+ All Categories
Home > Technology > Pcs 070514

Pcs 070514

Date post: 24-May-2015
Category:
Upload: hydrologywebsite1
View: 133 times
Download: 3 times
Share this document with a friend
Popular Tags:
35
Overview Overview of of Hydrology Project Hydrology Project World Bank Monitoring Mission May 06-09, 2014 New Delhi
Transcript
Page 1: Pcs 070514

Overview Overview ofof

Hydrology ProjectHydrology Project

World Bank Monitoring MissionMay 06-09, 2014

New Delhi

Page 2: Pcs 070514

OBJECTIVES – HP-II

To extend and promote the sustained and effective

use of Hydrological Information system (HIS)

developed under HP-I by all potential users

concerned with the water Resources Planning and

Management, both in public and private, thereby

contributing to improve productivity and cost

effectiveness of water related investments

Page 3: Pcs 070514

Salient features of HP-II

•Effective Date of start of Project- April 5, 2006

•Closing Date- May 31, 2014

•Estimated cost of the project- Rs. 631.83 crore

•Funding- World Bank (IBRD Loan)- US$104.98 million

•Coverage- 13 states and 8 central organizations

Page 4: Pcs 070514

Implementing Agencies - HP-II

INDIA

On Going States

New States

Map not to scale

Central Agencies

HP -I : 6 Nos. CWC, CGWB, CWPRS, NIH, IMD, MOWR

New : 2 Nos. BBMB, CPCB

States

HP – I: 9 Nos. Andhra Pradesh, Chhattisgarh, Gujarat, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Orissa, Tamil Nadu

New: 4 Nos. Goa, Himachal Pradesh, Punjab, Pondicherry

Page 5: Pcs 070514

Andhra Pradesh GW• Key Achievements:

– Data centre constructed– 1262 additional piezometers (1162 complete)– Two PDS– DWLR

• Post project:– State Division– Upgrade labs, improve data analysis

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTAP SW 108 335 181 168% 54%

Page 6: Pcs 070514

Andhra Pradesh SW• Key Achievements:

– Civil works for RT-DAS system– Planning for upgrade RT-DAS– Upgrade of computer equipment– Four out of 5 reservoirs surveyed for PDS, with one report submitted

and 3 more by 31/05/2014

• Post project:– Consolidation of what has been achieved

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTAP SW 70 88 58 83% 66%

Page 7: Pcs 070514

Chhattisgarh GW• Key Achievements:

– 58 piezometers with 11 DWLR– Training Hall– Seasonal planning in 21 catchments

• Post project:– State budget and staff available for HIS activities– Training plans for replacement staff

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTChhattisgarh GW 92 62 53 58% 85%

Page 8: Pcs 070514

Chhattisgarh SW• Key Achievements:

– DSS (Planning) work– PDS work– Conference room and meeting hall upgrade– Staff training

• Post project:

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTChhattisgarh SW 84 41 39 46% 95%

Page 9: Pcs 070514

Gujarat GW• Key Achievements:

– 228 piezometers, with 26 DWLR– Establishment of DSS(P) Cell– GIS data layer procurement– PDS work in Dharoi

• Post project:– Continue monitoring and maintenance of facilities– Data to be used for aquifer mapping, MNREGA projects

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTGujarat GW 104 172 173 166% 101%

Page 10: Pcs 070514

Gujarat SW• Key Achievements: (TAMC opinion)

– Real time AWS network– Upgrade G-D AWLR to real-time– DSS (Planning)– PDS work

• Post project:

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTGujarat SW 94 96 65 69% 68%

Page 11: Pcs 070514

Karnataka GW• Key Achievements: (TAMC opinion)

– New piezometers (but no new DWLR)– One building (but not the other)– PDS Bangalore study– DSS (Planning)

• Post project:

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTKarnataka GW 144 138 73 51% 53%

Page 12: Pcs 070514

Karnataka SW• Key Achievements:

– Rainfall data reporting 1010 stations via sms– 16 AWS with real time (with further 15 for reservoir WL)– Real time water level recorder network (12 locations) with data

management and ADCP– DSS (Planning)– Training Centre at KERS

• Post project:– All monitoring to be continued with state funding

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTKarnataka SW 91 111 106 116% 95%

Page 13: Pcs 070514

Kerala GW• Key Achievements:

– Regional data centre building at Ernakulam– DSS (Planning)– PDS (with Kerala SW and NIH)– Replacement computer hardware– Awareness-raising materials

• Post project:– Completion / Furnishing the Ernakulum building?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTKerala GW 108 165 137 127% 83%

Page 14: Pcs 070514

Kerala SW• Key Achievements:

– Training centre at Thrissur– New G-D locations: 7 complete and 3 nearly complete– Network upgrade in Bharathapuzha Basin (Real time:7 RG, 6 WLR)– DSS (Planning)– PDS (with Kerala GW and NIH)– Replacement computer hardware– Awareness-raising materials

• Post project:– More basins for DSS(P)– More applications of HIS data

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTKerala SW 75 131 113 151% 86%

Page 15: Pcs 070514

Madhya Pradesh GW• Key Achievements: (TAMC opinion)

– Water quality sampling equipment – Piezometer construction: 51 plus 29 for PDS– Upgrade offices– PDS work

• Post project:

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTMP GW 120 43 31 26% 72%

Page 16: Pcs 070514

Madhya Pradesh SW• Key Achievements:

– RT-DAS procurement and installation in Wainganga basin– Upgradation of data centres– Sediment survey Tawa reservoir– DSS (planning) work

• Post project:– Staffing will continue– Training replacement staff

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTMP SW 82 106 100 122% 94%

(includes 3 crores in 2014-15?)

Page 17: Pcs 070514

Maharashtra GW• Key Achievements:

– Upgrade of hardware and software– DSS (planning) work – including monitoring equipment– Staff capacity building and training– Vehicles– PDS work

• Post project:– Increasing groundwater network density– Development of on-line data dissemination system– Development of DSS applications

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTMaharashtra GW 130 131 127 98% 97%

Page 18: Pcs 070514

Maharashtra SW• Key Achievements:

– Data centre at Pune for RT-DSS– RT-DAS system for 248 stations linked to RTSF&ROS system– DSS(P) for Upper Bhima– PDS completed

• Post project:– Extension of DSS(P) and RT-DSS to other basins– Operation and maintenance of HIS– Training and awareness raising

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTMaharashtra SW 98 375 381 389% 102%

(includes 7.6 crores in 2014-15)

Page 19: Pcs 070514

Orissa GW• Key Achievements: (TAMC view)

– Upgrading of data centre– New piezometers (40?) and DWLR (real time)– PDS started (completion when?)– DSS(Planning work)

• Post project:– ?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTOrissa GW 112 92 80 71% 87%

Page 20: Pcs 070514

Orissa SW• Key Achievements:

– RT-DAS (civil works complete, equipment under transport)– DSS(P) work– PDS complete

• Post project:– Budget to pay for RT-DAS?– RESOLITION OF DUPLICATE SOE CLAIM??

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTOrissa SW 101 135 89 88% 66%

Page 21: Pcs 070514

Tamil Nadu• Key Achievements:

– 57 real time raingauges, 6 real time AWS– Civil works at 50 G-D sites– 200 piezometers– DSS(P) unit with surveying and software and training for MIKESHE

• Post project:– Continue with DSS(P)– RT-DAS system– Range of other ideas

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTTamil Nadu 207 328 316 153% 96%

Page 22: Pcs 070514

Goa• Key Achievements:

– Data centre and laboratory established– 11 G-D stations established: RT-DAS and ADCP– Telemetry from 4 AWS and 6ARG– 57 piezometers plus monitoring of 47 open wells (30 DWLR inc 27 with

telemetry)– PDS complete

• Post project:– Continuity of work assured– Funds for operation and maintenance will be provided

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTGoa 187 222 222 119% 100%

(including 3.5 crores in 2014-15)

Page 23: Pcs 070514

Himachal Pradesh• Key Achievements: (TAMC estimate)

– Data centre and laboratory established plus lab in Shimla– 25 G-D stations established with bubbler AWLR: with 8 cableways and– Climate monitoring includes 35 ARG, 4 AWS and 16 snow pillow with Telemetry

plus 101 standard raingauge– 80 Piezometers plus 80 DWLR– Two PDS - 1 complete

• Post project:– Required budget assured??– Sharing data?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTHimachal 495 595 452 91% 76%

Page 24: Pcs 070514

Punjab• Key Achievements:

– 750 groundwater observation wells completed and in use– 25 G-D sites established– 82 raingauges in progress– Sub-divisional data centres nearly complete– State Data Centre in progress– IT systems procured

• Post project:– Completion and furnishing of data centre?– State budget sufficient for maintaining system?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTPunjab 410 446 481 117% 108%

(includes 20.55 crore in 2014-15)

Page 25: Pcs 070514

Pondicherry• Key Achievements:

– 37 groundwater observation points with telemetry DWLR– Level 2+ lab plus State Data Centre built and equipped– PDS nearly complete

• Post project:– Puducherry Water Resources Organisation (a society) established– State budget sufficient for maintaining system?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTPondicherry 132 146 131 99% 90%

Page 26: Pcs 070514

BBMB• Key Achievements: (TAMC view)

– RT-DAS system operational– RT-DSS complete and under final calibration and proving in 2014

monsoon– PDS

• Post project:– Budget sufficient for maintaining system?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTBBMB 242 396 222 92% 56%

(to October 2013)

Page 27: Pcs 070514

CGWB• Key Achievements: (TAMC view)

– Aquifer Mapping work well under way– Development of eGEMS well under way – but hardware / software?– Networks Piezometers for Punjab, Goa…– DWLR?– PDS

• Post project:– Budget sufficient for completion and then training and maintaining

system?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTCGWB 280 663 309 110% 47%

(to October 2013)

Page 28: Pcs 070514

CWC• Key Achievements: (TAMC view)

– HDA development progress substantial– New monitoring equipment: ADCP plus RT-WQMS– NWA development– eSWIS progress substantial

• Post project:– Budget sufficient for completion and then training and maintaining

systems?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTCWC 248 267 162 65% 61%

(to October 2013)

Page 29: Pcs 070514

CPCB• Key Achievements: (TAMC view)

– RT-WQMS established and functioning well– Web-based water quality data dissemination tool (eWQIS) progressing

well– Laboratory and office renovation– Water quality assessment review

• Post project:– Budget sufficient for completion and then training and maintaining

system?

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTCPCB 167 150 101 60% 67%

(to October 2013)

Page 30: Pcs 070514

NIH• Key Achievements:

– DSS(Planning) developed and pilot studies complete– Trainers trained for DSS(P)– PDS programme substantially complete

• Post project:– Support for DSS(P) helped by AMC– Training for state and central agencies on DSS(P)– Further development of DSS(P) applications

INR Millions

AgencyAllocation

PIPAllocation

MTRProjected

Expenditure % PIP %RCTNIH 484 447 468 97% 105%

Page 31: Pcs 070514

Spill Over Works

• KEY SOFTWARE SYSTEMS– CWC with Hydrological Design Aids– CWC with eSWIS– CGWB with eGEMS

• Funding assured?• Training and roll out resources assured?• IA able to fully participate post-project?

Page 32: Pcs 070514

Spill Over Works (cont.)

• PUNJAB: State Data Centre plus fittings• MP SW: RT-DAS arrangements?• Orissa SW: RT-DAS arrangements?

• CPCB: Web GIS completion

Page 33: Pcs 070514

Spill Over Works (cont.)

All Agencies:

•Funding for AMC for equipment procured•Recurrent expenditure budgets no longer supported from loan•Training for new staff?

Page 34: Pcs 070514

Large workload still before end May?

• Maharashtra SW• Goa• BBMB• CGWB• CWC• CPCB

Page 35: Pcs 070514

THANKS


Recommended