© 2015 PT Nusantara Infrastructure Tbk
PT Nusantara Infrastructure Tbk. Public Expose
Jakarta, May 12th 2015
© 2015 PT Nusantara Infrastructure Tbk
Presentation Contents
2
Company Overview 3
Strategic Business Unit 7
Toll Sector 8
Water Sector 13
Port Sector 18
Renewable Energy Sector 20
23
Financial Performance 28
Telco Towers Sector
© 2015 PT Nusantara Infrastructure Tbk 3
PT Nusantara Infrastructure Tbk Overview
© 2015 PT Nusantara Infrastructure Tbk
Company Overview
Founded through backdoor listing in 2006, PT Nusantara Infrastructure
Tbk. (PTNI) is an Indonesia’s leading private infrastructure company.
o Total Assets CAGR 2006 – 2014 of 31% IDR 4,116 Bn (1)
o Total Equity CAGR 2006 – 2014 of 26% IDR 2,405 Bn (2)
o Market Capitalization CAGR 2006 – 2014 of 11.3% IDR 2,879 Bn (3)
on the Jakarta Stock Exchange META:IJ (as of Q1 2015 Share Price
IDR 189, Shares Outstanding 15.235 Bn)
4
A
Note:
(1) As of March Q1 2015.
(2) As of March Q1 2015.
(3) As of March Q1 2015.
© 2015 PT Nusantara Infrastructure Tbk
Investment Policy & Strategy
5
Diversified Infrastructure Portfolio
Focus Strategic Assets
Stable & Growth Assets
Relatively High Margin
Medium – Long Term Contract
© 2015 PT Nusantara Infrastructure Tbk
Corporate Structure – as of Q1 2015
6
Cap Asia
invested in 2013
Partnered
with PEP in
2014
Partnered
with LDC in
2012
ISAB
Acquired
2012
PORTS
Acquired
2012
Acquired &
Developed
2013
Acquired &
Developed
2012
WATER
TBN DCC SCTK
Developed
2012
ENERGY
IME
Acquired
2014
TELECOM TOWERS
KIN
Acquired
2006
Expanded
2008
Acquired
2006
Acquired &
Developed
2009
Developed
2007
TOLL ROADS
BSD BMN JLB
JTSE
Strategic Business
Unit (SBU) - Level
Business Unit
(BU) - Level
Acquired
2012
TKCM
74.99% 99.99% 99.99% 99.99% 99.99%
88.93% 98.53% 25.00% 39.00% 51.00% 51.00% 64.99% 45.02% 69.36%
99.39% 28.00%
As Per 31 March 2015
JEXWAY
partnered in 2014
© 2015 PT Nusantara Infrastructure Tbk
Strategic Business Unit
7
© 2015 PT Nusantara Infrastructure Tbk
Toll Road
8
© 2015 PT Nusantara Infrastructure Tbk
Marga Utama Nusantara
9
Focus in Developing Strategic Roads
Current Portfolio:
1. Harbour Road - Makassar.
2. Airport Toll Road - Makassar.
3. Commuter Road – Greater Jakarta.
4. Jakarta International Airport Road (2nd) – JORR 1.
A
© 2015 PT Nusantara Infrastructure Tbk
Recent Updates – JLB Access
10
JLB Toll Road started its 1st operation in February 2010 with total length of 10 Km.
The toll road connects West and North Jakarta, Tangerang, and direct access to Soekarno
Hatta International Airport.
JLB is the second toll road connecting to Jakarta International Airport.
JLB Toll Road
PIK Area
Airport Toll JSMR
JORR W2 Toll Road
JLB Toll Road
Jakarta Tangerang
Toll Road JSMR
JLB PIK & Airport Access JLB JORR W2 & Jakarta Tangerang Access
Direct Crossing PIK
Area
(2013)
1
Direct Crossing to
JORR W2 Toll Road
(2014)
2 New Access Ramp
to Airport
(2015)
3
A
© 2015 PT Nusantara Infrastructure Tbk
JLB Performance
11
55,586
66,059
87,159
-
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
2012 2013 2014
JLB Traffic Growth 2012 - 2014
171,909
207,232
285,695
-
50,000
100,000
150,000
200,000
250,000
300,000
2012 2013 2014
JLB Revenue Trend (In IDR Million)
YoY Growth
+18.8%
YoY Growth
+31.9%
YoY Growth
+20.5%
YoY Growth
+37.8%
High growth drivers resulted from increasing
mobility and strategic access to airport.
Better connectivity supported for solid
revenue growth trend.
© 2015 PT Nusantara Infrastructure Tbk
23 24
100
0
20
40
60
80
100
120
Q1 2014 Q1 2015 2015F
Traffic Volume
12
Q1 2015 Performance
84
53
69
84
53
70
-
10
20
30
40
50
60
70
80
90
100
Toll Revenue OperatingIncome
EBITDA
Q1 2015 YoY Growth Comparison
1Q2014 1Q2015
In IDR Bn Million of Vehicles
Traffic volume is still showing good growth
throughout the first quarter; presenting a good
start for year 2015.
Class I vehicles are still dominating for the traffic
contributions.
Estimated FY 2015F traffic will reach up to 100
millions of vehicles.
MUN is still running at 83.3% EBITDA margin,
increased slightly from 82.1% last year; showing
improvements in management efficiency.
© 2015 PT Nusantara Infrastructure Tbk
MUN Performance
13
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
2013 2014 Q1 2015
59.2% 62.8% 63.1%
79.0% 82.2% 84.0%
MUN Consolidated Performance
Operating Income Margin EBITDA Margin
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
2013 2014 Q1 2015
59.2% 62.8% 60.5%
79.0% 82.2% 84.6%
BSD Performance
Operating Income Margin EBITDA Margin
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
2013 2014 Q1 2015
59.2% 62.8% 66.5%
79.0% 82.2% 78.2%
BMN Performance
Operating Income Margin EBITDA Margin
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
2013 2014 Q1 2015
59.2% 62.8% 64.5%
79.0% 82.2% 85.8%
JTSE Performance
Operating Income Margin EBITDA Margin
© 2015 PT Nusantara Infrastructure Tbk
Recent Updates – Jexway Partnership
14
In November 2014, JEXWAY joined as part of BSD shareholders.
JEXWAY will enter to a mutually beneficial cooperation agreement to ensure the
business expansion of MUN, using Japanese Advance Technologies
1. Project estimation
2. Traffic Control System
3. Facilities Control Center
4. Asset Management
Signing Ceremony at Osaka, Japan Group Photo with JEXWAY Team
© 2015 PT Nusantara Infrastructure Tbk 15
Water
© 2015 PT Nusantara Infrastructure Tbk
POTUM
16
Key Opportunities:
100% access clean water (current access 58%) (1)
MDG access to 10.3 mio households (2)
Current Portfolio:
1. Cisadane Households Project – TKCM.
2. Medan Industrial Project – DCC.
3. East Serang Project – SCTK.
Source:
(1) Bappenas Book 2014
(2) Bappenas RPJMN 2015 - 2019
A
© 2015 PT Nusantara Infrastructure Tbk
Operational Activities – TKCM
17
Project Profile
Asset WTP
Status Operating & Expansion
process
Concession 15 years (2004 – 2019)
Customers PDAM Tangerang and
surrounding households
Water Tariff IDR 1,507 / m3
Official Screen Set-up Water Intake House (Cisadane River) 6 NOS Sedimentation Tanks
1,275 1,286
1575
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2014 2015 Future
Water Production Capacity (liter/sec)
© 2015 PT Nusantara Infrastructure Tbk
Operational Activities – SCTK
18
Acquired 65% of shares by POTUM in end of 2013.
Has successfully signed amandment of concession agreeement with PDAM Serang to extend
the concession to another 25 years until 2038 in end of 2013.
Started the construction for SCTK development to produce water up to 375 lps.
Has signed a project financing facility with ICBC up to IDR 102 bio in beginning of 2015 .
Project Profile
List of Activities
Recent Updates B
Asset WTP
Status Operating & Expansion
process
Concession 25 years (2013 – 2038)
Customers
140 industrial customers
(incl.few households through
PDAM)
Water Tariff IDR 8,500 / m3 65
110
375
0
50
100
150
200
250
300
350
400
2014 2015 Future
Water Production Capacity (liter/sec)
© 2015 PT Nusantara Infrastructure Tbk
Operational Activities – DCC
19
POTUM acquired 51% shares in DCC in 2012.
Signed an exclusive agreement with PT Kawasan Industri Medan (KIM) to supplies clean
water in 2012.
Commenced of 1st operational in 2013 with capacity of 100 lps.
Project Profile
List of Activities
Asset WTP
Status Operating & Expansion
process
Concession 20 years (2011 – 2031)
Customers
PT Kawasan Industri Medan
(ditributes to 153 industrial
customers
Water Tariff IDR 5,800 / m3
100 100
235
0
50
100
150
200
250
2014 2015 Future
Water Production Capacity (liter/sec)
© 2015 PT Nusantara Infrastructure Tbk
Q1 2015 Financial Performance
Income Statement Q1 2015 YoY (Unaudited) Comparison
20
In IDR Million 2015 2014 Change (Δ)
Q1 Q1 % IDR
Revenue (1) 7,203 3,719 94% 3,484
EBITDA 3,395 257 1,221% 3,145
Margin % 40% 2%
Net Income* 2,893 1,502 93% 1,391
Margin % 34% 13%
Revenue increased by 94% YoY to 7,2 billion.
Net Income increased by 93%.
Company’s prospect is showing a good signal with increasing EBITDA by 1,221%.
Note:
(1) Excluding Construction Revenue
* Net income after minority interest
© 2015 PT Nusantara Infrastructure Tbk 21
Port
© 2015 PT Nusantara Infrastructure Tbk
ISAB Seaport Expansion
• In 2013, Tankfarm capacity was
48,000 MT.
• By 2014 the capacity has been
expanded up to 105,000 MT.
• In 2015, this capacity will reach
120,000 MT.
22
Source: Company information
-
20,000
40,000
60,000
80,000
100,000
120,000
2011 2012 2013 2014 2015F
14,000
48,000 48,000
105,000
120,000
In M
etr
ic T
on
Tank Storage Capacity (MT)
A
© 2015 PT Nusantara Infrastructure Tbk
Renewable Energy
23
© 2015 PT Nusantara Infrastructure Tbk
Renewable Energy Development
2012 2013 2014 2015
PT Energi Infranusantara
established
Focusing in Renewable
Energy Development
1
Source: Company information
Completed feasibility study
and design construction
3
Start construction PT.
Inpola Meka project - Lau
Gunung Mini Hydro Power
Plant 2 x 7.5 MW
Expected in Operation:
Mid 2016
5
Shares acquisition 45% of
PT. Inpola Meka Energi
(Mini Hydro Power Plant )
2 Amandment PPA for
extention of COD
(Commercial Operating
Date)
4
© 2015 PT Nusantara Infrastructure Tbk
Project Summary
25
Project Name : Lau Gunung
Energy Type / Technology : Hydro / Run off River
Installed Capacity : 15 MW (2 x 7.5 MW)
Annual Energy Output : 107 gWh per year
Availability Factor: 81%
Location : Tanah Pinem, Kabupaten Dairi, North Sumatera
River : Lau Gunung River
Estimated Catchment Area : 559.06 km2 (30% conservation forest, 70 public
plant)
Water Debit : 10.61 m3/sec
Concession Period : 20 Years
Estimated Head : 140 m (Net)
• The project is expected to start
its operation by mid of 2016.
Source: Company information
Project Profile – PT Inpola Meka Energy (Mini Hydro Power Plant)
Location Map (North Sumatera)
74 km
74.5 km from
Medan
Capital City
© 2015 PT Nusantara Infrastructure Tbk
Telecommunication Tower Sector
26
© 2015 PT Nusantara Infrastructure Tbk
Company Background
• In January 2014, PT Nusantara Infrastructure Tbk invested IDR 138 bn in equity and Providence Equity
Partners financed IDR 460 bn in a loan to PT Telekom Infranusantara, which subsequently subscribed for
shares in KIN.
– PTTI invested IDR 500 bn as primary proceeds, while the remaining IDR 98 bn was used to acquire secondary
shares in KIN.
– PTNI (through PTTI) is the 69.36% controlling equity shareholder in KIN.
• Use of primary proceeds of IDR 500 bn:
– Acquisition of the tower assets.
– Funding further growth of KIN (organic and inorganic).
27
As Per 31 March 2015
Legend:
• KIN : PT Komet Infra Nusantara
KIN
PT Nusantara
Infrastructure Tbk.
(META:IJ)
69.36%
99.99%
PT Tara Telco
(existing founder
shareholder, individual)
PT Graha Mekatama
Telindo
(existing founder
shareholder, individual)
13.70% 16.94%
PT Telekom
Infranusantara
Providence Equity
Partners
Debt
Instrument
© 2015 PT Nusantara Infrastructure Tbk
193
591
646
243
125 30
23
29 3
0
100
200
300
400
500
600
700
Tara Komet Corona Organic B2S KIN 2014 Telematika Ida Lombok New Builds KIN Q1 2015
Tower Growth Evolution
Source: Company information
(Towers) #
28
January 2014 July 2014 December 2014 January 2015 April 2015
A
KIN Key Strategies:
• Focus on quality tenants underpinned
by attractive long-term contracts
• Strong colocation potential to
enhance cash flows
• Strong, experienced and professional
management team backed up by high
quality sponsors
• Combination between robust organic
growth and potential small tower
acquisitions
© 2015 PT Nusantara Infrastructure Tbk
Revenue Breakdown Comparison FY 2014 vs. Q1 2015
20.5%
23.8%
7.1%
22.1%
16.3%
9.4% 0.7%
TSEL
XL
ISAT
Hutch
Smart
Flexi
Internux
29 Source: Company information
30.0%
17.0%
15.0%
22.0%
12.0%
4.0% 0.0%
TSEL
XL
ISAT
Hutch
Smart
Flexi
Internux
Revenue Composition FY 2014 Revenue Composition Q1 2015
Total Revenue FY 2014: IDR 132.8 bn
Total Revenue Q1 2015: IDR 38.7 bn
(+290% YoY)
© 2015 PT Nusantara Infrastructure Tbk
2014 Performance
30
132,882
76,670 75,704
64,376 56,212 966
11,328
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Revenue Opex EBITDA D&A Operatingincome
Financing &Others
Net Profit *
In ID
R M
illio
n
KIN successfully booked Revenue IDR 132.8 bn in 2014, were contributed from 7 major tenants.
EBITDA and Operating Margin accounted for 57.7% and 57.0% respectively.
Financing and other expenses contributed 8.5% out of the total revenue, which created net profit of IDR 64.3 bn
(48.4%).
The company showed a robust growth throughout the year, contributed 25.6% revenue out of total PTNI’s
consolidated revenue.
Income Statement 2014 (Audited) Breakdown
* Net income after minority interest
© 2015 PT Nusantara Infrastructure Tbk 31
NI Consolidated Financial Performance
2014 & Q1 2015
© 2015 PT Nusantara Infrastructure Tbk 32
The revenue rose 22% YoY driven by solid growth business expansion.
Operating income increased by 58% YoY to 202 billion showed robust performance in operation
level; more efficiency and advanced know – how.
Net Income increased by 65% YoY determined by continuous strong growth in diversified business
lines combined with optimal capital.
The company is showing good prospects with increasing EBT by 66% and EBITDA by 46%.
* Net income after minority interest
In IDR Million 2014 2013 Change (Δ)
December December % IDR
Revenue 518,378 425,860 22% 92,518
Operating Income 202,417 128,474 58% 73,943
Margin % 40% 30%
EBT 189,985 114,729 66% 75,256
Margin % 36% 27%
EBITDA 278,280 191,015 46% 87,265
Margin % 53% 45%
Net Income* 93,260 56,395 65% 36,865
Margin % 18% 13%
NI Consolidated – 2014 Financial Highlights
Income Statement 2014 YoY (Audited) Comparison
© 2015 PT Nusantara Infrastructure Tbk 33
NI Consolidated – 2014 Financial Position
Total Assets
Increased by 58%, driven by growth
among other investment sectors
2014 4,074,897
58%
2013 2,579,581
Total Liabilities
Increase by 107% to support further
business growth
2014 1,709,624
107%
2013 823,177
Retained Earnings
Strong net income growth resulted
significance increase in retained earnings by 372%.
2014 76,024
372%
2013 (16,099)
Total Equity
Increase by 34%, supported through
growth in net income and new capital
injection for telco project
2014 2,365,273
34%
2013 1,756,404
© 2015 PT Nusantara Infrastructure Tbk 34
Description 2015
Q1
1. Liquidity Ratio
Current Ratio 3.44x
Cash Ratio 1.63x
2. Solvency Ratio
Debt to Equity 71%
Debt to Asset 42%
Net Debt (IDR Billion) (1) 336
3. Multiples IDR Billion
─ Market Capitalization 2,879
─ Total Equity 2,405
─ Shares Outstanding 15,235
Price to Book Ratio 1.20x
NI Consolidated – Q1 2015 Financial Position
Financial Position and Ratios as of Q1 2015
2014 Solvency Ratio FY 2014
Interest Bearing Debt to EBITDA (2) 3.39x
DSCR – Interest Coverage (3) 1.90x
Note:
(1) Calculated based on Bank
Loan only (Interest Bearing
Debt) items and excluding
consumer financing
liabilities.
(2) Calculated based on Bank
Loan only (Interest Bearing
Debt) items and excluding
consumer financing
liabilities.
(3) DSCR – Interest Coverage
calculated based on
Operating Income /
Financing Expense
© 2015 PT Nusantara Infrastructure Tbk 35
NI Consolidated – Q1 2015 Performance
Income Statement Q1 2015 YoY Comparison
130,665
62,560
84,018
26,371
104,780
32,001
49,512
15,559
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Revenue Operating income EBITDA Net Profit *
Q1 2015 Q1 2014
Revenue
+25% YoY
Operating
Income
+95% YoY
EBITDA
+70% YoY
Net Profit
+69% YoY
* Net income after minority interest
In IDR Million
Growth in all sectors reflected a solid business performance
growth.
© 2015 PT Nusantara Infrastructure Tbk
Positioning – Local Co. with Global Partners
36
Proven track record of operating, building and acquiring strategic assets throughout Indonesia and working
with foreign investors and partners, including Louis Dreyfus Commodities Holdings Limited (“LDC”),
Capital Advisors Partners Asia Pte Ltd (“Cap Asia”), Providence Equity Partners (“PEP”), and
Japan Expressway & West Nippon Expressway (“JEXWAY”).
A
2012
Strategic Partnership with Louis Dreyfus
Commodities (“LDC”)
In ISAB for a multi-purpose seaport in
Lampung
2013
Investment with Capital Advisors Partners
Asia Pte. Ltd. (“Cap Asia”)
25% in MUN amounting IDR 681 bio via capital
enlargement and divestment
2014
Co-Investment with Providence Equity Partners (“PEP”)
IDR 460 bio of debt instrument from PEP to TI for KIN acquisition
1
2
3
4
2015
Cooperation with JEXWAY (Japan
Expressway) and W-NEXCO (West
Nippon Expressway)
Entering to a mutually beneficial cooperation in MUN Operational
Excellence
© 2015 PT Nusantara Infrastructure Tbk
Growth Strategy
37
Proven track records in establishing Partnership with Global Players
Experience in the Development, Acquisition and Operating Infrastructure Asset
Well Positioned to benefit Indonesia Infrastructures Gap
© 2015 PT Nusantara Infrastructure Tbk
Thank You
38
www.nusantarainfrastructure.com