+ All Categories
Home > Documents > PAUL PRIDDY RETAILEXPERIENCEMARC2012

PAUL PRIDDY RETAILEXPERIENCEMARC2012

Date post: 14-Aug-2015
Category:
Upload: paul-priddy-mcibse-mashrae
View: 24 times
Download: 0 times
Share this document with a friend
Popular Tags:
9
1 Paul Jonathan Priddy I Eng; MCIBSE; MASHRAE Senior MEP Project Manager Retail Project Portfolio & Experience Project: Deira City Centre Expansion & Upgrade, Dubai, UAE Position: Senior M&E Project Manager Employer: Mace International Ltd Period: August 2005 to September 2006 Deira City Centre, Replacement of 26 MW of air cooled chilled water plant to water cooled, re-demise of IKEA (7,000 m 2 ) into 12 retail units, upgrade of food court and Magic Planet, toilet upgrades, lighting upgrades etc. Key Duties & Responsibilities
Transcript
Page 1: PAUL PRIDDY RETAILEXPERIENCEMARC2012

1

Paul Jonathan Priddy I Eng; MCIBSE; MASHRAE

Senior MEP Project Manager

Retail Project Portfolio & Experience

Project: Deira City Centre Expansion & Upgrade, Dubai, UAE

Position: Senior M&E Project Manager

Employer: Mace International Ltd

Period: August 2005 to September 2006

Deira City Centre,

Replacement of 26 MW of air cooled chilled water plant to water cooled, re-demise of IKEA (7,000 m2) into 12 retailunits, upgrade of food court and Magic Planet, toilet upgrades, lighting upgrades etc.

Key Duties & Responsibilities

Page 2: PAUL PRIDDY RETAILEXPERIENCEMARC2012

2

· Site Management and supervision of all aspects of M&E construction associated with large scale workspackages including introduction of KPI`s for major activities in particular repetitive works and activities

· Management of a team of engineers & inspectors covering the following services plumbing & fire protection,electrical (MV & LV), Extra Low Voltage (ELV), HVAC & vertical transportation

· Overall control and responsibility for MEP progress and programme against key milestones

· Direct procurement of MEP work packages, plant and equipment to ensure required quality and maintainprogramme

· Management and reporting on the MEP programme and progress, identification of key issues, risks, weeklylook ahead, monthly report etc

· Review and approval of interim payments to contractors and suppliers

Project: Mall of the Emirates Dubai, UAE

Position: Senior M&E Project Manager

Employer: Mace International Ltd

Period: June 2003 to October 2005

Mall of the Emirates

Mall of the Emirates contains approximately 240,000m2 of retail units (400 No) and the entire mall forms a total of350,000m2, 7000 multi storey car park, 415 bedroom Kempinski Hotel, Ski Dubai.

· Full scope of mechanical, electrical & plumbing services/systems

· 52 MW Water cooled chiller plant

Page 3: PAUL PRIDDY RETAILEXPERIENCEMARC2012

3

· 98 MW Electrical Load

· Dedicated 120 MW HV Substation

· Multiple mechanical, electrical and plumbing sub-contract packages

· Direct procurement of M&E Subcontract

Key Duties & Responsibilities

· Site Management and supervision of all aspects of M&E construction associated with large scale workspackages including introduction of KPI`s for major activities in particular repetitive works and activities

· Management of a team of engineers & inspectors covering the following services plumbing & fire protection,electrical (MV & LV), Extra Low Voltage (ELV), HVAC & vertical transportation

· Overall control and responsibility for MEP progress and programme against key milestones

· Direct procurement of MEP work packages, plant and equipment to ensure required quality and maintainprogramme

· Management and reporting on the MEP programme and progress, identification of key issues, risks, weeklylook ahead, monthly report etc

· Review and approval of interim payments to contractors and suppliers

Mall of the Emirates – Kempinski Hotel & Ski Dubai

Page 4: PAUL PRIDDY RETAILEXPERIENCEMARC2012

4

Mall of the Emirates – Main mall

Project: Mirdif City Centre

Position: Senior M&E Project Manager

Employer: Majid Al Futtaim Properties

Period: September 2006 to August 2009

Mirdif City Centre main Entrance

Page 5: PAUL PRIDDY RETAILEXPERIENCEMARC2012

5

Mirdif City Centre Aerial View

Main Entrance

250,000 m2 retail mall with 18,000 m2 hypermarket, and 7500 space parking structure.

· Full scope of mechanical, electrical & plumbing services/systems

· 44 MW Water cooled chiller plant

Page 6: PAUL PRIDDY RETAILEXPERIENCEMARC2012

6

· 88 MW Electrical Load

· Dedicated 120 MW HV Substation

· Multiple mechanical, electrical and plumbing sub-contract packages

Key Duties & Responsibilities

· MEP Design Management

· Overall management of the MEP works from a time, cost and quality perspective

· Overall MEP progress reporting and identification of key issue, impacts and mitigation measures

· MEP Procurement, pre-qualification of contractors and suppliers

· Management & coordination of utilities and infrastructure

· Ensure implementation of quality control procedures and methods

· Health & Safety

· QA/QC

· Contract Administration

· Change Management

· Implementation of international best practice from a design and installation perspective

Project: Bahrain City Centre

Position: Senior M&E Project Manager

Employer: Majid Al Futtaim Properties

Period: September 2006 to January 2009

Main Central Rotunda

Page 7: PAUL PRIDDY RETAILEXPERIENCEMARC2012

7

Main Mall

Saks 5th Avenue Entance with 2 No. Kempinski Hotels

250,000 m2 retail mall with 12,000 m2 hypermarket, 2 No. 300 room 20 storey 5 * Kempinski hotels, indoor water parkand 7500 space parking structure.

· Full scope of mechanical, electrical & plumbing services/systems

· 44 MW Water cooled chiller plant

Page 8: PAUL PRIDDY RETAILEXPERIENCEMARC2012

8

· 78 MW Electrical Load

· Multiple mechanical, electrical and plumbing sub-contract packages

Key Duties & Responsibilities

· MEP Design Management

· Overall management of the MEP works from a time, cost and quality perspective

· Overall MEP progress reporting and identification of key issue, impacts and mitigation measures

· MEP Procurement, pre-qualification of contractors and suppliers

· Management & coordination of utilities and infrastructure

· Ensure implementation of quality control procedures and methods

· Health & Safety

· QA/QC

· Contract Administration

· Change Management

· Implementation of international best practice from a design and installation perspective

· Support Clients “in house” facilities management team

Project: Muscat City Centre Expansion, Sultanate of Oman

Position: Senior M&E Project Manager

Employer: Majid Al Futtaim Properties

Period: September 2006 to September 2008

Page 9: PAUL PRIDDY RETAILEXPERIENCEMARC2012

9

Muscat City Centre Expansion

40,000 m2 retail mall extension and 2000 space car parking structure

Key Duties & Responsibilities

· MEP Design Management

· Overall management of the MEP works from a time, cost and quality perspective

· Overall MEP progress reporting and identification of key issue, impacts and mitigation measures

· MEP Procurement, pre-qualification of contractors and suppliers

· Management & coordination of utilities and infrastructure

· Ensure implementation of quality control procedures and methods

· Health & Safety

· QA/QC

· Contract Administration

· Change Management

· Implementation of international best practice from a design and installation perspective

· Support Clients “in house” facilities management team


Recommended