exceed 85 decibels.

1.2 REFERENCED PUBLICATIONS

The publications listed below from a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards for Underground Metal and Non-metal Mines

1.2.2 State of California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17 (Article 31), Mine Safety Orders

1.2.3 American Conference of Governmental Industrial Hygienists (ACGIH)

o Threshold Limit values for Toxic Dusts, Fumes and Mists

1.2.4 Air Movement and Control Association (AMCA)

o AMCA 99 Standards Handbook

o AMCA 203 Field Performance Measurement

o AMCA 210 Laboratory Methods of Testing Fans

o AMCA 300 Standard Test Code for Sound Rating

1.2.5 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

SHEET OF WBS NUMBERN DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 7 11.2.6.6.01 FS-SP-11091

EORM LV-314A (7-88)

Page 62: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX MOBILE DUST COLLECTION UNITS

1.3 SYSTEM DESCRIPTION

Each mobile dust collection unit shall be a complete operating unit with enclosed filter bags, pressure type operated fans, electrical motors and components, hydraulic components, adaptors for ductwork connections and dry collection bins for safe dust removal into plastic bags.

The system will include metal centrifuge type pre-cleaners and fabric filter collectors to remove coarse dust and separate parti'culates from dust laden air. The overall efficiency of the filter bags shall be at least 90% collection of the submicron particulates down to 0.8 microns. Collected dust shall drop into bins that have sufficient storage capacity for 8-hours of continuous operation.

The unit will primarily be enclosed in a metal framework with controls/accessories mounted outside and will be provided with hydraulic drive and steering levers for control of localized movement. It shall be equipped with foam-filled flat proof tires and a tow bar assembly for towing by diesel powered mobile equipment for transport and relocation underground.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the Mobile Dust Collection Units II.

1.4.2 The Vendor shall have an approved Quality Assurance Program.

PART 2- PRODUCTS

2.1 MATERIALS AND EQUIPMENT

o Metal Frame

o Ducting Adaptors

o Centrifuge Chamber and Dust Bins

o Filter Bags

o Vibrator Controls

FENIX &OF UMB ENT NO. RE".

FORM LV-314A (7-88)

Page 63: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX MOBILE DUST COLLECTION UNITS

o Electric Motors - Hydraulic System Motor: 15HP, 480 Volts, 3 phase - Centrifuge Fan Motor: 40 HP, 480 Volts, 3 phase - Filter Bag Fan Motor: 15 HP, 480 Volts, 3 phase

o Hydraulic System - lever controls and hoses

o Electrical Controls - switches and receptacles

o Lubrication System

o Fans

o Silencers

o Tires

o Towing-Assembly

o Painting - factory applied finish

o Safety Devices - Parking Brake - Reflectors - Fire Extinguisher

2.1.1 No component such as: metal frame, ducting adaptors, tire

wheels-axle shall exceed 4.5 ft. x 4.5 ft. in cross sectional area in order to pass through the shaft opening.

2.2 PERFORMANCE CRITERIA

PART 3 - EXECUTION

3.1 INSTALLATION

3.1.1 Surface Start-Up

3.1.2 Disassembly for lowering down shaft

3.1.3 Subsurface Reassembly per manufacturer's instructions

3.2 INSPECTION AND TESTING

3.2.1 Initial inspection (surface) - check controls, fan vibration and performance and noise level

FENIX & SCISSON, INC.

EORM LV-314A (7-88)

Page 64: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 11XXX MOBILE DUST COLLECTION UNITS

3.2.2 Final inspection at operating face

3.2.3 Operational test - for dust collection efficiency, overall performance and acceptance.

Page 65: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

DES CRIPTION

NO DATA REQUIREMENTS REQUIRED FOR THIS OUTLINE SPE(IFICATION

*

"AC" - AS COMPLETED "BFR" - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED PS' - PRIOR TO SHIPMENT

"*BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 7 1 1.2.6.6.0 FS-SP-ll0g1

Form LV-315A

Page 66: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION(OUTLINE SPECIFICATION)

FS-SP-1504 NO.

Q.A. LEVEL IT

TITLE:

APPROVED BY

MAIN MINE VENTILATION FANS DIVISION 15 - MECHANICAL SUBDIVISION - HEATING, VENTILATING AND AIR CONDITIONING

DATE 12l-9

DATE 2 - 5rAPPROVED BY

DATE / z" 7- -APPROVED BY

REVISION DESCRIPTION

Revised to add Table of

-313B (.-88)

Page 67: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

MAIN NINE VENTILATION FANS

PAGEPART 1 - GENERAL

1.1 1.2 1.3 1.4

Work Included Referenced Publications System Description Quality Assurance

3 3 4. 4

5 6 6

PART 2 - PRODUCTS

2.1 Materials 2.2 Fabrication 2.3 Factory Testing

PART 3 - EXECUTION

3.1 Installation 3.2 Acceptance

DATA REQUIREMENTS LIST

and Testing

I - - -- -U,-

FENIX & SCISSON, INC. 8

7 7

8

WBS NUMBER DOCUMENT NO. REV.

1.2.6.7.1 FS-SP-1504 1

FORM LV-314A (7-88)

SHEEiT 2

Page 68: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION l5XXX

SECTION 15XXX MAIN MINE VENTILATION FANS

PART 1 - GENERAL

1.1 WORK INCLUDED

The work included under this section covers the design, fabrication, testing and delivery of direct drive, vane axial, main mine ventilation fans. The fans will be used as the primary equipment for underground ventilation during the ESF construction and operations.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards for Underground Metal and Non-metal Mines.

1.2.2 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, (Art. 31) Mine Safety Orders

1.2.3 Air Movement and Control Association (AMCA)

o AMCA 99 Standards Handbook

o AMCA 203 Field Performance Measurement

o AMCA 210 Laboratory Methods of Testing Fans

o AMCA 300 Standard Test Code for Sound Rating

1.2.4 American WeldinQ Society (AWS)

o D1.1 Structural Welding Code, Steel

1.2.5 National Fire Protection Association (NFPA)

o 70 National Electrical Code

FORM LV-314A (7-88)

SI SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 8 1.2.6.7.1 FS-SP-1504 1

Page 69: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX MAIN MINE VENTILATION FANS

1.3 SYSTEM DESCRIPTION

The system includes seven (7) mine ventilation fans:

o Four units + one spare, each of 48" dia/200 BHP/1770 rpm to deliver 83,000 cfm at 11" water gage static pressure (sea level base).

(1) ES-i Surface Fan (1) ES-I Underground Booster Fan (2) ES-2 Underground Booster Fans (1) Spare

o One unit + one spare, each of 60" dia/350 BHP/1770 rpm to deliver 162,000 cfm at 10" water gage static pressure (sea level base).

(1) ES-2 Surface Fan (1) Spare

The fans shall be vane axial direct drive units with motor in the air

stream. Blade settings are to be adjustable and the fans are to deliver at least 50% of rated capacity in a reverse mode. Attenuator shall be provided so that the noise level, beyond a distance of 10

feet from the fan shall not exceed 80 decibels. Monitor for fan vibration, bearing temperatures and air pressure are also to be provided.

Specific fan locations shall be as shown in the Contract Drawings.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance level assignment for the Main Mine Ventilation Fans is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's Quality Assurance program describing specified work, including descriptions which identified management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 4 8 1.2.6.7.1 FS-SP-1504 I

FORM LV-314A (7-88)

Page 70: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX MAIN MINE VENTILATION FANS

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Housing and Guide Vanes

o Construction

o Dimensions

o Clearances

o Class Rating

2.1.2 Fan Wheels

o Construction

o Dimensions

o Class Rating

2.1.3 Fan Blades

o Construction

o Clearances

o Class Rating

o Adjustability

2.1.4 Electric Motor

o Voltage/Amperage Rating/RPM

o Frame Type/Size

o Insulation

o Direct Drive Shaft

FORM LV-314A (7-88)

X SHEET OF WBS NUMBER OOOUMENTNO. REV. FENIX & SCISSON, INC. 5 8 1.2.6.7.1 FS-SP-1504

Page 71: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

MI SECTION 15XXX MAIN MINE VENTILATION FANS

o Reversibility

o Bearings

o Lubrication

2.1.5 Inlet/Outlet Adaptors

o Construction

o Dimensions

o Screens

2.1.6 Noise Silencer

o Construction

o Dimensions

2.1.7 Painting - Standard Factory Finish

2.1.8 Monitors

o Air Pressure

0 Bearing Temperature

o Vibration

2.2 FABRICATION

2.2.1 Fabrication shall be in accordance with approved shop drawings and

.Schedule of Delivery.

2.3 FACTORY TESTING

2.3.1 Fan Performance

o Air Quantity

o Pressure

SHEET OF WOS NUMBER DOCUMENT NO. REV

FENIX & SCISSON, INC. 6 8 1.2.6.7.1 FS-SP-15041

EORM LV-314A (7-88)

Page 72: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

2.3.2

2.3.3

o Brake Horsepower

o Efficiency

Vibrations and Balancing Data

Silencer Performance

PART 3 - EXECUTION

3.1 INSTALLATION AND TESTING

3.1.1 Field Inspection

3.1.2 Field Performance Test

3.1.3 Field Vibration Test

3.3.3 Field Silencer Performance Test

ACCEPTANCE

FENIX & SCISSON, INC.SHEET OF WBt. NUMBER DOCUMENT NO.

7 8 1.2.6.7.1 FS-SP-1504

EORM LV-314A (7-88)

SECTION 15XXX MAIN MINE VENTILATION FANS

3.2

R EV.

1jI mI

Page 73: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

NUMBER OF RUE WHEN RQIE

DESCRIPTION REN COPIES REFERENCE FOR

REQUIRED REQUIRED

NO DATA REQUIREMENTS REQUIREO FOR THIS OUTLINE SPEýIFICATION

"AC - AS COMPLETED *BFR° - BEFORE FABRICATION RELEASE

"BC° - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC.

8 8 1.2.6.7.1 FS-SP-1504 1

Form LV-315A

Page 74: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1505 NO.

TITLE: AUXILIARY MINE VENTILATION FANS DIVISION 15 - MECHANICAL SUBDIVISION - HEATING, VENTILATING AND AIR CONDITIONING

DATE 12 -- /-99APPROVED BY

DATE ý: - 85APPROVED BY

APPROVED BY

WBs NUMBER

1.2.6.7.1FENIX & SCISSON, INC.DOCUMENT NO.

FS-SP-1505

Form LV-313B (9-88)

DATE /2"--7- -

O.A. LEVEL II-

Page 75: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

AUXILIARY MINE VENTILATION FANS

PAGEPART 1 - GENERAL

1.1 1.2 1.3 1.4

Work Included Referenced Publications System Description Quality Assurance

3 3. 4 4

PART 2 - PRODUCTS

5 6 6

2.1 Materials 2.2 Fabrication 2.3 Factory Testing

PART 3 - EXECUTION

3.1 Installation 3.2 Acceptance

DATA REQUIREMENTS LIST

and Testing 7 7

8

FENIX & SCISSON, INC.SHEET OF 1WBSNUMBER DOCUMENT NO. REV.

2 8 11.2.6.7.1 1 FS-SP-1505 1

EORM LV-314A (7-88)

Page 76: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX AUXILIARY MINE VENTILATION FANS

PART 1 - GENERAL

1.1 WORK INCLUDED

The work included under this section covers the design, fabrication, testing and delivery of direct drive, vane axial, auxiliary mine ventilation fans. The fans will be used as the auxiliary equipment for underground ventilation during the ESF construction and operations.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards for Underground Metal and Nonmetal Mines.

1.2.2 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, (Art. 31) Mine Safety Orders

1.2.3 Air Movement and Control Association (AMCA)

o AMCA 99 Standards Handbook

o AMCA 203 Field Performance Measurement

o AMCA 210 Laboratory Methods of Testing Fans

o AMCA 300 Standard Test Code for Sound Rating

1.2.4 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

1.2.5 National Fire Protection Association (NFPA)

o 70 National Electrical Code

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 8 1.2.6.7.1 FS-SP-1505 1

EORM LV-314A (7-88)

Page 77: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX AUXILIARY MINE VENTILATION FANS

1.3 SYSTEM DESCRIPTION

The system includes twenty five (25) auxiliary ventilation fans:

o Twelve units + one spare, each of 32" dia/15 BHP/1770 rpm to deliver 20,000 cfm at 3.25" water gage total pressure (sea level base)

o Four units + one spare, each of 32" dia/5 BHP/1170 rpm to deliver 18,000 cfm at 0.9" water gage total pressure (sea level base)

o Three units + one spare, each of 42 1/4" dia/100 BHP/1770 rpm to deliver 45,000 cfm at 10" water gage total pressure (sea level base)

o Two units + one spare, each of 42 1/4" dia/50 BHP/1770 rpm to deliver 45,000 cfm at 5" water gage total pressure (sea level base)

The fans shall be vane axial direct drive units with motor in the air stream. Blade settings are to be adjustable. Attenuator shall be provided so that the noise level, beyond a distance of 10 feet from the fan shall not exceed 80 decibels.

Actual locations of auxiliary fans are shown in Title I drawing number FS-GA-0225.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the Auxiliary Mine Ventilation Fans is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a.Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and procedures, and documentation.

SHEET OF WOS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 4 8 1.2.6.7.1 FS-SP-15051

FORM LV-314A (7-88)

Page 78: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX AUXILIARY MINE VENTILATION FANS

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Housing and Guide Vanes

o Construction

o Dimensions

o Clearances

o Class Rating

2.1.2 Fan Wheels

o Construction

o Dimensions

o Class Rating

2.1.3 Fan Blades

o Construction

o Clearances

o Class Rating

o Adjustability

2.1.4 Electric Motor

o Voltage/Amperage Rating/RPM

o Frame Type/Size

o Insulation

o Direct Drive Shaft

o Bearings

o Lubrication

SHEET OF WBSNUMBER DOCUMENT NO. REV

FENIX & SCISSON, INC. 5 8 1.2.6.7.1 FS-SP-1505 1

FORM LV-314A (7-88)

Page 79: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX AUXILIARY NINE VENTILATION FANS

2.1.5 Inlet/Outlet Adaptors

o Construction

o Dimensions

o Screens

2.1.6 Noise Silencer

o Construction

o Dimensions

2.1.7 Painting-Standard Factory Finish

2.2 FABRICATION

2.2.1 Fabrication shall be in accordance with approved shop drawings and Schedule of Delivery.

2.3 FACTORY TESTING

2.3.1 Fan Performance

o Air Quantity

o Pressure

o Brake Horsepower

o Efficiency

2.3.2 Vibration and Balancing Data

2.3.3 Silencer Performance

SHEET OF 1WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 6 8 1l.2.6.7.1 FS-SP-15051

EORM LV-314A (7-88)

Page 80: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX AUXILIARY MINE VENTILATION FANS

PART 3 - EXECUTION

3.1 INSTALLATION AND TESTING

3.1.1 Field Inspection

3.1.2 Field Performance Test

3.1.3 Field Silencer Performance Test

3.2 ACCEPTANCE

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO.

7 8 11.2.6.7.1 FS-SP-1505

EORM LV-314A (7-88)

REV.

I

Page 81: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

* NUMBER OF WHEN INMROFREQUIRED

DESCRIPTION WHEN COPIES REFERENCE FOR NREQUIRED REQUIRED

NO DATA REQUIREMENTS REQUIREr FOR THIS OUTLINE SPEýIFICATION

"AC - AS COMPLETED "BFR - BEFORE FABRICATION RELEASE

"BC - BEFORE CONTRACT CAN BE AWARDED 'PS - PRIOR TO SHIPMENT

"BU - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) *WS - WITH SHIPMENT

- APPROVAL BY MANAGER "REC"- RECORD'ACM'

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC.

8 8 1.2.6.7.1 FS-SP-1505 1

Form LV-315A

Page 82: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO. FS-SP-1506

Q.A. LEVEL II

TITLE: VENTILATION DUCTING DIVISION 15 - MECHANICAL SUB DIVISION HEATING, VENTILATING AND AIR CONDITIONING

DATE /2-/-,f

A� ��AAA�( DATE 2--88

APPROVED BY�4�44+jjf� ji-Ž�

REVISION DESCRIPTION

Revised to add Table of

FENIX & SCISSON, INC.

Form LV-313B (9-88)

APPROVED BY

APPROVED BY

DATE )

Page 83: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

VENTILATION DUCTING

PART 1 - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Materials

PART 3 - EXECUTION

3.1 Installation 3.2 Inspection

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC. 2

U'-5F 5

WB$ NUMBER DOCUMENT NO.

1.2.6.7.1 FS-SP-1506

FORM LV-314A (7-88)

PAGE

3 3 4 4

4

4 4

5

I R EV.

1

Page 84: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX .VENTILATION DUCTING

PART 1 - GENERAL

1.1 WORK INCLUDED

This specification covers the furnishing, installation, and testing of all ductwork for the mine ventilation system.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 American Society for Testing and Materials (ASTM)

o A36 Standard Specification for Structural Steel

o A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

o A569 Specification for Steel, Carbon (0.15 Maximum Percent) Hot-Rolled Sheet and Strip Commercial Quality

o E162 Test Method for Surface Flammability of

Materials Using a Radiant Heat Energy Source

1.2.2 National Fire Protection Association (NFPA)

o NFPA 90A Installation of Air Conditioning and Ventilating Systems

1.2.3 Underwriters Laboratories Inc (UL)

o 181 Factory-Made Air Ducts and Connectors

1.2.4 Sheet Metal and Air Conditioning Contractors' National Association (SMACNA)

o (1985) HVAC Duct Construction Standards - Metal and Flexible

o (1979-2) Fibrous Glass Duct Construction Standards

1.2.5 Code of Federal Regulations (CFR)

o .30 CFR 57 Safety and Health Standards-Underground Metal and Non-metal Mines

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FNX&SISNIN. 3 5 1.2.6.7.1 FS-SP-1506 1

EFORM LV-314A (7-88)

Page 85: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 15XXX VENTILATION DUCTING

1.2.6 State of California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17 (Article 31), Mine Safety Orders

1.3 SYSTEM DESCRIPTION

1.3.1 Ventilation ducting shall be provided in the ESF shafts and the underground workings, as indicated in the Contract Drawings.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Ventilation Ducting is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality-Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Sheet steel ducting in shaft (ASTM A569)

2.1.2 Phenolic fiberglass ducting in level workings (SMACNA 1979-2)

2.1.3 Couplings and gaskets.

PART 3 - EXECUTION

3.1 INSTALLATION

3.1.1 Support

3.1.2 Alignment

3.1.3 Sealing at joints

3.2 INSPECTION

3.2.1 Acceptance

SHEET OF WBS NUMBER DOCUMENT NO. R EV.

FENIX & SCISSON, INC. 5 1.2.6.7.1 FS-SP-1506 1

FORM LV-314A (7-88)

Page 86: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPE;IFICATION

"AC - AS COMPLETED "BFR' - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 5 1.2.6.7.1 FS-SP-1506 1

Form LV-315A

Page 87: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-0201 NO. Q.A. LEVEL II

TITLE: ES-i AND ES-2 COLLAR INSTALLATION DIVISION 2 SITEWORK SUBDIVISION - SITE PREPARATION

APPROVED BY

APPROVED BY

APPROVED BY

DATE

DATE

DATE /)•'C •

SHEET OF WBS NUMBERI DOCUMENT NO. REV.

1 7 1.2.6.3.2 FS-SP-0201 1FENIX & SCISSON, INC.

Form LV-313B (9-88)

Page 88: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-1 AND ES-2 COLLAR INSTALLATION

PART 1 - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Reinforced Concrete 2.2 Embedded Metal 2.3 Collar Doors 2.4 Fences and Gates

PART 3 - EXECUTION

3.1 Excavation 3.2 Concrete Placement 3.3 Installation 3.4 Test Support Before and After Concrete Placement

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2

OF

7

WBS NUMBER DOCUMENT NO.

1.2.6.3.2 FS-SP-0201

FORM LV-314A (7-88)

PAGE

3 3 4" 4

4 4 4 4

4 6 6 6

7

REV.

1

i

Page 89: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX ES-1 AND ES-2 COLLAR INSTALLATION

PART 1 - GENERAL

1.1 WORK INCLUDED

This specification covers the excavation for the ES-1 and ES-2 collars, the construction of the reinforced concrete collar and the installation of miscellaneous structures.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Federal Regulations

o 30 CFR 57 Safety and Health Standards Underground Metal and Nonmetal Mines

o 27 CFR Chap. 1 Part 55, Commerce in Explosives

o 29 CFR 1926 Part U, Blasting and Use of Explosives (OSHA)

1.2.2 U.S. Department of Interior - Bureau of Reclamation

o Construction Safety Standards, Sec. 24

1.2.3 U.S. Department of Energy - Nevada Nuclear Waste Site Investigation

o DOE/NV/00410-77, Exploratory Shaft at Yucca Mountain Safety and Health Program Plan

1.2.4 State of Nevada

0 Title 46, Chapter 512, Health and Safety Standards for Open Pit and Underground Metal and Non-Metal Mines, and Sand, Gravel and Crushed Stone Operations

1.2.5 State of California Administrative Code

o 8 CAC 4.17, Mine Safety Orders

EORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 1 1.2.6.3.2 FS-SP-0201 I

Page 90: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX ES-i AND ES-2 COLLAR INSTALLATION

1.3 SYSTEM DESCRIPTION

Excavate for shaft collars. Install reinforcing steel and embedded metal, and form and pour collar concrete. Install embedments, fences and gates.

1.4 QUALITY ASSURANCE

The Quality Assurance Level Assignment for ES-1 and ES-2 Collar Installation is II.

PART 2 - PRODUCTS

2.1 REINFORCED CONCRETE

o See Specification Number FS-SP-0303, "Cast-in-Place Concrete"

2.2 EMBEDDED METAL

o See Specification Items"

Number FS-SP-0503,

o See Specification Number FS-SP-0502,

"Anchor Bolts and Embedded

"Miscellaneous Steel"

2.3 COLLAR DOORS

o See Specification Number FS-SP-1412, "Sinking Collar Doors"

2.4 FENCES AND GATES

o See Specification Number FS-SP-0502, "Miscellaneous Steel"

PART 3 - EXECUTION

3.1 EXCAVATION

3.1.1 Blast Hole Drilling(Refer to FS-SP-0205, "Controlled Drilling and Blasting")

o Drilling Equipment

FORM LV-314A (7-88)

S & HEET- oF WBS NUMBER DOCUMENT NO. R EV.

FENIX & SCISSON, INC. 4 7 1.2.6.3.2 FS-SP-0201 1

Page 91: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX ES-1 AND ES-2 COLLAR INSTALLATION

o Minimize Drill Water Use

o Hole Patterns

3.1.2 Blasting (Refer to FS-SP-0205, "Controlled Drilling and

Blasting")

o Charging

o Dust and Fire Control

o Minimize Water Usage

o Vibration Monitoring

3.1.3 Scaling and Temporary Support

3.1.4 Testing Support After Blast

o Rock Matrix Hydrologic Test

o Hydrochemistry Test

o Chlorine 36 Test

o Visual Inspection for Perched Water

o Shaft Mapping

o Radial Borehole Test

3.1.5 Mucking

o Loading

o Hoisting (with Crane)

o Rubble Collection for Hydrochemistry Test

o Dust Control (Requirements for dust control during muck cycle)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 7 1.2.6.3.2 FS-SP-02011

EORM LV-314A (7-88)

Page 92: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX ES-i AND ES-2 COLLAR INSTALLATION

Test Support Prior to Concrete Placement

Geologic Mapping

Location Markers

Radial Borehole Test

0

0

0

CONCRETE PLACEMENT (Refer to FS-SV-0308, "Shaft Liner Concrete")

o Forming

o Reinforcing

o Embedded Metal

o Block-Outs

INSTALLATION

o Embedments

o Fences and Gates

TEST SUPPORT BEFORE AND AFTER CONCRETE PLACEMENT

o Radial Bore Hole Tests

FENIX & SCISSON, INC.SHEET

6OF

7

WBS NUMBER DOCUMENT NO.

1.2.6.3.2 FS-SP-0201

EORM LV-314A (7-88)

3.1.6

3.2

3.3

3.4

REV.

1 V

Page 93: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED

DESCRIPTION REQUIRED COPIES REFERENCE FOR

DESCRIPTEO REQUIRED R EN

NO DATA REQUIREMENTS REQUIRE[ FOR THIS OUTLINE SPE;IFICATION

"AC' - AS COMPLETED 'BFR - BEFORE FABRICATION RELEASE

"BC'- BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 7 7 1.2.6.3.2 FS-SP-0201 1

Form LV-315A

Page 94: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION(OUTLINE SPECIFICATION)

FS-SP-0202 NO.

Q.A. LEVEL IT

TITLE: SHAFT SINKING, ES-i DIVISION 2 - SITEWORK SUBDIVISION - SITE PREPARATION

DATE - /?- -/ 8APPROVED BY

Qk�&\ �CAAAAAPPROVED BY

DATE -- "8 8,

DATE

APPROVED BY

Form

•r F

%I*

Page 95: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

SHAFT SINKING, ES-1

PAGEPART 1 - GENERAL

1.1 Work Included -1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

3 3. 4 5

PART 2 - PRODUCTS

None 5

PART 3 - EXECUTION

Alignment Overbreak and Underbreak Blast Hole Drilling Blasting Scaling and Temporary Support Excavation of ES-i Shaft Test Support After Blast Mucking Temporary Services Test Support Prior to Lining Placement Test Support After Lining Placement

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2

OF

9

WBS NUMBER DOCUMENT NO. REV.

1.2.6.3.2 FS-SP-0202 1

FORM LV-314A (7-88)

3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11

5 5 5 5 6 6 7 7 7 7 8

9

EORM LV-314A (7-88) ] i •

Page 96: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-1

PART 1 - GENERAL

WORK INCLUDED

This work covered by this specification includes shaft excavation below the collar section by drill and blast methods, temporary ground support, and testing support services.

REFERENCED PUBLICATIONS

The publications listed below form a part of.this specification.

1.2.1 Federal Regulations

o 30 CFR 57

o 27 CFR

o 29 CFR 1926

U. S. DeDartment of

Safety and Heal th StandardsUnderground Metal and Nonmetal Mines

Chap. 1 Part 55, Commerce in Explosives

Part U, Blasting and Use of Explosives (OSHA)

Interior - Bureau of Reclamation

o Construction Safety Standards

U. S. Department of Energy - Nevada Nuclear Waste Site Investigation

0 DOE/NV/00410, Exploratory Shaft at Yucca MountainSafety and Health Program Plan

State of Nevada

o Title 46, Chapter 512, Health and Safety Standards for Open Pit and Underground Metal and Non-metal Mines, and Sand, Gravel and Crushed Stone Operations.

FORM LV-314A (7-88)

1.1

1.2

1.2.2

1.2.3

1.2.4

. SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 9 1.2.6.3.2 FS-SP-0202 1

Page 97: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-i

1.2.5 State of California Administrative Code

o Title 8, Chapter 4, Subchapter 17 - Mine Safety Orders

1.2.6 American Conference of Governmental Industrial Hygienists (ACGIH)

o Threshold Limit Values for Chemical Substances and Physical Agents in the Workroom Environment

1.3 SYSTEM DESCRIPTION

The system specifies activities required for conventional shaft

excavation, including:

o Blast Hole Drilling*

o Blasting*

o Muck Loading and Hoisting

o Temporary Ground Support

o Temporary Utilities

o Temporary Ventilation

o Temporary Communications

0. Schedule

o Location

o Dimensions

o Permanent Ground Support

o Outfitting

*Requirements for blasthole drilling and blasting are further

specified in FS-SP-0205, "Controlled Drilling and Blasting."

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 4 g 1.2.6.3.2 FS-SP-0202 I

EORM LV-314A (7-88)

Page 98: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX .SHAFT SINKING, ES-i

1.4 QUALITY ASSURANCE

The Quality Assurance Level Assignment for Shaft Sinking is II.

PART 2 - PRODUCTS

None

PART 3 - EXECUTION

3.1 ALIGNMENT

o Survey Tolerances

o Excavation Centerline Tolerances

3.2 OVERBREAK AND UNDERBREAK

o Allowed Tolerances on Overexcavation and Underexcavation

3.3 BLAST HOLE DRILLING

(Refer to FS-SP-0205, "Controlled Drilling and Blasting")

3.3.1 Equipment

o. Subcontractors Option

o Minimize Drill Water Use

3.3.2 Hole Patterns

3.4 BLASTING

(Refer to FS-SP-0205, "Controlled Drilling and Blasting")

EORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 9 1.2.6.3.2 FS-SP-0202 1

Page 99: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX .SHAFT SINKING, ES-I

3.4.1 Patterns

3.4.2 Dust and Fume Control I

3.4.3 Minimize Water Usage

3.5.4 Vibration Monitoring

3.5 SCALING AND TEMPORARY SUPPORT I

3.5.1 Wet Down and Scale

3.5.2 Temporary Support

o Rock Bolts (FS-SP-0208, "Rock Bolting")

o Wire Mesh

o Straps

o Shotcrete (FS-SP-0307, "Shotcrete")

3.5.3 Minimizing Water Usage 1

3.6 EXCAVATION OF ES-1 SHAFT I

3.6.1 Constraints on Excavation Sequence

A number of testing activities under the direction of the CONTRACTING OFFICER will be carried out concurrent with underground construction and which will require construction to stop for specified periods of time at particular locations. These constraints allow for the installation of test facilities to be time-phased with excavation in order to avoid loss of test data. The constraints imposed on an excavation sequence and schedule by the concurrent testing activities are to be determined.

Constraints related to DAS Alcoves: To be determined

Constraints Related to Monitoring Arrays: To be determined

Constraints Related to Tests: To be determined

Constraints Related to Groundwater Inflow Monitoring: The CONTRACTOR shall notify the CONTRACTING OFFICER immediately of any groundwater inflow during underground excavation.

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 6 9 1.2.6.3.2 FS-SP-0202 1

EORM LV-314A (7-88)

Page 100: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-I

3.7 TEST SUPPORT AFTER BLAST

3.7.1 Visual Inspection for Perched Water

3.7.2 Rock Matrix Hydrologic Test

3.7.3 Hydrochemistry Test

3.7.4 Chlorine 36 Test

3.7.5 Shaft Mapping

3.7.6 Radial Borehole Test

3.8 MUCKING

3.8.1 Rubble Collection for Sample Management Facility

3.8.2 Loading

3.8.3 Hoisting

3.8.4 Dumping

3.8.5 Dust Control (Requirements for dust control during muck cycle)

3.9 TEMPORARY SERVICES

o Compressed Air

o Cbnstruction Water

o Waterwaste Discharge

o Ventilation

o Electrical Power

0 Communications

EORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 7 9 1.2.6.3.2 FS-SP-0202 I

Page 101: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-i

3.10 TEST SUPPORT PRIOR TO LINING PLACEMENT

3.10.1 Before each pour:

o Geologic Mapping

o Location Markers

3.10.2 Selected Locations

o Radial Borehole Tests

o Shaft Convergence Tests

3.10.3 Utilities and ServicesContractor shall assure the following utilities and services

are available to support testing:

o Electric Power

o Compressed Air

o Lighting

o Dust Collection

3.10.4 Testinq/Instrumentation AccessThe Contractor shall provide access for TBD persons to all

in-shaft instrument arrays for monitoring and maintenance.

3.10.5- Testing Support Priority

The Contractor shall provide testing support on a priority basis second to safety, and as specified by the Principle Investigator through coordination with the Contracting Officer.

3.11 TEST SUPPORT AFTER LINING PLACEMENT

Provide access to radial boreholes and shaft convergence test holes to service test instruments as needed.

FENIX & SCISSON, INC.

FORM LV-314A (7-88)

I

I I

I

I

Page 102: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQ COPIES REFERENCE R

REURDREQUIRED FOR _ _ _ _ _ _ _ _ _ _ _ REQUIREDj __ j_

NO DATA REQUIREMENTS REQUIREII FOR THIS OUTLINE SPECIFICATION

"AC' - AS COMPLETED "BFR" - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS" - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SSHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC.

9 9 1.2.6.3.2 FS-SP-0202 1

Form LV-315A

Page 103: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO.FS-SP-0203 NO. Q, A. L E V E L

TITLE: SHAFT SINKING, - ES-2 DIVISION 2 - SITEWORK SUBDIVISION - SITE PREPARATION

DATE /Z-Z

DATE .2-7-88

DATE •.•2C 7,iL-7

FENIX & SCISSON, INC.

.1 3 .1

OF JWBS NUMBER' DOCUMENT NO.

8 1.2.6.5.1 FS-SP-0203 1

Form LV-313B (9-88)

Page 104: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

SHAFT SINKING, ES-2

PART I - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

None

PART 3 - EXECUTION

3.1 Alignment 3.2 Overbreak and Underbreak 3.3 Blast Hole Drilling 3.4 Blasting 3.5 Sealing and Temporary Support

"3.6 Excavation of ES-2 Shaft 3.7 Test Support After Blast 3.8 Mucking 3.9 Temporary Services 3.10 Shaft Concrete Lining

DATA REQUIREMENTS LIST

FORM LV-314A (7-88)

PAGE

3 3 4 5

5

5 5 5 5 6 6 7 7 7 7

8

SHEET OF WSS NUMBER DOCUMENT NO. R EV.

FENX SISQN IC. 2 8 1.2.6.5.1 FS-SP-02031

Page 105: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-2

PART 1 - GENERAL

WORK INCLUDED

The work covered by this specification includes shaft excavation below the collar section by drilling and blast methods, and temporary ground support.

REFERENCED PUBLICATIONS

The publications listed below form a part of this specifipation.

1.2.1 Federal Reaulations

o 30 CFR 57

o 27 CFR

o 29 CFR 1926

1.2.2 U. S. Department of

Safety and Health Standards Underground Metal and Non-metal Mines

Chap. I Part 55, Commerce in Explosives

Part U, Blasting and Use of Explosives (OSHA)

Interior - Bureau of Reclamation

o Construction Safety Standards

U. S. Department of Energy - Nevada Nuclear Waste Site Investigation

o DOE/NV/00410, Exploratory Shaft at Yucca Mountain Safety and Health Program Plan

State of Nevada

o Title 46, Chapter 512, Health and Safety Standards for Open Pit and Underground Metal and Non-metal Mines, and Sand, Gravel and Crushed Stone Operations

FENIX & SCISSON, INC.SHEET

3OF WBS NUMBER

8 1.2.6.5.1

DOCUMENT NO. REV.

FS-SP-0203 1

FORM LV-314A (7-88)

1.1

1.2

1.2.3

1.2.4

I

Page 106: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-2

1.2.5 State of California Administrative Code

o Title 8, Chapter 4, Subchapter 17 - Mine Safety Orders

1.2.6 American Conference of Governmental Industrial Hygienists (ACGIH)

o Threshold Limit Values for Chemical Substances and Physical Agents irf the Workroom Environment

1.3 SYSTEM DESCRIPTION

The system specifies activities required for conventional shaft excavation, including:

o Blast Hole Drilling*

o Blasting*

o Muck Loading and Hoisting

o Temporary Ground Support

o Temporary Utilities

o Temporary Ventilation

o Temporary Communications

o. Schedule

o Location

o Dimensions

o Permanent Ground Support

o Outfitting

*Requirements for blasthole drilling and blasting are further specified in FS-SP-0205, "Controlled Drilling and Blasting."

FORM LV-314A (7-88)

S&SHEET OF WS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 8 1.2.6.5.1 FS-SP-0203 1

Page 107: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

r

3.3.1

3.3.2

BLASTING

(Refer to

3.4.1

3.4.2

Equipment

o Subcontractors Option

o Minimize Drill Water Use

Hole Patterns

FS-SP-0205, "Controlled Drilling and Blasting")

Patterns

Dust and Fume Control

FENIX & SCISSON, INC.SHEET

5

OF

8

WBS NUMBER

1.2.6.5.1 11FO-UMPNI NU.

FS-SP-0203

FORM LV-314A (7-88)

SECTION 02XXX .SHAFT SINKING, ES-2

1.4 QUALITY ASSURANCE

The Quality Assurance Level Assignment for Shaft Sinking is II.

PART 2 - PRODUCTS

None

PART 3 - EXECUTION

3.1 ALIGNMENT

o Survey Tolerances

o Excavation Centerline Tolerances

3.2 OVERBREAK AND UNDERBREAK

o Allowed Tolerances on Overexcavation and Underexcavation

3.3 BLAST HOLE DRILLING

(Refer to FS-SP-0205, "Controlled Drilling and Blasting")

3.4

I -I

Page 108: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-2

3.4.3 Minimize Water Usage

3.4.4 Vibration Monitoring

3.5 SCALING AND TEMPORARY SUPPORT

3.5.1 Wet Down and Scale

3.5.2 Temporary Support

o Rock Bolts (FS-SP-0208, "Rock Bolting")

o Wire Mesh

o Straps

o Shotcrete (FS-SP-0307, "Shotcrete")

3.5.3 Minimizing Water Usage

3.6 EXCAVATION OF ES-2 SHAFT

3.6.1 Constraints on Excavation Seauence

A number of testing activities under the direction of the CONTRACTING OFFICER may be carried out concurrent with underground construction and which may require construction to stop for specified periods of time at particular locations. These constraints allow for the installation of test facilities to be time-phased with excavation in order to avoid loss of test data. The constraints imposed on an excavation sequence and schedule by the concurrent testing activities are to be determined.

Constraints Related to Tests: To be determined

Constraints Related to Groundwater Inflow Monitoring: The CONTRACTOR shall notify the CONTRACTING OFFICER immediately of any groundwater inflow during underground excavation.

EORM LV-314A (7-88)

Z

SHEET OF WBS NUMBER DOCUMENT NO. REV. 6 8 1.2.6.5.1 FS-SP-0203 1

Page 109: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 02XXX SHAFT SINKING, ES-2

3.7 TEST SUPPORT AFTER BLAST

o Visual Inspection for Perched Water

o Geologic Mapping (if required)

3.8 MUCKING

3.8.1 Loading

3.8.2 Hoisting

3.8.3 Dumping

3.8.4 Dust Control (requirements for dust control during muck

cycle)

3.9 TEMPORARY SERVICES

o Compressed Air

o Construction Water

o Waterwaste Discharge

o Ventilation

o Electrical Power

o Communications

3.10 SHAFT CONCRETE LINING

(Refer to FS-SP-0308, "Shaft Liner Concrete")

FORM LV-314A (7-88)

FENIX & SCISSON, INC.

Page 110: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPEZIFICATION

"AC' - AS COMPLETED 'BFR" - BEFORE FABRICATION RELEASE "BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT "BU - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS° - WITH SHIPMENT

*ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. RFEV. FENIX & SCISSON, INC. 8 8 1.2.6.5.1 FS-SP-0203 1

Form LV-315A

Page 111: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO. FS-SP-0301

Q.A. LEVEL TBD

TITLE: FORMS, SHAFT LINER DIVISION 5 - METALS SUBDIVISION - STRUCTURAL STEEL

APPROVED BY

APPROVED BY

APPROVED BY

DATE

DATE

DATE

)2--7-38

'7c;/9~

AEST. OR IPAGESIR

incorporation of Title 1 100% See Review Comments Text

__________________________________ J

REV. DT EV. BV. APPROVED B RV. DAToE

S EABE1

REVISION DESCRIPTION

'ý ýe'c ý ýa

Page 112: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

FORMS, SHAFT LINER

PART I - GENERAL

Work Included Referenced Publications System Description Quality Assurance

PART 2 - PRODUCTS

2.1 Materials 2.2 Equipment 2.3 Fabrication

PART 3 - EXECUTION

Not Used

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.ISHEET 2

OF JWBS NUMBERI DOCUMENT NO. REV.

8 1.2.6.4.1 FS-SP-03011 1

EORM LV-314A (7-88)

1.1 1.2 1.3 1.4

PAGE

3 3 4. 4

4 5 5

7

8

Page 113: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

V SECTION 05XXX FORMS, SHAFT LINER

PART 1 - GENERAL

1.1 WORK INCLUDED

The work under this specification includes furnishing all materials, equipment, tools and labor required to fabricate, paint and deliver a steel form for a concrete lined shaft.

1.2 REFERENCED PUBLICATIONS

The publications listed below foFm a part of this specification.

1.2.1 American Institute of Steel Construction (AISC)

o M011 Manual of Steel Construction, Eighth Edition

o S314 Structural Joints Using ASTM A325 or A490 Bolts

o M013 Detailing for Steel Construction

1.2.2 American Society for Testing and Materials (ASTM)

o A6 General Requirements for Rolled Steel Plates, Shapes, Sheet Piling, and Bars for Structural Use

o A36 Specification for Structural Steel

o A53 Standard Specification for Pipe, Steel, Black Hot-Dipped, Zinc Coated Welded and Seamless

o A325 High-Strength Bolts for Structural Steel Joints

o A490 Heat Treated Steel Structural Bolts, 150 ksi Minimum Tensile Strength

o A500 Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

o A563 Specification for Carbon and Alloy Steel Nuts

o F436 Specification for Hardened Steel Washer

SHEET OF I OBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 8 12641 F-SP-03011

FORM LV-314A (7-88)

Page 114: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX FORMS, SHAFT LINER

1.2.3 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

o A2.4 Standard Symbols for Welding, Brazing and Nondestructive Examination

1.2.4 Steel Structures Printing Council (SSPC)

o SP6 Commercial Blast Cleaning

1.3 SYSTEM DESCRIPTION

The shaft liner form shall consist of a base ring, barrel structure and pour lip totaling up to 20 feet high for a 12" foot diameter shaft.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for this fabrication is to be determined.

1.4.2 The vendor shall have an approved quality assurance program describing specified work, including a description which identifies management controls related to the fabrication process, quality control and inspection requirements, material procurement procedures test procedures, and documentation.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Structural steel plates, shapes and bars shall conform to ASTM A36 Specification.

2.1.2 Structural tubing shall conform to ASTM A500 Grade B Specification.

2.1.3 High strength bolts shall conform to ASTM A325 Specification.

2.1.4 Carbon and alloy steel nuts shall conform to ASTM A563 Specification.

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 4 8 1.2.6.4.1 FS-SP-0301 1

FORM LV-314A (7-88)

Page 115: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

FORM LV-314A (7-88)

SECTION 05XXX FORMS, SHAFT LINER

2.1.5 Hardened steel washers shall conform to ASTM F436 Specification, Vendor shall supply two washers per bolt.

2.1.6 Pipe shall conform to ASTM A53 Grade B Specification, pipe

shall be black.

2.1.7 All material shall be new and clean.

2.1.8 Plate material shall be ordered to thickness and shall not be more than 0.01" less than nominal thickness. •

2.2 EQUIPMENT

2.2.1 All welding equipment shall be in good condition and subject to inspection and approval by the QCR.

2.3 FABRICATION

2.3.1 Welding to be done by using: qualified welding equipment, qualified procedures and qualified welders and/or inspectors.

2.3.2 Fabrication shall be in accordance with approved shop drawings, AISC Manual of Steel Construction, AWS Structural Welding Code - Steel, and this specification.

o Plates to be formed by rolling shall be cold rolled.

o No localized heating for forming will be permitted.

o The edges of all parts to be joined by welding shall be prepared by machining, grinding, flame cutting or combinations of these methods.

0 All weld joints and the immediate area shall be mechanically or chemically cleaned of all foreign matter.

0 Close fitup is required at points where fillet welds are applied.

o Welding shall be performed with 70 Ksi low hydrogen electrodes.

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 8 1.2.6.4.1 FS-SP-0301

Page 116: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX FORMS, SHAFT LINER

o All welding shall conform to AWS DI.1.

0 All weld defects as specified herein and in the AWS D1.1 Structural Welding Code - Steel, Section 8.15 shall be repaired as specified in Section 3.7 of the AWS Code.

2.3.3 Inspection and testing of welds shall be in accordance with Chapter 6 of the AWS D1.1 Code.

o Inspection and testing shall be performed by the vendor.

0 All welds shall be 100% visual and dimensionally inspected. Up to 50% of the welds shall also be magnetic particle or dye penetrant inspected as requested by the QCR.

0 If stiffener rings are spliced by butt weld, this weld shall be full penetration, and 100% radiographically inspected.

o The weld inspector shall certify that the welds were inspected, repaired where required and reinspected and are free of specified defects.

2.3.4 Dimensional Inspection

o The vendor shall give proper notice and furnish all facilities necessary for inspection. This shall include personnel and equipment required. Any inspection may be witnessed by the QCR.

0 Prior to fabrication, the vendor shall identify and measure the thickness of each plate. The thickness shall be measured at each corner and at the centerline on each edge. A record of each plate thickness shall be supplied to the QCR prior to fabrication. Plates 0.01" less than nominal thickness will not be accepted.

o For checking dimensional tolerances, the vendor shall completely erest the form. Dimsnsions shall be measured at 70 Fahrenheit (±10 ), and shall be in accordance with certified drawings.

- At any point along the form axis, the radius shall not exceed 6 feet 1/4 inch, ± 1/4 inch.

EORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

6 8 1.2.6.4.1 FS-SP-0301 1

Page 117: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

I

2.3.5

2.3.6

SECTION 05XXX FORMS, SHAFT LINER

- Overall height ± 1/4"; bottom of base ring to top of top circumferential stiffener.

- Spacing circumferential and vertical stiffeners + 1/4".

- Plumbness: 1/2" measured centerline top of form to centerline bottom of base ring.

- Wall straightness ± 1/2" measured at any'location on the circumference.

Mark each section of the form to assure erection at the site will be identical to shop erection.

Blast clean in accordance with SSPC SP6.

PART 3 - EXECUTION

Not Used

FENIX & SCISSON, INC.SHEET OF WBS NUMBER

7 8 1.2.6.4.1

LDV~sM~fM ["-J1

FS-SP-0301

FORM LV-314A (7-88)

*�.*9 � I

1

Page 118: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED

NO DATA REQUIREMENTS REQUIRE[ FOR THIS OUTLINE SPE;IFICATION

"AC" - AS COMPLETED 'BFR" - BEFORE FABRICATION RELEASE "BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FNX&SISNIN. 8 8 1.2.6.4.1 FS-SP-0301 1Form LV-315A

Page 119: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

I TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION).

FS-SP-0308 NO.

O.A. LEVEL II

TITLE: SHAFT LINER CONCRETE DIVISION 3 - CONCRETE SUBDIVISION - CAST IN PLACE CONCRETE

APPROVED BY

APPROVED BY

APPROVED BY

DATE

DATE

DATE

.1

FENIX & SCI

Form LV-313B (9-88)

SSON, INC.SHEET

1OF WBS NUMBER DOCUMENT NO. REV.

8 1.2.6.4.1 FS-SP-0308 1

Page 120: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

SHAFT LINER CONCRETE

PART 1 - GENERAL

1.1 Work Included 1-;2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Materials 2.2. Mixes

PART 3 - EXECUTION

3.1 Mixing 3.2 Placing 3.3 Formwork 3.4 Placing 3.5 Sampling 3.6 Vibrating 3.7 Curing 3.8 Testing

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2OF

8

WBS NUMEER DOCUMENT NO.

1.2.6.4.1 FS-SP-0308

FORM LV-314A (7-88)

PAGE

3 3 51 5

5 6

6 6 6 6 7 7 7 7

8

REV.

1

I

I

Page 121: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 03XXX SHAFT LINER CONCRETE

PART 1 - GENERAL

1.1 WORK INCLUDED

The work of this section includes the supply of all labor, plant and

materials and the performance of all work necessary for supplying and

placing concrete in the shafts and subsurface, as shown on the Contract Drawings, and as specified.

1.2 REFERENCED PUBLICATIONS .

The publications listed below form a part of this specification.

1.2.1 American Concrete Institute (ACI)

0

0

0

0

214

301

315

318-1

o 318

o 347

o 305

o 306-1

1 2.2 American

Recommended Practice for Evaluation of Strength Test

Results of Concrete

Specification for Structural Concrete for Buildings

Details and Detailing of Concrete Reinforcement

Building Code Requirements for Structural Plain Concrete

Building Code Requirements for Reinforced Concrete

Recommended Practice for Concrete Formwork

Hot Weather Concreting

Cold Weather Concreting

Society for Testing and Materials (ASTM)

o A97 Steel Welded Wire Fabric, Deformed for Concrete Reinforcement

o A185 Steel Welded Wire Fabric, Plain, for Concrete

Pl acement

o A615 Deformed and Plain Billet-Steel Bars for Concrete

o A775 Epoxy-coated Reinforcing Steel Bars

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

3 8 1.2.6.4.1 FS-SP-0308 1

EORM LV-314A (7-88)L{

•gmW•

Page 122: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 03XXX SHAFT LINER CONCRETE

o C31 Making and Curing Concrete Test Specimens in the Field

o C33 Specification for Concrete Aggregates

o C39 Test Method for Compressive Strength of Cylindrical Concrete Specimens

o C40 Organic Impurities in Fine Aggregates for Concrete

o C87 Effect of Organic Impurities in Fine Aggregate on Strength of Mortar

o C88 Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate

o C94 Ready-Mixed Concrete

o C125 Standard Definitions of Terms Relating to Concrete and Concrete Aggregates

o C127 Specific Gravity and Absorption of Coarse Aggregate

o C128 Specific Gravity and Absorption of Fine Aggregate

o C131 Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

o C136 Sieve Analysis of Fine and Coarse Aggregates

o C138 Test Method for Unit Weight, Yield, and Air Content (Gravimetric) of Concrete

o C143 Slump of Portland Cement Concrete

o C150 Standard Specification for Portland Cement

o C156 Water Retention by Concrete Curing-Materials

o C171 Sheet Materials for Curing Concrete

o C172 Sampling Freshly Mixed Concrete

o C260 Air-Entraining Admixtures for Concrete

FENIX & SCISSON,WBS NUMBER DOCUMENT NO. REV.

FBI &SISO, N.4 8 1.2.6.4.1 FS-SP-03081

FORM LV-314A (7-88)

Page 123: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 03XXX SHAFT LINER CONCRETE

o C231 Air Content of Freshly Mixed Concrete by the Pressure Method

o C311 Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use as a Mineral Admixture in Portland Cement Concrete

o C494 Specification for Chemical Admixtures for Concrete

o D75 Practice for Sampling Aggregates

o D512 Test Methods for Chloride Ion in Water .

o D1293 Standard Test Methods for pH of Water

o D1888 Test Methods for Particulate and Dissolved Matter, Solids or Residue in Water

1.2.3 American Welding Society (AWS)

o D1.4 Structural Welding Code-Reinforcing Steel

1.3 SYSTEM DESCRIPTION

Set formwork, place and cure concrete for the shaft liner to provide support for the shaft excavation and anchorage for shaft furnishings. Where required, blockouts will be placed to allow access to shaft instrumentation holes.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Shaft Liner concrete is II.

1.4.2 The supplier shall have an approved Quality Assurance program.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Portland Cement

Shall conform to the requirements of ASTM C150

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FEI &SISO, N.5 8 1.2.6.4.1 FS-SP-03081

FORM LV-314A (7-88)

-7

Page 124: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 03XXX SHAFT LINER CONCRETE

2.1.2. AggreQates

Shall conform to requirements of ASTM C33

2.1.3 Air-Entraining Admixtures

Shall conform to requirements of ASTM C260

2.1.4 Chemical Admixtures

Shall conform to requirements of ASTM C496

2.1.5 Reinforcement

Provide reinforcing bars and welded steel fabric reinforcement conforming to ASTM A615 and A97 and in accordance with the applicable drawings.

2.2 MIXES

Furnish mix proportions to obtain concrete of 5,000 psi 28-day compressive strength when tested according to ASTM C39.

PART 3 - EXECUTION

3.1 MIXING

Begin mixing within 30 minutes after cement has been added to the aggregates.

3.2 PLACING

Transport concrete from the mixer to the forms as rapidly as practical without causing segregation or loss of ingredients.

3.3 FORMWORK

Forms will be placed to tolerance as shown on the Contract Drawings. The I minimum distance from the bottom of the forms to the shaft bench shall be I 20 feet.

3.4 PLACING

Method of placement into the forms shall not cause segregation of the ingredients. Blasting shall not resume before concrete has taken its initial set.

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FNIX & SCISSON, INC. I 6 8 1.2.6.4.1 FS-SP-0308 1

Page 125: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

I

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. R EV.

7 8 1.2.6.4.1 FS-SP-0308 1

EORM LV-314A (7-88)

SECTION 03XXX SHAFT LINER CONCRETE

3.5 SAMPLING

Obtain samples at point of discharge into the forms to perform slump tests and to form test cylinders for testing in an approved materialstesting laboratory.

3.6 VIBRATING

Vibrate the newly-placed concrete in the forms for no longer than necessary to achieve consolidation.

3.7 CURING

Allow concrete to cure for a minimum period of 48 hours after placement before removing forms. (This may be modified by the'Contracting Officer based on a pre-construction test program).

3.8 TESTING

Frequency of obtaining concrete samples for testing shall be at the direction of the CONTRACTING OFFICER. Minimum acceptable sampling shall be no more than seven cylinders from each batch delivered to the site.

Page 126: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

=' NUMBER OF * WHEN REQUIRED

DESCRIPTION REQUIRED COPIES REFERENCE FOR REQUIRED

NO DATA REQUIREMENTS REQUIRED FOR THIS PUTLINE SPE(IFICATION

"AC' - AS COMPLETED 'BFR - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU" - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS - WITH SHIPMENT

"ACM" - APPROVAL BY MANAGER "REC" - RECORD

Form LV-315A

FENIX & SCISSON, INC. SHEET OF WBS NUMBER DOCUMENT NO. REV.

8 8 1.2.6.4.1 FS-SP-0308 1

Page 127: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

I TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-0503 NO.

Q.A. LEVEL II

TITLE: ANCHOR BOLTS AND EMBEDDED ITEMS DIVISION 5 METALS SUBDIVISION METAL FASTENING

APPROVED BY

APPROVED By

APPROVED BY

/1- 3-c- # DATE

DATE

D Ec 7 //F7 DATE/

FormFENIX & SCI(

Form LV-31 3B (£-88)

3SON, INC.OF JWBS NUMBER DOCUMENT NO. REV.

6 1.2.6.7.3 FS-SP-0503 1

I

i J

Page 128: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ANCHOR BOLTS AND EMBEDDED ITEMS

PAGEPART I - GENERAL

1.1 1.2 1.3 1.4

Work Included Referenced Publications System Description Quality Assurance

PART 2 - PRODUCTS

2.1 Materials 2.2 Accessories 2.3 Fabrication

PART 3 - EXECUTION

3.1 Installation 3.2 Inspection

DATA REQUIREMENTS LIST

3 3 4 4

4 4 4

5 5

6

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 6 1.2.6.7.3 FS-SP-0503 I

FORM LV-314A (7-88)

Page 129: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX

ANCHOR BOLTS AND EMBEDDED ITEMS

PART 1 - GENERAL

1.1 WORK INCLUDED

The work of this section includes the furnishing and fabricating of anchor bolts, inserts, steel plates or shapes used: in the base of headframes; in bolting the hoists to the foundation; in connecting buntons,.guides and utility brackets to the walls of the shafts; in connecting station framing; in bolting the loading flask and surge bin in the loading pocket of the ES-2 shaft and in bolting the tail shaft cross beams and ladder landings as detailed in the Contract Drawings.

1.2 REFERENCED PUBLICATIONS

The publications listed below from a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

0 30 CFR 57 Safety and Health Standards for Underground Metal and Nonmetal Mines

1.2.2 California Administrative Code (CAC)

o Title 8, Subchapter 17, Mine Safety Orders

1.2.3 American Institute of Steel Construction (AISC)

o MOll Manual of Steel Construction, 8th Edition

1.2.4 American National Standards Institute

(ANSI)

o A10.13 Safety Requirements for Steel Erection

1.2.5 American Society for Testing and Materials (ASTM)

o A36 Standard Specification for Structural Steel

o A307 Standard Specification for Carbon Steel Bolts and Studs 60,000 psi Tensile Strength

o F436 Standard Specification for Hardened Steel Washers

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 6 1.2.6.7.3 FS-SP-0503

FORM LV-314A (7-88)

Page 130: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX ANCHOR BOLTS AND EMBEDDED ITEMS

1.2.6 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

1.3 SYSTEM DESCRIPTION

Anchor bolts and embedded items are comprised of threaded rods, nuts and washers, plates or rolled shapes with welded stud anchors, ferrule loop type inserts or expansion type anchors complete with nuts and washers.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Anchor Bolts and Embedded Items is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management control relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Anchor Bolts (ASTM A307) 2.1.2 Plates and Rolled Shapes (ASTM A36) 2.1.3 Expansion Anchors or Inserts (Stainless Steel) 2.1.4 Nuts (A307) 2.1.5 Washers (ASTM F436)

2.2 ACCESSORIES

2.2.1 Welding Electrodes (AWS D1.1)

2.3 FABRICATION

2.3.1 Fabrication shall be in accordance with the AISC Manual of Steel Construction, AWS Structural Welding Code, Steel and this specification.

FENIX &SHEET OF WBS NUMBER DOCUMENT NO. REV.

FEI &SISO , N.4 6 1.2.6.7.3 FS-SP-05031

FORM LV-314A (7-88)

Page 131: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 05XXX ANCHOR BOLTS AND EMBEDDED ITEMS

PART 3 - EXECUTION

3.1 INSTALLATION

3.1.1 Anchor Bolts and embedded items shall be installed as shown in the Contract Drawings.

3.1.2 Survey plan will be shown as a developed elevation on the drawings.

3.2 INSPECTION

3.2.1

3.2.2

FENIX & SCISS(

FORM LV-314-A (7-88)

Visual Inspection Welds (AWS D1.1, Part 6)

Inspection of Installed Items (anchor bolts, embedded items and fasteners).

Page 132: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED__ REQUIRED

NO DATA REQUIREMENTS REQUIRE[ FOR THIS )UTLINE SPE(IFICATION

.AC' - AS COMPLETED "BFR° - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT "BU° - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS - WITH SHIPMENT

"*ACM' - APPROVAL BY MANAGER "REC" -RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC.

6 6 1.2.6.3.2 FS-SP-0503 1

Fcrm LV-315A

Page 133: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-0701 NO.

TITLE: SUMP LINERS DIVISION 7 SUBDIVISION -

THERMAL AND MOISTURE PROTECTION WATERPROOFING

APPROVED BY

APPROVED

APPROVED

BYe

I{ FENIX & SCI Form LV-313B (9-88)

SSON, INC.

DATE

DATE

DATE

O.A. LEVEL IT -

Page 134: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

SUMP LINERS

PAGE PART 1 - GENERAL

1.1 Work Included 3 1.2 Referenced Publications 3 1.3 System Description 3 1.4 Quality Assurance 3

PART 2 - PRODUCTS

2.1 Materials 3

PART 3 - EXECUTION

3.1 Fitting and Installation 4 3.2 Anchoring in Place 4 3.3 Ambient Conditions 4 3.4 Thermal Welding of Plastic Sheets 4 3.5 Testing 4 3.6 Acceptance 4

DATA REQUIREMENTS LIST 5

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 5 1.2.6.7.3 FS-SP-0701 I

Page 135: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION O1XXX

SECTION 07XXX SUMP LINERS

PART I - GENERAL

1.1 WORK INCLUDED

The work under this specification includes the furnishing and installation, at the bottom of each shaft, a watertight thermoplastic lining system.

1.2 REFERENCED PUBLICATIONS

1.1.1 American Society for Testing and Materials (ASTM):

D1248

D2103

Specification for Polyethylene Plastics Molding and Extrusion Materials Standard Specification for Polyethylene Film and Sheeting

1.3 SYSTEM DESCRIPTION

1.3.1 Furnish and install at the bottom of each shaft a watertight plastic lining to contain ground or process water originating from the formation or introduced from underground workings.

The material has a non-slip surface and a high impact resistance The lining is anchored in place with headed studs, thermal welded to the lining and embedded in concrete. All seams are thermal welded after placement to ensure complete water tightness.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Sump Liners is II.

1.4.2 The supplier shall have an approved Quality Assurance Program.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Preformed panels of 5 mm thickness polyethylene sheeting.

2.1.2 Accessories: Seam flashing and/or panel connection assemblies.

FENIX & SCISSON, INC.SHEET

3

OF WBS NUMBER DOCUMENT NO. REV.

5 1.2.6.7.3 FS-SP-0701 1I EORM LV-314A (7-88)

I

Page 136: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 07XXX SUMP LINERS

2.1.3 Special Equipment: Thermal welding guns for connecting adjoining panels.

PART 3 - EXECUTION

3.1 FITTING AND INSTALLATION

3.2 ANCHORING IN PLACE

3.3 AMBIENT CONDITIONS

3.4 THERMAL WELDING OF PLASTIC SHEETS

3.5 TESTING

3.6 ACCEPTANCE

EORM LV-314A (7-88)

S&SHEET OF JW S NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 1.2.6.7.3 FS-SP-0701 1

Page 137: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

DESCRIPTION

NO DATA REQUIREMENTS REQUIREI FOR THISIOUTLINE SPEPIFICATION

"AC - AS COMPLETED -BFR - BEFORE FABRICATION RELEASE

"BC - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) -WS - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 5 1.2.6.7.3 FS-SP-0701 1

Form LV-315A

Page 138: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1403 NO.

Q.A. LEVEL I

TITLE: ES-] HEADFRAME DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - SCAFFOLDING

APPROVED BY

APPROVED BY

APPROVED BY

(2kt 1K\�U.-&

7�4e �4C�2�

DATE /- &z7d,-/

DATE

ATE 1/6e DATE/

SHE

FENIX & SCISSON, INC.ET OF WBS NUMBER DOCUMENT NO. REV.

7 1.2.6.4.2 FS-SP-1403 1

Form LV-313B (9-88)

A J

Page 139: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-1 HEADFRAME

PAGE

PART 1 - GENERAL

1.1 1.2 1.3 1.4 1.5

Work Included Related Sections Referenced Publications System Description Quality Assurance

PART 2 - PRODUCTS

2.1 Materials 2.2 Equipment 2.3 Fabrication

PART 3 - EXECUTION

3.1 3.2 3.3 3.4

Erection/Installation Modifications Structure Adjustment Tolerances

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2

OF WBS NUMBER DOCUMENT NO. REV.

7 1.2.6.4.2 FS-SP-1403 1

3 3 3 4! 4

5 5 5

5 5 6 6

7

I FORM LV-314A (7-88)

I l

Page 140: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX

ES-i HEADFRAME

PART I - GENERAL

1.1 WORK INCLUDED

The work described in this Section consists of furnishing all materials, equipment, tools, labor, and incidental services to fabricate, and deliver the headframe structural steel in accordance with this specification and the Contract Drawings.

RELATED SECTIONS

FS-SP-0501 Structural Steel FS-SP-0502 Miscellaneous Steel FS-SP-0503 Anchor Bolts and Embedded Items

REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.3.1 American National Standards Institute (ANSI)

1.3.2

1.3.3

1.3.4

o A10.13 Safety Requirements for Steel Erection

o A58.1 Minimum Design Loads for Buildings and other Structures

American Institute of Steel Construction (AISC)

o Moll

American

Manual

iron and

of Steel Construction, Eighth Edition

StAel Institute (AISI)

o SG-671 Cold Formed Steel Design Manual, Specification for the Design of Cold-Formed Steel Structural Members: Part I

American Society for Testing and Materials (ASTM)

0

0

ASTM A36

ASTM A307

o ASTM A325

FENIX & SCISSON, INC.

Standard Specification for Structural Steel

Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

Standard Specification for High-Strength Bolts for Structural Steel Joints

SHEET OF WBS NUMBER DOCUMENT NO. REV.

3 7 1.2.6.4.2 FS-SP-1403 1

EORM LV-314A (7-88)

1.2

1.3

S..... .... ..... .......... | .... ii

I

Page 141: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-i HEADFRAME

1.3.5 American Welding Society (AWS)

o AWS D1.1 Structural Welding Code - Steel

1.3.6 o Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards-Underground Metal and Nonmetal Mines

1.3.7 o California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders

o Title 8, Chapter 4, Subchapter 20, Tunnel Safety Orders

1.4 SYSTEM DESCRIPTION

Fabrication of the ES-i headframe includes:

1. Shaft headframe structural steel members

2. Fixed guide structural steel supports within the headframe

3. Stairs and platforms

1.5 QUALITY ASSURANCE

1.5.1 The Quality Assurance Level Assignment for the ES-i Headframe is II.

1.5.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 4 7 1.2.6.4.2 FS-SP-1403 I

FORM LV-314A (7-88)

Page 142: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-i HEADFRAME

PART 2 - PRODUCTS

MATERIALS

2.1.1

2.1.2

2.1.3

2.1.4

Furnish structural steel in accordance with Contract Documents and requirements specified by AISC and ASTM.

High-strength bolts: Furnish bolts complying with requirements specified in ASTM A325.

Anchor Bolts: Furnish anchor bolts complying wfth requirements specified in FS-SP-050.3.

Other bolts and washers: Furnish carbon steel bolts and washers conforming to requirements specified in ASTM A307.

EQUIPMENT

2.2.1 All welding equipment shall be in good condition and subject to inspection and approval by the Contracting Officer or his representative.

FABRICATION

2.3.1 Headframe: Fabricate headframe in accordance with Contract Drawings.

PART 3 - EXECUTION

3.1 ERECTION/INSTALLATION

Erection by Contractor of the headframe shall be in standards as outlined in "Referenced Publications".

conformance with

MODIFICATIONS

The Contractor may install, add, attach, modify, or steel members, platforms, or mechanical supports to after obtaining proper direction of the Contracting includes sheave bracing, etc.

delete structural the headframe only Officer. This

FENIX & SCISSON, INC.SHEET

5

OF WBS NUMBER DOCUMENT NO. REV.

7 1.2.6.4.2 FS-SP-1403 1

EORM LV-314A (7-88)

2.1

2.2

2.3

3.2

Page 143: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-i HEADFRAME

STRUCTURE ADJUSTMENT

The Contractor shall establish a survey plan to monitor the elevations of the headframe columns and backleg foundation connection. If elevation differentials exceed one inch, then the Contractor shall adjust the verticality of the structure by jacking, adding shims, etc.

(Scheduling of surveying and records - later.)

TOLERANCES

(Later)

FENIX & SCISSON, INC.SHEET

6

OF WBS NUMBER DOCUMENT NO. REV.

7 1.2.6.4.2 FS-SP-1403 1

FORM LV-314A (7-88)

3.3

3.4

Page 144: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

w, NUMBER OF WHEN NMEOFREQUIRED

DESCRIPTION REN COPIES REFERENCE FOR

REQUIRED REQUIRED

NO DATA REQUIREMENTS REQUIREr FOR THIS OUTLINE SPE(IFICATION

"AC' - AS COMPLETED 'BFR' - BEFORE FABRICATION RELEASE

"BC; - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU° - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS° - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 7 7 1.2.6.4.2 FS-SP-1403 1

Form LV-315A

Page 145: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO.FS-SP-1404

Q.A. LEVEL II

ES-2 HEADFRAME DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - SCAFFOLDING

APPROVED BY

APPROVED BY

APPROVED BY

(7;,, '(.

�}-�A

72� 4' �&d�-

// - e•DATE

DATE 2-2-88

DATE / 1/•gg

S SECT. OR . REV. D REVISION DESCRIPTION i PAGES !REV. BY1 APPROVED BY NO. DATE

Revised to add Table of I 122 Contents and D.R.L. 12 & 7 1SF4AFl S4 Av on

1 1 I

FENIX & SCISSON, INC.SHEET

1OF WBS NUMBER

7 1.2.6.5.2DOCUMENT NO.

FS-SP-1404

,-orm LV-313B (9-88)

TITLE:

REV.

11

Ij

Page 146: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-2 HEADFRAME

PAGE PART I - GENERAL

1.1 Work Included 3 1.2 Related Sections 3 1.3 Referenced Publications 3 1.4 System Description 4 1.5 Quality Assurance 4

PART 2 - PRODUCTS

2.1 Materials 5 2.2 Equipment 5 2.3 Fabrication 5

PART 3 - EXECUTION

3.1 Erection/Installation 5 3.2 Modifications 5 3.3 Structure Adjustment 6 3.4 Tolerances 6

DATA REQUIREMENTS LIST 7

FORM LV-314A (7-88)

F &SHEET OF WBS NUMBER DOCUMENT NO. R EV.

FENIX & SCISSON, INC. 7 1.2.6.5.2 FS-SP-1404 1

Page 147: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

I

o A10.13 Safety Requirements for Steel Erection

0 A58.1 Minimum Design Loads for Buildings and Other Structures

American Institute of Steel Construction (AISC)

Mo11Manual of Steel Construction, Eighth

Edition

and Steel Institute (AISI)

o SG-671 Cold-Formed Steel Design Manual Specification for the Design of Cold-Formed Steel Structural Members: Part I

American Society for Testing and Materials (ASTUM

ASTM A36

ASTM A307

Standard Specification for Structural Steel

Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO.

3 7 1.2.6.5.2 FS-SP-1404

FORM LV-314A (7-88)

1.3.2

0

Ameritcan Iron1.3.3

1.3.4

0

0

REV.

1

Am ri a IronI . .. . .. .. . ... . .

S............ ... i

I

SECTION 14XXX ES-2 HEADFRAME

PART 1 - GENERAL

1.1 WORK INCLUDED

The Work described in this Section consists of furnishing all materials, equipment, tools, labor, and incidental services to fabricate and deliver the headframe structural steel in accordance with this specification and the Contract Drawings.

1.2 RELATED SECTIONS

FS-SP-0501 Structural Steel FS-SP-0502 Miscellaneous Steel FS-SP-0503 Anchor Bolts and Embedded Items

1.3 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.3.1 American National Standards Institute (ANSI)

I

Page 148: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 HEADFRAME

o ASTM A325 Standard Specification for HighStrength Bolts for Structural Steel Joints

American Welding Society (AWS)

0 AWS D1.1 Structural Welding Code - Steel

Code of Federal Regulafions (CFR)

0 30 CFR 57 Safety and Health Standards-Underground Metal and Nonmetal Mines

1.3.7 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders

0 Title 8, Chapter 4, Subchapter 20, Tunnel Safety Orders

SYSTEM DESCRIPTION

Fabrication of the ES-2 headframe includes:

1. Shaft headframe structural steel members

2. Fixed counterweight guides and structural steel supports for timber guides within the headframe

3. Stairs and platforms

QUALITY ASSURANCE

1.5.1 The Quality Assurance Level Assignment for the ES-2 Headframe is II.

1.5.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management control relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

FENIX & SCISSON, INC.SHEET

4

OF WBS NUMBER DOCUMENT NO.

7 1.2.6.5.2 FS-SP-1404

EORM LV-314A (7-88)

1.3.5

1.3.6

1.4

1.5

REV.

1

I"

Page 149: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 HEADFRAME

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1

2.1.2

2.1.3

2.1.4

EQUIPMENT

2.2.1

Furnish structural steel in accordance with Contract Documents and requirements specified by AISC and ASTM.

High-strength bolts: Furnish bolts complying with requirements specified in ASTM A325.

Anchor bolts: Furnish-anchor bolts complying with requirements specified in FS-SP-0503.

Other bolts and washers: Furnish carbon steel bolts and washers conforming to requirements specified in ASTM A307.

All welding equipment shall be in good condition and subject to inspection and approval by the Contracting Officer or his representative.

FABRICATION

2.3.1 Headframe: Drawings.

Fabricate headframe in accordance with Contract

PART 3 - EXECUTION

3.1 ERECTION/INSTALLATION

Erection (by Contractor) of the headframe shall be in conformance with

standards as outlined in "Referenced Publications".

3.2 MODIFICATIONS

The Contractor may install, add, attach, modify, or steel members, platforms, or mechanical supports to after obtaining proper direction of the Contracting includes sheave bracing etc.

FENIX & SCISSON, INC.

delete structural the headframe only Officer. This

SHEET OF WBS NUMBER DOCUMENT . REV.

5 7 1.2.6.5.2 FS-SP-1404 1

FORM LV-314A (7-88)

2.2

2.3

Page 150: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 HEADFRAME

3.3 STRUCTURE ADJUSTMENT

The Contractor shall establish a survey plan to monitor the elevations of the headframe columns and backleg foundation connection. If elevation differentials exceed one inch, then the Contractor shall adjust the verticality of the structure by jacking, adding shims, etc.

(Scheduling of surveying and records - later.)

3.4 TOLERANCES

(Later)

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 6 7 1.2.6.5.2 FS-SP-1404 1

Page 151: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

DESCRIPTION

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPECIFICATION

"AC" - AS COMPLETED 'BFR' - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED -PS' - PRIOR TO SHIPMENT "BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) "WS - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 7 7 1.2.6.5.2 FS-SP-1404 1

Form LV-315A

.. I

Page 152: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1406 NO.

O.A. LEVEL II

TITLE:

APPROVED BY

SHAFT CONVEYANCE GUIDES DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION: ELEVATORS

DATE /z-l-8

DATE 2-8APPROVED BY

DATE - - -----APPROVED BY

WBS NUMBERI DOCUMENT NO.

1.2.6.7.3 FS-SP-1406

Form

7, 1A

Page 153: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

SHAFT CONVEYANCE GUIDES

PAGEPART 1 - GENERAL

1.1 1.2 1.3 1.4 1.5

Work Included Referenced Publications System Description Quality Assurance Delivery and Storage

3 3. 4 4 4

PART 2 - PRODUCTS

2.1 2.2 2.3 2.4

3.1 3.2 3.3 3.4

Timber Steel Back-Up Beams for Timber Guides Steel Guides Fasteners

Shipping Storage, Inspection, Inventory Installation Inspection of Installation Maintenance and Inspection Program

DATA REQUIREMENTS LIST

4 4 5 5

5 5 5 5

7

FENIX & SCISSON, INC.SHEET

2

OF

6

WBS NUMBER DOCUMENT NO.

1.2.6.7.3 FS-SP-1406

EORM LV-314A (7-88)

PART 3 - EXECUTION

REV.

1

I I"

I

Page 154: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX SHAFT CONVEYANCE GUIDES

PART 1 - GENERAL

1.1 WORK INCLUDED

The work under this specification includes furnishing and installing timber conveyance guides in ES-I and ES-2, and steel counterweight guides in ES-2.

1.2 REFERENCED PUBLICATIONS

1.2.1 Code of Federal Regulations (CFR)

30 CFR57 Safety and Health Standards Underground Metal and Non Metal Mines: 57.19102 - Shaft Guides

1.2.2 California Administrative Code

o Title 8, Subchapter 17, Mine Safety Orders: 7130 - Shaft Guides

1.2.3 American Society For Testing and Materials (ASTM)

o D245 Methods for Establishing Structural Grades and Related Allowable Properties for Visually Graded Lumber

o D2555 Methods for Establishing Clear Wood Strength Values

o D2016 Standard Test Methods for Moisture Content of Wood

o A500 Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

0 A36 Standard Specification for Structural Steel

o A6 Standard Specification for General Requirements for Rolled Steel Plates, Shapes, Sheet Piling, and Bars for Structural Use

o A325 Standard Specification for High-Strength Bolts for Structural Steel Joints

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 6 1.2.6.7.3 FS-SP-1406 1

FORM LV-314A (7-88)

Page 155: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX SHAFT CONVEYANCE GUIDES

o A563

1.2.4 National

Specification for Carbon and Alloy Steel Nuts

Lumber Grades Authority (NLGA)

o 189a Mine Guides, (Grade "Clear") Standard Grading Rules for Canadian Lumber (Approved by the American Lumber Standards Board of Review).

1.2.5 American Welding Society (AWS)

o D1.1

0 A2.4

Structural Weldlng Code, Steel

Standard Symbols for Welding Brazing and Nondestructive Examination

SYSTEM DESCRIPTION

There are two types of guide systems required at ESF, timber guides for skips and mancages, and structural steel tubing guides for the ES2 counterweight. The timber guides include structural steel back-up.

QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the Shaft Conveyance Guides is II.

1.4.2 Material Suppliers shall have an approved Quality Assurance Program.

DELIVERY AND STORAGE

PART 2 - PRODUCTS

2.1 TIMBER

2.1.1 Material

2.1.2 Properties

2.1.3 Treatment

2.2 STEEL BACK-UP BEAMS FOR TIMBER GUIDES

2.2.1 Material

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

4 6 1.2.6.7.3 FS-SP-1406 1

FORM LV-314A (7-88)

1.3

1.4

1.5

I

I

I

Page 156: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX SHAFT CONVEYANCE GUIDES

2.2.2 Fabrication

2.2.3 Coating

2.3 STEEL GUIDES

2.3.1 Material

2.3.2 Fabrication

2.4 FASTENERS

PART 3 - EXECUTION

3.1 Shipping, storage, inspection, inventory

3.2 Installation

3.3 Inspection of Installation

3.4 Maintenance and Inspection Program

FORM LV.314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV. 5 6 1.2.6.7.3 FS-SP-1406 1

Page 157: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

**

WHEN NUMBER OF REQUIRED

DESCRIPTION REN COPIES REFERENCE FOR

REQUIRED REQUIRED

NO DATA REQUIREMENTS REQUIREO FOR THIS OUTLINE SPEIFICATION

"AC' - AS COMPLETED "BFR - BEFORE FABRICATION RELEASE

"BC'- BEFORE CONTRACT CAN BE AWARDED -PS - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 6 6 1 .2.6.7.3 FS-SP-14061

Form LV-315A

Page 158: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION(OUTLINE SPECIFICATION)

FS-SP-1407 NO.

O.A. LEVEL IT

TITLE: ES-i SHAFT SINKING DECK DIVISION 5 - METALS SUBDIVISION - METAL FABRICATIONS

DATE /_2--/-e- -APPROVED BY

DATE ý'-- 83APPROVED BY

DATEAPPROVED BY

FEENIX & SCISSON, INC.

orm LV-313B (9-88)

Page 159: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-1 SHAFT SINKING DECK

PAGE

PART 1 - GENERAL

1.1 1.2 1.3 1.4

Work Included Referenced Publications System Description Quality Assurance

3 3 4 4

PART 2 - PRODUCTS

2.1 2.2 2.3 2.4

Materi al s Fabrication Coating Inspection

4 4 4 4

PART 3 - EXECUTION

3.1 3.2 3.3 3.4 3.5

Surface Preparation Erection Installation Inspection Protection

5 5 5 5 5

6DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SH�T Ut.SH2ET

20 F

6WS$ NUMBER DOCUMENT NO. REV.

11.2.6.7.3 FS-SP-1407 1

EORM LV-314A (7-88)

Page 160: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-i SHAFT SINKING DECK

PART I - GENERAL

1.1 WORK INCLUDED

The work under this specification includes furnishing all materials, equipment, tools and labor required to fabricate, paint and deliver a steel 3-stage work deck for shaft sinking and geological and geotechnical testing.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 American institute of Steel Construction (AISC)

o M013 Detailing for Steel Construction

1.2.2 American Society for Testing and Materials (ASTM)

o A6 General Requirements for Rolled Steel Plates, Shapes, Sheet Piling, and Bars for Structural Use

o A36 Standard Specification for Structural Steel

0 A53 Standard Specification for Pipe, Steel, Black Hot-Dipped, Zinc Coated Welded and Seamless

0 A307 Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

o A500 Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

o A501 Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing

o A563 Specification for Carbon and Alloy Steel Nuts

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 3 6 1.2.6.7.3 FS-SP-1407 1

EORM LV-314A (7-88)

Page 161: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-1 SHAFT SINKING DECK

o F436 Standard Specification for Hardened

Steel Washers

1.2.3 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

o A2.4 Standard Symbols for Welding, Brazing and Nondestructive Examination

1.2.4 Steel Structures Paintinq Council (SSPC)

o SSPC SP6 Commercial Blast Cleaning

1.3 SYSTEM DESCRIPTION

The ES-I Sinking Deck consists of a 3-stage work deck which will be

suspended in the shaft on wire ropes. The work deck will have one

opening for one sinking bucket and two hinged areas for the

cryderman and utility lines. It will have provisions for mounting

special equipment for shaft wall mapping.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the ES-i Sinking Deck is

II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work,

including descriptions which identifies management control relative

to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 Materials

2.2 Fabrication

2.3 Coating

2.4 Inspection

FENIX & SCISSON, INC.BS NUMBER DOCUM.ENT NO. RE

FENIX a CSOIC 6 1.2.67. FS-SP-14071

FORM LV-314A (7-88)

Page 162: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-i SHAFT SINKING DECK

PART 3 - EXECUTION

Surface Preparation

Erection

Installation

Inspection

Protection

EORM LV-314A (7-88)

3.1

3.2

3.3

3.4

3.5

FENIX & SCISSON, INC.WBS NUMER DOCUMENT NO. REV.

FEI &SISO, N. 5 6 1.2.6.7.3 FS-SP-1407 -11

Page 163: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

I WHEN NUMBER OF REQUIRED

DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED

NO DATA REQUIREMENTS REQUIRE) FOR THIS IOUTLINE SPEjIFICATION

".AC - AS COMPLETED "BFR" - BEFORE FABRICATION RELEASE

"BC; - BEFORE CONTRACT CAN BE AWARDED -PS" - PRIOR TO SHIPMENT

"BU - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM" - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC.

6 6 1.2.6.7.3 FS-SP- 1407 1

Form LV-315A

Page 164: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1408 NO.

Q.A. LEVEL I

ES-i CONVEYANCE DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - LIFTS

SPECIFICATION A - SINKING CONVEYANCE

SPECIFICATION B - PERMANENT CONVEYANCE

APPROVED BY

APPROVED BY

APPROVED BY

kJ��\

8 4�Z�Z�

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

1 7 1.2.6.7.3 FS-SP-1408 I

Form LV-313B (9-88)

TITLE:

DATE

DATE -- -\2

DATE 26-LZZ

-7 7 .Sý:

Page 165: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

A - SINKING CONVEYANCE

PAGE PART 1 - GENERAL

1.1 Work Included 3 1.2 Referenced Publications 3 1.3 System Description 4 1.4 Quality Assurance 4

PART 2 - PRODUCTS

2.1 Fabrication 4 2.2 Painting 4

PART 3.- EXECUTION

3.1 Drop Testing 4 3.2 Shipping and Storage 4 3.3 Installation 4 3.4 Inspection and Acceptance 4

B - PERMANENT CONVEYANCE

PART 1 - GENERAL

1.1 Work Included 5 1.2 Referenced.Publications 5 1.3 System Description 5 1.4 Quality Assurance 6

PART 2 - PRODUCTS

2.1 Fabrication 6 2.2 Painting 6

PART 3 - EXECUTION

3.1 Drop Testing 6 3.2 Shipping and Storage 6 3.3 Installation 6 3.4 Inspection and Acceptance 6

DATA REQUIREMENTS LIST 7

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 7 11.2.6.1.3 FS-SP- 1408

-ORM LV-314A (7-88)

Page 166: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-1 CONVEYANCE,(SINKING CONVEYANCE)

PART 1 - GENERAL

1.1 WORK INCLUDED

This specification is for the fabrication and delivery of a safety crosshead and sinking bucket to be used for hoisting men, muck and material during shaft sinking.

1.2 REFERENCED PUBLICATIONS

1.2.1 Federal Regulations

o 30 CFR 57 Safety and Health Standards-Underground Metal and Nonmetal Mines

1.2.2 State of California Administrative Code

o Title 8, Chapter 4, Subchapter 17 - Mine Safety Orders

1.2.3 American Institute of Steel Construction (AISC)

o M011 Manual of Steel Construction, Eighth Edition

o M013 Detailing for Steel Construction

1.2.4 American Society for Testing and Materials (ASTM)

o A6 General Requirements for Rolled Steel Plates, Shapes, Sheet Piling, and Bars for Structural Use

o A689 Specification for Carbon and Alloy Steel Bars for Springs

1.2.5 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

o A2.4 Standard Symbols for Welding Brazing and Nondestructive Examination

SHEET OF WBS NUMBER DOCUMENT NO. R EV. FENIX & SCISSON, INC. 3 7 1.2.6.7.3 FS-SP-1408I

FORM LV-314A (7-88)

Page 167: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-I CONVEYANCE (SINKING CONVEYANCE)

1.3 SYSTEM DESCRIPTION

The system consists of a hoisting crosshead which uses stationary wire ropes for guidance, under which a circular bucket is suspended for hoisting men, muck and materials. The crosshead will be equipped with a bonnet to shield personnel riding in the bucket from falling materials, and safety dogs which grip the guide ropes in the event that the hoist rope connection goes slack.

1.4 QUALITY ASSURANCE

o The Quality Assurance Level Assignment for the Sinking Conveyance is II.

o The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 FABRICATION

o Approved Shop Drawings

o Inspection and Testing of Welds

o Dimensional Inspection

2.2 PAINTING

PART 3 - EXECUTION

3.1 DROP TESTING

3.2 SHIPPING & STORAGE

3.3 INSTALLATION

3.4 INSPECTION & ACCEPTANCE

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 14 7 1.2.6.7.3 FS-SP-1408 1

FORM LV-314A (7-88)

Page 168: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-1 CONVEYANCE (PERMANENT CONVEYANCE)

PART 1 - GENERAL

1.1 WORK INCLUDED

This specification is for the fabrication and delivery of a mancage.

REFERENCE

1.2.1

1.2.2

PUBLICATIONS

Federal Regul ations

o 30 CFR 57 Metallic and Non-Metallic Underground Mines (MSHA)

State of California Administrative Code

o Title

American

8, Chapter 4, Subchapter 17 - Mine Safety Orders

Institute of Steel Construction (AISC)

o Code of Standard Practice

o Detailing for Steel Construction

1.2.4 American Society for Testing and Materials (ASTM)

o A6 General Requirements for Rolled Steel Plates, Shapes, Sheet Piling, and Bars and Structural Use

o A689 Specification for Carbon and Alloy Steel Bars for Springs

American Welding Society (AWS)

o D1.I

o A2.4

Structural Welding Code Steel, Steel

Standard Symbols for Welding, Brazing and Nondestructive Examination

SYSTEM DESCRIPTION

The system consists of a single deck mancage with guide shoes, guide rollers, and broken rope safety dog system for timber guides, manually operated chairing device integral with the cage.

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

5 7 1.2.6.7.3 FS-SP-1408 1

FORM LV-314A (7-88)

1.2

1.2.3

1.2.5

1.3

Page 169: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

1.4

PART 2 - PRODUCTS

2.1 FABRICATION

o Approved Shop Drawings

o Inspection and Testing of Welds

o Dimensional Inspection

2.2 PAINTING

PART 3 - EXECUTION

DROP TESTING

SHIPPING & STORAGE

INSTALLATION

INSPECTION & ACCEPTANCE

FENIX & SCIS

FORM LV-314A (7-88)

"SON, INC.SHEE

6

ZT OF WBS NUMBER DOCUMENT NO. RREV.

7 1.2.6.7.3 FS-SP-1408 1

3.1

3.2

3.3

3.4

SECTION 14XXX ES-1 CONVEYANCE (PERMANENT CONVEYANCE)

QUALITY ASSURANCE

0 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work,

including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

Page 170: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

S NUMBER OF* JWHEN NMEOFREQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED __REQUIRED ___

NO DATA REQUIREMENTS REQUIRED FOR THIS OUTLINE SPECIFICATION

"AC - AS COMPLETED 'BFR° - BEFORE FABRICATION RELEASE

"*BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM" - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC.

1 1 1.2.6.7.3 FS-SP-14081

Form LV-315A

Page 171: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

- • FS-SP-1409

NO.

Q.A. LEVEL IT

TITLE: ES-2 MUCK LOADING SYSTEM DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - MATERIALS HANDLING SYSTEMS

APPROVED BY

APPROVED BY

APPROVED By

DATE - •.'-Af

DATE

DDc 7, 1?E DATE

FENIX & SCISSON, INC.OF JWBS NUMBER DOCUMENT N. REV.

7 1.2.6.6.0 FS-SP-14090 1

Form LV-3 13B (9-88)

Page 172: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-2 MUCK LOADING SYSTEM

PART 1 - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 PRODUCTS

2.1 Materials 2.2 Equipment 2.3 Fabrication 2.4 Shop Painting

PART 3 - EXECUTION

3.3 Erection/Installation 3.4 Inspection 3.5 Dimensional Inspection/Tolerances

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET

2

OF

7

WBS NUMBER

1.2.6.6.0

IF -

DOCUMENT NU.

FS-SP-1409

FORM LV-314A (7-88)

PAGE

3 3 4" 5

5 5 5 6

6 6 6

7

R V.

Page 173: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 MUCK LOADING SYSTEM

PART 1 - GENERAL

1.1 WORK INCLUDED

The work described in this Section consists of furnishing all materials, equipment, tools, labor, and incidental services to fabricate and deliver the Muck Loading System for underground in accordance with this specification and the Contract Drawings. Shop painting and necessary field touch up is also included.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 American National Standards Institute (ANSf)

0

1.2.2

1.2.3

1.2.4

A10.13 Safety Requirements for Steel Erection

American Institute of Steel Construction (AISC)

0 Moil

American Iron

Manual of Steel Construction, Eighth Edition

and Steel Institute (AISI)

0 SG-671 Cold-Formed Steel Design Manual Specification for the Design of Cold-Formed Steel Structural Members: Part I

American Society for Testing and Materials (ASTM)

0

0

ASTM

ASTM

0 ASTM

0 ASTM

American

A36 Standard Specification for Structural Steel

A307 Standard Specification Carbon Steel Bolts and Studs 60000 psi Tensile Strength

A325 Standard Specification for High-Strength Bolts for Structural Steel Joints

A449 Standard Specification for Quenched and Tempered Steel Bolts and Studs

Weldinq Society (AWS)

AWS D1.1 Structural Welding Code - Steel

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

3 7 1.2.6.6.0 FS-SP-1409 1

1.2.5

0

S.... ..... l F

"American

'ORM LV-314A (7-88)

I I

I

I

Page 174: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 MUCK LOADING SYSTEM

Code of Federal Reaulations (CFR)

o 30 CFR 57 Safety and Health Standards - Underground Metal and Nonmetal Mines

California Administrative Code (CAC)

o Title 8, Chapter 4, Sub-Chapter 17, Mine Safety Orders

Federal Specification (Fed. Soec.)

o TT-C-490B

o TT-P-645A

Cleaning Methods and Pretreatment of Ferrous Surfaces for Organic Coatings

Primer, Paint, Zinc Chromate, Alkyd Type

Military Specification (Mil. Spec.)

0 DOD-P-15328D(1) Primer (Wash), Pretreatment, (Formula No. 117 for Metals) (Metric)

1.2.10 Steel Structures Painting Council (SSPC)

o SSPC SP3 Power Tool Cleaning

o SSPC SP6 Commercial Blast Cleaning

SYSTEM DESCRIPTION

The system will be used for sizing and storing muck in the pocket for measuring and loading a 10 ton muck skip. The system will be installed in an excavation made in the rock. The system consists of a steel bar grizzly, with a maximum 12-inch clear opening, installed on top of a 150-ton steel surge bin which will have an air-operated gate at the bottom. The surge bin is to discharge into a volumetric type measuring flask, with a 10-ton capacity, and having an air-operated gate. The flask will discharge into a fixed chute leading to the skip. An access ladder is to be provided for the bottom of the measuring flask to the top of the surge bin.

FENIX & SCISSON, INC.SHEET

4OF WBS NUMBER DOCUMENT NO.

7 1.2.6.6.0 FS-SP-1409

FORM LV-314A (7-88)

1.2.6

1.2.7

1.2.8

1.2.9

1.3

REV.

1

Federal Snecification (Fed. Snec.)

Page 175: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX

ES-2 MUCK LOADING SYSTEM

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the ES-2 Muck Loading System is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Furnish structural steel in accordance with Contract Documents and requirements specified by AISC and ASTM.

2.1.2 High-strength bolts: Furnish bolts complying with requirements specified in ASTM A325.

2.1.3 Anchor bolts: Furnish anchor bolts complying with requirements specified in ASTM A36.

2.1.4 Other bolts and washers: Furnish carbon steel bolts and

washers conforming to requirements specified in ASTM 307.

2.1.5 Furnish air-operated cylinders. Refer to FS-SP-1512

Compressed Air System.

2.2 EQUIPMENT

2.2.1 All welding equipment shall be in good condition and subject to inspection and approval by the Quality Assurance representative.

2.3 FABRICATION

2.3.1 Surge Bin: Fabricate for installation a 150-ton surge bin, complete with structural steel support, and an air-cylinder operated gate in accordance with the Contract Drawings.

2.3.2 Grizzly: Fabricate for installation steel bars on top of the surge bin with a maximum of 12-inch clear opening in accordance with the Contract Drawings.

FENIXS& SCISSON, INC. 7NUMBER DOCUMET NO. REV.

FENI &5CSO ,IC 7 1.2.6.6.0 FS-SP-14091

FORM LV-314A (7-88)

Page 176: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

Measuring

Measuring Flask:

Skip Feed:

Access Ladder:

SECTION 14XXX ES-2 MUCK LOADING SYSTEM

Fabricate for installation a 10-ton measuring flask, complete with structural steel support below the surge bin, to the 10-ton skip in Shaft Number 2, in accordance with the Contract Drawings.

Fabricate for installation a skip feed chute from the measuring flask to the 10-ton skip in Shaft Number 2, in accordance with the Contract Drawings..

Fabricate for installation an access ladder from the bottom of the measuring flask to the top of the surge bin, in accordance with the Contract Drawings.

SHOP PAINTING

2.4.1 Surface Cleaning (SSPC SP6) (SSPC SP3)

2.4.2 Pretreatment (Mil Spec DOD-P-15328) or (Fed. Spec. TT-C-490)

2.4.3 Priming (Fed. Spec. TT-P-645)

Factory Applied Finish Coating: System expect Grizzly.

For the Muck Loading

PART 3 - EXECUTION

3.3 ERECTION/INSTALLATION

Erection by Contractor of the muck loading system shall be conformance with the Contract Drawings and this specification.

3.4 INSPECTION

3.4.1

3.5

Visual Inspection Welds (AWS D1.1, Part 6)

DIMENSIONAL INSPECTION/TOLERANCES

FENIX & SCISSON, INC.SHEET

6

OF WBS NUMBER DOCUMENT NO.

7 1.2.6.6.0 FS-SP-1409

EORM LV-314A (7-88)

2.3.3

2.3.4

2.3.5

2.4

2.4.4

REV.

1

I

Page 177: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR REQUIRED

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPEOIFICATION

"AC" - AS COMPLETED "BFR" - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER REC RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC.FS-SP-1409 1

Form LV-315A

Page 178: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO.

Q.A.

TITLE: MONORAIL HOISTS AND JIB CRANES DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - HOISTS AND CRANES

APPROVED BY

APPROVED BY

APPROVED BY

FS-SP-1410

LEVELII

DATE /2

DATE

DATE

REVISION DESCRIPTIONiSECT. OF• PALES jREV. B'Y APPROVED BY

Revised to add Table of

Revised to add Table of /-" Contents and D.R.L. 2 & 5 SEE _bove12__

FENIX & SCISSON, INC.SHEET

1OF

5YBS8 NUMBER

1.2.6.6.0DOCUMENT NO.

FS-SP-1410

Form LV-313B (9-88)

" It'V. DATE NO0

I - -. -

REV.

1

Page 179: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

MONORAIL HOISTS AND JIB CRANES

PAGEPART 1 - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 PRODUCTS

2.1 General

PART 3 - EXECUTION

3.1 Fabrication 3.2 Pre-Erection Inspection 3.3 Erection and Installation 3.4 Operational Inspection 3.5 Testing 3.6 Acceptance

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHiEET

2

OF

5

WBS NUMsBER DOCUMENT NO. REV

1.2.6.6.0 FS-SP-14410 1

FORM LV-314A (7-88)

3 3 3 3

4

4 4 4 4 4 4

5

Page 180: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX MONORAIL HOISTS AND JIB CRANES

PART I - GENERAL

1.1 WORK INCLUDED

The work under this specification covers the procurement, installation and testing of monorail and jib crane systems.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Military Specifications (Mil. Spec.)

0 MIL-H-904H(2) Hoists, Chain, Hand-Operated, Hook and Trolley

o MIL-M-82021A

1.2.2 American Soc

o A275 Magne

1.2.3 American Wel

0 D1.1 Struci

1.2.4 American Nat

Suspension

Monorail Track Beam Systems for Trolley Suspended Hoists

iety for Testing and Materials (ASTM)

tic Particle

dinq Society

tural

ional

Examination of Steel Forgings

MAWS'

Welding Code, Steel

Standards Institute (ANSI)

0 B30.11 Monorail and Underhung Cranes

1.3 SYSTEM DESCRIPTION

1.3.1 Electrically operated monorail hoists will be installed at the top of each headframe to handle the head sheaves of the main hoists.

1.3.2 Jib Cranes will be installed at the collar of each shaft to permit handling of materials and equipment to and from the hoisting compartment. The Jib Cranes shall also be used to position the conveyance of the emergency hoist.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the Monorail Hoists and Jib Cranes is II.

1.4.2 The vendor shall have an approved Quality Assurance program.

SHEET OF WBS NUMBER DOCUMENT NO. REV.

•ENIX & SCISSON, INC. 5 1.2.6.6.0 FS-SP-1410 1

EORM LV-314A (7-88)

S.... •

l

I

I

0

Page 181: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX MONORAIL HOISTS AND JIB CRANES

PART 2 - PRODUCTS

2.1 GENERAL

2.1.1 Capacity of Hoists and Cranes

2.1.2 Hook lift height

2.1.3 Hook

2.1.4 Trolley

2.1.5 Monorail beam

PART 3 - EXECUTION

3.1 Fabrication

3.2 Pre-erection Inspection

3.3 Erection and Installation

3.4 Operational Inspection

3.5 Testing

3.6 Acceptance

FENIX & SCIS•

FORM LV-314A (7-88)

SON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

4 5 1.2.6.6.0 FS-SP-1410 1

I

Page 182: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

=' NUMBER OF " IWHEN NMEOFREQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQU__I RED REQUIRED

NO DATA REQUIREMENTS REQUIREO FOR THIS DUTLINE SPE( :IFICATION

"AC' - AS COMPLETED 'BFR' - BEFORE FABRICATION RELEASE

"BC; - BEFORE CONTRACT CAN BE AWARDED -PS' - PRIOR TO SHIPMENT "BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

Form LV-315A

SHEET OF WBS NUMBER DOCUMENT NO. REv

FE I C SS N N . 5 5 1.2.6.6.0 FS-SP-1410

Page 183: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1411 NO.

G.A. LEVEL IT

TITLE: ES-2 CONVEYANCE DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - TRANSPORTATION SYSTEMS

APPROVED BY ( 4" 4.

APPROVED BY

APPROVED BY

REVISION DESCRIPTION

IncQrporation of Title I 100% Review Comments

DATE

DATE 88

DATE

.1REV. DATE REV. BY APPROVED BY NO.

-/t LEE ABVE 1

.................

FENIX & SCISSON, INC.

Form LV-313B (9-88)

I

I -

&

Page 184: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-2 CONVEYANCE

PAGE PART 1 - GENERAL

1.1 Work Included 3 1.2 Referenced Publications 3 1.3 System Description 4 1.4 Quality Assurance 5

PART 2 - PRODUCTS

2.1 Materials 5 2.2 Equipment 5 2.3 Fabrication 5 2.4 Shop Painting 6

PART 3 - EXECUTION

3.1 Erection and Installation 6 3.2 Inspection 6 3.3 Dimensional Inspection/Tolerances 6 3.4 Testing and Acceptance 6

DATA REQUIREMENTS LIST 7

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 7 11.2.6.7.4 FS-SP-1411 1

Page 185: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 CONVEYANCE

PART 1 - GENERAL

WORK INCLUDED

The work described in this section consists of furnishing all materials, equipment, tools, labor, and incidental services to fabricate and deliver a double-deck man cage over a 10 ton bottom dump skip for ES-2 in accordance with this specification and the Contract Drawings. Shop painting and necessary field touch-up is also included.

REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1,1 Ampriran Natinnal Standards Institute (ANSI)

1.2.2

o A10.13 Safety Requirements for Steel

Erection

American Society for Testing and Materials (ASTM)

o A36

o A53

o A275

o A283

o A325

o A514

FENIX & SCISSON, INC.

Standard Specification for Structural Steel

Standard Specification for Pipe, Steel, Black and Hot Dipped, Zinc-Coated Welded and Seamless

Magnetic Particle Examination of Steel Forgings

Standard Specification for Low and Intermediate Tensile Strength Carbon Steel Plates.

Standard Specification for High Strength Bolts for Structural Steel Joints

Standard Specification for High Yield Strength, Quenched and Tempered Alloy Steel Plate, Suitable for Welding

SHEET

13I ( EORM LV-314A (7-88)

OF WBS NUMBER DOCUMENT NO.

7 1.2.6.7.4 FS-SP-1411

REV.

1

1.1

1.2

I

I

I

Page 186: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 CONVEYANCE

1.2.4 Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards-Underground

Metal and Non-metal Mines

1.2.5 California Administrative Code (CAC)

o Title 8, Chapter 4 Subchapter 17, Mine Safety Orders

1.2.6 Federal Specification (Fed. Spec.)

o TT-C-490B Cleaning Methods and Pretreatment of Ferrous Surfaces for Organic Coatings

o TT-P-645A Primer, Paint, Zinc Chromate, Alkyd Type

1.2.7 Military Specification (Mil. Spec.)

o DOD-P-15328D(1) Primer (Wash), Pretreatment, (Formula No. 117 for Metals) (Metric)

1.2.8 Steel Structures Painting Council (SSPC)

o SSPC SP3 Power Tool Cleaning

o SSPC SP6 Commercial Blast Cleaning

1.3 SYSTEM DESCRIPTION

This system covers the design, fabrication, testing and installation of one'double deck cage over a skip for ES-2. The skip/cage will be guided on rigid timber guides. The completed skip/cage assembly shall consist of. double deck cage with deck frame, side frames, side panels, access doors, inspection deck with bonnet, safety catch assembly, rope attachment, anti-trailing rope device, guide shoes, guide roller assemblies, floor grating, roof hatch, ladder, and overhead handholds. The skip is a 10 ton capacity bottom dump type, with bail common to both skip and cage. The skip shall be provided w~th an equipment lowering attachment located below the skip suitable for attaching heavy loads.

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 14 7 11.2.6.7.4 FS-SP-1411 11

Page 187: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

I SECTION 14XXXS~ SECTION 14XXX

ES-2 CONVEYANCE

1.4 QUALITY ASSURANCE

1.4.1

1.4.2

The Quality Assurance Level Assignment for the ES-2 Conveyance is II.

The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified w6rk, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1

2.1.2

2.1.3

EQUIPMENT

2.2.1

Structural steel in accordance with requirements specified by AISC and ASTM.

High-Strength bolts: Bolts complying with requirements specified in ASTM A325.

Other bolts and washers: Carbon steel bolts and washers conforming to requirements specified in ASTh 307.

All welding equipment shall be in good condition and subject to inspection and approved by the Quality Assurance representative.

FABRICATION

2.3.1 General: The skip/cage shall be in accordance with the requirements of this specification and shall be the manufacturer's standard commercial product.

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO.

5 7 1 1.2.6.7.4 FS-SP-1411FORM LV-314A (7-88)

2.2

2.3

REV.

1

Page 188: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-2 CONVEYANCE

Contract Drawings: Refer to the Contract show all required main features necessary fabrication and function of the skip/cage

Drawings. for proper system.

2.3.3 Too of Cage: The top of the cage to be equipped with inspection platform and protective bonnet. An access hatch with hinged door will also be located on top of each deck and on protective bonnet.

SHOP PAINTING

Surface Cleaning (SSPC SP6) (SSPC SP3)

Pretreatment (Mil Spec DOD-P-15328) of (Fed. Spec. TT-C-490)

Priming (Fed. Spec. TT-P-645)

Factory Applied Finish Coating: structure.

For the main conveyance

The Contractor shall erect and install accordance with manufacturer's written Drawings and this specification.

each skip/cage system in instructions, the Contract

INSPECTION

3.2.1 Visual Inspection Welds (AWS D1.1, Part 6)

DIMENSIONAL INSPECTION/TOLERANCES

TESTING AND ACCEPTANCE

FORM LV-314A (7-88)

2.3.2 They design,

2.4

2.4.1

2.4.2

2.4.3

2.4.4

PART 3 - EXECUTION

3.1 ERECTION AND INSTALLATION

3.2

3.3

3.4

I

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 6 7 1.2.6.7.4 FS-SP-1411 1

Page 189: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED

NO DATA REQUIREMENTS REQUIREB FOR THIS OUTLINE SPECIFICATION

*

"AC° - AS COMPLETED "BFR" - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT "BU" - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS' - WITH SHIPMENT

'ACM' - APPROVAL BY MANAGER "REC" - RECORD

F SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 7 1.2.6.7.4 FS-SP-1411 Form LV-315A

Page 190: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1412 NO.

Q.A. LEVEL IL

TITLE: SINKING COLLAR DOORS DIVISION 5 - METALS SUBDIVISION - METAL FABRICATIONS

APPROVED BY

APPROVED BY

APPROVED BY

4',fW,1~Q\I

,&A42ý ¼

DATE ~ -o

DATE

DATE O67

REVISION DESCRIPTION PE S 0

Incorporation of Title I 100% See Rpview Comments xt

REV. DATE REV. BI APPROVED BY NO. D

1.2-749 L 1 ,- I •'JI°

FENIX & SCISSON, INC.

ýorm LV-313B (9-88)

.pLm•, . • v•,,/nj-

Page 191: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

SINKING COLLAR DOORS

PART 1 - GENERAL

Work Included Referenced Publications System Description Quality Assurance

PART 2 - PRODUCTS

Materials Equipment Fabrication Shop Painting

PART 3 - EXECUTION

3.1 Erection 3.2 Inspection Test 3.3 Dimensional Inspection/Tolerances

DATA REQUIREMENTS LIST

1.1 1.2 1.3 1.4

PAGE

3 3 4 4

2.1 2.2 2.3 2.4

4 5 5 5

5 6 6

7

FSEET OF WBSNUMBER DOCUMENTNO. REV.

FENIX & SCISSON, INC. 2 7 1.2.6.7.3 FS-SP-1412

FORM LV-314A (7-88)

Page 192: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX

SINKING COLLAR DOORS

PART 1 - GENERAL

1.1 WORK INCLUDED

The work described in this section consists of furnishing all materials, equipment, tools, labor and incidental services to fabricate and deliver sinking collar doors for ES-1 and ES-2 in accordance with this specification and the Contract Drawings. Shop painting and necessary touch-up is also included.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o Title 30, Part 57 Safety and Health Standards for Underground Metal and Nonmetal Mines

1.2.2 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders

1.2.3 American National Standards Institute (ANSI)

o A10.13 Safety Requirements for Steel Erection

1.2.4 American Institute of Steel Construction (AISC)

o MOll Manual of Steel Construction, 8th Edition

o S326 Specification for the Design, Fabrication nd Erection of Structural Steel for Buildings

o M013 Detailing for Steel Construction

1.2.5 American Society for Testing and Materials (ASTM)

o A36 Standard Specification for Structural Steel

o A307 Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

o A325 Standard Specification for High Strength Bolts for Structural Steel Joints

o A514 Standard Specification for High Yield Strength Quenched and Tempered Alloy Steel Plate, Suitable for Welding

FORM LV-314A (7-88)

,SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 3 7 1.2.6.7.3 FS-SP-1412 1

Page 193: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

F SECTION 14XXX SINKING COLLAR DOORS

o A563 Standard Specification for Carbon and Alloy Steel

Nuts

o F436 Standard Specification for Hardened Steel Washers

1.2.6 American Welding Society (AWS)

o D1.1 Structural Welding Code, Steel

1.2.7 Federal Specification (Fed. Spec.)

o TT-C-490 Cleaning Methods and Pretreatment of Ferrous Surfaces for Organic Coatings

o TT-P-645 Primer, Paint, Zinc-Chromate, Alkyd Type

1.2.8 Military Specification (Mil. Spec.)

o DOD-P-15328D1 Primer (Wash), Pretreatment, (Formula No. 117 for Metals) (Metric)

1.3 SYSTEM DESCRIPTION

This system covers the design, fabrication, testing and installation of collar doors. The complete assembled collar doors shall be installed at the ES-1 and ES-2 collar level. It consists of a heavy designed structure complete with hinges and air cylinder operator. The door will be used as a protective shield for personnel working in the shaft during sinking operation.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Sinking Collar Doors is II.

1.4.2 The vendor shall furnish for the contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 MATERIALS

SHEET OF jWBSNUMBERI DOCUMENT NO. REV.

FENIX & SCISSON, INC. 4 7 11.2.6.7.31 FS-SP-1412 j

FORM LV-314A (7-88)

Page 194: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX SINKING COLLAR DOORS

2.1.1 Furnish structural steel in accordance with Contract Documents and requirements specified by AISC and ASTM.

2.1.2 High-strength bolts: Furnish bolts complying with requirements specified in ASTM A325.

2.1.3 Other bolts and washer: Furnish carbon steel bolts and washers conforming to requirements specified in ASTM 307.

2.1.4 Furnish air-operated cylinders. Refer to FS-SP-1512 Compressed

Air System.

2.2 EQUIPMENT

2.2.1 All welding equipment shall be in good condition and subject to inspection and approval by the Quality Assurance representative.

2.3 FABRICATION

2.3.1 Fabrication shall be in accordance with approved shop drawings, AISC Specification for the Design, Fabrication and Erection of Construction, AWS Structural Welding Code - Steel and this specification.

2.4 SHOP PAINTING

2.4.1 Surface cleaning (SSPC SP6) (SSPC SP3)

2.4.2 Pretreatment (Mil. Spec. DOD-P-15328) or (Fed. Spec. TT-C-490)

2.4.3 Priming (Fed. Spec. TT-P-645)

2.4.4 Factory Applied Finish Coating: For the sinking collar doors.

PART 3 - EXECUTION

3.1 ERECTION

31.1 Contractor shall erect sinking collar doors in accordance with AISC Manual of Steel Construction and AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings, AWS Structural Welding Code - Steel and this specification.

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 5 7 1.2.6.7.3 FS-SP-1412 1

FORM LV-314A (7-88)

Page 195: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX SINKING COLLAR DOORS

3.2 INSPECTION/TEST

3.4.1 Visual Inspection Welds (AWS D1.1, Part 6)

3.4.2 Operational Tests of Collar Doors

3.3 DIMENSIONAL INSPECTION/TOLERANCES

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

6 7 11.2.6.7.3 FS-SP-1412 1FORM LV-314A (7-88)I

I

Page 196: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

DEIWHEN NUMBER OF REQUIRED DESCRIPTION RE URE D COPIES REFERENCE

SREWUIRED REQUIRED FOR

NO DATA REQUIREMENTS REQUIRE ) FOR THIS OUTLINE SPECIFICATION

"AC' - AS COMPLETED tBFR" - BEFORE FABRICATION RELEASE "BC' - BEFORE CONTRACT CAN BE AWARDED 'BPS - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) `WS" - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER UREC" RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 7 7 1.2.6.7.3 FS-SP-14121

Form LV-315A

Page 197: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

FS-SP-1413 NO.

O.A. LEVEL TI

TITLE: FIXED AND RETRACTABLE MUCK CHUTES DIVISION 5 - METALS SUBDIVISION METAL FABRICATIONS

APPROVED BY

APPROVED BY

APPROVED BY

KL-i F,,

-. Y�z"�-�7Vw�

IFENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUMENT NO. REV.

1 7 1.2.6.4.2 1 FS-SP-1413 I

Form LV-313B (9-88)

DATE L- 20

DATE \q-I" 80

DATE Ae //19

('ý, ,dr

Page 198: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

FIXED AND RETRACTABLE MUCK CHUTES

PAGE PART 1 - GENERAL

1.1 Work Included 3 1.2 Referenced Publications 3

1.3 System Description 4 1.4 Quality Assurance 5

PART 2 - PRODUCTS

2.1 Materials 5 2.2 Equipment 5 2.3 Fabrication 5 2.4 Shop Painting 6

PART 3 - EXECUTION

3.1 Erection 6 3.2 Inspection 6

3.3 Dimensional Inspection/Tolerances 6 3.4 Testing and Acceptance 6

DATA REQUIREMENTS LIST 7

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 7 1.2.6.4.2 FS-SP-1413 1

Page 199: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX FIXED AND RETRACTABLE MUCK CHUTES

PART 1 - GENERAL

1.1 WORK INCLUDED

The work described in this section includes the furnishing all materials, equipment tools, labor, detailing of shop drawings, fabrication and delivery of fixed and retractable muck chutes for ES-1 and ES-2 in accordance with this specification and the Contract Drawings. Shop painting and necessary field touch up is also included.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)o Title 30, Part 57, Safety and Health

Underground Metal and Nonmetal Mines

California Administrative Code (CAC)

Standards for

o Title 8, Subchapter 17, Mine Safety Orders

American Manual Standards Institute (ANSI)

o A10.13 Safety Requirements for Steel Erection

American Institute of Steel Construction (AISC)

o MOll Manual of Steel Construction, 8th Edition

o S326 Specification for the Design, Fabrication and Erection of Structural Steel for Buildings

o. M013 Detailing for Steel Construction

American Society for Testing and Materials (ASTM)

0

0

A36

A307

0 A325

FENIX & SCISSON, INC.

Standard Specification for Structural Steel

Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

Standard Specification for High Strength Bolts for Structural Steel Joints

SHEET OF WBS NUMBER DOCUMENT NO. EV

3 7 1.2.6.4.2 FS-SP-1413 1

1.2.2

1.2.3

1.2.4

1.2.5

FORM LV.314A (7-88)I

Page 200: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX FIXED AND RETRACTABLE MUCK CHUTES

o A514

o A563

o F436

IStandard Specification for High Yield Strength Quenched and Tempered Alloy Steel Plate, Suitable for Welding

Specification for Carbon and Alloy Steel Nuts I

Standard Specification for Hardened Steel Washers

American Welding Society (AWS)

0 D1.1 Structural Welding Code, Steel

Federal Specification (Fed Spec)

o TT-C-490 Cleaning Methods and Pretreatment of Ferrous Surfaces for Organic Coatings

o TT-P-645 Primer, Paint, Zinc-Chromate, Alkyd Type

Military Specification (Mil Spec)

o DOD-P-15328 Primer (Wash), Pretreatment, (Formula No. 117 for Metals)

1.2.9 Steel Structures PaintinQ Council (SSPC)

o SSPC SP3 Power Tool Cleaning

o SSPC SP6 Commercial Blast Cleaning

SYSTEM.DESCRIPTION

The system will be used to receive the loaded sinking muck bucket from underground excavation. It will direct the muck to a fixed discharge chute leading to a dump truck or concrete apron pad at the collar level. The system will be air cylinder operated, installed and supported in the headframe.

FORM LV-314A (7-88)

1.2.6

1.2.7

1.2.8

I

1.3

FSHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 4 7 1.2.6.4.2 FS-SP-1413 1

Page 201: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX FIXED AND RETRACTABLE MUCK CHUTES

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for Fixed and Retractable Muck Chutes is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management control relative to the fabrication process, quality control and inspection requirements, material procurements and test procedures, and documentation.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1 Furnish structural steel in accordance with Contract Documents and requirements specified by AISC and ASTM.

2.1.2 High-strength bolts: Furnish bolts complying with requirements specified in ASTM A325.

2.1.3 Other bolts and washers: Furnish carbon steel bolts and washers conforming to requirements specified in ASTM 307.

2.1.4 Furnish air-operated cylinders. Refer to FS-SP-1512 Compressed Air System.

2.2 EQUIPMENT

2.2.1 All welding equipment shall be in good condition and subject to inspection and approval by the Quality Assurance Representative.

2.3 FABRICATION

2.3.1 Fabrication shall be in accordance with approved shop drawings, AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings, AISC Manual of Steel Construction, AWS Structural Welding Code - Steel and this specification.

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FEIX& CSSNIN.5 7 1.2.6.4.2 FS-SP-1413

FORM LV-314A (7-88)

Page 202: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX FIXED AND RETRACTABLE MUCK CHUTES

2.4 SHOP PAINTING

2.4.1 Surface Cleaning (SSPC SP6) (SSPC SP3)

2.4.2 Pretreatment (Mil Spec DOD-P-15328) or (Fed. Spec. TTC-490)

2.4.3 Priming (Fed. Spec. TT-P-645)

2.4.4 Factory Applied Finish Coating: For the Fixed and Retractable muck chutes.

PART 3 - EXECUTION

3.1 ERECTION

3.1.1 Contractor shall erect Sinking Dump Doors and Chutes in accordance with AISC Manual of Steel Construction and AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings, AWS Structural Welding Code.- Steel and this specification.

3.2 INSPECTION

3.2.1 Visual Inspection Welds (AWS D1.1, Part 6)

3.3 DIMENSIONAL INSPECTION/TOLERANCES

3.4 TESTING AND ACCEPTANCE

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 6 7 1.2.6.4.2 FS-SP-1413 1

Page 203: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

B OF IWHEN N ME FREQUIRED DESCRIPTION REQUIRED REIRES REFERENCE FOR

REQUIRED UIEDFO

NO DATA REQUIREMENTS REQUIRE) FOR THIS OUTLINE SPE ýIFICATION

"AC - AS COMPLETED 'BFR' - BEFORE FABRICATION RELEASE

"BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS" - WITH SHIPMENT

"ACM' - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 7 7 1.2.6.4.2 FS-SP-1413 1

Form LV-315A

Page 204: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION)

NO.FS-SP-1414

Q.A. LEVEL II

WIRE ROPE AND ATTACHMENTS DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - HOISTS AND CRANES

APPROVED BY

APPrmuOVED 01

APPROVED BY

;T7T I�AAA 4h��� t'�x

REVISION DESCRIPTION EPAGES|REV. 0B APPROVED BY NE. DATE

Incorporation of Title I SSeeEE 1 1 fnnQ% Rpvipw CnmmnntR Tet SEE AOVEIt ______ ______ ________

______________________________I _______ _______ , ____ ___ ___ ___ I _ _ )___ I I I_ _.

Form LV-313B (9-88)

TITLE:

DATE

DATE

DATE

SHEET OF WBS NUMBER DOCUMENT NO. REV

FENIX & SCISSON, INC. 1 5 1.2.6.4.2 FS-SP-1414 R I

Page 205: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

WIRE ROPE AND ATTACHMENTS

PAGE PART I - GENERAL

1.1 Work Included 3 1.2 Referenced Publications 3 1.3 System Description 3 1.4 Quality Assurance 4

PART 2 - PRODUCTS

2.1 Materials 4

PART 3 - EXECUTION

3.1 Shipping 4 3.2 Storage 4 3.3 Spooling from Shipping Spool to Hoist Drum 4 3.4 Attachment to Hoist Drum 4 3.5 Attachment to Conveyance 4 3.6 Inspection and Testing 4 3.7 Acceptance 4

DATA REQUIREMENTS LIST 5

EORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSON, INC. 2 5 1.2.6.4.2 FS-SP-1414 1

Page 206: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX WIRE ROPE AND ATTACHMENTS

PART 1 - GENERAL

1.1 WORK INCLUDED

This work under this specification includes the supply and installation of conveyance hoist ropes and attachments for shafts ES-1 and ES-2.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o 30 CFR57 Safety and Health Standards - Underground Metal and Nonmetal mines

1.2.2 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17 - Mine Safety Orders

o Title 8, Chapter 4, Subchapter 20 - Tunnel Safety Orders

1.2.3 American National Standards Institute (ANSI)

o M11.1 Wire Rope for Mines

1.3 SYSTEM DESCRIPTION

o Wi.re rope, in sufficient length shall be furnished to extend from the hoist drum to the maximum depth in the shaft, as shown in the Contract Drawings

o Rope-end fittings and attachments, shall be furnished as shown in the Contract Drawings

o Hoist rope length to include allowances for cut-offs and dead turns.

FORM LV-314A (7-88)

SHEET OF WBS NUMBER DOCUMENT NO. REV. FENIX & SCISSON, INC. 3 5 1.2.6.4.2 FS-SP-1414 1

Page 207: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX WIRE ROPE AND ATTACHMENTS

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the Conveyance Hoist Ropes is II.

1.4.2 The supplier shall have an approved Quality Assurance Program.

PART 2 - PRODUCTS

2.1 MATERIALS

2.1.1

2.1.2

Rope construction and strength

Fittings and attachments

PART 3 - EXECUTION

3.1 Shipping

3.2 Storage

3.3 Spooling from shipping spool to hoist drum

3.4 Attachment to hoist drum

3.5 Attachment to conveyance

3.6 Inspection and Testing

3.7 Acceptance

FENIX & SCISSON, INC.SHEET

4OF

5

WBS NUMBER DOCUMENT NO.

1.2.6.4.2 FS-SP-1414

FORM LV-314A (7-88)

U

7 I REV. 1i

\

! I|

Page 208: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NUMBER OF REQUIRED DESCRIPTION RUE COPIES REFERENCE j OR REQUIRED REQUIRED

NO DATA REQUIREMENTS REQUIRE] FOR THIS OUTLINE SPEOIFICATION

"AC" - AS COMPLETED *BFR' - BEFORE FABRICATION RELEASE "BC - BEFORE CONTRACT CAN BE AWARDED 'PS° - PRIOR TO SHIPMENT *BU° - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'WS° - WITH SHIPMENT

*ACMa - APPROVAL BY MANAGER "REC" - RECORD

SHEET OF WBS NUMBER DOCUMENT NO. REV. 5 5 1.2.6.4.2 FS-SP-1414 1

Form LV-315A

Page 209: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION(OUTLINE SPECIFICATION)

FS-SP-1416 NO.

O.A. LEVEL IT

TITLE: ES-I SHAFT EQUIPPING DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - MATERIAL HANDLING SYSTEMS

DATE - /- SAPPROVED B9

DATE -qsAPPROVED BY

APPROVED BY;��� 4L DATE o 7/W9

ForFENIX & SCI(

Form LV-S13B (9-88)

3SON, INC.HE ET OF JWBS NUMBER DOCUMENT NO. REV.

5 1.2.6.7.3 FS-SP-1416 1

•w a • w • v

V,ý-ýý -*-,-lAAAA'-

7 -

Page 210: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-1 SHAFT EQUIPPING

PART 1 - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Materials and Fabrication

PART 3 - EXECUTION

Permanent Alignment Plant Modi Equipping Access to

Equipment to be Installed and Tolerances fications for Equipping Sequence and Schedule Test Instrument Locations

DATA REQUIREMENTS LIST

PAGE

3 3 3 3

3.1 3.2 3.3 3.4 3.5

3

4 4 4 4 4

5

FORM LV-314A (7-88)

FENIX & SCISSON, INC SHEET OF WBS NUMBERI DOCUMENT NO. REV.

1EI CSOIC 2 5 1.2.6.7.3 FS-SP-1416 I1

Page 211: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-1 SHAFT EQUIPPING

PART 1 - GENERAL

1.1. WORK INCLUDED

This specification covers the installation of the shaft internals for ES-i.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations (CFR)

o 30 CFR 57 Safety and Health Standards Underground Metal and Nonmetal Mines

1.2.2 State of Nevada Revised Statutes (NVR)

o 46 NVR 512 Mine Safety and Health Standards for Open Pit and Underground Metal and Nonmetal Mines and Sand, Gravel and Crushed Stone Operations.

1.2.3 California Administrative Code (CAC)

o 8 CAC 4.17 Mine Safety Orders

1.3 SYSTEM DESCRIPTION

The system includes all of the shaft internal structures, ventilation ducting, utilities, and the conveyance.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for ES-i Shaft Equipping is II.

PART 2 - PRODUCTS

2.1 MATERIALS AND FABRICATION

SHEET OF WBS NUMBER DOCUMENT NO. REV.

FENIX & SCISSONt INC. 3 5 1.2.6.7.3 FS-SP-1416

FORM LV-314A (7-88)

Page 212: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX ES-1 SHAFT EQUIPPING

2.2.1 Materials and fabrication for ES-i shall be as specified in other related sections.

PART 3 - EXECUTION

3.1 PERMANENT EQUIPMENT TO BE INSTALLED

o Buntons

o Guides

o Manway

0

0

Services

Conveyance

ALIGNMENT AND TOLERANCES

PLANT MODIFICATIONS FOR EQUIPPING

o Work Deck

o Collar

EQUIPPING SEQUENCE AND SCHEDULE

ACCESS TO TEST INSTRUMENT LOCATIONS I

3.2

3.3

3.4

3.5

F &SHEET OF WBS NUMBER DOoUMENTNO. REV. 4FENIX & SCISSON, INC. 5 1.2.6.7.3 FS-SP-1416 1

FORM LV-314A (7-88)

Page 213: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

WHEN NMEOFREQUIRED DESCRIPTION REWIRED COPIES REFERENCE FOR ERERUIRED

NO DATA REQUIREMENTS REQUIRE ) FOR THIS OUTLINE SPEMIFICATION

"AC' - AS COMPLETED *BFR' - BEFORE FABRICATION RELEASE "BC' - BEFORE CONTRACT CAN BE AWARDED 'PS' - PRIOR TO SHIPMENT

"BU' - BEFORE USE (OF PROCEDURE OR BY PERSONNEL) *WS' - WITH SHIPMENT

*C ** "ACM° - APPROVAL BY MANAGER "REC" - RECORD

Form LV-315A

SHEET OF WBS NUMBER DOCUMENT NO. REVFENIX & SCISSON, INC. 5 1.2.6.7.3 FS-SP-1416 1

Page 214: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION(OUTLINE SPECIFICATION)

NO.FS-SP-1417

G.A. LEVEL IT

TITLE: ES-2 SHAFT EQUIPPING DIVISION 14 - CONVEYING SYSTEMS SUBDIVISION - MATERIAL HANDLING SYSTEMS

APPROVED BYDATE -/-Re

.4~

APPROVED B)

APPROVED BY

s-. 1 �

;�e �4tt-� -

DATE

DATE •7 /?99

FENIX & SCISSON, INC.

Form LV-313B (9-88)

r

Page 215: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TABLE OF CONTENTS

ES-2 SHAFT EQUIPPING

PART 1 - GENERAL

1.1 Work Included 1.2 Referenced Publications 1.3 System Description 1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Materials and Fabrication

IT 3 - EXECUTION

3.1 Permanent Equipment to be Installed 3.2 Alignment and Tolerances 3.3 Plant Modifications for Equipping 3.4 Equipping Sequence and Schedule

DATA REQUIREMENTS LIST

FENIX & SCISSON, INC.SHEET OF WBS NUMBER DOCUM.ENT. NO.

FORM LV-314A (7-88)

PAGE

3 3 3 3

PAR

3

4 4 4 4

5A

,, v

RxEV.S• •) J

i I

Page 216: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

�cr� SECTION 14XXX

X•;•• I, • ..... SECTION 14XXX T _ IT• I ES-2 SHAFT EQUIPPING

PART 1 - GENERAL

1.1 WORK INCLUDED

This specification covers the installation of the shaft internals for ES-2.

1.2 REFERENCED PUBLICATIONS

The publications listed below form a part of this specification.

1.2.1 Code of Federal Regulations "CFR)

o 30 CFR 57

State of Nevada

Safety and Health Standards - Underground

Metal and Nonmetal Mines

Revised Statutes (NRSI

o 46 NRS 512 Mine Safety and Health Standards for Open Pit and Underground Metal and Nonmetal Mines and Sand, Gravel and Crushed Stone Operations.

California Administrative Code (CAC)

o 8 CAC 4.17 Mine Safety Orders

1.3 SYSTEM DESCRIPTION

The system includes all of the shaft internal structures, ventilation plenum, utilities, conveyance and counterweight.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for ES-2 Shaft Equipping is II.

PART 2 - PRODUCTS

2.1 MATERIALS AND FABRICATION

2.1.1 Materials and fabrication for ES-2 shall be as specified in other related sections.

REV.

1

FORM LV-314A (7-88)

1.2.2

1.2.3

,SHEET OF WBS NUMBER DOCUMENT NO. '-FENIX & S5CISON, II•C. 3 5 1. 2.6.7.4 FS-SP-1417

Page 217: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

---- i-i

SECTION 14XXX ES-2 SHAFT EQUIPPING

PART

3.1

3 - EXECUTION

PERMANENT EQUIPMENT TO BE INSTALLED

o Buntons

o Guides

o Station Structure

o Loading Pocket Equipping

o Tail Shaft Equipping

o Services

o Conveyance and Counterweight

\a�$ .�:,.

*-r�-'T

� �.

3.2 ALIGNMENT AND TOLERANCES

3.3 PLANT MODIFICATIONS FOR EQUIPPING

o Work Deck

o Collar

3.4 EQUIPPING SEQUENCE AND SCHEDULE

3 t'.

FN NSHEET OF

5

WBS NUMBER DOCUMENT

1.2.6.7 FSP14iFORM LV-314A (7-88)

NO. REV.A

-K 2...... "he•

I 1. r

-i 47,

Page 218: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST

NUMBER OF DESRIPIONWHEN REQUIRED DESCRIPTIONEQUIRED COPIES REFERENCE R 'R Q I E "ff. 'EQ I • FOR

ýREOU1R.qC

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPE -IFICATION

AC 4 AS *.PEI D.-..FR -,BEFORE FABRICATION RELEASE

*BC BE-ýfFOR CNTAC CNBE AWAR-D'ED ýPSu - PRIOR TO SHIPMENT %BU' - BEFORE USE (OF PROCEDURE ORBY PERSONNEL) S- W-IT.H SHIPMENT

'A ..-.P-RVAL4ý-MN-~f-- jýRC` ýRECORD

FELX& cý4- SEET OF WBS-NUMBER DOCUMENT NO. RV

.FENIX & g,.- ,,."N,

S5 5 .,26.7.4 " FS-SP-14171 Form LV-315A

Page 219: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

TECHNICAL SPECIFICATION (OUTLINE SPECIFICATION),

FS-SP-1418 NO.

-- Q-A-.LEV-E F--

TITLE: EMERGENCY ESCAPE4?10ST D I V I S I ON- 14- -- CONVEY IN-G SYSTEMS SUBDIVISION - HOISTS AND CRANES

APPROVED BY

APPROVED BY

APPROVED BY

�TTQ - �Q\A�A VtAA

;�(

DATE /2-/-8

DATE

DATE

o Form LV-313B (9-88) 1ý •.• . . .. . ...... .. .. ...........

2

OSHEET F WBS NUMBER DOCUýt;M.E I .REV.-.

FENIX 4 SCSSN II ~t_____ 6 t~6. SS!41& iL1

-- 77 - • .

Page 220: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

xxxv: T�3�

TABLE OF CONTENTS

EMERGENCY ESCAPE HOIST

PART I - GENERAL

1.2 'oif0-enc' .'*..i .. "k 1.3 System Description 1.4 Quality Assurance

PART. 2 ... PRODUCTS

2.1,., Materials and, Eqyipment 2.2' --•Fabirtoi•€ ' 2••:• -• '":

PART 3- EXECUTION ; ?- :' " '.

3.1 Shop Insp~tiAn- i•iirt"f"n 3.2 F.iedj Testing#Id Ope~ration 3.3 AW(riep-ncte-

DATA REQUIREMENTS LISTI 2

" ."' .. -l L ,.'•? .'i r ."" " 3 "3

4 5

5 5 5

6

2�\ � . -

. .. 4;[

*1 .S

EOUAW ^L--3--4(7--8 .

V'PAG

-` - - - - `. --F•~--S -NUMBER. DOCUMENT NO. REV.

YENIX SMI80ON, INC. [2 6" i2.6.444 FS-SP-1418 1

Page 221: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX EMERGENCY ESCAPE HOIST

1.1 WORK INCLUDED

The work under this section includes the design, fabrication and deltyery of an emergency escape hoist for operation in the ESF shaft"s. ir.. - IT

The hoist shall be capable of evacuating pe rso l o t dconveyance between the shaft collar apd#t Mhe pj a•tiiig'.i'is.

1.2 REFERENCED PUBLICATIONS , ':§su• •

The publications listed below form a part of this specification.

1.2.1 Anti-Friction Bearing Manufacturers Associtatflf-it AFBitmAt

0 STD11 Load Ratings and' Pitigi• ., Si; Ball < Bearings

1.2.2 American Welding Society (AWS) .

o DI.1 Structural Welding CQd1 ,r ý .. ,

1.2.3 American Society for Testihq'and •teriHils. IASTM)

o A36 Standard Specification for Structural Steel T "•, - ' f"-L " , - • , ; -•i•:,

1.2.4 Code of Federal Reoulations (CFR)

o 30CFR57 Safety and Health Standards Underground Metal and Nonmetal Mines

1.2.5 California Administrative Code (CAC)

o Title 8, Chapter 4, Subchapter 17, Mine Safety Orders

1.3 SYSTEM DESCRIPTION

The unit covered by this specification shall be capable of the following performance:

0 Being positioned at the collar of either shaft to operate a personnel cage in the conveyance hoisting compartment of the shaft.

SHEET OF'-- WBS NUMEBR • ...

FENIX & SCISS"1,iNY., .2 FS-SP-1418 I

CVM LY-0 I 14P4 11 -001

Page 222: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION 14XXX EMERGENCY ESCAPE HOIST

o Operating as a self-contained unit completely independent of the plant power supply.

0 Being readily moved from one locatiOn to another with a minimum of delay.

o Operating over the total depth of either shaft at variable speeds from 50 to 100 ft/min.

1.4 QUALITY ASSURANCE

1.4.1 The Quality Assurance Level Assignment for the Emergency Hoist Unit is II.

1.4.2 The vendor shall furnish for the Contracting QA Representative's approval, a Quality Assurance program describing specified work, including descriptions which identifies management controls relative to the fabrication process, quality control and inspection requirements, material procurement and test procedures, and documentation.

PART 2 PRODUCTS

2.1 MATERIALS AND EQUIPMENT

o Engine-powered truck chassis

o Diesel engine hoist prime mover

o Hydraulic hoist motor

o Smooth-faced steel hoist drum

o Hoist.braking system

o Hoist safety systems

o Operator's control console

o Wire rope and attachments

o Hydraulic stabilizing jacks

FORM LV-314A (7-88)

: SHEET OF " WBS NUMBER DOCUMENT NO. REV. FNIX & SCISSON:, INC. : 4 6 '1.2.6.4.2 FS-SP-1418 1

Page 223: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

SECTION

2.1 Con't,-b ý5~J9'qm~ozl 3 fli bw-sjno-1V,9 s zs ptjf,-fCO o [a -qL2 i~waq itnsrq

o P~~R~d~h~4 aMe~o ~ bs~om yj~bse pnrs- 0

o Personnel cage .Crbl

0 t 'o s Urrlif"It 00 0 02 moil

2.2 FABRICATION -1W/q'-' YTT JAUD

ul fL~~qn r t -f v T

3.1 Shop Insft4W~4d'Testing thf2Cl~P'

3.2 Field Testing and Operation

3.3 Acceptance

14XXX HOIST

S

-c 0'A j:7ry

S~ ~'gJ 4 ~. V.

~~~~~~~L E '~Z0i£ ~~ i

J FENIX & SCISSON, INC. 6 2126 4.Z T

FORM LV-314A (7-Býf-

EMERGENCY ESCAPE

I

V

Page 224: Part 2 - Volume 3A Outline Specifications to Yucca …506.2 o 301 1.2.3 American Soc 0 0 C33 C42 o C87 0 C94 Guide to Certification of Shotcrete Nozzlemen Guide to Durable Concrete

DATA REQUIREMENTS LIST�

* ""NUMBER OF ..... * *

WHEN REQUIRED DESCRIPTION REQUIRED COPIES REFERENCE FOR

REQUIRED

NO DATA REQUIREMENTS REQUIREI FOR THIS OUTLINE SPE:IFICATION

ý'AC: AS..COMPLETED 'BFR'.- BEFORE FAýBRICATION RELEASE :"Z,BC- BEFORE CONTRACT CAN BE AWARDED 'PS - PRIOR TO SHIPMENT

'B'-BEFORE USE (OF PROCEDURE OR BY PERSONNEL) 'W5 - WITH SHIPMENT

.APPROVAL Y MANAGER C" - RECORD

SHEET OF WBS.NUMBER DOCUMENT NO. REV.

"FENIX & SCISSONE, INC. 6 6 1.2.6.4.2 FS-SP-1418 1

Form LV-315A


Recommended