+ All Categories
Home > Documents > Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October...

Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October...

Date post: 11-Jan-2016
Category:
Upload: charla-parsons
View: 227 times
Download: 3 times
Share this document with a friend
Popular Tags:
16
Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014
Transcript
Page 1: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

Partner for progress

David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK

Date October 2014

Page 2: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

2

Kiwa NV – History

Kiwa NV

Est. 1948, Dutch Waterworks

Product Certification for water related products

Change in ownership 2006

Head office Rijswijk Approx 1000 Employees

9 countries

Page 3: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

3

Kiwa – Structure

Structure by Country - in addition to UK locations

Structure by Sector – in addition to water related products

NL Germany Sweden China

Turkey Italy Belgium Spain

Gas Food System (ISO9000)

Automotive

Building Personnel Retail Chemicals

Page 4: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

4

Kiwa UK – History

Est. as Kiwa Quality Services

Est. 2001 , Chepstow

Relocated to Ebbw Vale 2005

Laboratory facilities to start 2010

Page 5: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

5

Kiwa UK – Currently

Watertec

Gastec

CMT

Blackwood Electrical

PAI

PCS

Page 6: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

6

Kiwa Watertec

Product Areas Water Regulations Testing

WRAS Kiwa UK

Thermostatic Valve Testing Buildcert TMV 2/3 KIWA NV Product Certification

G3 Building Regulations Testing Unvented Water Heaters

Factory Inspections Product Certification

Consultancy

Page 7: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

7

Laboratory Facilities

NL - Rijswijk (DWI Unit) , Nieuwegein (Plastics) , Apeldoorn (Gas)

UK – Cheltenham ( Solid Fuel , Water ), Ebbw Vale ( Water Related – Pressure, Flow …. )

Page 8: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

8

UK Water Supply ( Water Fittings) Regulations 1999

4.2 refers to For the purposes of this regulation, a water fitting is of an appropriate quality or standard only if:-

a) it bears an appropriate CE marking in accordance with the directive (the Construction Products Directive);

b) it conforms to an appropriate harmonised standard or European technical approval;

c) it conforms to an appropriate British Standard or some other national specification of an EEA State which provides the equivalent level of performance; or

d) it conforms to a specification approved by the regulator.

Page 9: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

9

WRAS approval – Traditional Route

WRAS application Drawings; material lists

Assessment of Materials BS6920 Non metallic materials

Mechanical Assessment Regulators Specification

Compile Technical File Submission to PAG

WRAS Approval 5 year Validity

Page 10: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

10

The Application F2

WRAS application Drawings; material lists Brochures

Page 11: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

11

Assessment of materials

Assessment of Materials BS6920 Non metallic materials Use WRAS approved Parts Non metallics Only

Page 12: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

12

Mechanical Tests

Mechanical Assessment Regulators Specification No reference to Current BS/En Site Visits / Laboratory tests

Page 13: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

13

Technical File

Compile Technical File Submission to PAG DEADLINES !!

Page 14: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

14

WRAS Approval

WRAS Approval 5 year Validity Issued at the PAG ( Product Assessment Group )

Page 15: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

15

Discussion Items ?

Prices / Leadtimes

Use of other test results/reports

Manifold - Deadlegs

Installation requirements

Alternatives ? Kiwa UK Approval Scheme

Page 16: Partner for progress David Jay, Business Manager Kiwa Watertec, Division of Kiwa UK Date October 2014.

16

Kiwa Watertec (UK)

P artner for p rogress


Recommended