+ All Categories
Home > Documents > PATENTED REPAIR PRODUCTS FOR AIR COOLED HEAT...

PATENTED REPAIR PRODUCTS FOR AIR COOLED HEAT...

Date post: 28-May-2020
Category:
Upload: others
View: 26 times
Download: 0 times
Share this document with a friend
2
• Quickly identify and repair leaking tubes across the water box using specially designed tools • No need to remove the outer plate of the water box • QA system certified to ISO-9001 • Can be supplied under ANSI N45.2, 10CFR50 Appendix B PATENTED REPAIR PRODUCTS FOR AIR COOLED HEAT EXCHANGERS
Transcript

• Quickly identify and repair leaking tubes across the water box using specially designed tools

• No need to remove the outer plate of the water box

• QA system certified to ISO-9001

• Can be supplied under ANSI N45.2, 10CFR50 Appendix B

PATENTED REPAIR PRODUCTS FOR AIR COOLED HEAT EXCHANGERS

© EST Group | DC8017 2/10

AIR COOLED HEAT EXCHANGER REPAIR PRODUCTS

Identifying leaking tubes in an air cooled heat exchanger has always been a

difficult task, due to the configuration of the finned tubes. Often, when tubes

failed in the middle of a bundle, it was nearly impossible to verify the leaking

tube. The G-150 pneumatic tube testing gun set allows tubes to be quickly

tested and identified for plugging. The G-150 tube testing guns are easy to

operate. After attaching a channel head extension, which allows the test guns

to operate outside the water box, simply insert both the air injection gun and

plugging gun into the tube ends, and press the air control valve, expanding

the seals on both guns and pressurizing the tube. Any reduction of pressure

indicated on the large pressure gauge will reveal even the smallest tube leak.

Traditional tube plugging methods in air cooled heat exchangers involved

tacking a rod to a tapered pin and beating the pin into the tube end. The rod

was then shaken to break it free from the tapered pin. Tapered pins are not only

unreliable, they can turn into lethal projectiles that can pose a real safety hazard

for your workers. Resistant to thermal cycling and able to provide a seal that’s

helium-leak tight, EST Group’s patented CPI Pop-A-Plug® installs using

controlled force. This protects against damage to tubesheet ligaments and

adjacent tubesheet joints. The CPI Pop-A-Plug® takes only seconds to install.

Air cooled heat exchangers often experience excessive wear and tube failures

at the tube inlets. However, once fluid enters the tube and becomes linear

(usually within one foot of the tube end), the remainder of the failed tube is

actually in good condition. EST Group’s Hydra-Loc™ tube sleeving service is the

perfect life-extension process for this application. Utilizing a thin walled sleeve

that matches the material of the damaged tube, EST Field Service personnel

bridge over the damaged area of the tube, using our Hydra-Loc™ tube sleeve

expansion system. This process not only extends the operational life of tubes, it

can also recover plugged tubes, and bring them back into service.

Tube Testing - G-150 Test Gun Set

Tube End Repair - Hydra-Loc™ Tube Sleeving

Tube Plugging - CPI Pop-A-Plug®

Let our trained field service technicians help you!

We have the experience and know-how to handle even

the most demanding jobs safely, competently, and on-time.

EST GroupHatfield, PA 19440 USA(P) 215.721.1100 800.355.7044(F) [email protected]://estgroup.cwfc.com

EST Group B.V.Hoorn 312a2404 HL Alphen aan den RijnThe Netherlands(P) +31.172.418841(F) [email protected]

EST Group Asia35 Tannery Road, #11-10 Tannery BlockRuby Industrial ComplexSingapore 347740(P) +65.6745.8560(F) [email protected]

Gulf Coast Rental and Sales3201 N. Highway 146, Suite BBaytown, TX 77520 USA(P) 281.422.6073 800.355.7044(F) [email protected]


Recommended