+ All Categories
Home > Documents > Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula...

Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula...

Date post: 09-Sep-2019
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
16
Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation Workshop
Transcript
Page 1: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

Partner Experience:

Equatorial Guinea

Paula BremerMarathon Equatorial Guinea Production Limited (MEGPL)

Natural Gas STAR Implementation Workshop

Page 2: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

2

Equatorial Guinea: Alba Field

Four offshore production platforms

Onshore gas/condensate processing facilities

Current production (gross)– 945 mmscf/d gas– ~60,000 bpd condensate

Currently re-injecting 20 mmcf/d (normal operations)

Page 3: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

3

Location of Alba Field

18 miles northwest of Bioko Island

Regional Map

Punta Europa Gas/ Condensate Processing Facilities

Page 4: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

4

Equatorial Guinea LNG Operations S.A. (EG LNG)

Marathon Equatorial Guinea Production Limited (MEGPL)

Atlantic Methanol Production

Company LLC (AMPCO)

Location of Punta Europa Facilities

Page 5: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

5

Alba Platform Operations

Alba A Alba C

Alba BAlba B2

Potential 600 MMSFCD

Gas Re-injected

60,000 BPDCondensate

945 MMSCFD Gas Production

Page 6: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

6

Punta Europa Processing Facilities

LPG Plant

AMPCO

EG LNGCondensate

MEGPL

Page 7: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

7

Alba Field – History of OperationsApril 1984 Discovery well 13B1-1X drilled

December 1991 First Production (A platform: Alba 2, Alba 3)

November 1996 LPG Plant construction complete (2,400 bpd)

September 2000 Phase 1 Development Offshore re- injection of gas commences

February 2001 Methanol production begins

January 2002 Marathon acquires Alba assets

October 2004 Phase 2A Complete Continuous flaring ceases

May 2007 LNG Plant begins production

Page 8: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

8

Natural Gas STAR Partnership

U.S. Natural Gas STAR Partner – 1994

International Gas STAR Partner – 2006

MOC was a charter member of both the U.S. and International Natural Gas STAR programs.

Awarded Production Partner of the Year –1997 and 2006

Cumulative methane reductions of 51.6 Bcfbetween 1994 and 2007

Page 9: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

9

Methane Reduction Projects

Two categories of projects – all relate to reductions in flaring of natural gas

–Process Control Modifications–Equipment Modifications/Installation

Methane Reductions

0

500

1000

1500

2000

2500

3000

3500

2006 2007 2008

Year

mm

scf

Equipment Modifications/InstallationsProcess Control Modifications

Total Reductions

Page 10: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

10

Flaring Reductions

Flare vs Gas Production Ratio

0

100

200

300

400

500

2004 2005 2006 2007 2008(est)

mm

cf fl

ared

/ bc

f pro

duce

d

Page 11: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

11

Process Control Modifications

Reviewed emergency shutdown (ESD) settings –too high/low

Eliminated single-point failure controls (where possible) – reduces affect of “false” data in controls

Reviewed interconnected controls – allows for quicker/automatic load transitions between redundant equipment

Page 12: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

12

Equipment Modification/Installation

Installed redundant equipment – increases capacity to allow for maintenance without product loss

Re-routed vapors away from the flare and back into the process where feasible

Installed pump to improve water handling capabilities

Overhead compressors re-routed scrubber liquid to a closed drain system (from pressure process vessel)

Page 13: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

13

Methane Reduction - Economics

Natural gas is low value commodity for MEGPL under it’s present supply contracts

Project economics are typically driven by lost production or value of liquid recoveries from the gas

Page 14: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

14

Lessons Learned:

Improve the quality of data used for emission calculations – lack of meters, documentation, etc. You need to know where your losses are!

Capture “low hanging fruit” – review ESD set points, control logic, etc

Operations and maintenance need to be engaged – not just an environmental issue.

Moving from construction to operation mentality takes time and effort.

Page 15: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

15

MEGPL – Government Interaction

Limited environmental regulations – don’t address air emissions/greenhouse gases

Proactive – prepare a “Flaring Philosophy” document each year for review with the Ministry of Mines, Industry and Energy (MMIE)

Page 16: Partner Experience: Equatorial Guinea - US EPA · Partner Experience: Equatorial Guinea Paula Bremer Marathon Equatorial Guinea Production Limited (MEGPL) Natural Gas STAR Implementation

16

MEGPL - Social Responsibility Malaria Control Project – public/private partnership to reduce malaria rate.

– Eliminated 95% of disease transmitting mosquitoes and reduced infection rates by 45% reduction in malaria

Education Scholarships – Texas A&M and University of South Carolina

Malabo Landfill – Construction of landfill used for waste generated on island. Operation of landfill by Malabo City Hall

Books for Bioko – employee driven program to provide school supplies for local schools


Recommended