Ulaan Ovoo - The flagship of coal deposits in northern Mongolia
Oct 2009Redhill Energy Inc2060-777 Hornby StreetVancouver BC V 6Z 1T7T: 604-642-2625F: 604-642-2629
Ulaan Ovoo
Prophecy’s Ulaan Ovoo Mine
• High Quality Abundant Thermal Coal+
• Min AR 5,000 kcal/kg, Max 1% Sulphur, 10% Ash• 20 year+ mine life• Proven Reserve: 20 Mt; Resource: 208 Mt
• Low Cost Mining• Single seam, 50 meters thickness, strip ratio 2: 1
• Potential Sales to:• Offshore markets (China, South Korea, & Japan)• Domestic (Mongolia and Russia)
Prophecy Coal Corp.T: +1.604.569.3661F: [email protected]
Fulfilling Asia’s Energy NeedsProphecy’s Ulaan Ovoo Mine April 2011
Why Invest in Prophecy
• Proxy for growth in Mongolia and China
• Strong demand for thermal coal and electricity
• Top quartile low cost coal producer with 1.4b tonnes+ supply
• Commenced coal production, permitting power plant
• Strong growth profile
Ulaan Ovoo Seam Cross Section
TSX: PCY, OTCQX: PRPCF, Frankfurt: 1P2
Corporate Structure & InformationSymbol TSX: PCY, OTCQX: PRPCF, Frankfurt: 1P2
Shares:Issued and Outstanding Fully Diluted
Market Capitalization Cash* (no debt) Investment Holdings Avg. Daily Vol (TSXV: PCY)
*As at September 2011
198,026,307 240,184,001
$100M CAD$4M CAD$75M CAD
700,000
+Ulaan Ovoo: 174 million tonnes of measured, 34 million tonnes of indicated, and 20 million tonnes of proven coal. Ulaan Ovoo’s resource numbers are from the Dec 2010, 43‐101 Prefeasibility Study by Wardrop Engineering. Chandgana: 665 million tonnes of measured and 545 million tonnes of indicated coal. Chandgana’s resource numbers are from the September 2007, 43‐101 Technical Report by Behre Dolbear & Company (USA), Inc. for Chandgana Tal and from the September 2010, 43‐101 Technical Report by Kravits Geological Services, LLC for Chandgana Khavtgai.
October
Ulaan Ovoo - The flagship of coal deposits in northern Mongolia
Oct 2009Redhill Energy Inc2060-777 Hornby StreetVancouver BC V 6Z 1T7T: 604-642-2625F: 604-642-2629
Ulaan Ovoo
Think China, Think Mongolia, Think Prophecy
Chandgana Coal Mine
600 ‐> 4,200 MW Power Plant on site
Transmission to Mongolia, China
Think China, Think Mongolia, Think Prophecy
Prophecy’s Chandgana Coal Field April 2011
Fulfilling Asia’s Energy Needs
Prophecy Coal Corp.T: +1.604.569.3661F: [email protected]
Certain statements contained in this Presentation, including statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and statements related to matters which are not historical facts, are forward-looking information within the meaning of securities laws. Such forward-looking statements, which reflect management’s expectations regarding Prophecy’s future growth, results of operations, performance, business prospects and opportunities are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance, or achievements expressed or implied by such forward-looking statements. Forward-looking statements in this Presentation include, without limitation, statements regarding the permitting, development and production of the Company’s Chandgana Power Plant, including approval of the license to build Chandgana Power Plant from the Mongolian government and completion of a feasibility study by late 2011 and other information concerning possible or assumed future results of operations of Prophecy. Although Prophecy has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not anticipated, estimated or intended. Accordingly, readers should not place any undue reliance on forward-looking statements as such information may not be appropriate for other purposes. We disclaim any intention or obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except as required by law.
Russia
Mongolia
China
Darkhan
Erdenet
Ulaanbaatar
Mandalgobi
Choir
Baganuur
Choibalsan
Baruun - Urt
Undurkhaan
Bayanmunkh
Bor Undur
Chandgana havtgai
Selendum
border
- 100 MW
- 80 MW
- 150 MW
- 100 MW
- 20 MW
- 20 MW
100 MW
20 MW 140 MW
370 MW
330 MW
- 40 MW400km
Beijing
1,000km
Chandgana Power Plant Project
•Abundant low cost coal• Low Strip and Low Cost• M&I resource 1.2 billion tonnes+
•Large Scalable power plant• Proposed Phase 1 : 600MW (Mongolian
consumption)• Proposed Phase 2 : 3,600MW (to China)
•Timeline• Permit application (Q2‐2011)• Application Starts (Q2‐2013)• Start up phase (Q2 2015)
Directors and AdvisorsJivko Savov, Director
• Deputy CEO of En+ and • Deputy Chairman of EurosibEnergo
Michael Deats, Director• Ex‐Managing Director of BP Coal South Africa
Chuluunbaatar Baz, Director• Chairman of Monnis Group Mongolia
Harald Batista , Advisor• Brother to Eike Batista (EBX Group)
TSX: PCY, OTCQX: PRPCF, Frankfurt: 1P2