ã SAP AG 2009April 2009 Release
180document.xls
04/18/2023
Title of the accelerator
Purpose In this section indicated the prupose of the accelerator……..
Project Identification
Project Name Project Number Project Type
Customer Name Customer Number Project Start.Finish
Project Sponsor Program Manager Project Manager (Customer)
Project Manager Service Partner(s) Project Manager (Service Partner)
PCM Project Methodology
Project Methodology - Project Preparation - Assessment
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Scope
Project Preparation Business Blueprint Realization
PSD
Project ScopingDocument
CP
ComercialProposal
TRD
TechnicalRecommendation
Document
Validation
PHD
Pre-Sales Handover Document
Main Menu Project Methodology Model Building Methodology
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Project Methodology
Project Methodology - Project Preparation - Assessment
reports, etc.
Customers
Ü Understand the customers Business RequirementsÜ Gather detailed information regarding structures, allocations/calculations,
Ü Estimate the consulting effort required
Ü Pre-Sales Handover Document (PHD)
Ü Commercial Proposal (CP)Ü Project Scoping Document (PSD)Ü Technical Recommendation Document (TRD)
Ü Implementation MethodologyÜ Pre-Sales ModelÜ Propossal TemplateÜ Case Studies
Ü Project sponsorÜ Project managerÜ Business UserÜ IT Representative
Realization Final Preparation Go Live And Support
Knowledge AreaModel Building Methodology
Tests
Optimizations
Technical Design
Deployment Project Review
Construction
End User/IT Training
Modeler Training
Iterative Methodology
SuppliersÜ Project managerÜ Sales TeamÜ Technical Support (Install)
PCM Project Methodology
Methodology
Knowledge Area
Objectives & Benefits Project Roles By Phase Personal Skills
Typology of Project Customer Team Project Management Skills
SAP Consulting Involvement Supplier Team Business Skills
Solution Design Skills
Technical skills/All Roles
Technical Sills/EPO Consultant
Templates
Document Title Project PhaseÜ Project Scoping Questionnaire AssesmentÜ Technical Recommendation Document AssesmentÜ Project Charter Template StartupÜ Project Plan Template StartupÜ Business Req Spec Template Business RequirementsÜ General Technical Specifications Template DesignÜ Details Technical Specifications Template DesignÜ Quality Test Plan Template DesignÜ Acceptance Memo Template DeploymentÜ Case study template ReviewÜ Project review Report ReviewÜ Issue Log Template Phase ReviewÜ Risk Log Template Phase ReviewÜ Status Reporting Template Phase Review
Tools
Document Title Project PhaseÜ English Template Document StartupÜ Stage Agenda Template StartupÜ Status Reporting Template StartupÜ Contact List Template StartupÜ Customer Communication Form StartupÜ Directory Structure Startup
Project Preparation Business Blueprint Realization
Main Menu Project Methodology Model Building Methodology
How To Use This Methodology Project Roles Skills Matrix
Ü Project Organization StartupÜ Communication Plan StartupÜ Project Teams Roles StartupÜ Change Management Process StartupÜ Quality Assurance Plan StartupÜ Issue Management Process StartupÜ Issue Log Template StartupÜ Risk Management Process StartupÜ Risk Log Template StartupÜ Pre-Sales Handover Doc AssesmentÜ Project Estimation Tool AssesmentÜ Stage Agenda Template Business RequirementsÜ Key Business Questions Business RequirementsÜ Book design Documentation Business RequirementsÜ Model Allocation Template Business RequirementsÜ Example Allocation Types Business RequirementsÜ Example Model Design DesignÜ Model Review Template OptimizationsÜ Lessons Learned template ReviewÜ ALG Satisfaction Survey ReviewÜ Model Specific Training Template TrainingÜ Server Sizing Questionaire Installation
Main Menu
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical skills/All Roles
Technical Sills/EPO Consultant
Project Phase Document NameAssesment PSD - EPO Project Scoping Document.doc
Assesment TRD - EPO Technical Recommendations.doc
Startup PJC - Project Charter v1.0.doc
Startup PPT - Project Plan Template v1.0.mpp
Business Requirements BRS - Business Requirements Specifications v1.0.doc
Design GTS - General Technical Specifications v1.0.doc
Design DTS - Detailed Technical Specifications v1.0.doc
Design QTP - Quality Test Plan v1.0.doc
Deployment CAD - Customer Acceptance Document v1.0.doc
Review CST - Case studies Template.doc
Review PRR - Project Review Report.doc
Phase Review ILT - Issue Log Template.xls
Phase Review RLT - Risk Log Template.xls
Phase Review Project Status Report v3.0.doc
Project Phase Document NameStartup ETD - English Template Document v1.0.doc
Startup SAT Startup - State Agenda Template for Startup v1.0.doc
Startup Project Status Report v3.0.doc
Startup PJC - Project Charter v1.0.doc
Startup CCF - Customer Communication Form v1.0.doc
Startup PFS - Knowledge Base Folder Structure v1.0.xls
Realization Final Preparation Go Live And Support
Knowledge AreaModel Building Methodology
Skills Matrix
Startup PJC - Project Charter v1.0.doc
Startup PCP - Project Communications Plan v1.0.doc
Startup PTR - Project Teams Roles v1.0.doc
Startup CMP - Change Management Process v1.0.doc
Startup QAP - Quality Assurance Plan v1.0.doc
Startup IMP - Issue Management Process v1.0.doc
Startup ILT - Issue Log Template.xls
Startup RMP - Risk Management Process v1.0.doc
Startup RLT - Risk Log Template.xls
Assesment PHD - Pre-Sales Handover Document v1.0.doc
Assesment PCM
Business Requirements SAT BusReq - State Agenda Template for Business Requirements v1.0.doc
Business Requirements KBQ - Key Business Questions v1.0.doc
Business Requirements BDD - Book Design Documentation v1.0.doc
Business Requirements MAT - Model Allocation Template v1.0.doc
Business Requirements EAT - Example Allocation Types.xls
Design EMD - Example Model Design.xls
Optimizations MRT - Model Review Template v1.0.doc
Review LLR - Lessons Learned Report V1.0.doc
Review ASS - ALG Satisfaction Survey.doc
Training MST - Model Specific Training Template v1.0.doc
Installation Server Sizing.zip
PCM Project Methodology
Project Methodology - Project Preparation - Assessment
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Scope
Project Preparation Business Blueprint Realization
PSD
Project ScopingDocument
CP
ComercialProposal
TRD
TechnicalRecommendation
Document
Validation
PHD
Pre-Sales Handover Document
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Project Methodology
Project Methodology - Project Preparation - Assessment
reports, etc.
Customers
Ü Understand the customers Business RequirementsÜ Gather detailed information regarding structures, allocations/calculations,
Ü Estimate the consulting effort required
Ü Pre-Sales Handover Document (PHD)
Ü Commercial Proposal (CP)Ü Project Scoping Document (PSD)Ü Technical Recommendation Document (TRD)
Ü Implementation MethodologyÜ Pre-Sales ModelÜ Propossal TemplateÜ Case Studies
Ü Project sponsorÜ Project managerÜ Business UserÜ IT Representative
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
SuppliersÜ Project managerÜ Sales TeamÜ Technical Support (Install)
PCM Project Methodology
Project Methodology - Project Preparation - Startup
Process Flow Objectives
Prerequisites
Deliverables
Other ToolsSetup Project Environment
Project Preparation Business Blueprint Realization
PJP
Project Plan
CP
Approved ComercialProposal
PJC
Project Charter
Validation
TRD
Approved TechnicalRecommendations
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Key Players
Project Methodology
Project Methodology - Project Preparation - Startup
-- not yet converted
Ü Setup the project environment
Ü Approved Commercial Proposal (CP)Ü Approved Technical Recommendations (TRD)
Ü Project Plan (PJP)Ü Project Charter (PJC)
Ü English Template DocumentÜ Stage Agenda TemplateÜ Status Reporting TemplateÜ Contact List TemplateÜ Customer Communication FormÜ Directory StructureÜ Project OrganizationÜ Communication PlanÜ Project Teams RolesÜ Change Management ProcessÜ Quality Assurance PlanÜ Issue Management ProcessÜ Issue Log Template
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Customers
Suppliers
Ü Risk Management Process Ü Risk Log Template
Ü Project sponsorÜ Project managerÜ Business UserÜ IT Representative
Ü Project managerÜ Sales TeamÜ Technical Support (Install)
PCM Project Methodology
Project Methodology - Business Blueprint - Business Requirements & Functional Design
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Project Preparation Business Blueprint Realization
Need Analysis
Functional Scope
BRS
BusinessRequirementsSpecifications
PJC
Project Charter
TRD
Approved TechnicalRecommendations
Model Definition(s)
ModelSpecification
Final Delivarable
Client Requirements
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
PJP
Project Plan
Key Players
Ü Product Perspective
BusinessRequirementsSpecifications
Validation
Approved TechnicalRecommendations
Project Plan
Project Methodology
Project Methodology - Business Blueprint - Business Requirements & Functional Design
Ü Identify the functional and technical needs of the customerÜ Evaluate the workload and resources requiredÜ Analyze risks and success factorsÜ Define the acceptance criteria for functional deliverablesÜ Review the Technical Recommendations
Ü Client RequirementsÜ Project Charter (PJC)Ü Project Plan (PJP)Ü Technical Recommendation Document (TRD)
Ü Business Requirement Specifications (BRS)Ü Updated Project Plan (PJP)Ü Updated Technical Recommendation Document (TRD)
Ü Stage Agenda Template (SAT)Ü Data Dictionary TemplateÜ Key Business Questions (KBQ)Ü Book design Documentation (BDD)Ü Security/User TemplateÜ Model Allocation Template (MAT)
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Customers
Suppliers
Ü Example Allocation Types (EAT) Product Perspective
Ü Project sponsorÜ Project managerÜ Business UserÜ End User(s)
Ü Project managerÜ Business Consultant
PCM Project Methodology
Project Methodology - Business Blueprint - PCM Installation
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Notes
Project Preparation Business Blueprint Realization
Installation
TRD
TechnicalRecommendation
Document
Validation
CAD
Customer AcceptanceDocument
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Project Methodology
Project Methodology - Business Blueprint - PCM Installation
autonomous on the installations
Customers
Suppliers
Ü Transfer knowledge to the IT Representative to allow the customer to be
Ü Install and validate the PCM Environment
Ü Technical Recommendation Document (TRD)
Ü Installed software on Production/Operation Environment (CAD)
Ü Installation GuideÜ Customer Acceptance Document (CAD)Ü Server Sizing Questionaire
Ü IT Representative
Ü Technical Support (install)
Ü Refer to standard SAP installation methodology.Ü Use the installation guide available in the lastest version of PCM installation CD.
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Project Methodology - Realization - Modeler Training
Process Flow Objectives
Prerequisites
Deliverables
Key Players
Notes
Project Preparation Business Blueprint Realization
Training for Modeler/Admin
PJC
Project Charter
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Project Methodology
Project Methodology - Realization - Modeler Training
Customers
Suppliers
Ü Train the modeler in preparation for the design session.
Ü Project Charter (PJC)
Ü Design related trainingÜ Advanced Rules and Books Training CourseÜ Ad-hoc Advanced Modules e.g. Work Manager
Ü Modeler/Administrators
Ü Project managerÜ Senior Consultant
Ü Refer to standard SAP training methodology.
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Project Methodology - Realization - Design
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Project Preparation Business Blueprint Realization
Model Architecture
Input/Output Interfaces
Technical Architecture
BRS
Business Requirement
Specifications
Specifications
GTS
GeneralTechnical
Specifications
DTS
DetailTechnical
Specifications
TRD
TechnicalRecommendations
Document
Validation
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Key PlayersGeneralTechnical
Specifications
DetailTechnical
Specifications
Test SchedulePJP
Project Plan
Validation
QTP
Quality Test Plan
Project Methodology
Project Methodology - Realization - Design
Ü Gather detailed data and design the modelÜ Recommend design concerning : data, operational processes, IT infrastructure, functional organization, securityÜ Define and validate the acceptance test scheduleÜ Evaluate precisely the workloads and resources required
Ü Updated project Plan (PJP)Ü Business Requirement Specification (BRS)Ü Updated Technical Recommendation (TRD)
Ü Design Specification Ü General Technical Specifications (GTS) Ü Detailed Technical Specifications (DTS)Ü Quality Test Plan (QTP)Ü Updated Project Plan (PJP)Ü Updated Technical Recommendations Document (TRD)
Ü Model Design Example (EMD)Ü Rules LibraryÜ Model Library
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Customers
Suppliers
Ü Project sponsorÜ Project managerÜ End User(s)Ü Data administrator
Ü Project managerÜ Business ConsultantÜ Product & Senior Product Consultants
PCM Project Methodology
Project Methodology - Realization - Construction
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Project Preparation Business Blueprint Realization
Build The Reports
Functional Tests
QTP
Quality Test Plan
Knowledge Transfer
Validation
GTS
GeneralTechnical
Specifications
DTS
DetailTechnical
Specifications
OPD
OperationalMaintenance
Document
Build The Model
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Key Players
Validation
Project Methodology
Project Methodology - Realization - Construction
Ü Build the model, populate data and perform functional testingÜ Develop reporting interfaces and securityÜ Document the operational proceduresÜ Use a step by step validation process (interfaces, rules, etc.)Ü Start validation and deployment phases
Ü Updated project Plan (PJP)Ü Design Documents Ü General Technical Specifications (GTS) Ü Detailed Technical Specifications (DTS)Ü Quality Test Plan (QTP)
Ü Validated modelÜ Operational Maintenance Document (OPD)Ü Test Plan Resut (TPR)
Ü Product DocumentationÜ Optimization ToolsÜ Rules LibraryÜ Model Building Methodology
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Customers
Suppliers
Ü Project sponsorÜ Project managerÜ Business UserÜ IT Representative
Ü Project managerÜ Product ConsultantÜ Senior Product Consultant
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Model
Process Flow and minimal suite of actions.
the assignments can be built following by the rules.
because avoid to re-build previous step many times.
Ü The purpose of this phase is to build the model following the Design specification and a logical
Ü The model is built step by step: each new step depending on all the previous steps.
Ü The first step is to build the structure. It represents the foundation of the model.
Ü So the data can be populated and the data imports automated. With the data and the structure,
Ü The last step is then to build the security.
Ü This phase and the respect of the action orders insures a minimum of effort, rapidity and stability,
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Model
and minimal suite of actions.
the assignments can be built following by the rules.
because avoid to re-build previous step many times.
The purpose of this phase is to build the model following the Design specification and a logical
The model is built step by step: each new step depending on all the previous steps.
The first step is to build the structure. It represents the foundation of the model.
So the data can be populated and the data imports automated. With the data and the structure,
The last step is then to build the security.
This phase and the respect of the action orders insures a minimum of effort, rapidity and stability,
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build The Structure
Process Flow Structure Building Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisites
Deliverable
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build The Structure
Structure Building Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Detail Technical Specifications) without restriction on the structure section
Ü Build the structure of the modelÜ Follow the Design SpecificationsÜ Insure the model basis
Ü Validated Design Documents (General Technical Specifications and
Ü Model Basis
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Model - Populate Data
Process Flow Data Population Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisit
Deliverables
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Model - Populate Data
Data Population Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Populate data Ü Test the reliability of the importsÜ Automate the data importsÜ Test the reliability of the automationÜ Test the accuracy of the first results regarding the Design SpecificationsÜ Connect the model with its environment (data sources)
Ü Model with the structureÜ Validated Design Documents without restriction on the input data sectionÜ Availability of the set of input data
Ü Model with the structure and dataÜ Process for the automation of the data imports
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build The Assignments
Process Flow Assignment Building Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisites
Deliverables
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build The Assignments
Assignment Building Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Build the assignmentsÜ Link the items to each others Ü Follow the Design Specifications
Ü Model with the structure and populatedÜ Validated Design Documents without restriction on the assignment section
Ü Model with the structure, data and assignments
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build Rules
Process Flow Rule Building Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisites
Deliverables
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build Rules
Rule Building Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Build the specific rules needed for the completion of the modelÜ Follow the Design SpecificationsÜ End the designed modelÜ Allow to achieve the calculation
Ü Model with the structure, data and assignmentsÜ Validated Design Documents without restriction on the rules section
Ü Model with the structure, data, assignments and rulesÜ Completed and calculated model
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build Security
Process Flow Security Building Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisites
Deliverables
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Model - Build Security
Security Building Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Build the security required for the different types of usersÜ Limit the access of users to all or a part of modelÜ Follow the Design SpecificationsÜ End the model building
Ü Model with the structure, data, assignments and rulesÜ Validated Design Documents without restriction on the security section
Ü Complete Model
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Report
Process Flow phase, following the Design specification.
foundation of the reports. This first steps allowed to build the books and the reports.
Ü The purpose of this phase is to build the reports associated to the model built in the previous
Ü The reports are also built step by step: starting with the base, the grids building, which are the
Ü The last step based on the model and the reports is to build the workflow which finished the model.
Ü This phase and the respect of its building logic insure early results and a reliable model.
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Report
phase, following the Design specification.
foundation of the reports. This first steps allowed to build the books and the reports.
The purpose of this phase is to build the reports associated to the model built in the previous
The reports are also built step by step: starting with the base, the grids building, which are the
The last step based on the model and the reports is to build the workflow which finished the model.
This phase and the respect of its building logic insure early results and a reliable model.
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Reports - Build Grids
Process Flow Grid Building Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisites
Deliverables
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Reports - Build Grids
Grid Building Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Build the grids defined in the Design SpecificationsÜ Allow to visualize the resultsÜ Allow to analyze the trace back of the costÜ Allow to control the accuracy of model calculation
Ü Complete model Ü Validated Design Documents without restriction on the books section
Ü Model with the catalog of grids
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Reports - Build Books/Reports
Process Flow Grid Building Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisites
Deliverables
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Reports - Build Books/Reports
Grid Building Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Build the books and reports defined in the Design SpecificationsÜ Build the output of the model (including output data)Ü Allow to show the results and the analyze to usersÜ Allow the users to access to a part of the modelÜ Allow to communicate about the model and its resultsÜ Apply the security on all the booksÜ Automate the Report Manager
Ü Complete modelÜ Availability of the catalog of gridsÜ Validated Design Documents without restriction on the books section
Ü Complete books and reports
PCM Project Methodology
Model Building Methodology - Realization - Construction - Build The Reports - Build Workflow
Process Flow Workflow Building Process Flow
Project Preparation Business Blueprint Realization
Build The Structure
Build Security
Populate Data
Build The Assignments
Build Rules
Automate Data Import
Build The Model
Build Grids
Build Books/Reports
Build Workflow
Build The Reports
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Objectives
Prerequisites
Deliverables
Build Workflow
Finished Model
Model Building Methodology
Model Building Methodology - Realization - Construction - Build The Reports - Build Workflow
Workflow Building Process Flow
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü If needed, build communication and agreement between Project Manager and usersÜ Send information email
Ü Complete model with grids, books and reportsÜ Validated Design Documents with the complete communication process
Ü Finished Model
PCM Project Methodology
Project Methodology - Realization - Model Tests
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Preparation Business Blueprint Realization
Test Data Loads
Test Allocation/Calculation
Check Allocation Balance
Test Books/Report/Output Performane
Validation
GTS
GeneralTechnical
Specifications
DTS
DetailTechnical
Specifications
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Validation
Project Methodology
Project Methodology - Realization - Model Tests
Customers
Suppliers
Ü Test overal model functionalityÜ Test allocation balanceÜ Test book/reporting functionalityÜ Test data loading mechanism
Ü Completed ModelÜ Design Documents Ü General Technical Specifications (GTS) Ü Detailed Technical Specifications (DTS)
Ü Model test results
Ü Model balancing book
Ü Project manager
Ü Project managerÜ Senior Product Consultant
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Project Methodology - Realization - Model Review
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Preparation Business Blueprint Realization
Review Data Loads
Review Allocation/Calculation
Review Allocation Balance
Review Books/Report/Output
Validation
GTS
GeneralTechnical
Specifications
DTS
DetailTechnical
Specifications
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Validation
Project Methodology
Project Methodology - Realization - Model Review
Customers
Suppliers
Ü Review the rules and model structure for functional/calculation correctnessÜ Review Books & Books Script for functionality and appropriateness
Ü Tested ModelÜ Design Documents Ü General Technical Specifications (GTS)
Ü Recommendations for model improvements
Ü Model Review Template (MRT)
Ü Project manager
Ü Project managerÜ Senior Product Consultant
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Project Methodology - Realization - Optimizations
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Preparation Business Blueprint Realization
Review The Model
Write Recommendations
GTS
GeneralTechnical
Specifications
DTS
DetailTechnical
Specifications
TRD
TechnicalRecommendations
Document
PSQ
Model Review
Document
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Validation
Project Methodology
Project Methodology - Realization - Optimizations
Customers
Suppliers
Ü Reviewing the rules and model design for performance improvementsÜ Review Books Script and functionality for performance improvementsÜ Review Interfaces for performance improvement e.g. Report Manager
Ü Completed ModelÜ Design Documents Ü General Technical Specifications (GTS) Ü Detailed Technical Specifications (DTS)
Ü Recommendations for model improvements
Ü Model Review Template (MRT)Ü Optimization Tools
Ü Project manager
Ü Project managerÜ Product ConsultantÜ Senior Product Consultant
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Project Methodology - Final Preparation - End User/IT Training
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Preparation Business Blueprint Realization
PJP
Project Plan
CP
Approved ComercialProposal
Deliver Training
SCQ
Satisfaction Questionaire
Validation
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Notes
Project Methodology
Project Methodology - Final Preparation - End User/IT Training
the software
Customers
Suppliers
Ü Train the customer in the required functionality to enable them to operate
Ü Commercial ProposalÜ Project Charter
Ü Basic Training CourseÜ Advanced Rules and Books Training CourseÜ Ad-hoc Advanced Modules e.g. Work Manager
Ü Model Specific Training Template (MST)Ü Training Guide(s) And Course Materials
Ü Business User(s)
Ü Project managerÜ Sales TeamÜ Technical Support (Install)
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Refer to standard SAP training methodology.
PCM Project Methodology
Project Methodology - Final Preparation - Deployment
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Preparation Business Blueprint Realization
PTM
Training Manual
Training Course for The Model
Production Startup
OPD
OperationMaintenance
Document
CAD
User AcceptanceDocument
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Project Methodology
Project Methodology - Final Preparation - Deployment
Customers
Suppliers
Ü Start up productionÜ Deploy the model in the Operational EnvironmentÜ Train the users and ensure transfer of know-how to administrators and operatorsÜ Initiate maintenance process
Ü Update Project Plan (PJP)Ü Operational Maintenance Document (OPD)
Ü Training Package for Users And AdministratorsÜ Acceptance of Model (CAD)
Ü Model Specific Training ChecklistÜ End User Manual Template
Ü Project ManagerÜ End UsersÜ Future administrator
Ü Project Manager
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Ü Technical consultantÜ Training Consultant
PCM Project Methodology
Project Methodology - Final Preparation - Project Review/Support
Process Flow Objectives
Prerequisites
Deliverables
Other Tools
Key Players
Project Preparation Business Blueprint Realization
Project Review Phase
PJC
Project Charter
PJP
Project Plan
Evaluate Benefits And Impacts PRR
Project ReviewDocument
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Project Methodology
Project Methodology - Final Preparation - Project Review/Support
development, review technical requirement
Customers
Ü Complete project review : decision-making processes, deployment,
Ü Identify positive and negative pointsÜ Formalize know-how and experience gained from the projectÜ Validation of impact upon the organization Ü Project Plan (PJP)Ü Project Charter (PJC)Ü Business Specification (BRS)Ü Technical Recommendation Dcoument (TRD)
Ü Project Review Report (PRR)Ü Case Study (CST)Ü Customer Summary (Internal)Ü Technical Recommendation Document (TRD)
Ü Lessons Learned Template (LLR)Ü SAP Satisfaction Survey (ASS)
Ü Project SponsorÜ Project Manager
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
SuppliersÜ Project managerÜ Business ConsultantÜ Senior Manager
PCM Project Methodology
Knowledge Area - How To Use This Methodology
How To Use This Methodology
The method is a reference for planning, managing, and executing projects to implement an PCM solution according to the SAP approach.
This first version concentrates on the aspect relevant to the design and construction of a PCM model.
Who should use this Methodology?The method for implementing PCM projects, is aimed at experienced consultants and project managers performing the implementation of ABC/ABM project.
This first version covers also the essential prerequisite skills such as project management and knowledge of PCM software.
What should be read?
Provide the different stages and the logical sequence to build a model.
Provide the project roles, the essential prerequisite skills by project role, and some guidelines to help you to use this methodology.
This experience may come from involvement in other types of project. Consultants and Project Managers who are already experienced in implementing ABC/ABM project may also find this version useful as a quick check list or a source of example deliverables.
Ü Project Methodology Provide a guide to the key stages required for managing a PCM implementation project. These stages are aligned with all Project Methodology suggested by our partners. But in this part, prerequisites, deliverables, process flows and activities for each phase are documented with what is specific for PCM implementation. You will find templates to help you to move forward in your project step by step.
Ü Model Building Methodology
Ü Knowledge area
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Ü Templates and Tools Provide some example templates and an overview of the tools that could be used to achieve a PCM implementation project. The same documents are also available in the first part, spread out over the different phases of the project methodology.
Knowledge Area
Knowledge Area - How To Use This Methodology
How To Use This Methodology
The method is a reference for planning, managing, and executing projects to implement an PCM solution according to the SAP approach.
This first version concentrates on the aspect relevant to the design and construction of a PCM model.
The method for implementing PCM projects, is aimed at experienced consultants and project managers performing the implementation of ABC/ABM project.
This first version covers also the essential prerequisite skills such as project management and knowledge of PCM software.
Provide the different stages and the logical sequence to build a model.
Provide the project roles, the essential prerequisite skills by project role, and some guidelines to help you to use this methodology.
This experience may come from involvement in other types of project. Consultants and Project Managers who are already experienced in implementing ABC/ABM project may also
Provide a guide to the key stages required for managing a PCM implementation project. These stages are aligned with all Project Methodology suggested by our partners. But in this part, prerequisites, deliverables, process flows and activities for each phase are documented with what is specific for PCM implementation. You will find templates to help you to move forward in your project step by step.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
Provide some example templates and an overview of the tools that could be used to achieve a PCM implementation project. The same documents are also available in the first part, spread out over the different phases of the project methodology.
PCM Project Methodology
Knowledge Area - How To Use This Methodology - Objectives & Benefits
Objectives of The Methodology
The Methodology describes in an exhaustive way the general step of construction of a model and different the phases from implementation.It provides hints, tips, templates, questionnaires, techniques, and defined process for planning projects
The method structures each step :
Global Benefits
There are two key features of the Methodology
The Methodology has been developed to
Ü Standardization of the processesÜ Identification of the key playersÜ WorkshopsÜ Documents templates
Ü Business focusÜ Proven from experience
Ü Enable clients to successfully implement PCM environments.Ü Maximize business benefits and return on investment
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
This methodology has evolved from the best practices
Benefits to SAP Consulting
The SAP Methodology
Benefits to Partners
The SAP Methodology
Ü Minimize project risks.
Ü Feedback from projects world-wide over the yearsÜ Learned what works, what doesn’tÜ Methodology reviewed on a regular basis
Ü Enables consultants to implement projects in a repeatable, efficient mannerÜ Supports project implementations of varying scales,Ü Promotes SAP Consulting as a professional organizationÜ Allows corporate training for consultants (and partners)
Ü Provides opportunities for partners/management consultants with PCM expertiseÜ Iterative approach offers opportunities to build long-term relationships and enterprise-wide implementations based on successful projectsÜ Enables consultants to implement projects in a repeatable, efficient mannerÜ Can be integrated with existing partner methodologies.
Knowledge Area
Knowledge Area - How To Use This Methodology - Objectives & Benefits
The Methodology describes in an exhaustive way the general step of construction of a model and different the phases from implementation.It provides hints, tips, templates, questionnaires, techniques, and defined process for planning projects
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
Iterative approach offers opportunities to build long-term relationships and enterprise-wide implementations based on successful projects
PCM Project Methodology
Knowledge Area - How To Use This Methodology - Typology of Projects
Typology of Projects
The objective of this project is to help the customer to define the business requirements. In this type of project, we start the project from scratch. There is no legacy system.
Ü Type 1: Global Project
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Project Preparation Business Blueprint Realization
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Case 1: The Business Requirements Specifications meets with the SAP expectations
Case 2: The Business Requirements Specifications does not meet with the SAP expectations
We have to reformulate the Business Requirements Specifications (possibility to do a re-engineering)
ü Starting stage: Assessment4 First Deliverable: Business Requirements Specifications
Ü Type 2: Project with existing Business Requirements Specifications
ü Starting stage: the Design phase, with a workshop to validate our understanding Business Requirements 4 First Deliverable: General Technical Specifications
ü Starting stage: Business Requirements4 First Deliverable: Business Requirements Specifications (reformulated) and General Technical Specifications
Ü Type 3: Project with existing Business Requirements Specifications but they look like Technical Specifications.
ü Starting stage: the Design phase with a workshop to validate our understanding of the Business Requirements4 First Deliverable: the General Technical Specifications and an introduction which summarizes the Business Requirements
Ü Type 4: Project migration. The customer has an existing model (Excel, Metify, Competitor software)
ü Starting stage: the Design phase4 First Deliverable: the General Technical Specifications and an analysis of the difference between PCM and the current system
Knowledge Area
Knowledge Area - How To Use This Methodology - Typology of Projects
The objective of this project is to help the customer to define the business requirements. In this type of project, we start the project from scratch. There is no legacy system.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
Case 2: The Business Requirements Specifications does not meet with the SAP expectations
We have to reformulate the Business Requirements Specifications (possibility to do a re-engineering)
Starting stage: the Design phase, with a workshop to validate our understanding Business Requirements
First Deliverable: Business Requirements Specifications (reformulated) and General Technical Specifications
Type 3: Project with existing Business Requirements Specifications but they look like Technical Specifications.
Starting stage: the Design phase with a workshop to validate our understanding of the Business Requirements First Deliverable: the General Technical Specifications and an introduction which summarizes the Business Requirements
Type 4: Project migration. The customer has an existing model (Excel, Metify, Competitor software)
First Deliverable: the General Technical Specifications and an analysis of the difference between PCM and the current system
PCM Project Methodology
Knowledge Area - How To Use This Methodology - SAP Consulting Involvement
SAP Consulting Involvement
This schema presents the SAP Consulting involvement on each Methodology stage with a partner in a Global Project.The expertise of SAP Consulting has to be used in the most important stages: The Design and the Optimizations.The installation is performed by the Helpdesk in order to know the Customer environment.The standard Training is mandatory performed by SAP, all specific training (focused to the model) could be deliver by the partner.
SAP Involvement Partner Involvement
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Project Preparation Business Blueprint Realization
Optimizations
Knowledge Area
Knowledge Area - How To Use This Methodology - SAP Consulting Involvement
This schema presents the SAP Consulting involvement on each Methodology stage with a partner in a Global Project.The expertise of SAP Consulting has to be used in the most important stages: The Design and the Optimizations.
The standard Training is mandatory performed by SAP, all specific training (focused to the model) could be deliver by the partner.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
Tests
Optimizations
Technical Design
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Realization Final Preparation Go Live And Support
Optimizations
Deployment Project Review/Support
End User/IT Training
PCM Project Methodology
Knowledge Area - Project Roles
Project Roles
The number of roles is independent of the number of individual people.A person may fill one or more roles during a project.The project size, the duration, the scope, the resource experience and the availability determine the number of roles that a single individual will fill.
An additional some groups of personnel act as project review groups. These groups are:
A project consists of many roles with specific responsibilities and activities.
To ensure an optimal project organization, there are two groups of personnel directly involved with the project. Each group plays a central role and is responsible for specific tasks during the execution of the project. These groups are:
Ü customer project teamÜ supplier project team
Ü the executive committee (sponsors, managers), which reviews progress and validates important decisionsÜ the quality assurance teamÜ the project review board (project managers of customer and supplier team), which acts as the project’s management team.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Project Roles
The project size, the duration, the scope, the resource experience and the availability determine the number of roles that a single individual will fill.
To ensure an optimal project organization, there are two groups of personnel directly involved with the project. Each group plays a central role and is responsible for specific tasks
the executive committee (sponsors, managers), which reviews progress and validates important decisions
the project review board (project managers of customer and supplier team), which acts as the project’s management team.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Project Roles - Project Roles By Phase
Project Roles by Phase
Ü Project Roles by phase displays the involvement of the various project roles throughout the solution phases
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Project Preparation Business Blueprint Realization
Tests
Optimizations
Review
Assessment
Startup
PCM Installation
Technical Design
Construction
Modeler TrainingBusiness Requirements
& Functional Design
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Project Roles - Project Roles By Phase
Project Roles by phase displays the involvement of the various project roles throughout the solution phases
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Realization Final Preparation Go Live And Support
Tests
Optimizations
Technical Design
Deployment Project Review/Support
Construction
End User/IT Training
Modeler Training
Iterative Methodology
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Project Roles - Customer Team
Client Project Team Roles
Project Sponsor
Business User
IT Representative
End User(s) The End Users advise the project team on the business requirements. In addition, they assure the quality of solution.
Database Administrator The Database Administrator provides the project team with access to all data sources.
The Project Sponsor defines the project’s objectives in relation to the organization’s objectives. The project sponsor also identifies the key members of the project’s management team, establishes key priorities, authorizes, and finances the project. The project sponsor is also responsibility for establishing and monitoring the escalation procedures to take in the event of conflict.
Project sponsors usually hold a senior position in the customer’s management team. In practice, they often delegate some of their direct involvement and decision making.
Business User are responsible for defining the project strategy, business requirements and validating the project direction at key points. The Business User understands the business rules and processing of the current organization. They inform the project team on how data is currently used in the organization, transformations or business rules that are applied to data. The business analyst will provide support in understanding the information.
The IT Representative advises the project team on the organizations overall IT strategy and co-ordinates the appropriate IT staff to support the project team. He provides expertise and support on the hardware platforms and on the customer’s network architecture.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Project Manager
Future administrator
Skills:
The Customer’s Project Manager is responsible for ensuring that the project delivers business value. The project manager manages the day-to-day direction and co-ordination of the project team and the reference group and presents the project status to the project sponsor. The customer project manager is also responsible for ensuring organizational support and resourcing for the project (such things as providing equipment, software, useraccounts for non-customer staff, office space, access passes/ID-cards, etc.).
Project sponsors usually hold a senior position in the customer’s management team. In practice, they often delegate some of their direct involvement and decision making.
The Future Administrator is responsible for maintaining the solution, including scheduling and monitoring refresh jobs.
Ü fundamentals of operating systemsÜ PCM maintenance and administrationÜ data management and administrationÜ understanding of PCM concepts
Knowledge Area
Knowledge Area - Project Roles - Customer Team
The End Users advise the project team on the business requirements. In addition, they assure the quality of solution.
The Database Administrator provides the project team with access to all data sources.
The Project Sponsor defines the project’s objectives in relation to the organization’s objectives. The project sponsor also identifies the key members of the project’s management team, establishes key priorities, authorizes, and finances the project. The project sponsor is also responsibility for establishing and monitoring the escalation procedures to take in the event of conflict.
Project sponsors usually hold a senior position in the customer’s management team. In practice, they often delegate some of their direct
Business User are responsible for defining the project strategy, business requirements and validating the project direction at key points. The Business User understands the business rules and processing of the current organization. They inform the project team on how data is currently used in the organization, transformations or business rules that are applied to data. The business analyst will provide support in understanding the
The IT Representative advises the project team on the organizations overall IT strategy and co-ordinates the appropriate IT staff to support the project team. He provides expertise and support on the hardware platforms and on the customer’s network architecture.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
The Customer’s Project Manager is responsible for ensuring that the project delivers business value. The project manager manages the day-to-day direction and co-ordination of the project team and the reference group and presents the project status to the project sponsor. The customer project manager is also responsible for ensuring organizational support and resourcing for the project (such things as providing equipment, software, useraccounts for non-customer staff, office space, access passes/ID-cards, etc.).
Project sponsors usually hold a senior position in the customer’s management team. In practice, they often delegate some of their direct
Administrator is responsible for maintaining the solution, including scheduling and monitoring refresh jobs.
PCM Project Methodology
Knowledge Area - Project Roles - Supplier Team
Supplier Project Team Roles
Project Manager
Business Consultant
Product Consultant
Senior Product Consultant
Training Consultant The Training Consultant is responsible for the design, development, and provision of the training given to the customer's employees. This involves:
The Project Manager is responsible for the day-to-day direction and co-ordination of the technical consultants. The service provider project manager interfaces directly with the customer’s project manager.
The Business Consultant advises the project team on the definition of the business process. The purpose of the Business Consultant is to address the business and functional criteria of the PCM model to meet the client needs Consultants are usually bought into the team to advise and guide the project team on specific subject matter, including modelling, business systems requirements, or data design.
The Product Consultant develops and tests the solution to the required quality according to the proposed design. The Product Consultant also constructs the model(s) and the reports. He is responsible for unit testing each other work.
The Senior Product Consultant works closely with the supplier project manager to ensure that the project processes are running smoothly and that every effort is made to deliver a high quality system. This person is responsible for the co-ordination of the design phase and the construction process and for ensuring that the application meets the business objectives.
Ü conducting on going training needs analyses to assess the target audience and to defineÜ the most efficient and effective method to provide the training designing and developing training and coaching programsÜ preparing training material, case studies, instructional demonstrations and hands-on training and coachingÜ organizing delivery of the training from the appropriate expert, and at the correct phase of the project
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Technical Consultant
Ü reviewing the training at each stage to continuously improve the quality and effectiveness of training as an intrinsic part of the project cycle.
The Technical Consultant is responsible for installation of PCM on client site. Further, they are required to assist the client with any installation issues, including pre-install requirements definition, installation, performance and stress testing, component testing.
Knowledge Area
Knowledge Area - Project Roles - Supplier Team
The Training Consultant is responsible for the design, development, and provision of the training given to the customer's employees. This involves:
The Project Manager is responsible for the day-to-day direction and co-ordination of the technical consultants. The service provider project manager interfaces directly with the customer’s project manager.
The Business Consultant advises the project team on the definition of the business process. The purpose of the Business Consultant is to address the business and functional criteria of the PCM model to meet the client needs Consultants are usually bought into the team to advise and guide the project team on specific subject matter, including modelling, business systems requirements, or data design.
The Product Consultant develops and tests the solution to the required quality according to the proposed design. The Product Consultant also constructs the model(s) and the reports. He is responsible for unit testing each other work.
The Senior Product Consultant works closely with the supplier project manager to ensure that the project processes are running smoothly and that every effort is made to deliver a high quality system. This person is responsible for the co-ordination of the design phase and the construction process and for ensuring that the application meets the business objectives.
conducting on going training needs analyses to assess the target audience and to definethe most efficient and effective method to provide the training designing and developing training and coaching programspreparing training material, case studies, instructional demonstrations and hands-on training and coachingorganizing delivery of the training from the appropriate expert, and at the correct phase of the project
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
reviewing the training at each stage to continuously improve the quality and effectiveness of training as an intrinsic part of the project cycle.
The Technical Consultant is responsible for installation of PCM on client site. Further, they are required to assist the client with any installation issues, including pre-install requirements definition, installation, performance and stress testing, component testing.
PCM Project Methodology
Knowledge Area - Skills Matrix
Skills MATRIX
The Role Skill Matrix describe in a matrix the minimum level of competencies required to perform the responsibilities included in the Role Definition.
It defines in details each level of competence for each competence relevant to the Supplier
We have identified five groups of competencies:
In this first version of the Methodology, we just have identified if we need a minimum level of a competence for each role (Project or Function oriented).
In the future version, each skill will be graduated.
Ü Personal skillsÜ Project Management skillsÜ Business skillsÜ Solution Design skillsÜ Technical Skills
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Skills Matrix
The Role Skill Matrix describe in a matrix the minimum level of competencies required to perform the responsibilities included in the Role Definition.
It defines in details each level of competence for each competence relevant to the Supplier
In this first version of the Methodology, we just have identified if we need a minimum level of a competence for each role (Project or Function oriented).
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Skills Matrix - Project Management Skills
Project Management Skills
PM : Project Manager TS : Technical Support (Install)BC : Business Consultant SP : Senior Product Consultant
The levels are different according the various roles.
TC : TrainerPC : Product Consultant
ü This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Skills Matrix - Project Management Skills
PC : Product Consultant
This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Skills Matrix - Business Skills
Business Skills
PM : Project Manager TS : Technical Support (Install)BC : Business Consultant SP : Senior Product Consultant
The levels are different according the various roles.
TC : TrainerPC : Product Consultant
ü This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Skills Matrix - Business Skills
PC : Product Consultant
This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Skills Matrix - Personal Skills
Personal Skills
PM : Project Manager TS : Technical Support (Install)BC : Business Consultant SP : Senior Product Consultant
The levels are different according the various roles.
TC : TrainerPC : Product Consultant
ü This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Skills Matrix - Personal Skills
PC : Product Consultant
This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Skills Matrix - Solution Design Skills
Solution Design Skills
PM : Project Manager TS : Technical Support (Install)BC : Business Consultant SP : Senior Product Consultant
The levels are different according the various roles.
TC : TrainerPC : Product Consultant
ü This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Skills Matrix - Solution Design Skills
PC : Product Consultant
This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Skills Matrix - Technical Skills/All Roles
Technical Skills/All Roles
PM : Project Manager TS : Technical Support (Install)BC : Business Consultant SP : Senior Product Consultant
The levels are different according the various roles.
TC : TrainerPC : Product Consultant
ü This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Skills Matrix - Technical Skills/All Roles
PC : Product Consultant
This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology
PCM Project Methodology
Knowledge Area - Skills Matrix - Technical Skills/Consultants
Technical Skills/Consultants
PM : Project Manager TS : Technical Support (Install)BC : Business Consultant SP : Senior Product Consultant
The levels are different according the various roles.
TC : TrainerPC : Product Consultant
ü This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Objectives & Benefits
Typology of Projects
How To Use This Methodology Project Roles Skills Matrix
SAP Consulting Involvement
Project Roles By Phase
Customer Team
Supplier Team
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Main Menu Project Methodology Model Building Methodology
Knowledge Area
Knowledge Area - Skills Matrix - Technical Skills/Consultants
PC : Product Consultant
This flag indicates a minimum level for the skill. In this first version on the methodology, the levels are not graduated.
Skills Matrix
Personal Skills
Project Management Skills
Business Skills
Solution Design Skills
Technical Skills/All Roles
Technical Skills/Consultants
Knowledge AreaModel Building Methodology