BHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam Unit # 7 -A V Seshagiri Rao- NTPC -Biswanath Mahapatra-BHEL
Transcript
Page 1: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Case study of

Optimisation Efforts

at

NTPC Ramagundam Unit # 7

-A V Seshagiri Rao- NTPC

-Biswanath Mahapatra-BHEL

Page 2: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

NTPC-Vision

A world class integrated power major,

powering India's growth, with increasing global

presence

Page 3: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

31704 MW

Page 4: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

NTPC Ramagundam Performance 1998-to 2010

86.21

90.22

89.25

86.14

91.52

88.54

90.51

86.45

88.90

90.14

94.4594.81

89.36

90.76

90.03

88.21

92.71

90.98 91.04 90.9590.57

91.49

93.52 93.65

80

82

84

86

88

90

92

94

96

1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10

P.L.F. (%)

AVAILABILITY (%)

Installed Capacity : 2600 MW

(3*200+4*500)

Page 5: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

U-7 performance

86.81

79.59

98.3994.65

101.19

93.64

80.41

99.15

92.77

98.65

0.00

20.00

40.00

60.00

80.00

100.00

120.00

2005-06 2006-07 2007-08 2008-09 2009-10

PLF

Availability

Page 6: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

PADO (Performance analysis, Diagnostics and

Optimisation)

Installed in Unit 7 in Oct 2008

Page 7: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

WHAT IS PADO?

• PADO is a software based optimisation and diagnostics

system based on client-server architecture.

• It’s a package rich in intensive information which aids

plant operator to run the plant with most optimum

efficiency , availability and maintainability.

• Massive Computation Engine for monitoring and

analysis of Performance Parameters of Power Plant.

Page 8: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Page 9: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

PADO MODULES

•PERFORMANCE ANALYSIS & MONITORING

MODULE

•SYSTEM & PERFORMANCE OPTIMISATION

•BPOS(BOILER PERFORMANCE OPTIMISATION

SYSTEM)

•CONTROL LOOP OPTIMISATION

•BOILER STRESS CONDITION ANALYSER

•SYSTEM & PERFORMANCE DIAGNOSIS MODULE

•INTELLIGENT WATER & STEAM CHEM. MGT

Page 10: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

PADO SYSTEM NETWORK CONFIGURATION FOR RAMAGUNDAM UNIT #7

Page 11: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Optimisation Package

Various features are as follows :

•Boiler related calculations :

Efficiency , Environmental Parameters, RLA , Metal temperatures Monitoring, APHs , Mills and Soot Blowing Analysis

•Turbine related calculations :

Heat rate. Cylinders efficiency , Heaters efficiency Condenser efficiency and CEP efficiency

•Energy Conservation :

Aux power consumption and Specific Power Consumption

Page 12: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Case study :

Soot Blowing Optimisation

Page 13: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

General Soot Blowing Practice

Time based

•Regular intervals

Parameter based

• Metal temperature

criteria

•Spray

•Flue gas exit

temperature

•Coal quality

•Slagging tendency

•Mill combination

Page 14: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

PADO Results

•Neural technology

•Heating Surfaces Heat Transfer efficiency

•Boiler gas Path temperatures

•Fire Ball Height

•Relationship Drawing

Page 15: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Page 16: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

16

Comparison of PADO results with Actual Boiler – 15th Sept 2009

Tune

settings

25 Sept

2009Observe Results –

05th Sept 2009

Operate &

confidence Building

– 15th Oct 2009

Design Of

Experiments

Page 17: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

17

7 Months Period

01-11-2008 to 30-05-2009

With

01-11-2009 to 30-05-2010

Data Comparison

Page 18: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Results comparison

Parameter Before PADO1.11.08 – 30.5.09

After PADO

1.11.09 – 30.5.10

Improvement

Unit Operating

Hours above 490

MW

4697 4844

Total soot blowing

steam consumption8923 5918 33.68 %

Soot Blowing Steam

Kg/MW3.853 2.393 37.89 %

Page 19: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Results Comparison

No. Of Times

Wall Blowers

Operation

Before PADO

1.11.08 – 30.5.09

After PADO

1.11.09 –30.5.10

Improvement

Cleaning Of wall

Blowers AB

Groups

710 391 44.93 %

Cleaning Of wall

Blowers C Group542 205 66.73 %

Cleaning Of wall

Blowers D Group531 216 61.04 %

Page 20: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Results comparison

No. Of Times

LRSB Operation

Before PADO

1.11.08 – 30.5.09

After PADO

1.11.09 – 30.5.10

Deviation

Div. Pnl 20 42 104 %

Platen SH 40 65 62.5 %

RH 38 57 50 %

LTSH 22 32 45.5 %

Eco 21 29 38.1 %

Page 21: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Results comparison

Parameter Before PADO1.11.2008 – 30.5.2009

After PADO

1.11.2009 – 30.5.2010

RH Metal temp Above 590

Deg in Hrs.52 41

RH Metal temp Above

594Deg in Hrs.22 21

RH Metal temp Above 598

Deg in Hrs.8 10

RH spray 30 T/Hr 34 T/hr

Heat Rate 2349 2336

Page 22: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

Before Implementation of SBO Module

Page 23: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

After Implementation of SBO Module

Page 24: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

24

Coal flow Vs SAPH Outlet Temperatures

Page 25: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

25

Coal flow Vs PAPH Outlet Temperatures

Page 26: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

26

Coal flow Vs FEGT

Page 27: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

27

Coal Flow Vs RH Metal temperature

Page 28: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

28

HRH temp Vs IPT Overall Efficiency

Page 29: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

29

Value Addition

- 40% Reduction in Wall Blowing

– Tube erosion will reduce –

• No Tube leakage Since Nov 2008

– Reduction in Steam consumption

– Excellent Data Reconciliation

– Easy Evaluation of Results

– Design of Experiments – made easy

– Further scope of improvement is visible

Page 30: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

BHEL EXPERIENCE IN PADO

•Commissioned : 12 units of 500MW sets viz; Simhadri

Stg.I , Ramagundam St.III , Rihand Stg.II , Vindhyachal

Stg. III , Talcher Stg. II & Bellary Unit # 1

•Under commissioning : 5 units of 500MW sets

•Under execution :

500MW sets : 32 units

195MW sets : 2 units

250MW sets : 7 units

600MW sets: 4 units

660 MW supercritical sets : 2 units

Page 31: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam

BHEL-ELECTRONICS DIVISION

BHEL EXPERIENCE IN PADO

•BHEL has executed PADO for the plants where

complete DCS platform ( SG , TG and Stn C&I ) has

been supplied by BHEL

•BHEL has also integrated and supplied PADO for the

plants where part of the DCS has been supplied by

other vendors

Page 32: BHEL-ELECTRONICS DIVISION Case study of …fs.gongkong.com/files/technicalData/201008/2010081520132100006.pdfBHEL-ELECTRONICS DIVISION Case study of Optimisation Efforts at NTPC Ramagundam