    COMMISSIONINGOFSTATION TRANSFORMER

    By- P C Trivedi

  • 7/31/2019 Pct Erection&Commsg

    2/15

    Healthiness check

    Protection check

    Insulation Quality of oil

    Terminal connection

    Cooling scheme

  • 7/31/2019 Pct Erection&Commsg

    3/15

    When erection is completed do the following tests:

    Inspection of Transformer

    Ensure proper leveling & foundation

    IR Values of Transformer & Cables

    Protective Relays & their operation

    Operation of associated switchgear

    Ensure proper earthing

    Ensure quality of oil

    Charging of Transformer

    No load operation

    Full load operation

  • 7/31/2019 Pct Erection&Commsg

    4/15

    Types of test conducted for transformer

    TYPE TESTWinding resistance test Insulation Resistance test Polarity test

    Short circuit testOpen Circuit testMagnetic balance test Vector group test

    SPECIAL TEST High Voltage test Tan-Delta test

  • 7/31/2019 Pct Erection&Commsg

    5/15

    DC SYSTEM COMMISSIONING

    BATTERY CHARGER

    BATTERIES

    BATTERY CHARGING IN BOOST MODE

    BATTERY CAPACITY CHECK

    BATTERY TRICKLE CHARGING

    DCDB CONNECTIONS

    DCDB CHARGING

  • 7/31/2019 Pct Erection&Commsg

    6/15

    LIGHTNING ARRESTER COMISSIONING

    Check that erection work is complete as per relevant drawings and erectioncompletion certificate is available.

    Check that no physical damage is apparent The insulator is clean The pressure relief device is ok The bolts-nuts & terminal etc. are tight No stain on corona rings The discharge counter advancement check Meggering tests are ok Insulation Resistance check for individual stack Resistance of ground connection

    Leakage current test Note down initial counter reading during testing and before charging. Earthing to Surge Arrester is to be insulated from the structure.

  • 7/31/2019 Pct Erection&Commsg

    7/15

    Bus Switching Scheme

    &Layout of Switchyard

  • 7/31/2019 Pct Erection&Commsg

    8/15

    PICTORIAL VIEW OF 400KV SWITCHYARD AT VSTPS

    PICTORIAL VIEW OF 400KV SWITCHYARD AT

    VSTPS

  • 7/31/2019 Pct Erection&Commsg

    9/15

    BUS SECTIONALISER

    MAIN BUS 1

    MAIN BUS 2

    TRANSFER BUS

    BUS COUPLER

    MAIN BUS 3

    MAIN BUS 4

    MAIN BUS 5

    MAIN BUS 6

    400 KV SWITCHYARD

  • 7/31/2019 Pct Erection&Commsg

    10/15

    Transfer Bus

    C.B.

    LI

    PGI

    E/S

    LA

    GT

  • 7/31/2019 Pct Erection&Commsg

    11/15

    LI

    R

  • 7/31/2019 Pct Erection&Commsg

    12/15

    Equipments provided in 400/132 KV

    Switchyards

    1.Circuit Breakers

    2.Isolators

    i)Line isolators

    ii)Bus Isolators

    3.Current transformers

    4.Capacitive voltage Transformers.

    5.Wave traps

    6.Lightning Arrestors.

    7.Relays

    8.PLCC S stem

  • 7/31/2019 Pct Erection&Commsg

    13/15

    10.Sequential Event Recorders.

    11.Bus Conductors.

    i)ACSR Moose Conductor, 54/7/3.53 (for 400 KV Bus)

    ii)ACSR Panther Conductor 30/7/3.0 (for 132 KV Bus)

    12.Shunt Reactors

    13.Earth Switches

    14.Earth conductors.

    15.Compressors