by Leonel Lima Ponce From Open Sewer to Open (Re)Source: Participatory Sustainable Infrastructure Planning for Favela Pica-Pau in Rio de Janeiro Demonstration of Professional Competency MS Urban Environmental Systems Management Pratt Institute PSPD final presentation
Popular Tags:
44
LEONEL LIMA PONCE Pratt Institute PSPD MS in Urban Environmental Systems Management Demonstration of Professional Competency Advisors: Jaime Stein . Alec Appelbaum . Evren Uzer . David Seiter Final Presentation - 26 April 2013 + = FROM OPEN SEWER TO OPEN (RE)SOURCE PARTICIPATORY SUSTAINABLE INFRASTRUCTURE PLANNING: PICA-PAU FAVELA IN RIO DE JANEIRO
Transcript

LEONEL LIMA PONCEPratt Institute PSPD

MS in Urban Environmental Systems Management

Demonstration of Professional CompetencyAdvisors:

Jaime Stein . Alec Appelbaum . Evren Uzer . David Seiter

Final Presentation - 26 April 2013

+ =

FROM OPEN SEWER TO OPEN (RE)SOURCE

PARTICIPATORY SUSTAINABLE INFRASTRUCTURE PLANNING:PICA-PAU FAVELA IN RIO DE JANEIRO

02

INFRASTRUCTURAL ISSUES

PARTICIPATORY SUSTAINABLE INFRASTRUCTURES

FAVELA PICA PAU: CLIENT + SITE + COMMUNITY

PARTICIPATORY PROCESS (FIELD WORK)

RESULTS + REASSESSMENTS

CONTINUATION + REPLICABILITY

PRESENTATION AGENDA:

of populationin cities a

50% over

in informalhousing b

800MILLION

of populationw/improved

sewage c

61%

03 a: Grimm, N. et al. “Global Change and the Ecology of Cities.” Science; vol.319, Feb. 2008: 756-759.b: United Nations Millenium Development goals: 2011 update. (2010 statistics)c: United Nations Millenium Development goals: 2011 update. (2008 statistics)

URBAN MIGRATION + INFORMAL SETTLEMENTS

GLOBAL URBAN MIGRATION

INFORMAL COMMUNITIES

STRAINED INFRASTRUCTURE

INFRASTRUCTURAL ISSUES

ofpopulationhas treatedsewage a,b

76%

2015: 86%2020: 89%

2030: 96%

04

cd

a: Cavallieri, F.; S. Oliveira. “A melhoria das condições de vida de habitantes de assentamentos precários no Rio de Janeiro.” IPP (RIo de Janeiro City Planning Dept.). Rio de Janeiro, Brazil; December 2006.b: “Plano Nacional de Saneamento Básico (National Basic Sanitation Plan).” SNSA (National Secretariat of Environmental Sanitation of Brazil). Brasília, Brazil: April 2011.c: Open sewer in a favela in Rio de Janeiro. http://oglobo.globo.com/participe/mat/2010/11/10/rio-salgado-na-zona-norte-do-rio-sofre-com-acumulo-de-lixo-falta-de-cuidado-922995860.asp; by Sizenaldo Marinho do Nascimentod: Effluent reaching the Guanabara Bay. http://www.ambientalsustentavel.org/2011/bid-vai-emprestar-us-452-milhoes-para-melhorar-esgoto-na-baia-de-guanabara/

SANITATION INFRASTRUCTURAL DEFICIT: RIO DE JANEIRO

SEWAGE TREATMENT GOALS (RJ STATE) b

*over R$ 135B cost (SE Region of Brazil)

INFRASTRUCTURAL ISSUES

NO participation

BY

2020 investment

in development of favelas c

05

a b

a: A Morar Carioca community facility project in Rio de Janeiro. http://www.uppsocial.org/acao-prefeitura/programa-morar-carioca-secretaria-municipal-de-habitacao/ b: Removals at a favela in the Jacarepaguá neighborhood. http://comitepopulario.wordpress.com/2013/02/22/graves-violacoes-de-direitos-humanos-no-largo-do-tanque-em-jacarepagua/#c: Municipal Housing Secretariat of Rio de Janeiro. “Conheça o Programa.” Morar Carioca summary. http://www.rio.rj.gov.br/web/smh/exibeconteudo?article-id=1451251d: Morar Carioca logo. http://www.cidadeolimpica.com/en/morar-carioca-en/

c

SOCIOPOLITICAL INFRASTRUCTURAL DEFICIT: FAVELAS

current favela redevelopment program

R$ 8BILLION

INFRASTRUCTURAL ISSUES

06

HOW CAN WE PROPERLY LEVERAGE THE

SOCIAL AND ENVIRONMENTAL ASSETSOF OUR CURRENT URBAN CONDITION,

SO AS TO IMPROVE THE QUALITY OF LIFE

OF ITS RESIDENTS?

07

NATURALSYSTEMS

COMMUNITYPARTICIPATION

SUSTAINABLEINFRASTRUCTURES

+ =

PARTICIPATORY SUSTAINABLE INFRASTRUCTURES

08

KNOWLEDGE

COLLABORATION

LEADERSHIP

TRUST

SOLUTIONS

ENGAGEMENT

ACCOUNTABILITY

TRANSPARENCY

COMMUNITY PARTICIPATION

09

SYSTEMS

PERFORMANCE

HABITATS

PROCESSES

OPEN SPACES

PUBLIC HEALTH

BIODIVERSITY

PRODUCTS

NATURAL SYSTEMS

10

ECOSYSTEM (SITE)

COMMUNITY

CLIENT

DEFINING A CLIENT

11

PARTNERSHIPS

INFRASTRUCTURAL NEED

POTENTIAL IMPACT

OPPORTUNITY

COMMUNITY BUY-IN + ORGANIZATION

DEFINING A CLIENT: SELECTION CRITERIA

12 a, photo by Christina Parkb. Catalytic Communities logo. courtesy of Catalytic Communitiesc, Irenaldo Honório da Silva. courtesy of Catalytic Communities

CATALYTICCOMMUNITIES

LEONELLIMA

PONCE

PICA-PAURESIDENTS’

ASSOCIATION

FAVELA ADVOCACY

NGORESEARCHERCOMMUNITYLEADERSHIP

PARTNERSHIPS

13map: Google/ NOAA. “Rio de Janeiro.” Google Maps (Orthographic photography).

Rio de Janeiro

Guanabara Bay

Niterói

PICA-PAU

SITE:RIO DE JANEIRO

map: Instituto Pereira Passos (IPP). “Mapas Digitais do Rio de Janeiro.” (digital interactive maps). http://portalgeo.rio.rj.gov.br/ipp_viewer/?config=config/ipp/cadlog.xml14

sewage treatment plant

sewage treatment plant

Guanabara Bay

Governor’s Island(airport)

Cordovil

PICA-PAU

~3 km

INFRASTRUCTURAL NEEDRIO DE JANEIRO >>> CORDOVIL

15images: Infrastructural issues, favela Pica-Pau. photos by Leonel Lima Ponce

AREAS OF

RISK

FAILINGCOMBINED

SEWER

INFORMALWATERPUMPS

+SEWERS

OPENSEWAGEDITCHES

+FLOODING

WASTEDUMPING

+CANALCSO’S

INFRASTRUCTURAL NEEDRIO DE JANEIRO >>> CORDOVIL >>> PICA-PAU

2,300-12,000 PEOPLE AFFECTED16

Pica Pau (official boundaries): Est. Area a: 3,8000 m2

Est. Population (2010) b: 2,300

Estimated Cordovil favela complex(subject to Morar Carioca project) Est. Area a: 235,000 m2 Est. Population (2010) b: 12,000

a: Instituto Pereira Passos (IPP). “Mapas Digitais do Rio de Janeiro.” (digital interactive maps). http://portalgeo.rio.rj.gov.br/ipp_viewer/?config=config/ipp/cadlog.xmlb: IBGE (Brazilian Institute of Geography and Statistics). “Censo Demográfico 2010: Aglomerados Subnormais.” Rio de Janeiro, Brazil: 2010.

a

POTENTIAL IMPACT: MORAR CARIOCA RIO DE JANEIRO >>> CORDOVIL >>> PICA-PAU

MAR./APR. 2013

17

RFP+

BIDS

DESIGN TEAMS

CHOSEN

SITESURVEY

+DIAGNOSIS

PROJECTDESIGN

CONSTRUCTION

* ARCHITECTS FOR CORDOVIL PROJECT CHOSE TO

HOST A COMMUNITY MEETING.

OPPORTUNITY: MORAR CARIOCA

MAR./APR. 2013

18

RFP+

BIDS

DESIGN TEAMS

CHOSEN

SITESURVEY

+DIAGNOSIS

PROJECTDESIGN

CONSTRUCTION

PARTICIPATORYPLANNING

WORKSHOPS

NATURALSYSTEMSINCORPORATION

OPPORTUNITY: MORAR CARIOCA

19

a b

a, b, c: Favela Pica-Pau in Cordovil; Irenaldo Honório da Silva. courtesy of Catalytic Communities

aa

c

ENVIRONMENTALEDUCATION

POLITICALADVOCACY

PARTICIPATORY SUSTAINABLE

INFRASTRUCTURES

COMMUNITY BUY-IN + ORGANIZATION

20

OPENENDED

ACTIVITIES

FAMILIARTOOLS +

SETTINGS

DIAGNOSTICEXPLORATIONS

RESULTORIENTEDACTIVITIES

NOVELTOOLS +SETTINGS

SOLUTIONS

PARTICIPATON STRATEGIES

MAR./APR. 2013

21

MORAR CARIOCA TIMELINE

MAR

18MAR

23MAR

30APR

06

SITE VISIT + WORKSHOPS

ORGANIZINGMEETINGS

TRANSECTWALKS

COMMUNITYVISIONING

WORKSHOPS

PARTICIPATORY + SUSTAINABLE TIMELINEPRE-RESEARCH RESEARCH

PARTICIPATON STRATEGIES: TIMELINE

22 a, Irenaldo Honório da Silva. courtesy of Catalytic Communitiesb. Catalytic Communities logo. courtesy of Catalytic Communities

b

a

PICA-PAU RESIDENTS’ ASSOCIATION (MAR. 23)

COMMUNITY PRIORITIES

AVAILABILITY

CAPACITY

PREFERRED SCOPE

INITIAL VISIT: SYSTEMS DIAGNOSIS

CATALYTIC COMMUNITIES (MAR./APR.)

PROJECT TEAM AVAILABILITY

CAPACITY

COLLABORATIVE ORGANIZING MEETINGS

23

COMMUNITY GUIDES

COMMUNITY ICONOGRAPHY

AGE

TENURE

GENDER

13 58

4 44

F M

MARCH 30: TRANSECT WALKS

24images: Transect Walks in Pica-Pau favela. 30 March 2013. photo by Leonel Lima Ponce.

PROCESS: THE WALK

GROUP WALK

DIAGNOSEINFRASTRUCTURAL ISSUES

MAPCOMMUNITY

INPUT

MARCH 30: TRANSECT WALKS

RESIDENTDIAGNOSIS

RESIDENTINTERVIEWSADAPTATIONS

EXPLAINED

GROUPOBSERVATIONS

25images: Transect map of Aricambú Street, in Pica-Pau favela. 30 March 2013. photo by Leonel Lima Ponce.

PRODUCT: TRANSECT MAPSMARCH 30: TRANSECT WALKS

PRIORITYAREAS

PRIORITYCATEGORIES

PRIORITYISSUES

26images: Transect Diagram of Pica-Pau favela. 30 March 2013. photo by Leonel Lima Ponce.

PRODUCT: TRANSECT DIAGRAMMARCH 30: TRANSECT WALKS

27images: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.

FREEPLAY

FOUNDOBJECTS

COMMUNITYBUILDING

Q:How can Pica-Pau resolve its problems, especiallywater, sewage, and waste?

APRIL 06: COMMUNITY VISIONING WORKSHOPPROCESS: “CITY AS PLAY”

CONNECTINGPROBLEMS

+ SOLUTIONS

28image: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.

APRIL 06: COMMUNITY VISIONING WORKSHOPPRODUCT: “CITY AS PLAY” - PHYSICAL MODELS

29images: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.

COMMUNITYPRIORITY

RE-EVALUATION

BROADERPARTICIPATION

TRANSPARENCY

PROCESS: REVIEW OF TRANSECT WALKSAPRIL 06: COMMUNITY VISIONING WORKSHOP

30images: Sustainable Infrastructure Matrix, by Leonel Lima Ponce. photo by Leonel Lima Ponce.

PROCESS: SUSTAINABLE INFRASTRUCTURE CATALOG

NATURAL SYSTEMS

PRIORITIESADDRESSED

OBSTACLESTO

IMPLEMENTATION

POTENTIALS+ VISIONS

APRIL 06: COMMUNITY VISIONING WORKSHOP

31images: Favela Pica-Pau community visioning workshop, 06 April 2013. courtesy of Catalytic Communities.

PROCESS: COMMUNITY VISIONING SESSION

RESIDENTSGROUPEDBY AREA

DISCUSSIONBASED ON

PRECEDING INFO(VISIONS)

COLLABORATIVEPROCESS

APRIL 06: COMMUNITY VISIONING WORKSHOP

INCORPORATEDSUSTAINABLE

SOLUTIONSPRIORITIZEDSOLUTIONS

ADDITIONALDIAGNOSES

32image: Community vision exercise, Pica-Pau community workshop, 06 April 2013. photo by Leonel Lima Ponce

PRODUCT: COMMUNITY VISIONING SESSIONAPRIL 06: COMMUNITY VISIONING WORKSHOP

33

TRANSECT WALKS: TAKEAWAYS

DIAGNOSIS: RESIDENTS VS. OFFICIAL

GROUP: DREW BYSTANDERS’ ATTENTION

GROUP: ENRICHED DISCUSSION

SEVERE INFRASTRUCTURE FAILURE

COMPLEX MIX: FORMAL + INFORMAL

LACK OF SPACE FOR LARGE PROPOSALS

INITIAL RESULTS

34

TRANSECT WALKS: PRIORITY ISSUES

FLOODING (ARICAMBU / ALLEYS)

WATER SUPPLY: PUMPS + RAINWATER COLLECTION

COMBINED SEWER SIPLLS OVER AT CATCHBASINS

OPEN SEWERS + BROKEN PIPES = CONTAMINATION

COMBINED SEWER OUTFALLS AT IRAJA RIVER

WASTE DUMPED AT IRAJA RIVER

DISEASES: INCIDENCES OF DENGUE, TB, OTHERS

PUBLIC WORKS EXACERBATE AREAS OF RISK

INITIAL RESULTS

35

COMMUNITY VISIONING WORKSHOP: TAKEAWAYS

RESIDENT COLLABORATION

RESIDENT LEADERSHIP +ACCOUNTABILITY

RESIDENTS: HOLISTIC SOLUTIONS

SMALL SCALE, PERSONAL SOLUTIONS

LARGE SCALE, UTOPIAN SOLUTIONS

BUY-IN: PROCESS + POSSIBILITIES

FEW NATURAL SYSTEMS IN SOLUTIONS

INITIAL RESULTS

36

BUILD OVER THE RIVER: SPACE GENERATION

CISTERN UNDER SOCCER COURT:WATER SUPPLY + FLOOD REDUCTION

RECYCLING PROGRAMS, STREET LEADERS:SUSTAINABLE MANAGEMENT

COMMUNITY VISIONING WORKSHOP: MAJOR VISIONS

DAYCARE > PRESCHOOLS >> TECHNICAL SCHOOLSCHILD + YOUTH DEVELOPMENT

GREEN SPACES AT DITCHES + EMPTY LOTSNATURAL SYSTEMS

INITIAL RESULTS

37

EXPAND TIMELINE

ENGAGE EVEN BROADER DEMOGRAPHIC

ADVOCACY + SOCIAL INFRASTRUCTURE

SEPARATE DESIGN WORKSHOP

MONITORING + MAINTENANCE WKSHOP

FEASIBILITY: TECHNICAL EXPERTS

JOB CREATION POSSIBILIIES

REASSESSMENTS

38

“WE WANT THIS TO CONTINUE BEYOND APRIL 6, 2013.

WE WANT TO GO BEYOND PAPER, BEYOND PROJECTS.

WE WANT SOLUTIONS.”

- Kelly Cristina Tavares de Jesusresident, Pica-Pau favela

39

POSSIBLE PARTNERSHIPS

RFP+

BIDS

DESIGN TEAMS

CHOSEN

SITESURVEY

+DIAGNOSIS

PROJECTDESIGN

CONST.

CATCOMM

PUBLIC DEFENDERS

STUDIO X

IBASE

TIBA INSTITUTE

UFRJ / PUC

ARQHOS

BOTANIC GARDENS

CONTINUATION

40

FLEXIBILITY

MORAR CARIOCA PROCESS

PARTICIPATORY + SUSTAINABLEPROCESS

INCORPORATION

COMMUNITY-BUILTINDIVIDUAL PROJECTS

PARALLELPLAN

CONTINUATION

41

TIMELINE

MORAR CARIOCA TIMELINE

MAY

2013

FUTURE WORKSHOPS

SUSTAINABLEPICA-PAU

PLAN

MAINTENANCE+ MONITORING

PARTICIPATORY + SUSTAINABLE TIMELINE

MID

2013LATE

2013EARLY

2014

NATURALSYSTEMSDESIGN

REMOVALS+ HOUSING

RIGHTS

CONTINUATION

42

SIMILAR TRENDS

PICA-PAU: PARTICIPATORY EXAMPLE

INFRASTRUCTURAL DEFICIT SOLUTIONS

=REPLICABILITY

43

THANK YOU!

MUITO OBRIGADO!

+ =

44

Pica-Pau Community (clients)

Irenaldo Honório da Silva

Resident Guides: Geraldo, Natalia, Paulo, Sebastião,

Karolayne, Marissa, Zilá; interviewees

Residents / Workshop Participants

Catalytic Communities (project team)

Theresa Williamson

Catherine Osborn, Gloria Jimenez, Sarah De Rose

Ministério Semear Church, Brás de Pina (workshop hosts)

ARQHOS (survey/technical support)

family + friends

ACKNOWLEDGEMENTS