Engineer: E-Sciences, Orlando E.O.R.: Ryan Mitchell, PE Runoff Area: 1.4 Acres PaveDrain Area: 8,868 SF Parking Lot Cross-section 5.6” PaveDrain 6” AASHTO #57 (crushed granite) 3.5’ AASHTO #2 open gravel FDOT Index 199, Type D2 geotextile envelope Stormwater Runoff Retention: 2.5” Stormwater Quality Improvements: Reduce TSS by 95% Reduce Nitrogen by 95% Reduce Phosphorous by 95% PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL
Transcript
Page 1: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

• Engineer: E-Sciences, Orlando• E.O.R.: Ryan Mitchell, PE• Runoff Area: 1.4 Acres• PaveDrain Area: 8,868 SF• Parking Lot Cross-section

• 5.6” PaveDrain• 6” AASHTO #57 (crushed

granite)• 3.5’ AASHTO #2 open gravel• FDOT Index 199, Type D2

geotextile envelope• Stormwater Runoff Retention: 2.5”• Stormwater Quality

Improvements:• Reduce TSS by 95%• Reduce Nitrogen by 95%• Reduce Phosphorous by 95%

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 2: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

PaveDrain Layout Drawings

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 3: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

PaveDrain Layout Drawings

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

Page 4: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

Original Limerock Parking Lot Excavation of Gravel Reservoir

Page 5: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

Placement of Gravel Reservoir Compaction of #57 Stone Subbase

Page 6: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

Starting in NE Corner with End Blocks and Half Blocks

Colored Blocks Installed Throughout

Page 7: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

PaveDrain Installation PaveDrain Installation

Page 8: PaveDrainCase Study: Highland Avenue Parking Lot ... · • Runoff Area: 1.4 Acres • PaveDrainArea: 8,868 SF • Parking Lot Cross-section • 5.6” PaveDrain ... Avenue Parking

PaveDrain Case Study: Highland Avenue Parking Lot, Melbourne, FL

Completed PaveDrain Installation