31
15
REPORTING BYMICHELLE JARBOE, GRAPHIC BY REID BROWN | THE PLAIN DEALER
Ontario St.
EuclidAve.
Prospect Ave.
CarnegieAve.
Euclid Ave.
E. 9thSt.
E. 14thSt.
E. 13thSt.
E. 2ndSt.
W. 6th
St.
W.
9thSt.
W. 10th
St.
W. 3rd
St.
E. 6thSt.
E. 18thSt.
E. 21st St.
E. 22ndSt.
E. 24th
St.
E. 30th
St.
E. 36th
St.
E. 40th
St.
Chester Ave.
Perkins Ave.
Payne A
ve.
Superio
r Ave.
St.Cla
ir Ave.
Lakesid
e Ave.
E.55th
St.
E.59th
St.
E. 46th
St.
E.66th
St.
E.57th
St.
E.63rd
St.
E.79th
St.
E.75th
St.
E.77thSt.
E.83rd
St.
E.86th
St.
E.84th
St.
E.89th
St.
E.93rd
St.
E.97th
St.
E.100th
St.
E.105th
St.
E.71stSt.
E. 107th
St.
StokesBlvd.
Adelbert Rd.
Cornell Rd.
Wade Park Ave.
Magnolia Dr.
E. 17thSt.
E. Huro
n
Rd.
E.4th St.
Cedar Ave.
E.101st
St.
E.115th
St.
Circle
Dr.
Hough Ave.
E. 101st St.
2
90
Central Ave.
St. VincentCharityHospital
Cleveland StateUniversity
Erie St.Cemetery
Quicken LoansArena
PublicSquare
Tower CityCenter
ProgressiveField
PlayhouseSquare
GatewayDistrict
UniversityHospitals
ClevelandClinic
Lake ViewCemetery
EastClevelandCemetery
C L E V E L A N D
WadePark
RockefellerPark
ClevelandBrownsStadium
Superior A
ve.
Rockwe
ll Ave.
6
322
Cedar Ave.
20
ForestHillRd.
Windermere
St.
E. 108th
St.
Martin
Luther King, Jr. Dr.
Park Lane
Ansel R
d.
E. 118th
St.
E. 123rdSt.
EastBlvd.
BellflowerRd.
EastBlvd
.
Mayfield Rd.
Ford Dr.
LakeviewRd.
Delmont Ave.Roxbury Ave.
Garfield Rd.
Emily
St.
Superior Ave.
Eddy Rd.
Belmore Rd.
Holyoke Ave.
Bryn Mawr Rd.
E. 12thSt.
E.125th
St.
C L E V E L A N DH E I G H T S
E A S TC L E V E L A N D
CuyahogaRiver
Public Square to Inner Belt ($605.9 million)
Wade O
val D
r.
E.65th
St.
Carnegie Ave.
SOURCES: Property owners, businesses and developers; Downtown Cleveland Alliance; PlayhouseSquare Real Estate Services; Cleveland State University; MidTown Cleveland Inc.; University Circle Inc.
The remaking of Euclid Avenue was primarily a transportation project — a $197 million federally funded effort to improve a major artery and to connectdowntown Cleveland to University Circle using a bus rapid transit line. But the project also promised economic development, with the revived road actingas a canvas for construction.That growth is happening. More than $3.3 billion in projects have been in the planning stages, under construction or completed near Euclid during the
past two years. That number might be higher, if not for timing: The corridor re-opened in October 2008, when the nation was at the height of a financialcrisis. The recession, a lending crunch and a real estate crisis have stalled some projects and wiped out others. And a number of projects that have emergedor survived are driven by institutions or propped up by tax credits and other subsidies.This map gives an overview of much of the development around the Euclid corridor.
Paving the wayto economic developmentMichelle Jarboe | The Plain Dealer
45
35
50
6158
5948
47
43
49
42
373628
41
44
1
45
3
2
78
10911 12
13
1415
16
1819
17
22
21
2320
24
2526
27
29 3031
32
33
34 38
3940
52 53
46
6564
55
60
54
56
63 62
66
67
51
6
University Circle ($2.5 billion)
Public Square improvements
Euclid Avenue planters
Terminal Tower renovations
Higbee Building renovations
Park Building condos
May Co. building renovations
East Fourth Street
Cleveland Bike Station
The Residences at 668
Schofield Building renovations
Truman and Security Federal renovations
Cowell & Hubbard Building renovations
Wyndham Cleveland atPlayhouseSquare renovations
13
10
9
8
7
6
12
4
5
3
11
2
1 East 14th Street improvements
Hanna Theatre and Hanna Building
CSU law school renovation
Allegro Realty Advisors
University Lofts
CSU student center
CSU garage
Stephanie Tubbs Jones transit center
CSU main classroom building
CSU new student housing
CSU College of Education building
Allen Theatre/Cleveland Play House/CSU project
19
18
25
24
23
22
21
20
17
16
15
14
Midtown ($186.8 million)
University Studios apartments
Power Direct call center and offices
4600 Euclid Avenue
RTA paratransit facility renovations
Ohio regional psychiatric hospital
Pierre’s Ice Cream expansion
American Sugar expansion
Galluci’s expansion
Euclid Tech Center
Victory Lofts building
Baker Electric Building
PIRHL senior housing development
Rainbow Place Apartments update
Woodhaven town houses
Cleveland Housing Networkhousing for the homeless
35
34
32
30
31
26
33
29
27
40
39
38
37
36
28
41
Cleveland Clinic, various projects
Cleveland Clinic, various projects
Park Lane Villa
Tudor Arms/Doubletree Hotel
Stokes VA Medical Center
Cleveland Museum of Natural History
Cleveland Museum of Art
Hawken School at University Circle
Uptown plaza
The Commodore,apartment and retail renovations
West gateway landscapingand lighting project
Global CardiovascularInnovation Center
43
48
42
50
49
45
44
55
46
47
51
52
53
54
$708million
$85million
University Circle Inc.University Hospitals hotel56
Museum of Contemporary Art Cleveland
Cleveland Institute of Art expansion
Cleveland Hearing & Speech Center
Uptown street improvements
Uptown neighborhood
Lot 45mixed-use transportation center
Abington Arms green renovations
East 120th Street rapid station
Circle 118
27 Coltman
Mayfield Road street improvements
57
58
59
65
64
61
60
62
63
66
67
$75,000 on study so far
$305,000
$40 million
$47 million
$12 million
$5-$6 million
$115 million
$370,000
$65 million
$44 million
$8 million
$4 million
$3 million so far
$1.7 million
$1.5 million
$5 million
$1.7 million
No cost or date set.
$84 million
$6 million
No cost available
$75,000-$100,000
$20 million
$12 million
$7 million
$9.8 million
$11 million
$7 million
$20 million
$2.5 million
$19.2 million
$20-$30 million
$9 million
$1 million
$12 million
$55 million
$14 million
$6.4 million
$27 million
$60 million
$36 million
$19.3 million
$30 million
$22 million
$539 million
No cost or date set
$350 million
$3 million
No cost or date set
$383 million
$27million
$7.5 million
$500,000
$25-$50 million
No cost or date set.
$53 million
$16 million
$4 million
$40-60 million
$1.5-$2.3 million
$9-10 million
$5 million
$10 million
$10 million
Salvation Army AdultRehabilitation Center renovations
University Hospitals CaseMedical Center projectsUniversity Hospitals CaseMedical Center projects
$150-200million
57
1/4 mile
Bus/rapidtransit stop
Recentlycompleted
Under wayor scheduled
to start
Proposed
PROJECTS
Projects over$100 million