+ All Categories
Home > Technology > PDP calculator

PDP calculator

Date post: 16-Apr-2017
Category:
Upload: cognition-corporation
View: 1,300 times
Download: 2 times
Share this document with a friend
11
Advanced Product Development Efficiency Enhancement Calculator for Product Development Process Improvement TODAY TOMORROW OPPORTUNITY Data Provide your own number Annual New Product Revenue ($M) Annual Product Dev. Costs ($M) Metrics Current Conditions After Improvements % Improvement #DIV/0! #DIV/0! #DIV/0! Business Implications Negative Impact of Missed Launch Impact ($M) After Improvements Net Improvement ($M) $0.0 #DIV/0! #DIV/0! $0.0 #DIV/0! #DIV/0! Impact of Missed Performance & / Reliability $0.0 #DIV/0! #DIV/0! $0.0 #DIV/0! #DIV/0! Impact of Compliance Vulnerability $0.0 #DIV/0! #DIV/0! $0.0 #DIV/0! #DIV/0! Total Annual Total Annual Total Annual Impact ($M) Impact ($M) Improvement ($M) Total Business Impact ($M) $0.0 #DIV/0! #DIV/0! TODAY TOMORROW OPPORTUNITY Cointact me at: [email protected] After improving the use of your PDP and leaning out your PDP process Product Development Process Investments To Date ($M) Product Development Process Importance (1-10 scale, 10 is Highest) Missed Launch Targets (% of projects) Facts Problem Cause Missed Performance & Reliability Targets (% of projects) Compliance Vulnerability (1-10 scale, 10 is worse) Revenue Impact (% of Annual Revenues) Cost Impact (% of Annual Costs) Revenue Impact (% of Annual Revenues) Cost Impact (% of Annual Costs) Revenue Impact (% of Annual Revenues) Cost Impact (% of Annual Costs) © 2011 Cognition Corporation
Transcript
Page 1: PDP calculator

Advanced Product Development

Efficiency Enhancement Calculatorfor Product Development Process Improvement

TODAY TOMORROW OPPORTUNITYData

Provide your own numbersAnnual New Product Revenue ($M)

Annual Product Dev. Costs ($M)

Metrics Current Conditions After Improvements % Improvement

#DIV/0!

#DIV/0!

#DIV/0!

Business ImplicationsNegative

Impact of Missed Launch Impact ($M) After Improvements Net Improvement ($M)

$0.0 #DIV/0! #DIV/0!

$0.0 #DIV/0! #DIV/0!

Impact of Missed Performance & / Reliability

$0.0 #DIV/0! #DIV/0!

$0.0 #DIV/0! #DIV/0!

Impact of Compliance Vulnerability

$0.0 #DIV/0! #DIV/0!

$0.0 #DIV/0! #DIV/0!

Total Annual Total Annual Total AnnualImpact ($M) Impact ($M) Improvement ($M)

Total Business Impact ($M) $0.0 #DIV/0! #DIV/0!TODAY TOMORROW OPPORTUNITY

Cointact me at: [email protected]

After improving the use of your

PDP and leaning out your PDP

processProduct Development ProcessInvestments To Date ($M)

Product Development ProcessImportance(1-10 scale, 10 is Highest)

Missed Launch Targets(% of projects)

Facts Problem

CauseMissed Performance & Reliability Targets(% of projects)

Compliance Vulnerability(1-10 scale, 10 is worse)

Revenue Impact(% of Annual Revenues)

Cost Impact(% of Annual Costs)

Revenue Impact(% of Annual Revenues)

Cost Impact(% of Annual Costs)

Revenue Impact(% of Annual Revenues)

Cost Impact(% of Annual Costs)

© 2011 Cognition Corporation

H10
Revenue from new product introductions or improvements. (exclude existing cash cows)
H12
Costs incurred as a part of new product development and introduction only.
H14
Does your company have a formal Product Development Process (PDP)? If so, what order of magnitude was the corporate investment? Consider anything you want: time, money, sweat, tears.
H16
In addition to the quality of your people and technology, to what extent do you count on your PDP for schedule, quality, and compliance assurance?
H20
What percentage of your projects miss their launch dates? Include (or not) cancelled projects in this metric. You could assume their launch dates are infinitely missed.
H22
What percentage of your projects miss their post-launch reliability and/or performance goals?
H24
On a scale of 1 to 10, how vulnerable are your projects (or is company) to regulatory or compliance issues. Score of 1 means your internal processes are very robust to scrutiny and 10 means you would likely get shut down. P.S. You don't have to answer this one: just put a 1 if you like.
H30
Time to market delays which results in lost revenue and market share to competition.
H32
Costs incurred as a result of longer design and manufacturing cycles.
H36
Loss of revenue as a result of recalls, post-launch firefighting issues etc.
H38
Costs incurred as a result of redesign, revalidate and other fire fighting related activities
H42
New products in pipeline that cannot be introduced to market as a result of compliance issues
H44
Costs incurred to validate process in order to meet compliance standards.
Page 2: PDP calculator

HOME

Page 3: PDP calculator

HOME

YOUR PDP IS NOT USED PROPERLY

Page 4: PDP calculator

HOME

THE CAUSE IS WITH PDP EXECUTION

The PDP Steps are Set Aside when Schedules are Stressed.

There is no common Framework to support the Execution.

Engineers drop it.

Page 5: PDP calculator
Page 6: PDP calculator
Page 7: PDP calculator
Page 8: PDP calculator

THE CAUSE IS WITH PDP EXECUTION

The PDP Steps are Set Aside when Schedules are Stressed.

There is no common Framework to support the Execution.

Engineers drop it.

Page 9: PDP calculator
Page 10: PDP calculator
Page 11: PDP calculator

Recommended