+ All Categories
Home > Documents > PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... ·...

PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... ·...

Date post: 06-Mar-2018
Category:
Upload: phamphuc
View: 225 times
Download: 6 times
Share this document with a friend
62
PCCP Workshop INDOT
Transcript
Page 1: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

PCCP WorkshopINDOT

Page 2: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

▪ INDOT/ACPA Technical Committee

2009 Specification Revisions2009 Test Method RevisionsStudies

Page 3: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

INDOT/ACPA Technical Committee

Materials ManagementFHWAConstruction ManagementDistrict Construction District TestingResearchIndustry

SpecificationsTest MethodsMiscellaneous ProblemsCost Savings Items

Page 4: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Concrete Mix Criteria

Minimum Cement Content reduced from 440 lbs/yd3 to 400 lbs/yd3

Phase I JTRP study on Optimization of Mixture Proportions indicated no compromise to strength, durability or performance

Page 5: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Concrete Mix Designs

New Trial Batches for material and source changes:

Very expensiveTime consuming for Contractor and INDOTHas caused delays in contracts

Page 6: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Weight (lb)

Volume (ft3)

One yd3

Materials SSD Batch

A 1.755 Air I 0 O

B 2.582 Cement J 507.6 P 508

C 0.452 Fly Ash K 70.5 Q 71

D 4.929 Water L 307.5 T(29gal)242

Paste (E) 9.718

Aggregate (F) 17.282

G 6.567 Fine Aggregate M 1073.6 R 1115

H 10.715 Coarse Aggregate N 1785.2 S 1810

Total (E + F) 27.0

Concrete Mix Designs

Streamline the ProcessReduce the number of Trial Batches because of change in materials or sourcesAllow more mixtures to be used without a Trial Batch

Page 7: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Weight (lb)

Volume (ft3)

One yd3

Materials SSD Batch

A 1.755 Air I 0 O

B 2.582 Cement J 507.6 P 508

C 0.452 Fly Ash K 70.5 Q 71

D 4.929 Water L 307.5 T(29gal)242

Paste (E) 9.718

Aggregate (F) 17.282

G 6.567 Fine Aggregate M 1073.6 R 1115

H 10.715 Coarse Aggregate N 1785.2 S 1810

Total (E + F) 27.0

Concrete Mix Designs QC/QA PCCP (501)

Submit CMDS to DTE on spreadsheet for approvalCMDS used to conduct Trial Batch

Page 8: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Concrete Mix Designs

Trial Batch conductedContractor submits Trial Batch results with the CMDSEliminate CMDT

Page 9: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Concrete Mix Designs

CMDP submitted 3 working days prior to production

Page 10: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Change in Materials

New CMDS with Trial Batch or Verification

Cement source and typePozzolan source or typeCoarse aggregate source or typeAdmixture type

Page 11: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Change in Materials Verification

Contractor and INDOT tests on first day of productionAcceptance tests may be used for verificationProduction may continue until flexural strength tests are completedMinimum 570 psi

Page 12: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Change in Materials Verification

Does not meet 570 psiStop ProductionFailed Material

Page 13: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Adjustments in Materials –Requires new CMD Submittal

Admixture sourceAdmixture product of the same type and from the same sourceFine aggregate sourceTarget unit weight due to change in aggregate propertiesFine to total aggregate ratio beyond ± 3%Increase in cement content

Page 14: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Adjustments in Materials

Trial Batch not requiredCMDS submitted to DTE for approval as CMDP one work day prior to production

Page 15: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Other Adjustments Allowed

Admixture dosage rateFine to total aggregate ratio within ±3%

No Trial Batch requiredNo DTE notification

Page 16: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Trial Batch

Concrete produced at plant by proportioning tolerances of 508.02 (b)

Concrete produced in lab – ASTM C 192

Page 17: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Trial Batch RequirementsAir Content -- 5.0% to 10.0%Plastic Unit Weight --within ± 3.0% of CMDS targetW/C Ratio -- within ±0.030 of CMDS target and does not exceed 0.450Flexural Strength --minimum of 570 psi at 7 days for average of two beams

Page 18: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

No Trial Batch

Minimum cement content of 564 lbs/yd3

and target W/C ratio of 0.420Class C concrete in accordance with 702 using class AP coarse aggregate

Page 19: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Non QC/QA PCCP -- 502Changes or Adjustments that require new CMDS to be submitted:

Cement source or typePozzolan source or typeAggregate source or typeAdmixture source or typeAddition or deletion of an admixtureProportioning of concrete – 502.04

Trial Batch for High Early Strength Concrete only

Page 20: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

PCCP Patching -- 506

Same as 501

Page 21: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Dowel Bars & Tie Bars

Epoxy coated bars protected from exposure to ultraviolet light and moisture during storageOnce placed into work, epoxy coated bars shall not be exposed to ultraviolet light for a total of more than 21 days prior to placement of concrete

Page 22: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

AASHTO/ASTM Revisions 2009

Review all test methods for revisions

▪ Materials Management▪ District/Production Labs▪ Independent Assurance Program▪ Qualified Technician Program▪ Training

Page 23: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

AASHTO T 121 – Unit Weight

Strike – off plate is required instead of the strike – off bar

Page 24: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

AASHTO T 23 – Making and Curing Test Specimens in the Field

Warning added –Hydraulic cementitious mixtures may cause burns to exposed skin and tissue upon long exposure

Page 25: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

ASTM C 173 – Air Content by Volumetric Method

Requires scoop to be moved around the perimeter of the bowl opening to ensure even distribution of concrete with minimal segregation

Page 26: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Certified Ready Mixed Plant Program

NRMCA Plant CertificationMore frequent scale calibrations2 year cycle for inspection of plantVoluntaryINDOT inspection

Page 27: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Certified Ready Mixed Plant Program

Delivery Vehicles included14 month cycle for certification

Page 28: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Aggregates - CAPP Certified Sources – 193

• Sand & Gravel – 104• Stone – 70• Sand, Gravel, & Stone – 8• Slag - 11

Page 29: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

CAPP SOURCES1995 - 81996 - 61997 - 511998 - 831999 - 19 2000 - 142001 - 15

2002 - 92003 - 72004 - 82005 - 52006 - 102007 - 62008 - 3

Page 30: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

CERTIFIED MATERIALS

Stone -- 1275Natural Sand -- 207Gravel -- 183Blast Furnace Slag -- 58Steel Slag -- 16

Page 31: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

AASHTO T 84 – Fine Aggregate Specific Gravity

Page 32: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Fine Aggregate Specific Gravity/Absorption

AASHTO T 84SubjectiveInfluenced by OperatorUnable to predict slumps in concrete -- absorption

Page 33: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

SS DetectFine Aggregate Specific Gravity

Page 34: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

● Sample is mixedby orbital motion

● Water added at 8 μl per injection for ¾ to 1 hours depending on absorption

Page 35: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

●Infrared light source “tuned” to water

● Stops when water is detected

Page 36: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Automated Vacuum Machine

● Agitates aggregate● Vacuums air from

sample● Agitate → 3 min

Vacuum → 3 min @ 22 in. Hg

Vacuum → 5 min @ 27 in. Hg

Page 37: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

SS DetectFine Aggregate Specific Gravity

Natural Sand –good comparison with AASHTO T 84 procedureStone Sand –amount passing No. 200 sieve

Page 38: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Volumetric Immersion Method

Normal absorptions are relatively small, so a large amount needs to be tested to allow accurate measurement of total absorbed water

Page 39: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Fine Aggregate Specific Gravity/Absorption

Desired CharacteristicsEasy to performEasy to understandEasily re-producedOperator and laboratory independent

Page 40: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Volumetric Immersion Method

Physically and visually measure:

total amount of water absorbed into the samplevolume displacement of dry samplevolume displacement of saturated sample

Page 41: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Volumetric Immersion Method

Large flask1200 g sampleSubmerge sample in flaskShake and roll flask for 3 min and read after 5 minRepeat and read after 10 min, 30 min, 60 min, 2hr, 4 hr, and 25 ± 1 hr

Page 42: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Volumetric Immersion Method

Absorptions are much differentSpecific gravity values areslightly higher

Page 43: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Volumetric Immersion Method

Impact to PCCPAbsorptions Slight adjustments to fine aggregate for yield

Slight change to Maximum Theoretical Unit Weight

Page 44: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Studies

PCCP Joint StudyAP Study – Sonic ModulusSmoothnessTop Size of AggregateRecycled ConcreteDepth of Concrete

Page 45: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Premature Distress around Joints

5-10 yr old pavementsLongitudinal and transverse jointsSR 933I-6586th StGeorgetown Rd.

Page 46: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise
Page 47: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise
Page 48: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Possible Solutions

Current procedure of initial saw cut, followed by a second saw cut, and then placement of a backer rod may be trapping water in the jointSolution – possibly require one 1/8 in. saw cut, leave joint open, and seal joint faces

Page 49: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Class AP Coarse AggregatesITM 210

Page 50: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

"D" Cracking

Page 51: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

AP Study

Investigate material in the marginal performing aggregates – Louisville formationFind a possible predictor for the AP test

High insoluble residueHigh clay contentPorosity

Page 52: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

AP Study -- Sonic Modulus

Measure modulus of elasticityAdditional information that may be used to evaluate aggregates

Page 53: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

AP AggregateSources – 92

Stone – 62Gravel – 26BF Slag – 4

DistrictsCrawfordsville - 9Ft. Wayne - 8Greenfield - 25LaPorte - 16Seymour - 24Vincennes - 9

Page 54: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Smoothness

Ramps and Turn Lanes included in profilograph requirements – design speed of mainline and lengths > 0.1 mi. lengthUrban Streets & Signalized Locations

Page 55: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Smoothness Inertial Profilers

Measures IRI which is used in design processProvides smoothness value upon completion of testingMore repeatableGood correlation with user responseTrue profile measurementPCCP tines – line lasers

Page 56: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Smoothness Inertial Profilers

Who will do testingTiming of evaluations during constructionIncentives related to expected pavement performanceIdentification and remediation of irregularities such as bumpsComplete by June, 2010

Page 57: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Top Size of Aggregate

Phase II of JTRP study 0n Optimization of Mixture Proportions for Concrete PavementsReduction in surface area – cementAP testing – size of freezer rack & molds

Page 58: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Recycled Materials

Blast Furnace SlagSlag CementFly AshGround Granulated Blast Furnace Slag Recycled Concrete

SubgradesConcrete

Page 59: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Recycled Concrete in Concrete

Unhydrated cement and finesD-Cracking

Page 60: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

CARRIAGE

DROP SCALES

STANDARD STEEL RULE

VERTICALSHAFT

100 mm (4.0 IN.)

BASE

Figure # 1

PCCP Core Length

Drainage Layer - No. 8 stone or ACBFITM 404 -- Removal of particles not substantially surrounded by mortarDemonstrated to Contractor on each contract

Page 61: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

Depth of Concrete

Provides quicker resultsSave expense of coringSave time of testingCost savings by Contractor not having to compensate bid for concrete lost in the subbase material

Page 62: PCCP Workshop INDOT - Indiana Chapterindianaconcretepavement.com/pdfdocuments/2009 Workshop... · PCCP Workshop INDOT ... Optimization of Mixture Proportions indicated no compromise

PCCP Rutting


Recommended