PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
2 of 24
TABLE OF CONTENTS
1.0 GENERAL ……………………………………………………………… .…………… ...3
1.1 INTRODUCTION ……………………………………………………………………… 3
1.2 DEFINITIONS ………………………………………………………………………… .3
1.3 REFERENCES ……………………………………………………………………… ...4
1.4 PARTIES AND REPRESENTATIVES ……………………………………………… 4
1.5 LANGUAGE …………………………………………………………………………… 5
2.0 COMMUNICATIONS AND CORRESPONDENCES ………………………………… .… ..5
2.1 PROJECTION ORGANIZATION …………………………………………………… .5
2.2 CORRESPONDENCES ……………………………………………………………… 5
2.3 MEETING ……………………………………………………………………………… 8
2.4 ACTION ITEM LIST ………………………………………………………………… 11
2.5 WAIVER REQUEST ………………………………………………………………… 12
2.6 TECHNICAL QUERY ……………………………………………………………… ..12
3.0 DOCUMENT HANDLING SYSTEM ………………………………………… ... … .……… 13
3.1 PROJECT NUMBERING SYSTEM ……………………………………………… ..13
3.2 DOCUMENT CONTROL …………………………………………………………… 22
3.3 VENDOR DOCUMENT CONTROL ……………………………………………… ..22
3.4 FINAL DOCUMENTATION ………………………………………………………… 22
4.0 ATTACHMENTS ………………………………………………………………… . … .23
Appendix 1. Discipline Category Code for Specifications, Calculation Sheets and Others Appendix 2. Requisition Type
Appendix 3. COMPANY’s Material Class Code
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 3/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
3 of 24
1. GENERAL
1.1 INTRODUCTION
The purpose of this coordination procedure is to establish a flow of documents andresponse on the project in order to direct the various forms of correspondence, toprovide administrative guidance for the exchange of information, and to coordinate theactivities effectively and correctly keeping all concerned parties informed throughout
the Engineering, Procurement, Construction for EPC 9 (CDU & HVU, Piperacks, FlareSystem) of JAZAN REFINERY & TERMINAL PROJECT for Saudi Arabian OilCOMPANY.
1.2 DEFINITIONS
"COMPANY" means “ Aramco Overseas Company B.V (AOC) “ if it is used in relationto work to be performed Out-of-Kingdom (OOK) under the Contract, and it means“SAUDI ARAMCO (SA) ” if it is used in relation to work to be performed In -Kingdom(IK) under the Construction Contract.
"
SAUDI ARA MCO " means the Saudi Arabian Oil Company.
"CONTRACTOR" means SK Engineering & Construction Co., Ltd. (SKEC)responsible for performing work and services pursuant to the Contract.
"Sub-cont rac tor" means any person to whom execution of any part of the Work,including preparation of any design or supply of any Materials, is sub-contracteddirectly or indirectly by the CONTRACTOR and includes its legal successors orpermitted assigns.
Originator means Person or organization generating the correspondence (Letter,Transmittal or Notes of Meeting).
Recipient means Person or organization receiving the correspondence (Letter,Transmittal or Notes of Meeting).
"WORK" means all the work and services to be performed by CONTRACTORpursuant to the Contract.
“
FACILITIES ”
means the entirety of all permanent structures, units and all other itemsbeing designed, procured, fabricated, constructed, or otherwise provided by
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 4/72
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 5/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
5 of 24
1.4.2 CONTRACTOR (SKEC)
CONTRACTOREui Sim (Edward) Jeong / Project ManagerSK Engineering & Construction Co., LtdSK G-Plant Building, 100 Euljiro, Jung-gu, Seoul, 100-847, Korea
1.5 Language
The official language is English.
2. COMMUNICATIONS AND CORRESPONDENCES
2.1 PROJECT ORGANIZATION
The project organization and assigned personnel of the CONTRACTOR is shown inthe CONTRACTOR ’s organization chart which will be submitted separately.
2.2 CORRESPONDENCES
2.2.1 General
All communication to COMPANY affecting contractual agreements or containingcommercial information will be through the COMPANY Representative.
Letter will be used for the communication affecting contractual agreement orcontaining commercial information. Transmittals will be used to convey documentssuch as data sheets, specification, report, calculation, procedure, TQ, MOM anddrawings from one party to another.
Technical communication between the COMPANY and the CONTRACTOR thatdoesn ’t constitute a change in the contract, and has no commercial or scheduleimpact can be negotiated by one-on-one meetings with Minutes of Meeting recordingany decision made.
All incoming and outgoing Letters, Transmittals, and Minutes of Meeting betweenCOMPANY and the CONTRACTOR will be coded and logged.
All information, decisions and agreements between COMPANY and other parties asidentified in this procedure are to be confirmed in writing so that they are properlydocumented for the record and future reference. This will be done through a Letter,
Transmittal or Minutes of Meeting, all of which constitute the correspondence of theproject.
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 6/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
6 of 24
Insofar as is practical, each communication will be limited to one subject. Hardcopycorrespondence and transmittals are distributed according to Project DistributionMatrix. Electronic mail will not be used to transmit documents, between theCOMPANY and the CONTRACTOR, which have a bearing on contractual matters.Native format electronic copies of the correspondence will be kept by theCONTRACTOR and should be available to the COMPANY.
Identification of documents other than correspondence will be numbered as perClause 3.1 “Project Number System ” in this procedure.
Confidentiality of the correspondence will be in accordance with the highestconfidentiality of the documents attached, following the indication of the COMPANYEngineering Procedure, SAEP- 127, “Security and Control of Saudi AramcoEngineering Data”.
Preparation of documents other than correspondence will follow the COMPANY ’sEngineering Procedure and Standard.
2.2.2 Correspondence Responsibilities
Each type of correspondence uses sequential numbers to identify each individual
piece of correspondence. The CONTRACTOR will record all Correspondences byusing CONTRACTOR ’s Documents Control System. Please refer to DocumentControl & Transmittal Procedure (Document No. : PE-003)
The CONTRACTOR will provide miscellaneous project documents except thesedocuments listed in Project Distribution Matrix to COMPANY personnel for projectpurposes.
2.2.3 Identifying Information
Each correspondence will contain the following information:
Name of Recipient, title and address
Project title
Date
Subject
Correspondence Number
Reference Number
From (Originator)To (Recipient)
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 7/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
7 of 24
2.2.4 Correspondence Numbering
All correspondences shall be identified by the following numbering system.
Example
SK/AOC-L-NNNN
(1) (2) (3) (4)
Where,
(1) Originator Identification Code (CONTRACTOR, SK EC)
(2) Recipient Identification Code
AOC = Aramco Overseas Company for OOK contract
SA = S audi Aramco for IK contract
VEN = Ven dor
SUB = Subcontractor
I(XXX) = Interface Contractor, XXX means interface Contractor
identification (example, HCK, DHT, NAR , etc)
(3) Correspondence Type
L : Letter
F : Fax
T : Transmittal
VP : Vendor P rint Transmittal
(4) Sequential Number, a four-digit number assigned by the Originator ’s organization
2.2.5 Authorized Signature
All correspondences will be signed by the authorized COMPANY or CONTRACTORRepresentative or their authorized alternate representative.
2.3 MEETING
In addition to formal and informal communications between COMPANY andCONTRACTOR, frequent formal routine meetings are necessary throughout the
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 8/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
8 of 24
duration of the Contract. All interface meetings shall be in accordance with the Interface ManagementProcedure.
2.3.1 Major Meetings
Major meetings will be scheduled on a regular basis and will be determined as theContract WORK develops. CONTRACTOR will provide to COMPANY Representative
with an agenda for each meeting at least one (1) full regularly scheduled workday priorto the meeting for COMPANY Representative’s comments. The major meetings are asfollow:
Quality Assurance & Control Meetings. Safety Meetings. Design Review Meetings. 3D Model Review Meetings. Procurement Status Meetings. Co-ordination Meetings. Special Interface Meetings.
2.3.2 Regular Progress Review Meetings
Progress review meetings will be held on a regularly scheduled basis. CONTRACTORwill provide to COMPANY Representative with an agenda for each meeting at leastone (1) full regularly scheduled workday prior to the meeting for COMPANYRepresentative’s comments. The major meetings are as follow:
Weekly MeetingsCONTRACTOR will conduct a weekly progress meeting at the Design Office to reviewprogress of the WORK including activities, procurement of material, WORK Schedule,interfaces, potential Change Orders and any other technical issues of concern.CONTRACTOR also will conduct Quality assurance and Inspection meeting separately.The initiate formal weekly procurement meeting will be held within forty (40) days fromeffective date of Contract.
Weekly Progress Meetings
Weekly Progress Meetings will be held at the Design Office once a week and a
Weekly Progress Report will be submitted to COMPANY one (1) working day prior tothe meeting.
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 9/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
9 of 24
The main purpose of the Weekly Progress Meeting is to discuss the Weekly ProgressReport. Particular attention will be directed towards any recovery actions required,and other topics may be introduced at the request of COMPANY or CONTRACTOR.
Weekly Procurement Meetings
Within forty (40) calendar days of effective date of Contract, CONTRACTOR shallinitiate formal weekly procurement meetings.
Weekly Procurement Meetings will be held at the Design Office once a week andWeekly Procurement Report will be submitted to COMPANY one (1) working day priorto the meeting.
The main purpose of the Weekly Procurement Meeting is to ensure that interrelatedprocurement and design problems are addressed directly and effectively by theconcerned parties and resolved promptly.
Weekly Quality Meetings
Weekly Quality Meeting will be held at the design office once a week and WeeklyQuality Report will be submitted to COMPANY one (1) working day prior to the
meeting.The main purpose of this meeting is to discuss and clarify overall aspects of projectquality assurance and procurement QC matters.
2.3.3 Management Review Meetings
After receiving COMPANY ’s instruction, CONTRACTOR will prepare presentations forand participate in COMPANY management review meetings that will be heldperiodically in any calendar year during the period from the effective date of thisContract through Contract completion.
2.3.4 Minutes of Meeting (MOM)
Each project meeting between the COTRACTOR and the COMPANY will be properlydocumented and recorded by Minutes of Meeting. Minutes of Meeting will identify theaction required, the individual responsible for action, and the date for completion.
Each project meeting between the CONTRACTOR and suppliers, and others will bealso documented and recorded by Notes of Meeting.
2.3.5 Minutes of Meeting (MOM) and Report Numbering
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 10/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
10 of 24
All Minutes of Meeting and Report shall be numbered in the following manner :
MOM-SK/AOC-XXX-XXX (0) (1) (2) (3) (4)
(0) Type Identification CodeMOM = Minutes of MeetingWR = Weekly ReportMR = Monthly Report
AR = Audit Report
(1) Originator Identification Code
SK = CONTRACTOR
(2) Recipient Identification Code
AOC = Aramco Overseas Company
SA = Saudi Aramco
VEN = Vendor
SUB = SubcontractorI(XXX) = Interface Contractor, XXX means interface Contractor
identification (example, HCK, DHT, NAR , etc)
(3) Field Identification Code
PCM = Project Control Management
ENG = Engineering
PRO = Procurement
CON = ConstructionINT = Interface
QA = Quality Assurance
QC = Quality Control
HSE = Health, Safety & Environment
PRE = Pre-Commissioning
OTH = Others
(4) Serial Number (001, 002, 003 etc. at each party)
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 11/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
11 of 24
2.3.6 Authorized Signature
All Minutes of Meeting will be signed by the each party ’s authorized Representative ortheir authorized alternate representative.
2.4 Action Item List
An Action Item List is a log with outstanding issues to be resolved in a timely mannerby either COMPANY or by the CONTRACTOR. The Action Item List which isoriginated during project meetings between COMPANY and the CONTRACTOR willbe issued weekly for individual review.
Action Item List will be discrete, definable, owned by an individual, and recognizableas an open item.
Incorporation of an Action Item will be done at any time and suggested by any of theproject members.
Any closed item along with the Action Item Number information will be deleted orhidden from the list after the item has been completed.
Action Item Number, Subject/Issue, Issued By, Referenced Document, Issued Date,Due Date, Forecast Date, Action By and Open/Closed status will be included in the
Action Item List. Please refer to the Attachment #4
2.4.1 Subject/Issue
A brief description of the issue will be included in this cell.
2.4.2 Due Date
The Due Date will not be changed unless project needs change.
2.4.3 Forecast Date
The Forecast Date is when the Issue should be resolved. This date will be updated asneeded. Update and bold the date when the issue is actually closed.
2.4.4 Open/Closed
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 12/72
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 13/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
13 of 24
3. DOCUMENT HANDLING SYSTEM
This is to describe the Document Numbering and Document Control of this project.
3.1 PROJECT NUMBERING SYSTEM
3.1.1 Project Execution Plan, Procedure and Manual
The project execution plan, procedure and manual will be used for the followingnumbering system.
PE – 001(XX-XXX)
(1) (2)
(1) Document Type IdentificationDocument Type is a double character alphabetical code. The following DocumentType will be used for document numbers.
PC = Project Execution & ControlPE = Project EngineeringPR = ProcurementHS = Health, Safety and EnvironmentQA = Quality Assurance and Quality ControlSC = ScheduleCO = Construction
PP = Pre-commissioning and CommissioningIN = InterfaceOT = Others
(2) Serial Number (001~999)
The Sheet Number is a three (3) digit numeric number ranging from 001 to 999.
3.1.2 Technical Specifications, Calculation Sheets and so on
The document numbers shall be assigned in accordance with the following procedure.
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 14/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
14 of 24
12170D-TS-51001 : Piping Material Specification(XX-XXXXX)
(1) (2) (3) (4)
(1) CONTRACTOR Job Number
12170D = CONTRACTOR
(2) Document TypeDocument Type is a double character alpha code. The following Prefix Letter willbe used for document numbers.TS = Technical SpecificationCA = CalculationOT = Others
(3) Discipline Category Code
The Discipline Category Code is a double numeric code and defines in Appendix 1
(Discipline Category Code for Specifications, Calculation Sheets).
(4) Serial Number (001~999)
The Sheet Number is a three (3) digit numeric number ranging from 001 to 999except for index/face sheets.
The size of final submission will be based on US sizes in accordance with SAES-A-202.
In case of technical specification numbering for instrument shall be assigned as below.
12170D-ISS-IN-NG110-1
(1) (2) (3)
(1) CONTRACTOR ’s Job Number
(2) Document Type (ISS: Instrument Specification sheet)
(3) Discipline Category Number + Requisition Type : Please refer to Clause 3.1.5 inthis document.
3.1.3 Drawing (PFD, P&ID, Plot Plan, Data Sheets … )
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 15/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
15 of 24
The drawing numbers shall be assigned in accordance with the following procedure.
V A – XXXXXX
(1)(2) (3)
(1) Prefix Letter
Prefix Letter is a single character alpha code. The following Prefix Letter will beused for document numbers.
V Central and Western Arabia
(2) Size Code
The Size Code for documents and drawings is a single alpha character that
defines the cut size of the document and drawing when printed or plotted. TheCONTRACTOR will use the ISO size during the detail design stage. The size offinal submission will be US sizes in accordance with SAES-A-202 as followingtable.
Identification LetterOverall Dimensions
mm Inches
A 711 × 1016 28 × 40
B 508 × 711 20 × 28
C 356 × 508 14 × 20D 279 × 432 11 × 17
E 216 × 279 8 1/2 × 11
(3) COMPANY Drawing Number
The drawings number is produced from COMPANY ’s I-Plant and assigned eachdrawing.
(4) Key Drawings
Piping and Instrument Diagrams (PID)
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 16/72
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 17/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
17 of 24
(1) CONTRACTOR Job Number
12170D = CONTRACTOR
(2) Document Type
PR = Purchase Requisition for QuotationTE = Technical Bid EvaluationPO = Purchase Order
(3) Discipline Category Number
ME = Mechanical EquipmentPI = Piping MaterialsEL = Electrical Equipment and Bulk MaterialsIN = Instrument Equipment and Bulk MaterialsFF = Fire FightingCS = Civil & Structural Materials
AR = Architecture MaterialsLC = Lab, Chemical & CatalystTC = Telecom
GE = General(4) Requisition Type
Requisition Type is described in Appendix 2.
(5) The last two digits are, if necessary, Serial No. for a subsequent ordering whichshall be started from 01.
COMPANY ’s Requisition/PO Structure
Prefix – Plant Code – Material Class Code – Increment Number - Suffix
(1) (2) (3) (4) (5)
Sample :
(1) PrefixThe prefix is a 4 digit alpha series, JJCI. The first digit "J" designates project name(JAZAN). The second digit "J" designates the material destination (Job Site). The
third and fourth digits "CI" indicate Contractor import; for In-Kingdom procuredmaterials, use "IK"
Requisition/POPrefix
Plant No. MaterialClass
Requisition/POIncrement No.
Suffix
JJCI J05 32 W285 DA
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 18/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
18 of 24
(2) Plant CodeThe plant Number is a standard Saudi Aramco code designating the Plant as belowtable. Note: Where material on one PO is to be used in multiple locations thedesignation M98 is used.
Plant Number Plant Description
J05 CDU, VDUJ70 PiperackJ77 FlareM98 Common Area
(3) Material Class CodeThe material Class Code is a standard Saudi Aramco Materials System (SAMS)code for the class of material. Please refer to Appendix 3 (COMPANY ’s MaterialClass Code).
(4) Increment NumberThe increment number series assigned for this project is detailed in the table below.The series is unique for each class of material within a plant. Additional incrementnumbers will be provided from the Company.
PlantNumber Plant Description Increment # ’s
J05 CDU, VDU W285 - 359J70 Piperack W285 - 359J77 Flare W285 - 359M98 Common Area W285 - 359
(5) SuffixThe Suffix Indicator, a 2-alpha code beginning with D, is used to indicate shippingconsignment number against a specific requisition; DA indicates the firstconsignment, DB the second, etc.
3.1.6 Naming Convention
3.1.6.1 P&ID drawing names and numbers shall comply with section 5 of Aramco standardSAES-A-202 and shall be specified by the Process Discipline.
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 19/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
19 of 24
3.1.6.2 Pipe Run Tag Naming Convention
Line Number: The Line Size is indicated by up to five digits followed by the inchsymbol. All nominal line sizes are expressed in inches even on metric drawings.Specification codes are per SAES-L-105 .
Example: 1-1/2"-CWS-1058-ICSIZ
The field mappings to the equivalent SPPID properties are as shown below:
XXXXXX – XXX-XXXX-XXXXXX
Nominal DiameterFluid CodeTag Seq NoPiping Material Class
3.1.6.3 Equipment Tag Naming Convention
Each equipment tag is unique for a specific piece of equipment or an associated itemwithin each plant and consists of 8 to 10 characters in length, excluding dashes asfollows:
Example #1: J05-F-1110 (8 characters)Example #2: J05-D-0141B (9 characters)Example #3: J05-210-GM-0311A (10 characters)
The field mappings to the equivalent SPPID properties are as shown below:
XXX – XX - XXXX-X
Plant Number(SPPID Area Name)Tag PrefixTag Seq NoTag Suffix
3.1.6.4 Instrument and Loop Tag Naming Convention
Following examples explain Instrument Tagging:
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 20/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
20 of 24
LIC-1008FIT-1025
The field mappings to the equivalent SPPID properties are as shown below:
XXX – XXXXXX - XXXX-XX
Plant Number(SPPID Area Name)Instrument Identifier(Measured Variable Code + Instr. Type ModifierTag Seq NoTag Suffix
Instrument loop tag is formatted as:
uu – vvv - nnnnss
where:uuu - Unit numbervvv - Instrument Measured Variablennnn - Instrument Tag Sequence Numberss - Loop Tag Suffix
3.1.7 Revision Number
3.1.7.1 Requisition, Execution Plan, Procedure and Manual
The serial revision number (i.e., A, B, C, D, etc.,) will be used before COMPANYapproval.
If the documents have been approved by COMPANY or no comment, the nextrevision number shall be “00 ” for Final.
3.1.7.2 Drawing (PFD, P&ID, Plot Plan, Data Sheets ….)
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 21/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
21 of 24
Revisions to non-certified drawings are considered developmental. Alpha charactersfor new drawings, i.e., A, B, C, D, etc.
After Company approval of alpha characters for drawings, the next revision numbershall be “0” for Construction.
The first certified and approved issue (As-Built Stage) of a new drawing shall berevision “00”.
Full numeric revision numbers (i.e., 01, 02, 03, etc.) are assigned to 100% fieldverified As-Built, cancelled drawings, face sheets and the drawings whose Plant
number has been changed.
3.1.7.3 Specifications and Calculations
The serial revision number (i.e., A, B, C, D, etc.,) will be used before COMPANYapproval.
If the documents have been approved by COMPANY or no comment, the nextrevision number shall be “0” for Construction.
3.2 DOCUMENT CONTROL
Refer to Document Control Procedure (Document No. : PE-003).
3.3 VENDOR DOCUMENT CONTROL
Refer to Vendor Prints Control Procedure (Document No. : PE-004).
3.4 FINAL DOCUMENTATION
The final documents shall follow SAEP-122.
4. ATTACHMENTS
Attachment #1. Letter Format (2 sheets) Attachment #2. Transmittal Format (2 sheets) Attachment #3. Minutes of Meeting (MOM) Format (2 sheets)
Attachment #4. Action Item List (1 sheet) Attachment #5. Technical Query Format (2 sheet)
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 22/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
1 of 2
Appendix 1. Discipline Category Code for Specifications, Calculation Sheets andOthers
Process 10 : Equipment List11 : Line List12 : Summary17 : Cause and Effect Diagram18 : Operating Manual19 : General
Civil 20 : General Specification (including design criteria)21 : Site Survey Report22 : Geotechnical Investigation Report23 : Drainage calculation24 : Pile system Design(or Soil improvement design)25 : Equipment Foundation Calculations26 : Pipe Rack Calculations(with foundation)27 : Steel Structure Calculations(with foundation)28 : Concrete structure Calculations(box culvers, etc)29 : Others
Architecture 30 : Structural Calculation31 : General
Mechanical 40 : Mechanical General41 : Towers & Vessels42 : Tanks, Bins and Totes43 : Heat Exchangers (All types)44 : Fired Equipment45 : Pumps46 : Compressors, Blowers, Fans and Turbines47 : Packaged Equipment
48 : MiscellaneousPiping 50 : Piping General Specification
51 : Piping Material Specification52 : Insulation Specification53 : Purchase Specification54 : Construction55 : Piping Calculation
(Stress Analysis Report, Wall Thickness, Surge, etc)57 : HVAC & Plumbing Specification and Calculation58 : 3D Model59 : Others
Electrical 60 : General Specification61 : Electrical System Study & Calculation
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 23/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
2 of 2
62 : Equipment Specification63 : Datasheet64 : Others
Instrument 70 : General Specification71 : Index & List72 : Instrument Data Sheet73 : Instrument Calculation75 : Alarm and Trip Settings77 : Others
Fire Fighting 80 : Design Basis for Fire Fighting System/Design HSE 81 : Maximum Firewater Demand Calculation
82 : Hydraulic Calculation83 : Dike Height Calculation84 : HAZOP & SIL85 : Others
General 91 : Lubricants List92 : Spare Parts List93 : Training Education Program
94 : Start-up & Commissioning Procedure95 : Inspection & Test96 : Report
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 24/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
1 of 37
Appendix 2. Requisition Type
# 1 ARCHITECTURE
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
ARCHIECTURE AA ARCHITECTURALGENERAL
AA000 ARCHITECTURAL GENERAL
AA100 PEB(PRE-ENGINEERED BUILDING)
AA200 BLAST DOOR
AA900 OTHERS (ARCHIECTURE)
# 2 CIVIL & STRUCTURAL
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
CIVIL &STRUCTURAL
CA CIVIL CA000 CIVIL GENERAL
CA100 PILE
CA200 ANCHOR BOLT
CA300 CONCRETE
CA400 REBAR
CA900 OTHERS
CB STEELSTRUCTURE
CB000 STEEL GENERAL
CB100 STEEL STRUCTURE
CB200 GRATING
CB900 OTHERS(Bolts and nuts, etc)
# 3 LAB, CHEMICAL& CATALYST
Discipline Material Category REQ. NO Req. Description Unit ofMeasureLAB,CHEMICAL&CATALYST
LA CHEMICAL &CATALYST
LA000 CHEMICAL & CATALYST GENERAL
LA100 CATALYST
LA200 PACKING MATERIAL
LA300 SPECIALITY CHEMICAL
LA400 COMMODITY CHEMICAL
LA900 OTHERS
LB LABORATORY LB000 LABORATORY EQUIPMENT GENERAL
LB100 LABORATORY EQUIPMENT
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 25/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
2 of 37
#4 MECHANICALNOTE: The highlighted columns in yellow are to be commonly used for Mechanical MR.
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MECHANICAL MA MECHANICALGENERAL MA000 MECHANICAL GENERAL
MA100 PAINTING, COATING & LINING
MA200 INSULATION & REFRACTORY
MA300 MATERIAL & WELDING
MA400 SEAL & GASKET
MA500 VIBRATION & NOISE
MA600 LUBRICANT & BEARING
MA700 WORK SHOP EQUIPMENT
MA800 PLATFORM & LADDER
MA900 OTHERS
MB TOWER,VESSEL,REACTORGROUP
MB000 TOWER, VESSEL, REACTOR GROUP
MB100 COLUMNS
MB110 COLUMNS(NOV.)
MB120 S.S
MB130 LOW ALLOY
MB140 COLUMNS(NOV.)
MB150 LINED
MB160 NON-FERROUS
MB190 OTHERS
MB200 REACTORS
MB210 C.S
MB220 S.S
MB230 LOW ALLOY
MB240 CLADDED
MB250 LINED
MB260 NON-FERROUS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 26/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
3 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MB290 OTHERS
MB300 PRESSURE VESSEL(I)_CS
MB310 PRESSURE VESSEL(II)_CS
MB320 PRESSURE VESSEL(III)
MB330 PRESSURE VESSEL(IV)
MB340 PRESSURE VESSEL(NOV.)
MB350 LINED
MB360 NON-FERROUS
MB390 OTHERS
MB400 NON CATEGORY VESSEL(I)
MB410 NON CATEGORY VESSEL(II)
MB420 S.S
MB430 LOW ALLOY
MB440 CLADDED
MB450 LINED
MB460 NON-FERROUS
MB490 OTHERS
MB500 STEEL STACK
MB510 SELF SUPPORTED
MB520 DERRICK
MB530 GUY WIRED
MB590 OTHERS
MB600 COLUMNS INTERNALS(NOV.)
MB610 COLUMNS INTERNALS
MB620 BUBBLE CAP TRAY
MB630 VALVE TRAY
MB640 RANDOM PACKING
MB650 STRUCTURE PACKING
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 27/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
4 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MB690 OTHERS
MB700 DUCT
MB800 (BLANK)
MB900 OTHERS
MB910 FRP Tank(Sewage lift station)
MB990 OTHERS
MC FIELD FAB.EQUIPMENTGROUP
MC000 FIELD FAB. EQUIPMENT GROUP
MC100 FIELD TANK
MC200 FLOATING ROOF TANK
MC210 SINGLE DECK
MC220 DOUBLE DECK
MC290 OTHERS
MC300 DOME ROOF TANK
MC310 ALUMINUM DOME
MC390 OTHERS
MC400 CRYOGENIC TANK
MC500 SPHERICAL TANK
MC510 ASME SECT. VIII, DIV.1
MC520 ASME SECT. VIII, DIV.2
MC530 A.D CODE
MC590 OTHERS
MC600 SHOP TANK
MC610 C.S
MC620 S.S
MC630 ALUMINUM
MC690 OTHERS
MC700 TANK ACCESSORIES
MC710 INTERNAL FLOATING COVER
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 28/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
5 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MC720
GAGE HATCH / BREATHER VALVE /EMERGENCY MANHOLE COVER /FLAME ARRESTER FLOATINGSKIMMER
MC730 FLOATING SKIMMER
MC740 TANK DRAIN SYSTEM
MC750 TANK SEAL SYSTEM
MC790 OTHERS
MC800 BIN & SILO ACCESSARIES
MC810 AIR KNOCKER
MC820 VIBRATING ACTUATOR
MC890 OTHERS
MC900 OTHERS
MD HEAT
EXCHANGERGROUP
MD000 HEAT EXCHANGER GROUP
MD100 SHELL & TUBE TYPE
MD110 S&T HEAT EXCHANGER(I)_CS
MD120 S&T HEAT EXCHANGER(II)
MD130 S.S (T) / S.S (S)
MD140 LOW ALLOY (T) / C.S (S)
MD150 NON FERROUS (T/S)
MD190 OTHERS
MD200 PLATE,SPIRAL,PANEL,DOUBLEPIPETYPE &ELECTRIC
MD210 PLATE TYPE
MD220 MULTI-TUBE HAIR PIN H/E
MD230 PANEL TYPE
MD240 SPIRAL TYPE
MD250 BLOCK TYPE
MD260 BAYONET TYPE H/E
MD270 BREECH LOCK TYPE
MD280 ELECTRIC HEATER
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 29/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
6 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MD290 OTHERS
MD300 AIR COOLED H/EX
MD310 SURF. AREA (BELOW 1000m2)
MD320 SURF. AREA (1000 - 5000 m2)
MD330 SURF. AREA (5000 - 10000 m2)
MD340 SURF. AREA (10000-20000 m2)
MD350 SURF. AREA (20000-40000 m2)
MD360 SURF. AREA (ABOVE 40000m2)
MD370 CCR REGENERATION COOLER
MD390 OTHERS
MD400 DEAERATOR
MD410 CAP. (BELOW 10 m3/hr)
MD420 CAP. (10 - 20 m3/hr)
MD430 CAP. (20 - 50 m3/hr)
MD440 CAP. (50 - 100 m3/hr)
MD450 CAP. (ABOVE 100 m3/hr)
MD490 OTHERS
MD500 AIR & GAS HEATER / ECONOMIZER
MD510 GAS & AIR HEATER (Air Pre Heater,Gas/Gas Heater. Etc.)
MD520 STEAM AIR HEATER
MD530 ECONOMIZER
MD540 B.S CODE
MD590 OTHERS
MD600 COOLING TOWER
MD610 CAP. (BELOW 500 m3/hr)
MD620 CAP. (500 - 1000 m3/hr)
MD630 COOLING TOWER
MD640 CAP. (3000 - 5000 m3/hr)
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 30/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
7 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MD650 CAP. (ABOVE 5000 m3/hr)
MD690 OTHERS
MD700 SURFACE CONDENSER
MD800 BRAND NAMED HEAT EXCHANGER
MD810 PACKINOX HEAT EXCHANGER
MD820 ABB(HELIX) HEAT EXCHANGER
MD830 BROWN FIN TUBE(TWISTED) HEATEXCHANGER
MD890 OTHERS
MD900 OTHERS
MD910 CRYOGENIC HEAT EXCHANGER
MD990 OTHERS
ME FIRED HEATER& BOILER
GROUP
ME000 FIRED HEATER & BOILER GROUP
ME100 FIRED HEATERS
ME110 PROCESS HEATER
ME120 HYDROGEN REFORMER
ME130 CRACKING FURNACE
ME140 HOT OIL HEATER
ME150 INDIRECT HEATER
ME190 OTHERS
ME200 FIRED BOILER
ME210 OIL & GAS BOILER
ME220 COAL BOILER
ME230 WASTE HEAT RECOVERY BOILER
ME240 HEAT RECOVERY STEAMGENERATOR
ME290 OTHERS
ME300 THERMAL OXIDIZER
ME310 FURNACE (including ThermalOxydizer)
ME320 SOLID WASTE INCINERATOR
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 31/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
8 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
ME330 LIQUID WASTE INCINERATOR
ME390 OTHERS
ME400 (BLANK)
ME500 FIRED DRYERS & KILNS
ME510 DRYER
ME520 KILN
ME590 OTHERS
ME600 BURNERS
ME610 OIL BURNER
ME620 GAS BURNER
ME630 GAS/OIL COMBINATION
ME690 OTHERS
ME700 FLARE SYSTEM
ME710 SELF SUPPORTED
ME720 DERRICK
ME730 GUY WIRED
ME740 BURN PIT
ME750VAPOR DISPOSAL SYSTEM (FiredType only, Absorber & Adsorber Typeto be MJ610)
ME790 OTHERS
ME800 (BLANK)
ME900 OTHERS
MF PUMP GROUP MF000 PUMP GROUP
MF100 CENTRIFUGAL PUMPS(HORIZONTAL)
MF110 API PUMPS(OH2)
MF120 API PUMPS(BB)
MF130 API - MULTI-STAGE
MF140 NON-API CENTRIFUGAL PUMPS(OH)
MF150 INDUSTRIAL - OVERHUNG
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 32/72
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 33/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
10 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MF600 FIRE FIGHTING PUMPS
MF610 HORIZONTAL - MOTOR DRIVEN
MF620 HORIZONTAL - ENGINE DRIVEN
MF630 VERTICAL - MOTOR DRIVEN
MF640 VERTICAL - ENGINE DRIVEN
MF690 OTHERS
MF700 SPECIAL SERVICE PUMP
MF710 BOILER FEEDWATER PUMP
MF720 CRYOGENIC PUMP
MF790 VERT. SULFUR PUMPS
MF800 MOTOR, REDUCER & COUPLING
MF900 OTHERS
MF910 OIL MIST LUBE-OIL SYSTEM
MF920 FORCED LUBE-OIL SYSTEM
MG COM-PRESSORGROUP
MG000 COMPRESSOR GROUP
MG100 CENTRIFUGAL GAS COMPRESSOR
MG110 CENT. COMPRESSOR(NOV.)
MG120 AXIAL
MG130 INTEGRALLY GEARED
MG190 OTHERS
MG200 RECIPROCATING GAS COMPRESSOR
MG300ROTARY POSITIVE DISPLACEM’T
GAS COMPRESSOR
MG310 SCREW COMPRESSOR
MG320 ROOTS
MG330 LIQUID RING COMPRESSOR
MG340 VANE
MG390 OTHERS
MG400 AIR COMPRESSOR
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 34/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
11 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MG410 INST. AIR COMP. PKG
MG420 RECIPROCATING
MG430 ROTARY POSITIVE DISPLACEMENT
MG490 OTHERS
MG500 FAN & BLOWER
MG510 BLOWER (API 617)
MG520 FAN (API 560)
MG530 ROOTS BLOWER
MG540 VENTILLATION FAN
MG550 HOT BLOWER (CCR Blower)
MG590 OTHERS
MG600STEAM TURBINE & GENERATORS(Steam Turbine Driven Compressor-To Follow Compressor Code)
MG610 STM TURBINE GENERATOR
MG620 STM TURBINE (Drive Only)
MG690 OTHERS
MG700 GAS TURBINE & GENERATORS
MG710 GAS TURBINE GENERATOR
MG720 GAS TURBINE (Drive Only)
MG730 TURBO-EXPANDER GENERATOR
MG740 TURBO-EXPANDER (Drive Only)
MG790 OTHERS
MG800 ENGINE GENERATORS
MG810 ENGINE GENERATOR(for Cogeneration)
MG820 EMERGENCY ENGINE GENERATOR(by Elec. Team)
MG890 OTHERS
MG900 OTHERS
MH SPECIAL MH000 SPECIAL PACKAGE GROUP
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 35/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
12 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
PACKAGEGROUP MH100 MIXING UNIT
MH110 TOP/BOTTOM ENTRY AGITATOR
MH120 SIDE ENTRY AGITATOR
MH130 STATIC MIXER
MH140
JET MIXER (Including Mixing
Eductor, Sparger, Aeration Nozzleetc.)
MH190 OTHERS
MH200 SEPARATION SYSTEM
MH210 INST. AIR DRYER PKG
MH220 GAS & LIQUID DEHYDRATION UNIT(including Liquid Propane Drier)
MH230 GAS & AIR SEPARATION UNIT (P.S.A)
MH240 GAS & AIR SEPARATION UNIT(Cryogenic Type)
MH250 FLARE GAS RECOVERYPACKAGE
MH260 ELECTRO-STATIC DESALTER
MH270 MERCURY REMOVAL UNIT
MH290 MEG RECLAMATION PKG
MH300 SOLID PRODUCTION & SEPARATIONSYSTEM
MH310 EXTRUDER
MH320 PELLETIZER
MH330 FLAKER
MH350 CYCLONE SEPARATOR
MH360 CENTRIFUGE / DECANTER
MH390 OTHERS
MH400 REFRIGERATION SYSTEM
MH410 COMPRESSOR TYPE
MH420 ABSORPTION TYPE
MH490 OTHERS
MH500 CHEMICAL INJECTION SYSTEM
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 36/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
13 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MH510 CHEMICAL INJECTION PKG
MH520GAS CHLORINATION SYSTEM(Hypo-chlorination-4751,Electrochlorination-4842)
MH590 OTHERS
MH600 DESUPERHEATER / PRESSURE LET-DOWN SYSTEM
MH610 DESUPER HEATER
MH620PRESS. LET-DOWN &DESUPERHEATING SYSTEM(including Turbine Bypass System)
MH690 OTHERS
MH700 VACUUM SYSTEM, EJECTOR,EDUCTOR
MH710 EJECTOR
MH720 VACUUM SYSTEM - EJECTOR
MH730 VACUUM SYSTEM - VACUUM PUMP
MH740 VACUUM SYSTEM - HYBRID TYPE
MH790 OTHERS
MH800 FILTER & COALSCER
MH810 FILTER
MH820 COALESCER
MH830 SELF-CLEANING FILTER (Auto-Strainer)
MH840 CARBON FILTER
MH890 OTHERS
MH900 OTHERS
MH910 NITROGEN GENERATION/VAPORIZATION PKGS
MH920 CONDENSER TUBE CLEANINGSYSTEM (Ball Re-circulation Type)
MH990 PROPANE REFRIGERANTPURGER(SAMPLER)
MJ WATERTREATMENT &ENVIRON-
MENTALEQUIPMENTGROUP
MJ000 WATER TREATMENT & ENVIRON-MENTAL EQUIPMENT GROUP
MJ100 WATER TREATMENT SYS.
MJ110 CLARIFIER / THICKENER
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 37/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
14 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MJ120 SOFTENER
MJ130 DEMI-WATER SYSTEM IONEXCHANGER TYPE
MJ140 DEMI-WATER SYSTEM ( RO TYPE)
MJ150 CONDENSATE TREATMENT SYSTEM
MJ160 RO WATER TREAT. PKG
MJ190 MBD WATER POL. PKG
MJ200 SEWAGE TREAT. PKG
MJ210 API SEPARATOR
MJ220 CPI PACKAGE
MJ230 DAF
MJ240 BIOLOGICAL TREATMENT
MJ250 OIL SKIMMER
MJ290 R.W./ H2S STRIP. PKG
MJ300 FLUE GAS TREATMENT / ANTI-AIRPOLUTION
MJ310 BAG FILTER
MJ320 ELECTRO-STATIC PRECIPITATOR(EP)
MJ330 SELECTIVE CATALYST REACTOR(SCR-NOx Removal)
MJ340 SELECTIVE NON-CATALYSTREACTOR (SNCR-NOx Removal)
MJ350 WET SCRUBBER (Wet Type SOx
Removal)MJ360 DRY INJECTOR (Dry Type SOx
Removal)
MJ390 OTHERS
MJ400 SEA WATER TREATMENT
MJ410SEA WATER INTAKE SYSTEM(Traveling Screen / Coarse Screen /Stop Gate)
MJ420 ELECTRO-CHLORINATION SYSTEM
MJ490 OTHERS
MJ500 DE-WATERING
MJ510 FILTER PRESS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 38/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
15 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MJ520 BELT FILTER PRESS
MJ530 VACUUM PRECOAT FILTER
MJ590 OTHERS
MJ600 ODOR REMOVAL SYSTEM
MJ610ODOR REMOVAL SYSTEM (Absorber& Adsorber Type including WasteTreatment Vapor Removal System)
MJ690 OTHERS
MJ700 NOISE / VIBRATION PROTECTION
MJ710 SILENCER
MJ720 ACOUSTIC ENCLOSURE
MJ790 OTHERS
MJ800 (BLANK)
MJ900DRINKING WATER CHEMICAL TREAT.PKG.
MK MATERIALHANDLINGEQUIPMENTGROUP
MK000 MATERIAL HANDLING EQUIPMENTGROUP
MK100 O/H CRANE & HOIST
MK110 OTC (DOUBLE GIRDER)
MK120 OTC (SINGLE GIRDER)
MK130 MONORAIL HOIST
MK140 AIR HOIST
MK150 MOBILE CRANE
MK160 CHAIN HOIST & TROLLEY
MK190 OTHERS
MK200 ELEVATOR & LIFTER, CRUSHER &SCREEN
MK210 ELEVATOR
MK220 LIFTER
MK250 MILL / CRUSHER / GRINDER /SHREDDER
MK260 VIBRATING SCREEN
MK290 OTHERS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 39/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
16 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
MK300 CONVEYOR & FEEDER
MK310 BELT CONVEYOR
MK320 SCREW CONVEYOR
MK330 CHAIN CONVEYOR
MK340 BUCKET ELEVATOR
MK350 VIBRATING CONVEYOR
MK360 ROTARY FEEDER
MK370 SLIDE GATE
MK390 OTHERS
MK400 PNEUMATIC TRANSFER SYSTEM
MK410 PNEUMATIC CONV. SYSTEM
MK420 ACCESSORIES
MK480 SLIDE VALVE
MK490 OTHERS
MK500 WEIGHING, BAGGING & PALLETIZINGSYSTEM
MK510 TRUCK SCALE
MK520 BAGGING MACHINE
MK530 PACKING MACHINE
MK540 PALLETIZING MACHINE
MK550 MAGNETIC SEPARATOR
MK590 OTHERS
MK600 STORAGE AUTOMATION & LOADINGARM
MK610 LOADING RACK C/W L.A
MK620 MARINE LOADING ARM
MK630 STORAGE AUTOMATION
MK690 OTHERS
MK700 COAL HANDLING SYS.
MK800 ASH HANDLING SYS.
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 40/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
17 of 37
# 5 PIPING
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
PIPING PA PIPESPA000 PIPE GROUP
PA110 CS SMLS PIPE
PA120 CS WELED(EFW & SAW) PIPE
PA130 CS WELDED(ERW) PIPE)
PA210LOW & INTERMEDIATE ALLOY STEELSMLS PIPE
PA220 LOW & INTERMEDIATE ALLOY STEELWELDED PIPE
PA310 SS SMLS PIPE
PA320 SS WELDED PIPE
PA410 NICKEL ALLOY PIPE
PA500 COPPER & COPPER ALLOY PIPING
PA600 CAST & DUCTILE IRON PIPING
PA900 PIPE OTHERS
PA910 CLAD PIPE
PB FITTINGS PB000 FITTING GROUP
PB100 FORGED FITTINGS
PB200 WROUGHT FITTINGS
PB300 PIPE BEND
PB400 NICKEL ALLOY FITTINGS
PB900 FITTING OTHERS
PC FLANGES PC000 FLANGE GROUP
PC100 FLANGES
PC400 NICKEL ALLOY FLANGES
PC900 FLANGE OTHERS
PD VALVES PD000 VALVE GROUP
PD100 FORGED STEEL VALVES
PD200 CAST STEEL VALVES
PD210 KNIFE GATE VALVES
PD300 BALL VALVES
PD400 PLUG VALVES
PD500 BUTTERFLY VALVES
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 41/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
18 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
PD600 WAFER CHECK VALVES
PD700 COPPER ALLOY BRONZE VALVES
PD800 CAST & DUCTILE IRON VALVES
PD900 NON-METALLIC VALVES
PE SPECIALVALVES PE000 SPECIAL VALVE GROUP
PE100 BLOW-DOWN VALVEPE200 SPECIAL CHECK VALVE
PE210 NON-SLAM CHECK VALVE
PE220 CIRCLE SEAL CHECK VALVE
PE230 PISTON LIFT CHECK VALVE
PE240 FOOT VALVE
PE300 STOP VALVES
PE400 SPECIAL NEEDLE VALVE
PE500 SPECIAL BALL VALVE
PE600 DIAPHRAGM VALVE
PE700 RAM PISTON VALVE
PE800 AUTOMATIC RECIRCULATION VALVE
PE900 VALVE OTHERS
PF GASKET, BOLT& NUTS
PF000 GASKET GROUP
PF100 GASKETS
PF200 ISOLATION KITS
PF500 BOLT & NUTS
PL LINED PIPING PL000 LINED PIPING GROUP
PL110 CS INTERNAL RUBBER LINED PIPING
PL120 CS INTERNAL PE LINED PIPING
PL130 CS INTERNAL PP LINED PIPING
PL140 CS INTERNAL CEMENT MORTARLINING PIPING
PL150 FBE COATING (EXCLUDING SUPPLY,FABRICATION)
PL160 CS INTERNAL LIQUID EPOXYCOATED PIPING
PL170 CS INTERNAL TEFLON LINED PIPING
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 42/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
19 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
PL190 LINED OTHERS
PN NON-METALPIPING PN000 NON-METAL PIPING GROUP
PN100 GRP PIPING
PN200 PE PIPING
PN300 PP PIPING
PN400 PVC PIPINGPN500 CPVC PIPING
PN900 NON-METAL OTHERS
PS SPECIAL ITEMS PS000 SPECIAL ITEM GROUP
PS100 STRAINERS
PS200 STEAM TRAP & STEAM MANIFOLD
PS300 SAMPLE COOLER & CLOSEDSAMPLING SYSTEM
PS350 CCR CATALYST SAMPLER SYSTEM(UOP)
PS400 SAFETY SHOWER & EYE WASH
PS500 FLEXIBLE HOSE & QUICKCOUPLINGS
PS550 DUR-O-LOK COUPLINGS (UOP)
PS600 MECHANICAL KEY INTERLOCKSYSTEM
PS650 CHAIN WHEELS
PS700 SPRAY NOZZLES
PS710 STEAM SAMPLING NOZZLES
PS720 STEAM LANCERS
PS750 DRIP FUNNELS
PS760 AERATION DIFFUSER
PS800 INSULATOR & END SEAL
PS900 SPECIALTY OTHERS
PT TUBING PT100 TUBE
PT200 TUBE FITTING
PT300 PRE-INSULATED TUBE & TUBEFITTING
PU UG PIPING PU000 U/G PIPING GROUP
PU100 U/G CS EXTERNAL COATED PIPING
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 43/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
20 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
PU200 FBE COATING (EXCLUDING SUPPLY,FABRICATION)
PU300 U/G CS EXTERNAL COATEDWROUGHT FITTING
PU400 U/G POST INDICATOR VALVE
PU500 U/G COATING & WRAPPINGMATERIAL
PU900 U/G OTHERS
PX SPECIALSUPPORTS
PX000 SPECIAL SUPPORT GROUP
PX100 COLD SUPPORT
PX200 SPRING HANGER SUPPORT
PX300 METAL EXPANSION JOINT
PX400 NON-METAL EXPANSION JOINT
PX500 RUBBER EXPANSION JOINT
PX600 HOLD DOWN SUPPORT
PX700 SNUBBER
PX900 SUPPORT OTHERS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 44/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
21 of 37
# 6 ELECTRICAL
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
ELECTRICAL EA POWERINCOMIMGSYSTEM
EA000 POWER INCOMING SYSTEM
EA100 PYLON / TOWER
EA200 CONCRETE POLE & ACCESSORIES
EA300 INSULATOR
EA400 CABLE & ACCESSORIES
EA500 EQUIPMENT (M.O.F)
EB ELECTRICALEQUIPMENT EB000 ELECTRICAL EQUIPMENT
EB100 PACKAGED TYPE SUBSTATION
EB200 EHV SYSTEM
EB210 GIS & OTHERS
EB220 EHV CONVENTIONAL TYPE SYSTEM
EB300 SWGR & MCC
EB310 H.V SWGR
EB320 M.V SWGR & MCC
EB330 L.V SWGR & MCC
EB340 DIST. PANEL BOARD & OTHERS
EB350 BUS DUCT
EB360 POWER CAPACITOR
EB370 NEUTRAL GROUND RESISTER (NGR)
EB380 VSD / AVR & SOFT STARTER
EB390 SCADA SYSTEM (ECP, ECMS,CONTROL DESK, ETC.)
EB400 AC & DC SYSTEM
EB410 UPS
EB420 BATTERY CHARGER
EB430 BATTERIES
EB500 TRANSFORMER
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 45/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
22 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
EB600 EMERGENCY DIESEL ENGINEGENERATOR
EC CONDUIT &FITTING EC000 CONDUIT & FITTING
EC100 STEEL CONDUIT PIPE
EC200 PVC CONDUIT PIPE
EC300 ALUMINIUM CONDUIT PIPE
EC400 PVC COATING CONDUIT & ELPCONDUIT
EC500 CABLE GLAND
EC600 WEATHER PROOF & EXPLOSIONPROOF & BULK MATERIAL
EC700
GENERAL PURPOSE TYPE BULKMATERIAL FOR INDOOR USE(CONVENIENCE RCPT, BOX, SWITCH,ETC.)
ED CABLE TRAY &FITTING
ED000 CABLE TRAY & FITTING
ED100 LADDER TYPE
ED200 SOLID TYPE
ED300 DUCT TYPE
ED400 PERPORATE TYPE
EE CABLE & WIRE EE000 CABLE & WIRE
EE100 HV CABLE, NON-ARMOURED TYPE
EE150 HV CABLE, ARMOURED TYPE
EE200 MV CABLE, NON-ARMOURED TYPE
EE250 MV CABLE, ARMOURED TYPE
EE300 LV CABLE, NON-ARMOURED TYPE
EE350 LV CABLE, ARMOURED TYPE
EE400 CONTROL CABLE, NON-ARMOUREDTYPE
EE450 CONTROL CABLE, ARMOURED TYPE
EE500 WIRE (IV, GV, BC, HIV)
EE600 SPECIAL CABLE & COMMUNICATIONCABLE(FIBER OPTICAL, COAXIAL)
EE700 TERMINATION & SPLICING KIT
EF LIGHTINGFIXTURE, EF000
LIGHTING FIXTURE, RECEPTACLE &PBS ETC.
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 46/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
23 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
RECEPTACLE &PBS ETC. EF100 WEATHER PROOF & EX-P TYPE
LIGHTING FIXTURE
EF200 ELECTRICAL DEVICE (PBS, WELDINGRECEPTACLE, & ETC.)
EF300 WELDING RECEPTACLE
EF400 CONVENIENCE RCPT (EXCEPTINDOOR USE)
EF500 CONTROL SWITCH STATION (PBS)EF600 TUMBLER SWITCH (EXCEPT INDOOR
USE)
EF700 PANEL BOARD
EF710 PANEL BOARD GENERAL TYPE
EF720 PANEL BOARD EXPLOSION-PROOFTYPE
EG COMMUNI-CATION SYSTEM EG000 COMMUNICATION SYSTEM
EG100
Public Address and General AlarmSystem
- In-Plant Communication System
EG310CCTV SYSTEM
- Process CCTV System
EG500 TELEPHONE Network SYSTEM
EG600
Data Communication System– Data Network System
- Wireless LAN
- Network Management System
EG700 Mobile RADIO SYSTEM
EH GROUNDING EH000 GROUNDINGEH100 GROUNDING MATERIAL
EH200 LIGHTNING PROTECTION MATERIAL
EJ SUPPORTMATERIAL
EJ000 SUPPORT MATERIAL
EJ100 UNISTRUT CHANNEL
EJ200 STEEL ANGLE
EJ300 C-CHANNEL
EJ400 STEEL PLATE
EXELECTRICALHEAT TRACINGSYSTEM
EX100 ELECTRICAL HEAT TRACINGSYSTEM
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 47/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
24 of 37
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
EX200 EHT PANEL
EX210 GENERAL TYPE
EX220 EXPLOSION-PROOF TYPE
EYCATHODICPROTECTIONSYSTEM
EY100 CATHODIC PROTECTION SYSTEM
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 48/72
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 49/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
26 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NA590 OTHERS
NA610SCADA (Supervisory Control and Data
Acquisition)
NA620MTU / RTU (Master Terminal Unit /
Remote Terminal Unit)
NA690 OTHERS
NA710 LCP (Local Control Panel)
NA790 OTHERS
NA810CRCS (Catalyst Regeneration Control
System)
NA820ACCS (Adsorbent Chamber Control
System)
NA890 OTHERS
NA910 CORROSION MONITORING SYSTEM
NA920 BLENDING SYSTEM
NA930 OPTIMIZER SYSTEM
NA940 BAS (Berth Aid System)
NA990 STEAM TRAP MONITORING SYSTEM
NB FLOW
INSTRUMENTS NB000 FLOW INSTRUMENT GROUP
NB110 ORIFICE
NB120 INTEGRAL ORIFICE
NB130 FLOW NOZZLE
NB140 VENTURI TUBE
NB150 ANNUBAR & PITOT TUBE
NB190 OTHERS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 50/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
27 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NB210 FLUMES
NB220 WEIR
NB230 WEDGE
NB240 ELBOW TAP
NB250 V-CONE METER
NB290 OTHERS
NB310 TURBINE FLOWMETER
NB320 P/D METER
NB330 MAGNETIC FLOWMETER
NB340 VORTEX FLOWMETER
NB350 ULTRASONIC FLOWMETER
NB360 MASS FLOWMETER (CORIOLIS)
NB370 THERMAL MASS FLOWMETER
NB390 OTHERS
NB410 ROTAMETER
NB420 PURGE SET
NB430 SIGHT FLOW GLASS
NB490 OTHERS
NB510 FLOW SWITCH (PADDLE TYPE)
NB520 FLOW SWITCH (THERMAL TYPE)
NB590 OTHERS
NB610 CUSTODY METERING
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 51/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
28 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NB690 OTHERS
NB790 OTHERS
NC LEVEL
INSTRUMENTSNC000 LEVEL INSTRUMENT GROUP
NC110 TANK GAUGING SYSTEM
NC190 OTHERS
NC210LEVEL INSTRUMENT (DISPLACEMENT
TYPE)
NC220LEVEL INSTRUMENT (GUIDED WAVE
RADAR TYPE)
NC230LEVEL INSTRUMENT (ULTRASONIC
TYPE)
NC240LEVEL INSTRUMENT (RADIATION
TYPE)NC250 LEVEL INSTRUMENT (RADAR TYPE)
NC260LEVEL INSTRUMENT (SERVO-BLANCE
TYPE)
NC270LEVEL INSTRUMENT (TANK FLOAT
TYPE)
NC280LEVEL INSTRUMENT (MAGNETIC
TYPE)
NC290LEVEL INSTRUMENT (CAPACITANCE
TYPE)
NC300LEVEL INSTRUMENT (RF ADMITTANCE
TYPE)
NC310MICROWAVE LEVEL INSTRUMENT
(AGAR PROBE)
NC390 OTHERS
NC410 LEVEL SWITCH (FLOAT TYPE)
NC420LEVEL SWITCH (VIBRATION /
CAPACITANCE / CONDUCTIVITY
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 52/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
29 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NC430LEVEL SWITCH (RF ADMITTANCE
TYPE)
NC440 LEVEL SWITCH (THERMAL TYPE)
NC490 OTHERS
NC510
LEVEL GAUGE (REFLEX,
TRANSPARENT, MAGNETIC TYPE)
NC520 LEVEL GAUGE (TANK FLOAT TYPE)
NC590 OTHERS
NC690 OTHERS
ND PRESSURE
INSTRUMENTSND000 PRESSURE INSTRUMENT GROUP
ND110PRESSURE AND D/P TRANSMETER /
ELECTRICAL LOCAL INDICATOR
ND190 OTHERS
ND210PRESSURE GAUGE, DRAFT GAUGE,
D/P GAUGE, & MANOMETER
ND290 OTHERS
ND310 PRESSURE SWITCH
ND390 OTHERS
ND410 LOCAL PNEUMATIC CONTROLLER
ND490 OTHERS
ND590 OTHERS
NE TEMPERATURE
INSTRUMENTSNE000 TEMPERATURE INSTRUMENT GROUP
NE110THERMOMETER (BIMETALLIC TYPE)
WITH THERMOWELL
NE120THERMOMETER (CAPILLARY TYPE)
WITH THERMOWELL
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 53/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
30 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NE190 OTHERS
NE210THERMOCOUPLE & RTD WITH
THERMOWELL
NE220 SPECIAL THERMOCOUPLE
NE290 OTHERS
NE310TEMPERATURE TRANSMITTER WITH
ELEMENT
NE390 OTHERS
NE410TEMPERATURE SWITCH WITH
THERMOWELL
NE490 OTHERS
NE510 PYROMETER
NE590 OTHERS
NE690 OTHERS
NF INSTRUMENT
VALVESNF000 INSTRUMENT VALVE GROUP
NF110 CONTROL VALVE
NF190 OTHERS
NF210 CONTROL VALVE (GLOBE TYPE)
NF220 CONTROL VALVE (BUTTERFLY TYPE)
NF230 CONTROL VALVE (V-BALL TYPE)
NF240 CONTROL VALVE (PLUG TYPE)
NF250 CONTROL VALVE (PINCH TYPE)
NF260CONTROL VALVE (SAUNDERS
DIPHRAGM TYPE)
NF270 CONTROL VALVE (SLIDING GATE
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 54/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
31 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
TYPE)
NF290 OTHERS
NF310ON-OFF VALVE (ON-OFF, SHUTDOWN,
BLOWDOWN)
NF320 ON-OFF VALVE (BALL TYPE)
NF330 ON-OFF VALVE (BUTTERFLY TYPE)
NF340 ON-OFF VALVE (SLIDING TYPE)
NF350 ON-OFF VALVE (PISTON RAM TYPE)
NF360 ON-OFF VALVE (GATE TYPE)
NF390 OTHERS
NF410 MOTOR OPERATED VALVE
NF420MOTOR OPERATED VALVE (BALL
TYPE)
NF430MOTOR OPERATED VALVE (BUTTERFLY
TYPE)
NF440MOTOR OPERATED VALVE (GATE
TYPE)
NF490 OTHERS
NF510 PRESSURE REGULATING VALVE
NF520 TANK BLANKETING VALVE
NF590 OTHERS
NF610 AIR OPERATED VALVE (AOV)
NF690 OTHERS
NF710GAS/HYDRAULIC OPERATED VALVE
(GOV)
NF790 OTHERS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 55/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
32 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NF810 DIVERT VALVE
NF820 3-WAY VALVE
NF830 AUTO RECIRCULATION VALVE (ARCV)
NF890 OTHERS
NF910 SOLENOID VALVE
NF920 PISTON ACTUATOR
NF990 OTHERS
NG SAFETY
INSTRUMENTSNG000 SAFETY INSTRUMENT GROUP
NG110 PRESSURE SAFETY RELIEF VALVE
NG120 PILOT-OPERATED RELIEF VALVE
NG130PRESSURE-VACUUM RELIEF VALVE
(BREATHER VALVE)
NG140 RUPTURE DISC
NG190 OTHERS
NG210 DELUGE VALVE
NG290 OTHERS
NG310 FIRE & GAS DETECTOR
NG320 GAS DETECTOR
NG330 FIRE DETECTOR
NG390 OTHERS
NG490 OTHERS
NH ANALYZERS NH000 ANALYZER GROUP
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 56/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
33 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NH110 ANALYZER PACKAGE SYSTEM
NH190 OTHERS
NH210 GC ANALYZER
NH220 RVP ANALYZER
NH230 HC ANALYZER
NH240 H2 ANALYZER
NH250 AIR DEMAND ANALYZER
NH260 H2S ANALYZER
NH270 TOTAL SULFUR ANALYZER
NH280 FLASH POINT ANALYZER
NH290 Hg ANALYZER
NH300 O2 ANALYZER
NH310 Ph/CONDUCTIVITY METER
NH320 MOISTURE ANALYZER
NH330 DENSITY ANALYZER
NH340 SP.GR ANALYZER
NH350 VISCOCITY ANALYZER
NH360 COLOR ANALYZER
NH370 H2SO4 ANALYZER
NH380 DISTILLATION ANALYZER
NH390 OTHERS
NH410 CEMS ANALYZER SYSTEM
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 57/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
34 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NH420 DUST ANALYZER
NH430 SOx ANALYZER
NH440 NOx ANALYZER
NH450 CO ANALYZER
NH460 CO2 ANALYZER
NH490 OTHERS
NH510 COD ANALYZER
NH520 BOD ANALYZER
NH530 MLSS ANALYZER
NH540 DO ANALYZER
NH550 CL ANALYZER
NH590 OTHERS
NH610 AUTO SAMPLER
NH690 OTHERS
NH790 OTHERS
NJ MISCELLANEOUS
INSTRUMENTS NJ000MISCELLANEOUS INSTRUMENT
GROUP
NJ110 FIELD SIGNAL INDICATOR
NJ120 I/P TRANSDUCER
NJ130 LIMIT SWITCH
NJ140 LOCAL HAND SWITCH
NJ150 PNEUMATIC MANUAL LOADER
NJ160 PROXIMITY SENSOR
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 58/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
35 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NJ170 TEST EQUIPMENT
NJ190 LOCAL PUSHBUTTON
NK INSTRUMENT
CABLESNK000 INSTRUMENT CABLE GROUP
NK110 INSTRUMENT CABLE
NK120 T/C EXTENSION CABLE
NK130 FIBER OPTIC CABLE
NK190 OTHERS
NL INSTRUMENT
CABLE TRAY &
FITTINGS
NL000INSTRUMENT CABLE TRAY & FITTING
GROUP
NL110 INSTRUMENT CABLE TRAY & FITTING
NL190 OTHERS
NM INSTRUMENT
JUNCTION BOXSNM000 INSTRUMENT JUNCTION BOX GROUP
NM110 INSTRUMENT JUNCTION BOX
NM190 OTHERS
NN INSTRUMENT
CONDUIT &
FITTINGS
NN000INSTRUMENT CONDUIT & FITTING
GROUP
NN110 CONDUIT PIPE FOR INSTRUMENT
NN120 CONDUTI FITTING FOR INSTRUMENT
NN130 CABLE GLAND FOR INSTRUMENT
NN140U-PVC PIPE & FITTING FOR
INSTRUMENT
NN190 OTHERS
NP INSTRUMENT NP000 INSTRUMENT PIPE & FITTING GROUP
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 59/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
36 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
PIPE & FITTINGS NP110 PIPE (C.S) FOR INSTRUMENT
NP120 PIPE FOR INSTRUMENT
NP130 PIPE FITTING FOR INSTRUMENT
NP140 MANUAL VALVE FOR INSTRUMENT
NP150 FLANGE FOR INSTRUMENT
NP160 GASKET FOR INSTRUMENT
NP170 BOLT & NUTS FOR INSTRUMENT
NP190 OTHERS
NQ INSTRUMENT
TUBE &
FITTINGS
NQ000INSTRUMENT TUBE & FITTING
GROUP
NQ110INSTRUMENT TUBE AND TUBE
FITTING / TUBE VALVE
NQ120INSTRUMENT TUBE FITTING & TUBE
VALVE
NQ130 SEAL POT / AIR MANIFOLD
NQ190 OTHERS
NR SUPPORT
MATERIALSNR000 SUPPORT MATERIAL GROUP
NR110 STANCHION
NR120 STEEL ANGLE / CHANNEL / PLATE
NR190 OTHERS
NS OTHER MISC.
MATERIALSNS000 OTHER MISC. MATERIAL GROUP
NS110 MULTI CABLE TRANSIT
NS120 SUNSHADE
NS130 INSULATING KIT
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 60/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
37 of 37
Discipline Material Category REQ.NO Req. Description Unit of
Measure
NS190 OTHERS
# 8 FIRE FIGHTING
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
FIRE FIGHTING- GENERAL
FA FIRE FIGHTINGSYSTEM FA000 FIRE FIGHTING SYSTEM FOR YARD
FA400FIRE FIGHITNG SYSTEM FORBUILDINGS
FA500 POST INDICATOR VALVES(UL LISTEDor FM APPROVED)
FA600 DELUGE VALVE (SKID TYPE)
# 9 HVAC
Discipline Material Category REQ. NO Req. Description Unit ofMeasure
HVAC HV HV000 HVAC
HV100 CHILLER, CONDENSING UNITS
HV200 AIR HANDLING UNITS
HV300 FANS
HV400 PUMPS
HV500 HEATERS
HV600 FILTER UNITS
HV700 HVAC CONTROL UNITS
HV800 TESTING, AIR BALANCING
HV900 HVAC OTHERS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 61/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A ANN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT EE PP CC 99Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential 1 of 3
Appendix 3. COMPANY ’ s Material Class CodeCLASS DESCRIPTION REMARK
01 PIPE (OTHER THAN DRILLING)
02 PIPE FITTING - FLANGED
03 PIPE FITTING - NON - FLANGED
04 VALVES
05 PLUMBLING / HEATING06 PACKING / GASKETS
07 CHAIN AND ROPES
08 HARDWARE ITEMS AND HOSES
09 BUILDING MATERIALS
10 FASTENERS, NAILS
11 FASTENERS, NAILS
12 METALS (MILL FORM) & MISCELLANEOUS METALS
13 MECHANICAL POWER TRANSMISSON
14 ELECTRICAL POWER DISTRIBUTION INSULATION15 ELECTRICAL CONDUCTORS, CONDUIT, FITTINGS
16 CIRCUIT BREAKERS, PROTECTION EQUIP, SWITCHES & WIRING
17 LIGHTING EQUIPMENT, MOTORS, GENERATORS & BATTERIES
18 COMMUNICATIONS EQUIPMENT
19 EMERGENCY STANDBY EQUIPMENT
20 WELDING EQUIPMENT
21 SAFETY, SECURITY, FIRE FIGHTING EQUIPMENT
22 MARINE & DIVING EQUIPMENT
23 COMPUTERS
24 AUTOMOTIVE EQUIPMENT
25 LABORATORY EQUIPMENT
26 (1) CHEMICALS, INHIBITORS, DEFOAMING AGENTS,LUBE & OILS
27 (2) LUBE & OILS, GASES, WATER TREATMENT (LAB/MISC/CHEMICALS)
27 REFRIGERATION, AC & VENTILATING EQUIPMENT
28 SAMAREC MATERIALS
28 EX-SAMAREC STOCK (JEDDAH)
28 EX-SAMAREC STOCK (RIYADH)
28 EX-SAMAREC STOCK (YANBU)
29 COMMUNITY & HOUSING INSECTERCIDES
30 INTERNAL COMB, ENGINE & ACC.BRAKES, LUB, TRANS, EQUIP .
31 (1) EXPLOSIVES
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 62/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
2 of 3
CLASS DESCRIPTION REMARK
31 (2) CONSTRUCTION EQUIPMENT, HOISTS
PUMPS, COMPRESSORS
32 BOLIERS, FURN, TANKS, TURB, HEAT EXCH, SEWAGE EQUIP
33 MACHINE CARPENTER SHOP EQUIPMENT
34 (1) INSTRUMENTATION
34 (2) INSTRUMENTATION VALVES
35 - 38 TOOLS, POWER TOOLS & PARTS39 OFFICE & SCHOOL SUPPLIES
40 PARTS FOR SCHOOL AND OFFICE EQUIPMENT
41 PHARMACEUTICALS
42 MEDICAL SUPPLIES
43 DENTAL SUPPLIES
44 PARTS FOR MEDICAL EQUIPMENT
45 (1) DRILLIMG & PRODUCING EQUIPMENT
45 (2) OCTB DRILLING & CHEMICAL / MUD / CEMENT
46 DRILLING SPARE PARTS
47 - 48 AVIATION EQUIPMENT SUPPLIES & SPARRE PARTS
49 - 50 PROCESSING PLANTS EQUIPMENT & SUPPLIES
THE FOLLOWING CLASSES ARE SPARE PARTS
51 CATERPILLAR COMPANY
52 AVIATION EQUIPMENT & SPARE PARTS
53 LIGHT VEHICLE SPARE PARTS
54 KENWORTH SPARE PARTS
55 LIGHT VEHICLE SPARE PARTS
56 CONSTRUCTION CAMP SPARES
57 TRAILER CUSHMAN
59 ENGINES, GM CONTINENTAL CUMMINS
60 SUPERIOR, WAUKESHA
62 OTHER ENGINES BRAKE SYSTEM, AXLES & TRANSMISSON PARTS
64 HEAVY VEHICLE SPARE PARTS
65 ELECTRICAL SYSTEM EQIPMENT FOR INTERNAL COMBUSTION ENGINE
66 FUEL & LUBRICATING EQUIPMENT
67 VEHICLE & INTERNAL CUMBUSTION ENG ACCESSORIES
68 OIL FILTERS & CARTRIDGES69 MAIN ROAD BLDG, EQUIP . (EXCEPT POWER SHOVELS & CRANES)
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 63/72
PROJECT COORDINATIONPROCEDURE
Contractor Job No. : 12170D
JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT
EE PP CC 99
Document No. : PE-001
Rev. No.: 00 Rev. Date: 09 Apr 2013
General Business Confidential
3 of 3
CLASS DESCRIPTION REMARK
70 POWE CRANES & SHOVELS
71 HEAVY LIFTING POWER CRANES & SHOVELS
72 MATERIAL HANGING EQUIPMENT 31 SPARE PARTS
73 TURBINES,. GAS STEAM
74 BOILER FURNACE HEAT EXCHANGERS
75 STEAM ENGINE LUBE OIL FILTER EQUIPMENT FOR CLASS 30
76 SHOP & WELDING EQUIPMENT - CLASS 3377 SEALS
78 PACKING FOR COMPRESSORS & TURBINES FOR CLASS 31
79 PUMPS (EXE. VACUUM & WELL - CLASS 31 - 35)
80 HEAVY DUTY PUMP SPARE PARTS
82 AC & REFRIGERATION SPARE PARTS - CLASS27
83 ELECTRICAL EQUIPMENT - CLASS 14, 15, 16 & 17
84 ELECTRICAL EQUIPMENT - CLASS 14, 15, 16 & 17
85 ELECTRICAL EQUIPMENT - CLASS 14, 15, 16 & 17
86 COMPUTER SPARE PARTS - CLASS 23
87 COMMUNICATION EQUIPMENT - CALSS 18
88 ELECTRONIC PARTS - CLASS 34 ( REGULATOR & ACTUATOR)
89-90 (1) VALVE SPARE PARTS ( EXCEPT CONTROL VALVES)
89-90 (2) SPARE PARTS FOR CLASS 34 (CNTL VALVES, RGLTR & ACTUATOR)
91-92 INSTRUMENT & MEASURING DEVICES - CLASS 34
93 PARTS FOR LABORATORY EQUIPMENT CLASS 25
94 MARINE EQUIPMENT FOR CLASS 22
95 PARTS FOR SAFETY, SECURITY, FIRE EQUIPMENT & COMMUNITY
99 IPSA ll SPARE PARTS
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 64/72
Jazan Refinery & Terminal Project (PKG9)
SK Engineering & Construction Co.Ltd. SK G-Plant Building, 100 Euljiro, Jung-gu, Seoul 100-847, Korea.Telephone: 82-2-3700-8129, Fax: 82-2-3771-5537
To : Mr. Sulaiman M. Al-Rubaian / Project Manager Date: 14 November 2012Aramco Overseas Company B.V. Total Sheets: 1+1
SK Engineering & Construction Co., Ltd.SK G-Plant Building, 100 EuljiroJung-gu, Seoul, 100-847, Korea
CC:
Letter No: SK/AOC-L-0001Your Ref:
PROJECT: JAZAN REFINERY & TERMINAL PROJECT (EPC9)Contract No. : 6600029570 (OOK)
SUBJECT: PAYMENT REQUEST No.1 : Advancement Payment of OOK
Dear Sir,
Yours faithfully,
___________________________Eui Sim (Edward) JeongProject Manager
Attachment:
Response Required YesResponse Due Date ASAPCommon Yes
Attachment #1-1
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 65/72
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 66/72
TRANSMITTAL
Mr. Sulaiman M. Al-Rubaian / Project Manager DATE : 14 November 2012
Aramco Overseas Company B.V. TR. NO. : SK/AOC-T-XXXX
SK G-Plant Building, 100 Euljiro CONTRACT NO. : 6600029570 (OOK)
Jung-gu, Seoul, 100-847, Korea REFERENCE : -
THE FOLLOWING DRAWINGS SPECIFICATION PROCEDURE / PLAN
DATA SHEETS CALCULATION MATERIAL REQUISITION
TBE VENDOR DOCUMENT MOM
ARE TRANSMITTED APPROVAL REVIEW INFORMATIONRECORD QUOTATION CONSTRUCTION
THIS IS ORIGINAL REVISION FINAL
SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE
Signed :
Eui Sim (Edward) Jeong / Project Manager
NOTE :
RECEIPT NOT REQUIRED
RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)
THE ABOVE DOCUMENT RECEIVED BY :
SIGNATURE TITLE DATE
DRAWINGS OR DOCUMENT NO.
Jazan Refinery & Terminal Project (PKG9)
Attachment #2-1
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 67/72
TRANSMITTAL
Mr. Sulaiman M. Al-Rubaian / Project Manager DATE : 14 November 2012
Aramco Overseas Company B.V. TR. NO. : SK/SA-T-XXXX
SK G-Plant Building, 100 Euljiro CONTRACT NO. : 6600029571 (IK)
Jung-gu, Seoul, 100-847, Korea REFERENCE : -
THE FOLLOWING DRAWINGS SPECIFICATION PROCEDURE / PLAN
DATA SHEETS CALCULATION MATERIAL REQUISITION
TBE VENDOR DOCUMENT MOM
ARE TRANSMITTED APPROVAL REVIEW INFORMATIONRECORD QUOTATION CONSTRUCTION
THIS IS ORIGINAL REVISION FINAL
SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE
Signed :
Eui Sim (Edward) Jeong / Project Manager
NOTE :
RECEIPT NOT REQUIRED
RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)
THE ABOVE DOCUMENT RECEIVED BY :
SIGNATURE TITLE DATE
Jazan Refinery & Terminal Project (PKG9)
DRAWINGS OR DOCUMENT NO.
Attachment #2-2
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 68/72
1 of 2
MINUTES OF MEETINGSubject : Sample MOM No.: MOM-SK/AOC-xxx-xxx
Date & Time : 14 November 2012 Project : Jazan Refinery & TerminalProject Package 9
Place : Contractor ’ s Seoul Office File :Originated By : SKEC Recorded By :
Participants Distribution
COMPANY : : All attendees
:
SKEC :
:
NO. DATEISSUED
ITEMS DISCUSSED ACTIONBY
DATENEEDED
Attachment #3
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 69/72
MINUTES OF MEETING (CONTINUATION) No. : MOM-SK/AOC-xxx-xxx JOB NO :
DATE : 14 November 2012
NO.DATE
ISSUED ITEMS DISCUSSED ACTIONBY
DATENEEDED
2 of 2
Approved by Issued by
COMPANY Project Manager SKEC Project Manager
Date: Date:
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 70/72
JAZAN REFINERY & TERMINAL PROJECT (PKG9)ACTION ITEMS LIST
RemarksAction ByNo Subject / Issue Issue Date Due Date Forecast DateIssued ByReferenceddocuments
Open/Closed
A t t a ch m
en
t # 4
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 71/72
TECHNICAL QUERY
Page 1 of 2
JAZAN REFINERY & TERMINAL PROJECT (EPC 9) Contract No. 6600029571 (IK) & 6600029570(OOK)
TQ No. TQ-Date:
Subject: Reference:
Disciplineo Processo Mechanicalo HVACo Rotating
o Pipingo Materialso Civilo Building/Structure
o Electricalo Instrumentationo Communicationo HSE
o Fire Fighting
o Procurement
o Quality
o Other _____________
Cost impact? Yes No Applicable to other packages? Yes No
Schedule impact? Yes No Waiver required? Yes No
PART 1 – SKE&C Query
Attachments: Yes No, If yes, provide reference numbers
Response required by (tentative date): Oct.15 ,2012
Raised by: Name: Sign: Date:Approved by: Name: Sign: Date:
PART 2 – AOC Response*
Attachment #5
8/10/2019 PE-001_R00
http://slidepdf.com/reader/full/pe-001r00 72/72