OPERATION AND MAINTENANCE
MANUAL FOR
1st& 2ndSTAGE 3 PHASE SEPARATOR
Petrodar Order No. 11!"#$311!!132$M%!1$!2!
E'()*ent Ta+ No. 1,- 2,- 3,- ,$/3!1
LEPS Do0 No. LEPS$2!!#1!!"$O&M
H(+e(+ Do0 No. PDOC$232!#$,D$MEC$!#"
Issue and Revision Record
016-03-
09Submitted for Approval LEPS LEPS
Re
No.Date Des0r()t(on
Pre)ared45
S'))(er
Re(e6ed45
S'))(er
A))roed45 HDC
O6ner Petrodar peratin! "ompan#Limited
EPCC Contra0tor $i!lei! Petroleum Services% Inv& "o& Ltd&
S'))(er 7 S'4$Contra0tor LA'SEL EPS (ec)nolo!ies PteLtd
INDE8
1.! SAFET9
Do0'*ent No LEPS$2!!#1!!"$O&M
etrodar Operating CompanyMoleeta F F Oil Development
roject
5/24/2018 PDOC 3phase Separator Operation Manual
2/20
1&1 Safet# *)en Enterin! t)e separator
1&+ Safet# *)en fillin! t)e vessel *it) il1&3 Safet# *)en Empt#in! t)e ,essel
2.! E%UIPMENT DESCRIPTION
+&1 Internals+&+ eir plates+&3 .affle+&/ ,orte .reaer +&2 e-sandin! Line and 4o55les+&6 $eatin! "oil
3.! START$UP PREPARATION
3&1 ,essel and Internals3&+ Pipe ors3&3 Instruments3&/ Electricit#
.! START$UP PROCEDURE
/&1 illin! *it) "rude/&+ Ad7ustment of Interface Level/&3 il Level
".! NORMAL OPERATION
2&1 4ormal peratin! and 8aintenance Instructions
.! S9MPTOMS OF FAULT9 SEPARATOR OPERATION
#.! SHUT DO:N PROCEDURE;Nor*a and E*er+en05 *ill be modified to meet site re;uirements
In an# case> if several safet# rules !overn t)e same application> t)e most constrainin! ones
*ill be applied
1.1 Saet5 6?en enter(n+ t?e se)arator
)en enterin! t)e separator t)e safet# rules applicable to process vessel s)ould be
follo*ed& As eample some of t)ese rules are listed )ere under
Aut)ori5ation permit to enter t)e vessel s)ould be delivered b# t)e relevant
aut)orit#
All vessel flan!es connected *it) process lines s)ould be blinded
,essel must be free of oil> *ater !as or dirt
An eplosivit# test must be carried out in all accessible parts of t)e vessel internal
Internal temperature must be acceptable
4atural or mec)anical ventilation s)ould be sufficient to permit *or inside t)e
vessel *it)out ris
Etc
1.2 Saet5 6?en enter(n+ t?e esse 6(t? o(
In order to avoid t)e information of eplosive miture> t)e vessel s)ould be totall#
pur!ed from air before c)ar!in! *it) )#drocarbons
()is pur!in! can be done usin! nitro!en or ot)er inert !as *)ic) is not )armful if
released to atmosp)ere
1.3 Saet5 6?en e*)t5(n+ t?e esse
In order to avoid formation of eplosive atmosp)ere *)en empt#in! t)e vessel > it is
absolutel# imperative to replace pumped put product b# inert !as?e& 4itro!en@ or
*ater under lo* pressure?B12psi!@
Do0'*ent No LEPS$2!!#1!!"$O&M
5/24/2018 PDOC 3phase Separator Operation Manual
6/20
Special care *ill be taen also to avoid an# vacuum in eac) vessel compartment
durin! pumpin! out&
2.! E%UIPMENT DESCRIPTION
2.1 Internas
Separators are )ori5ontall# mounted on a sid& ()e separator is divided in to t*o
compartments be a *eir plate& i&e t)e *ater side and t)e oil side& Internals consist of
*eir plate> baffles> vorte breaer and diverter& Internals are of SS316 and are bolted
to t)e vessel *it) fittin!s *)ic) are SA216
5/24/2018 PDOC 3phase Separator Operation Manual
7/20
2." Desand(n+ L(ne and noes
Inlet crude mi brin!s *it) it sand particles> *)ic) !et settles in t)e vessel& esandin!needs to be done to remove t)e accumulated sand in t)e vessel& re;uenc# of
desandin! operation depends on t)e sand content in a !iven crude mi& e-sandin!
*ater is circulated t)rou!) t)e desandin! line and it is spra#ed on t)e accumulated
sand at t)e bottom of t)e vessel t)rou!) t)e spra# no55les> *)ic) are fitted to t)e
desandin! pipes& esandin! line is of SS316 8aterial
2. Heat(n+ Co(
In order to maintain a temperature of 20 de!rees " in t)e separator at all times> even*)ile it is not in operation> )ot oil is circulated t)rou!) t)e )eatin! coils& Inlet )ot oil
temperature is +20C"
3.! START > UP PREPARATION
D IMPORTANT NOTE BEFORE STARTING AN9 OPERATION- PLEASEREFER TO CHAPTER 1.!. SAFET9.
3.1 ,esse and Internas
Ensure t)e condition of t)e pressure vessel and t)e internals&
")ec t)e maimum allo*able *orin! pressure and t)e operatin! temperature>
*)ic) are mared on t)e name plate of t)e vessel&
3.2 P()e :or@s
Ensure all pipe *or is correctl# installed
3.3 Instr'*ents
")ec all instruments for correct function
")ec all relief=safet# s#stem for correct operation
")ec all control valves and associate s#stem for correct function includin!
failureF modes&
3. Ee0tr(0(t5
All electrical part s)ould be carefull# c)eced G *irin! of all elements s)ould be c)eced
as *ell as t)eir satisfactor# connection> Eart)lin! circuit s)ould be c)eced
Do0'*ent No LEPS$2!!#1!!"$O&M
5/24/2018 PDOC 3phase Separator Operation Manual
8/20
.! START UP PROCEDURE
(See chapter 1.0 SAFETY)
.1 C?ar+(n+ 6(t? H5dro0ar4on
IMPORTANT NOTE
Beore 0?ar+(n+ 6(t? ?5dro0ar4on- t?e esse s?o'd 4e 0o*)ete5 ree o a(r. T?(s
)'r+e s?o'd 4e done 6(t? n(tro+en or an5 ot?er (nsert +as not ?ar*' to t?e
at*os)?ere. C?e0@ t?at a aes. Dra(ns ents sa*)e are 0osed and t?e(r 0a)s are
(nstaed. :?en t?e ee o o( (s 4et6een t?e o6 ee and ?(+? ee- t?en reset t?e
o6 and ?(+? aar* o t?e (ntera0e 45 )ress(n+ t?e reset )'s? 4'tton on t?e 0ontro
)ane.
.2 Ad'st*ent o Intera0e Lee
ollo* t)e development of t)e interface level b# usin! t)e level !au!e on t)e
standpipe& )en t)e set supper level is reac)ed> t)e control valves opens in
accordance *it) t)e controller si!nal and allo*s produce *ater to flo* out of vessel&
()e preferred settin!s at desi!n production rates for irst Sta!e Separator are as
follo*s
Interface Li;uid Level IL$$
IL$
ILL
ILLL
Do0'*ent No LEPS$2!!#1!!"$O&M
5/24/2018 PDOC 3phase Separator Operation Manual
9/20
Preferred settin! for Second Sta!e Separator is
Interface Li;uid Level IL$$
IL$
ILL
ILLL
"ontrol valves operation taen place suc) t)at t)e interface la#er sta#s bet*een IL$ and ILL
additional lo* level and )i!) level cut offs are provided bet*een IL$ and ILL&
")ec alarm and trip circuit for )i!) and lo* levels b# stimulatin! abnormal level conditions&
.3 O( Lee
il levels are maintained on t)e basis of follo*in! oil level settin!s&
()e preferred settin!s at desi!ned production rates are as follo*s
Li;uid Level in Separator L$$
L$
LL
LLL
Preferred settin!s for +nd sta!e are
Li;uid Level in Separator L$$
L$
LL
LLL
Levels are controlled bet*een L$ and LL& Additional cut offs are provided at L$$ and
LLL&
")ec alarm and trip circuits for )i!) and lo* level b# stimulatin! abnormal level
condition&
".! NORMAL OPERATION
".1 Nor*a O)erat(on and Ma(ntenan0es Instr'0t(ons?See ")apter 1&0 SAE(HF@
Do0'*ent No LEPS$2!!#1!!"$O&M
5/24/2018 PDOC 3phase Separator Operation Manual
10/20
".1.1 O)erat(on Data S?eet
If re;uired a dail# operatin! data s)eet *ill be issued& ()is data s)eetallo*s all essential parameters t)at allo* operation and control of t)e
plant&
".1.2 Pre)arat(on or t?e Ins)e0t(on o t?e ,esse
)en a vessel inspection is foreseen> t)e follo*in! recommendation
s)ould be applied
Stop t)e plant
")ec t)at t)ere is no volta!e on t)e Po*er unit
rain t)e vessel accordin! to ")apter 9&+
Isolate t)e vessel b# placin! blind flan!es on all t)e inlet and outlet
no55les&
pen bot) man)oles and top vent of vessel&
,ent t)e vessel *it) lo* pressure steam if available ?Lo*er t)an 3
bar@ for +/ )ours&
"onnect a stripped cable to an eart)lin! pad or to vessel *all> t)en
connect it to t)e electrode& 4o spar or presence of current s)ould be
detected&
"lean t)e internal *alls of vessel *it) pressuri5ed *ater> )ot if
available&
.efore enterin! t)e vessel ensure t)at t)e temperature )as dropped
sufficientl# to allo* entr# and t)at an# )armful or flammable !as )as
been pur!ed&
".1.3 Ma(ntenan0e and tro'4e > s?oot(n+
()e separator until offers )i!) operatin! reliabilit# because all parts of t)e units
vessel and internal ?baffles> *eir> etc @ pipin! etcstatic elements &It trouble on t)e
treatin! operations occurs> t)en refer to c)apter :&0
All items of e;uipments ?Instruments> vessels> po*er units> pipin! etc@ s)ould be ept
in !ood condition and clean ?free of rust@ t)e# s)ould be c)eced re!ularl# for !ood
operation and sealin!&
If a part or e;uipment appears to be fault# or out of order> t)en refer to t)e trouble G
s)ootin! !uide in t)e manufacturerJs manuals
Do0'*ent No LEPS$2!!#1!!"$O&M
5/24/2018 PDOC 3phase Separator Operation Manual
11/20
It is recommended t)at *)en t)e vessel is opened or maintenances internal
distribution and collection pipe *or to!et)er *it) t)e electrode s !rids and t)e vessel
s)ell are inspected for si!ns of erosion and=or corrosion&
".1. Po6er and 0ontro Pane
E;uipment on t)e control panel suc) as rela#s> contactors> voltmeter> ammeter and
pus) buttons *ill be c)eced and maintained re!ularl#&
.! S9MPTOMS OF FAULT9 SEPARATOR OPERATION
NOTE .efore ad7ustment in t)e plant> c)ec t)at operatin! conditions are inconformit# *it) re;uired specifications&
FAULT PRIMAR9 CAUSE SECONDAR9 CAUSE REMED91 $i!) oil ppm in
produce *ateroutlet
A Ineffective separation
B Level settin! of
interface level noteffective
a. "ontrol valve defective
4. "onnection fault at L(
0. ault in "S si!nals
Leaa!e t)rou!) .afflePlated
$i!)er production ratesover t)e desi!n rates
Reduce productionto desi!n limits
Lo* operatin!temperature
$i!) viscosit#
2 $i!) *ater ppm inoil outlet
A Leaa!e t)rou!) *eirplates
a. .olts on *eirloose=!aset notdefective
")ec and ti!)ten
B Level settin! ofinterface level noteffective
a. "ontrol valve defective
4. "onnection fault at L(
0. ault in "S si!nals
Leaa!e t)rou!) .affleplates
$i!)er production overt)e desi!n rates
Reduce productionto desi!n limits
Lo* operatin!temperature
$i!) viscosit#3 Sand content )i!) A Sand accumulation too a. "arr# out
Do0'*ent No LEPS$2!!#1!!"$O&M
5/24/2018 PDOC 3phase Separator Operation Manual
12/20
in outlet *ater )i!) desandin!operation
B a. 4o outflo* in
outflo* lines4o !as content 4. Kse inert !as
0.
" Improperfunctionin! ofvorte meter
C a.
4.
Improperfunctionin! of Pmeter
A
B
#.! SHUT DO:N PROCEDURE ;NORMAL AND EMERGENC9 debris> bloca!es etc&> ensure t)e# arefree of tar build-up etc&
3@ ")ec all items s)o* no si!ns of dama!e from erosion> sur!es etc&>c)ec *eirs and sound&
/@ ")ec all boltin! is ti!)t and fitted *it) second nut ?loc nut@&
2@ "arr# out re-certification inspection of pressure vessels in accordance*it) manufacturerJs instructions=statuar# re;uirements&
If it is necessar# to remove t)e internals from t)e vessels follo* t)e reversedprocedures outlined in section 3&3&
12.2.1 ,esseAs re;uired b# pressure vessel code> carr# out periodic re-certificationre;uirements&")ec for
"racin! of attac)ment *elds to s)ells
Erosion of vessel s)ells at areas around inlet=outlet no55les "orrosion around drain connections and instrumentation connections
"lo!!in!> plu!!in! of instrumentation connections
Pittin! or scuffin! of an# !aseted faces
Al*a#s use !asets *)en re-main! no55le=man*a# flan!e connections&