PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

2 of 24

TABLE OF CONTENTS

1.0 GENERAL ……………………………………………………………… .…………… ...3

1.1 INTRODUCTION ……………………………………………………………………… 3

1.2 DEFINITIONS ………………………………………………………………………… .3

1.3 REFERENCES ……………………………………………………………………… ...4

1.4 PARTIES AND REPRESENTATIVES ……………………………………………… 4

1.5 LANGUAGE …………………………………………………………………………… 5

2.0 COMMUNICATIONS AND CORRESPONDENCES ………………………………… .… ..5

2.1 PROJECTION ORGANIZATION …………………………………………………… .5

2.2 CORRESPONDENCES ……………………………………………………………… 5

2.3 MEETING ……………………………………………………………………………… 8

2.4 ACTION ITEM LIST ………………………………………………………………… 11

2.5 WAIVER REQUEST ………………………………………………………………… 12

2.6 TECHNICAL QUERY ……………………………………………………………… ..12

3.0 DOCUMENT HANDLING SYSTEM ………………………………………… ... … .……… 13

3.1 PROJECT NUMBERING SYSTEM ……………………………………………… ..13

3.2 DOCUMENT CONTROL …………………………………………………………… 22

3.3 VENDOR DOCUMENT CONTROL ……………………………………………… ..22

3.4 FINAL DOCUMENTATION ………………………………………………………… 22

4.0 ATTACHMENTS ………………………………………………………………… . … .23

Appendix 1. Discipline Category Code for Specifications, Calculation Sheets and Others Appendix 2. Requisition Type

Appendix 3. COMPANY’s Material Class Code

Page 3: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 3/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

3 of 24

1. GENERAL

1.1 INTRODUCTION

The purpose of this coordination procedure is to establish a flow of documents andresponse on the project in order to direct the various forms of correspondence, toprovide administrative guidance for the exchange of information, and to coordinate theactivities effectively and correctly keeping all concerned parties informed throughout

the Engineering, Procurement, Construction for EPC 9 (CDU & HVU, Piperacks, FlareSystem) of JAZAN REFINERY & TERMINAL PROJECT for Saudi Arabian OilCOMPANY.

1.2 DEFINITIONS

"COMPANY" means “ Aramco Overseas Company B.V (AOC) “ if it is used in relationto work to be performed Out-of-Kingdom (OOK) under the Contract, and it means“SAUDI ARAMCO (SA) ” if it is used in relation to work to be performed In -Kingdom(IK) under the Construction Contract.

"

SAUDI ARA MCO " means the Saudi Arabian Oil Company.

"CONTRACTOR" means SK Engineering & Construction Co., Ltd. (SKEC)responsible for performing work and services pursuant to the Contract.

"Sub-cont rac tor" means any person to whom execution of any part of the Work,including preparation of any design or supply of any Materials, is sub-contracteddirectly or indirectly by the CONTRACTOR and includes its legal successors orpermitted assigns.

Originator means Person or organization generating the correspondence (Letter,Transmittal or Notes of Meeting).

Recipient means Person or organization receiving the correspondence (Letter,Transmittal or Notes of Meeting).

"WORK" means all the work and services to be performed by CONTRACTORpursuant to the Contract.

FACILITIES ”

means the entirety of all permanent structures, units and all other itemsbeing designed, procured, fabricated, constructed, or otherwise provided by

Page 4: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 4/72

Page 5: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 5/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

5 of 24

1.4.2 CONTRACTOR (SKEC)

CONTRACTOREui Sim (Edward) Jeong / Project ManagerSK Engineering & Construction Co., LtdSK G-Plant Building, 100 Euljiro, Jung-gu, Seoul, 100-847, Korea

1.5 Language

The official language is English.

2. COMMUNICATIONS AND CORRESPONDENCES

2.1 PROJECT ORGANIZATION

The project organization and assigned personnel of the CONTRACTOR is shown inthe CONTRACTOR ’s organization chart which will be submitted separately.

2.2 CORRESPONDENCES

2.2.1 General

All communication to COMPANY affecting contractual agreements or containingcommercial information will be through the COMPANY Representative.

Letter will be used for the communication affecting contractual agreement orcontaining commercial information. Transmittals will be used to convey documentssuch as data sheets, specification, report, calculation, procedure, TQ, MOM anddrawings from one party to another.

Technical communication between the COMPANY and the CONTRACTOR thatdoesn ’t constitute a change in the contract, and has no commercial or scheduleimpact can be negotiated by one-on-one meetings with Minutes of Meeting recordingany decision made.

All incoming and outgoing Letters, Transmittals, and Minutes of Meeting betweenCOMPANY and the CONTRACTOR will be coded and logged.

All information, decisions and agreements between COMPANY and other parties asidentified in this procedure are to be confirmed in writing so that they are properlydocumented for the record and future reference. This will be done through a Letter,

Transmittal or Minutes of Meeting, all of which constitute the correspondence of theproject.

Page 6: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 6/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

6 of 24

Insofar as is practical, each communication will be limited to one subject. Hardcopycorrespondence and transmittals are distributed according to Project DistributionMatrix. Electronic mail will not be used to transmit documents, between theCOMPANY and the CONTRACTOR, which have a bearing on contractual matters.Native format electronic copies of the correspondence will be kept by theCONTRACTOR and should be available to the COMPANY.

Identification of documents other than correspondence will be numbered as perClause 3.1 “Project Number System ” in this procedure.

Confidentiality of the correspondence will be in accordance with the highestconfidentiality of the documents attached, following the indication of the COMPANYEngineering Procedure, SAEP- 127, “Security and Control of Saudi AramcoEngineering Data”.

Preparation of documents other than correspondence will follow the COMPANY ’sEngineering Procedure and Standard.

2.2.2 Correspondence Responsibilities

Each type of correspondence uses sequential numbers to identify each individual

piece of correspondence. The CONTRACTOR will record all Correspondences byusing CONTRACTOR ’s Documents Control System. Please refer to DocumentControl & Transmittal Procedure (Document No. : PE-003)

The CONTRACTOR will provide miscellaneous project documents except thesedocuments listed in Project Distribution Matrix to COMPANY personnel for projectpurposes.

2.2.3 Identifying Information

Each correspondence will contain the following information:

Name of Recipient, title and address

Project title

Date

Subject

Correspondence Number

Reference Number

From (Originator)To (Recipient)

Page 7: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 7/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

7 of 24

2.2.4 Correspondence Numbering

All correspondences shall be identified by the following numbering system.

Example

SK/AOC-L-NNNN

(1) (2) (3) (4)

Where,

(1) Originator Identification Code (CONTRACTOR, SK EC)

(2) Recipient Identification Code

AOC = Aramco Overseas Company for OOK contract

SA = S audi Aramco for IK contract

VEN = Ven dor

SUB = Subcontractor

I(XXX) = Interface Contractor, XXX means interface Contractor

identification (example, HCK, DHT, NAR , etc)

(3) Correspondence Type

L : Letter

F : Fax

T : Transmittal

VP : Vendor P rint Transmittal

(4) Sequential Number, a four-digit number assigned by the Originator ’s organization

2.2.5 Authorized Signature

All correspondences will be signed by the authorized COMPANY or CONTRACTORRepresentative or their authorized alternate representative.

2.3 MEETING

In addition to formal and informal communications between COMPANY andCONTRACTOR, frequent formal routine meetings are necessary throughout the

Page 8: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 8/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

8 of 24

duration of the Contract. All interface meetings shall be in accordance with the Interface ManagementProcedure.

2.3.1 Major Meetings

Major meetings will be scheduled on a regular basis and will be determined as theContract WORK develops. CONTRACTOR will provide to COMPANY Representative

with an agenda for each meeting at least one (1) full regularly scheduled workday priorto the meeting for COMPANY Representative’s comments. The major meetings are asfollow:

Quality Assurance & Control Meetings. Safety Meetings. Design Review Meetings. 3D Model Review Meetings. Procurement Status Meetings. Co-ordination Meetings. Special Interface Meetings.

2.3.2 Regular Progress Review Meetings

Progress review meetings will be held on a regularly scheduled basis. CONTRACTORwill provide to COMPANY Representative with an agenda for each meeting at leastone (1) full regularly scheduled workday prior to the meeting for COMPANYRepresentative’s comments. The major meetings are as follow:

Weekly MeetingsCONTRACTOR will conduct a weekly progress meeting at the Design Office to reviewprogress of the WORK including activities, procurement of material, WORK Schedule,interfaces, potential Change Orders and any other technical issues of concern.CONTRACTOR also will conduct Quality assurance and Inspection meeting separately.The initiate formal weekly procurement meeting will be held within forty (40) days fromeffective date of Contract.

Weekly Progress Meetings

Weekly Progress Meetings will be held at the Design Office once a week and a

Weekly Progress Report will be submitted to COMPANY one (1) working day prior tothe meeting.

Page 9: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 9/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

9 of 24

The main purpose of the Weekly Progress Meeting is to discuss the Weekly ProgressReport. Particular attention will be directed towards any recovery actions required,and other topics may be introduced at the request of COMPANY or CONTRACTOR.

Weekly Procurement Meetings

Within forty (40) calendar days of effective date of Contract, CONTRACTOR shallinitiate formal weekly procurement meetings.

Weekly Procurement Meetings will be held at the Design Office once a week andWeekly Procurement Report will be submitted to COMPANY one (1) working day priorto the meeting.

The main purpose of the Weekly Procurement Meeting is to ensure that interrelatedprocurement and design problems are addressed directly and effectively by theconcerned parties and resolved promptly.

Weekly Quality Meetings

Weekly Quality Meeting will be held at the design office once a week and WeeklyQuality Report will be submitted to COMPANY one (1) working day prior to the

meeting.The main purpose of this meeting is to discuss and clarify overall aspects of projectquality assurance and procurement QC matters.

2.3.3 Management Review Meetings

After receiving COMPANY ’s instruction, CONTRACTOR will prepare presentations forand participate in COMPANY management review meetings that will be heldperiodically in any calendar year during the period from the effective date of thisContract through Contract completion.

2.3.4 Minutes of Meeting (MOM)

Each project meeting between the COTRACTOR and the COMPANY will be properlydocumented and recorded by Minutes of Meeting. Minutes of Meeting will identify theaction required, the individual responsible for action, and the date for completion.

Each project meeting between the CONTRACTOR and suppliers, and others will bealso documented and recorded by Notes of Meeting.

2.3.5 Minutes of Meeting (MOM) and Report Numbering

Page 10: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 10/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

10 of 24

All Minutes of Meeting and Report shall be numbered in the following manner :

MOM-SK/AOC-XXX-XXX (0) (1) (2) (3) (4)

(0) Type Identification CodeMOM = Minutes of MeetingWR = Weekly ReportMR = Monthly Report

AR = Audit Report

(1) Originator Identification Code

SK = CONTRACTOR

(2) Recipient Identification Code

AOC = Aramco Overseas Company

SA = Saudi Aramco

VEN = Vendor

SUB = SubcontractorI(XXX) = Interface Contractor, XXX means interface Contractor

identification (example, HCK, DHT, NAR , etc)

(3) Field Identification Code

PCM = Project Control Management

ENG = Engineering

PRO = Procurement

CON = ConstructionINT = Interface

QA = Quality Assurance

QC = Quality Control

HSE = Health, Safety & Environment

PRE = Pre-Commissioning

OTH = Others

(4) Serial Number (001, 002, 003 etc. at each party)

Page 11: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 11/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

11 of 24

2.3.6 Authorized Signature

All Minutes of Meeting will be signed by the each party ’s authorized Representative ortheir authorized alternate representative.

2.4 Action Item List

An Action Item List is a log with outstanding issues to be resolved in a timely mannerby either COMPANY or by the CONTRACTOR. The Action Item List which isoriginated during project meetings between COMPANY and the CONTRACTOR willbe issued weekly for individual review.

Action Item List will be discrete, definable, owned by an individual, and recognizableas an open item.

Incorporation of an Action Item will be done at any time and suggested by any of theproject members.

Any closed item along with the Action Item Number information will be deleted orhidden from the list after the item has been completed.

Action Item Number, Subject/Issue, Issued By, Referenced Document, Issued Date,Due Date, Forecast Date, Action By and Open/Closed status will be included in the

Action Item List. Please refer to the Attachment #4

2.4.1 Subject/Issue

A brief description of the issue will be included in this cell.

2.4.2 Due Date

The Due Date will not be changed unless project needs change.

2.4.3 Forecast Date

The Forecast Date is when the Issue should be resolved. This date will be updated asneeded. Update and bold the date when the issue is actually closed.

2.4.4 Open/Closed

Page 12: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 12/72

Page 13: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 13/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

13 of 24

3. DOCUMENT HANDLING SYSTEM

This is to describe the Document Numbering and Document Control of this project.

3.1 PROJECT NUMBERING SYSTEM

3.1.1 Project Execution Plan, Procedure and Manual

The project execution plan, procedure and manual will be used for the followingnumbering system.

PE – 001(XX-XXX)

(1) (2)

(1) Document Type IdentificationDocument Type is a double character alphabetical code. The following DocumentType will be used for document numbers.

PC = Project Execution & ControlPE = Project EngineeringPR = ProcurementHS = Health, Safety and EnvironmentQA = Quality Assurance and Quality ControlSC = ScheduleCO = Construction

PP = Pre-commissioning and CommissioningIN = InterfaceOT = Others

(2) Serial Number (001~999)

The Sheet Number is a three (3) digit numeric number ranging from 001 to 999.

3.1.2 Technical Specifications, Calculation Sheets and so on

The document numbers shall be assigned in accordance with the following procedure.

Page 14: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 14/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

14 of 24

12170D-TS-51001 : Piping Material Specification(XX-XXXXX)

(1) (2) (3) (4)

(1) CONTRACTOR Job Number

12170D = CONTRACTOR

(2) Document TypeDocument Type is a double character alpha code. The following Prefix Letter willbe used for document numbers.TS = Technical SpecificationCA = CalculationOT = Others

(3) Discipline Category Code

The Discipline Category Code is a double numeric code and defines in Appendix 1

(Discipline Category Code for Specifications, Calculation Sheets).

(4) Serial Number (001~999)

The Sheet Number is a three (3) digit numeric number ranging from 001 to 999except for index/face sheets.

The size of final submission will be based on US sizes in accordance with SAES-A-202.

In case of technical specification numbering for instrument shall be assigned as below.

12170D-ISS-IN-NG110-1

(1) (2) (3)

(1) CONTRACTOR ’s Job Number

(2) Document Type (ISS: Instrument Specification sheet)

(3) Discipline Category Number + Requisition Type : Please refer to Clause 3.1.5 inthis document.

3.1.3 Drawing (PFD, P&ID, Plot Plan, Data Sheets … )

Page 15: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 15/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

15 of 24

The drawing numbers shall be assigned in accordance with the following procedure.

V A – XXXXXX

(1)(2) (3)

(1) Prefix Letter

Prefix Letter is a single character alpha code. The following Prefix Letter will beused for document numbers.

V Central and Western Arabia

(2) Size Code

The Size Code for documents and drawings is a single alpha character that

defines the cut size of the document and drawing when printed or plotted. TheCONTRACTOR will use the ISO size during the detail design stage. The size offinal submission will be US sizes in accordance with SAES-A-202 as followingtable.

Identification LetterOverall Dimensions

mm Inches

A 711 × 1016 28 × 40

B 508 × 711 20 × 28

C 356 × 508 14 × 20D 279 × 432 11 × 17

E 216 × 279 8 1/2 × 11

(3) COMPANY Drawing Number

The drawings number is produced from COMPANY ’s I-Plant and assigned eachdrawing.

(4) Key Drawings

Piping and Instrument Diagrams (PID)

Page 16: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 16/72

Page 17: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 17/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

17 of 24

(1) CONTRACTOR Job Number

12170D = CONTRACTOR

(2) Document Type

PR = Purchase Requisition for QuotationTE = Technical Bid EvaluationPO = Purchase Order

(3) Discipline Category Number

ME = Mechanical EquipmentPI = Piping MaterialsEL = Electrical Equipment and Bulk MaterialsIN = Instrument Equipment and Bulk MaterialsFF = Fire FightingCS = Civil & Structural Materials

AR = Architecture MaterialsLC = Lab, Chemical & CatalystTC = Telecom

GE = General(4) Requisition Type

Requisition Type is described in Appendix 2.

(5) The last two digits are, if necessary, Serial No. for a subsequent ordering whichshall be started from 01.

COMPANY ’s Requisition/PO Structure

Prefix – Plant Code – Material Class Code – Increment Number - Suffix

(1) (2) (3) (4) (5)

Sample :

(1) PrefixThe prefix is a 4 digit alpha series, JJCI. The first digit "J" designates project name(JAZAN). The second digit "J" designates the material destination (Job Site). The

third and fourth digits "CI" indicate Contractor import; for In-Kingdom procuredmaterials, use "IK"

Requisition/POPrefix

Plant No. MaterialClass

Requisition/POIncrement No.

Suffix

JJCI J05 32 W285 DA

Page 18: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 18/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

18 of 24

(2) Plant CodeThe plant Number is a standard Saudi Aramco code designating the Plant as belowtable. Note: Where material on one PO is to be used in multiple locations thedesignation M98 is used.

Plant Number Plant Description

J05 CDU, VDUJ70 PiperackJ77 FlareM98 Common Area

(3) Material Class CodeThe material Class Code is a standard Saudi Aramco Materials System (SAMS)code for the class of material. Please refer to Appendix 3 (COMPANY ’s MaterialClass Code).

(4) Increment NumberThe increment number series assigned for this project is detailed in the table below.The series is unique for each class of material within a plant. Additional incrementnumbers will be provided from the Company.

PlantNumber Plant Description Increment # ’s

J05 CDU, VDU W285 - 359J70 Piperack W285 - 359J77 Flare W285 - 359M98 Common Area W285 - 359

(5) SuffixThe Suffix Indicator, a 2-alpha code beginning with D, is used to indicate shippingconsignment number against a specific requisition; DA indicates the firstconsignment, DB the second, etc.

3.1.6 Naming Convention

3.1.6.1 P&ID drawing names and numbers shall comply with section 5 of Aramco standardSAES-A-202 and shall be specified by the Process Discipline.

Page 19: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 19/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

19 of 24

3.1.6.2 Pipe Run Tag Naming Convention

Line Number: The Line Size is indicated by up to five digits followed by the inchsymbol. All nominal line sizes are expressed in inches even on metric drawings.Specification codes are per SAES-L-105 .

Example: 1-1/2"-CWS-1058-ICSIZ

The field mappings to the equivalent SPPID properties are as shown below:

XXXXXX – XXX-XXXX-XXXXXX

Nominal DiameterFluid CodeTag Seq NoPiping Material Class

3.1.6.3 Equipment Tag Naming Convention

Each equipment tag is unique for a specific piece of equipment or an associated itemwithin each plant and consists of 8 to 10 characters in length, excluding dashes asfollows:

Example #1: J05-F-1110 (8 characters)Example #2: J05-D-0141B (9 characters)Example #3: J05-210-GM-0311A (10 characters)

The field mappings to the equivalent SPPID properties are as shown below:

XXX – XX - XXXX-X

Plant Number(SPPID Area Name)Tag PrefixTag Seq NoTag Suffix

3.1.6.4 Instrument and Loop Tag Naming Convention

Following examples explain Instrument Tagging:

Page 20: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 20/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

20 of 24

LIC-1008FIT-1025

The field mappings to the equivalent SPPID properties are as shown below:

XXX – XXXXXX - XXXX-XX

Plant Number(SPPID Area Name)Instrument Identifier(Measured Variable Code + Instr. Type ModifierTag Seq NoTag Suffix

Instrument loop tag is formatted as:

uu – vvv - nnnnss

where:uuu - Unit numbervvv - Instrument Measured Variablennnn - Instrument Tag Sequence Numberss - Loop Tag Suffix

3.1.7 Revision Number

3.1.7.1 Requisition, Execution Plan, Procedure and Manual

The serial revision number (i.e., A, B, C, D, etc.,) will be used before COMPANYapproval.

If the documents have been approved by COMPANY or no comment, the nextrevision number shall be “00 ” for Final.

3.1.7.2 Drawing (PFD, P&ID, Plot Plan, Data Sheets ….)

Page 21: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 21/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

21 of 24

Revisions to non-certified drawings are considered developmental. Alpha charactersfor new drawings, i.e., A, B, C, D, etc.

After Company approval of alpha characters for drawings, the next revision numbershall be “0” for Construction.

The first certified and approved issue (As-Built Stage) of a new drawing shall berevision “00”.

Full numeric revision numbers (i.e., 01, 02, 03, etc.) are assigned to 100% fieldverified As-Built, cancelled drawings, face sheets and the drawings whose Plant

number has been changed.

3.1.7.3 Specifications and Calculations

The serial revision number (i.e., A, B, C, D, etc.,) will be used before COMPANYapproval.

If the documents have been approved by COMPANY or no comment, the nextrevision number shall be “0” for Construction.

3.2 DOCUMENT CONTROL

Refer to Document Control Procedure (Document No. : PE-003).

3.3 VENDOR DOCUMENT CONTROL

Refer to Vendor Prints Control Procedure (Document No. : PE-004).

3.4 FINAL DOCUMENTATION

The final documents shall follow SAEP-122.

4. ATTACHMENTS

Attachment #1. Letter Format (2 sheets) Attachment #2. Transmittal Format (2 sheets) Attachment #3. Minutes of Meeting (MOM) Format (2 sheets)

Attachment #4. Action Item List (1 sheet) Attachment #5. Technical Query Format (2 sheet)

Page 22: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 22/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

1 of 2

Appendix 1. Discipline Category Code for Specifications, Calculation Sheets andOthers

Process 10 : Equipment List11 : Line List12 : Summary17 : Cause and Effect Diagram18 : Operating Manual19 : General

Civil 20 : General Specification (including design criteria)21 : Site Survey Report22 : Geotechnical Investigation Report23 : Drainage calculation24 : Pile system Design(or Soil improvement design)25 : Equipment Foundation Calculations26 : Pipe Rack Calculations(with foundation)27 : Steel Structure Calculations(with foundation)28 : Concrete structure Calculations(box culvers, etc)29 : Others

Architecture 30 : Structural Calculation31 : General

Mechanical 40 : Mechanical General41 : Towers & Vessels42 : Tanks, Bins and Totes43 : Heat Exchangers (All types)44 : Fired Equipment45 : Pumps46 : Compressors, Blowers, Fans and Turbines47 : Packaged Equipment

48 : MiscellaneousPiping 50 : Piping General Specification

51 : Piping Material Specification52 : Insulation Specification53 : Purchase Specification54 : Construction55 : Piping Calculation

(Stress Analysis Report, Wall Thickness, Surge, etc)57 : HVAC & Plumbing Specification and Calculation58 : 3D Model59 : Others

Electrical 60 : General Specification61 : Electrical System Study & Calculation

Page 23: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 23/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

2 of 2

62 : Equipment Specification63 : Datasheet64 : Others

Instrument 70 : General Specification71 : Index & List72 : Instrument Data Sheet73 : Instrument Calculation75 : Alarm and Trip Settings77 : Others

Fire Fighting 80 : Design Basis for Fire Fighting System/Design HSE 81 : Maximum Firewater Demand Calculation

82 : Hydraulic Calculation83 : Dike Height Calculation84 : HAZOP & SIL85 : Others

General 91 : Lubricants List92 : Spare Parts List93 : Training Education Program

94 : Start-up & Commissioning Procedure95 : Inspection & Test96 : Report

Page 24: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 24/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

1 of 37

Appendix 2. Requisition Type

# 1 ARCHITECTURE

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

ARCHIECTURE AA ARCHITECTURALGENERAL

AA000 ARCHITECTURAL GENERAL

AA100 PEB(PRE-ENGINEERED BUILDING)

AA200 BLAST DOOR

AA900 OTHERS (ARCHIECTURE)

# 2 CIVIL & STRUCTURAL

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

CIVIL &STRUCTURAL

CA CIVIL CA000 CIVIL GENERAL

CA100 PILE

CA200 ANCHOR BOLT

CA300 CONCRETE

CA400 REBAR

CA900 OTHERS

CB STEELSTRUCTURE

CB000 STEEL GENERAL

CB100 STEEL STRUCTURE

CB200 GRATING

CB900 OTHERS(Bolts and nuts, etc)

# 3 LAB, CHEMICAL& CATALYST

Discipline Material Category REQ. NO Req. Description Unit ofMeasureLAB,CHEMICAL&CATALYST

LA CHEMICAL &CATALYST

LA000 CHEMICAL & CATALYST GENERAL

LA100 CATALYST

LA200 PACKING MATERIAL

LA300 SPECIALITY CHEMICAL

LA400 COMMODITY CHEMICAL

LA900 OTHERS

LB LABORATORY LB000 LABORATORY EQUIPMENT GENERAL

LB100 LABORATORY EQUIPMENT

Page 25: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 25/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

2 of 37

#4 MECHANICALNOTE: The highlighted columns in yellow are to be commonly used for Mechanical MR.

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MECHANICAL MA MECHANICALGENERAL MA000 MECHANICAL GENERAL

MA100 PAINTING, COATING & LINING

MA200 INSULATION & REFRACTORY

MA300 MATERIAL & WELDING

MA400 SEAL & GASKET

MA500 VIBRATION & NOISE

MA600 LUBRICANT & BEARING

MA700 WORK SHOP EQUIPMENT

MA800 PLATFORM & LADDER

MA900 OTHERS

MB TOWER,VESSEL,REACTORGROUP

MB000 TOWER, VESSEL, REACTOR GROUP

MB100 COLUMNS

MB110 COLUMNS(NOV.)

MB120 S.S

MB130 LOW ALLOY

MB140 COLUMNS(NOV.)

MB150 LINED

MB160 NON-FERROUS

MB190 OTHERS

MB200 REACTORS

MB210 C.S

MB220 S.S

MB230 LOW ALLOY

MB240 CLADDED

MB250 LINED

MB260 NON-FERROUS

Page 26: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 26/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

3 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MB290 OTHERS

MB300 PRESSURE VESSEL(I)_CS

MB310 PRESSURE VESSEL(II)_CS

MB320 PRESSURE VESSEL(III)

MB330 PRESSURE VESSEL(IV)

MB340 PRESSURE VESSEL(NOV.)

MB350 LINED

MB360 NON-FERROUS

MB390 OTHERS

MB400 NON CATEGORY VESSEL(I)

MB410 NON CATEGORY VESSEL(II)

MB420 S.S

MB430 LOW ALLOY

MB440 CLADDED

MB450 LINED

MB460 NON-FERROUS

MB490 OTHERS

MB500 STEEL STACK

MB510 SELF SUPPORTED

MB520 DERRICK

MB530 GUY WIRED

MB590 OTHERS

MB600 COLUMNS INTERNALS(NOV.)

MB610 COLUMNS INTERNALS

MB620 BUBBLE CAP TRAY

MB630 VALVE TRAY

MB640 RANDOM PACKING

MB650 STRUCTURE PACKING

Page 27: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 27/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

4 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MB690 OTHERS

MB700 DUCT

MB800 (BLANK)

MB900 OTHERS

MB910 FRP Tank(Sewage lift station)

MB990 OTHERS

MC FIELD FAB.EQUIPMENTGROUP

MC000 FIELD FAB. EQUIPMENT GROUP

MC100 FIELD TANK

MC200 FLOATING ROOF TANK

MC210 SINGLE DECK

MC220 DOUBLE DECK

MC290 OTHERS

MC300 DOME ROOF TANK

MC310 ALUMINUM DOME

MC390 OTHERS

MC400 CRYOGENIC TANK

MC500 SPHERICAL TANK

MC510 ASME SECT. VIII, DIV.1

MC520 ASME SECT. VIII, DIV.2

MC530 A.D CODE

MC590 OTHERS

MC600 SHOP TANK

MC610 C.S

MC620 S.S

MC630 ALUMINUM

MC690 OTHERS

MC700 TANK ACCESSORIES

MC710 INTERNAL FLOATING COVER

Page 28: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 28/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

5 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MC720

GAGE HATCH / BREATHER VALVE /EMERGENCY MANHOLE COVER /FLAME ARRESTER FLOATINGSKIMMER

MC730 FLOATING SKIMMER

MC740 TANK DRAIN SYSTEM

MC750 TANK SEAL SYSTEM

MC790 OTHERS

MC800 BIN & SILO ACCESSARIES

MC810 AIR KNOCKER

MC820 VIBRATING ACTUATOR

MC890 OTHERS

MC900 OTHERS

MD HEAT

EXCHANGERGROUP

MD000 HEAT EXCHANGER GROUP

MD100 SHELL & TUBE TYPE

MD110 S&T HEAT EXCHANGER(I)_CS

MD120 S&T HEAT EXCHANGER(II)

MD130 S.S (T) / S.S (S)

MD140 LOW ALLOY (T) / C.S (S)

MD150 NON FERROUS (T/S)

MD190 OTHERS

MD200 PLATE,SPIRAL,PANEL,DOUBLEPIPETYPE &ELECTRIC

MD210 PLATE TYPE

MD220 MULTI-TUBE HAIR PIN H/E

MD230 PANEL TYPE

MD240 SPIRAL TYPE

MD250 BLOCK TYPE

MD260 BAYONET TYPE H/E

MD270 BREECH LOCK TYPE

MD280 ELECTRIC HEATER

Page 29: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 29/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

6 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MD290 OTHERS

MD300 AIR COOLED H/EX

MD310 SURF. AREA (BELOW 1000m2)

MD320 SURF. AREA (1000 - 5000 m2)

MD330 SURF. AREA (5000 - 10000 m2)

MD340 SURF. AREA (10000-20000 m2)

MD350 SURF. AREA (20000-40000 m2)

MD360 SURF. AREA (ABOVE 40000m2)

MD370 CCR REGENERATION COOLER

MD390 OTHERS

MD400 DEAERATOR

MD410 CAP. (BELOW 10 m3/hr)

MD420 CAP. (10 - 20 m3/hr)

MD430 CAP. (20 - 50 m3/hr)

MD440 CAP. (50 - 100 m3/hr)

MD450 CAP. (ABOVE 100 m3/hr)

MD490 OTHERS

MD500 AIR & GAS HEATER / ECONOMIZER

MD510 GAS & AIR HEATER (Air Pre Heater,Gas/Gas Heater. Etc.)

MD520 STEAM AIR HEATER

MD530 ECONOMIZER

MD540 B.S CODE

MD590 OTHERS

MD600 COOLING TOWER

MD610 CAP. (BELOW 500 m3/hr)

MD620 CAP. (500 - 1000 m3/hr)

MD630 COOLING TOWER

MD640 CAP. (3000 - 5000 m3/hr)

Page 30: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 30/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

7 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MD650 CAP. (ABOVE 5000 m3/hr)

MD690 OTHERS

MD700 SURFACE CONDENSER

MD800 BRAND NAMED HEAT EXCHANGER

MD810 PACKINOX HEAT EXCHANGER

MD820 ABB(HELIX) HEAT EXCHANGER

MD830 BROWN FIN TUBE(TWISTED) HEATEXCHANGER

MD890 OTHERS

MD900 OTHERS

MD910 CRYOGENIC HEAT EXCHANGER

MD990 OTHERS

ME FIRED HEATER& BOILER

GROUP

ME000 FIRED HEATER & BOILER GROUP

ME100 FIRED HEATERS

ME110 PROCESS HEATER

ME120 HYDROGEN REFORMER

ME130 CRACKING FURNACE

ME140 HOT OIL HEATER

ME150 INDIRECT HEATER

ME190 OTHERS

ME200 FIRED BOILER

ME210 OIL & GAS BOILER

ME220 COAL BOILER

ME230 WASTE HEAT RECOVERY BOILER

ME240 HEAT RECOVERY STEAMGENERATOR

ME290 OTHERS

ME300 THERMAL OXIDIZER

ME310 FURNACE (including ThermalOxydizer)

ME320 SOLID WASTE INCINERATOR

Page 31: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 31/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

8 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

ME330 LIQUID WASTE INCINERATOR

ME390 OTHERS

ME400 (BLANK)

ME500 FIRED DRYERS & KILNS

ME510 DRYER

ME520 KILN

ME590 OTHERS

ME600 BURNERS

ME610 OIL BURNER

ME620 GAS BURNER

ME630 GAS/OIL COMBINATION

ME690 OTHERS

ME700 FLARE SYSTEM

ME710 SELF SUPPORTED

ME720 DERRICK

ME730 GUY WIRED

ME740 BURN PIT

ME750VAPOR DISPOSAL SYSTEM (FiredType only, Absorber & Adsorber Typeto be MJ610)

ME790 OTHERS

ME800 (BLANK)

ME900 OTHERS

MF PUMP GROUP MF000 PUMP GROUP

MF100 CENTRIFUGAL PUMPS(HORIZONTAL)

MF110 API PUMPS(OH2)

MF120 API PUMPS(BB)

MF130 API - MULTI-STAGE

MF140 NON-API CENTRIFUGAL PUMPS(OH)

MF150 INDUSTRIAL - OVERHUNG

Page 32: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 32/72

Page 33: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 33/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

10 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MF600 FIRE FIGHTING PUMPS

MF610 HORIZONTAL - MOTOR DRIVEN

MF620 HORIZONTAL - ENGINE DRIVEN

MF630 VERTICAL - MOTOR DRIVEN

MF640 VERTICAL - ENGINE DRIVEN

MF690 OTHERS

MF700 SPECIAL SERVICE PUMP

MF710 BOILER FEEDWATER PUMP

MF720 CRYOGENIC PUMP

MF790 VERT. SULFUR PUMPS

MF800 MOTOR, REDUCER & COUPLING

MF900 OTHERS

MF910 OIL MIST LUBE-OIL SYSTEM

MF920 FORCED LUBE-OIL SYSTEM

MG COM-PRESSORGROUP

MG000 COMPRESSOR GROUP

MG100 CENTRIFUGAL GAS COMPRESSOR

MG110 CENT. COMPRESSOR(NOV.)

MG120 AXIAL

MG130 INTEGRALLY GEARED

MG190 OTHERS

MG200 RECIPROCATING GAS COMPRESSOR

MG300ROTARY POSITIVE DISPLACEM’T

GAS COMPRESSOR

MG310 SCREW COMPRESSOR

MG320 ROOTS

MG330 LIQUID RING COMPRESSOR

MG340 VANE

MG390 OTHERS

MG400 AIR COMPRESSOR

Page 34: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 34/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

11 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MG410 INST. AIR COMP. PKG

MG420 RECIPROCATING

MG430 ROTARY POSITIVE DISPLACEMENT

MG490 OTHERS

MG500 FAN & BLOWER

MG510 BLOWER (API 617)

MG520 FAN (API 560)

MG530 ROOTS BLOWER

MG540 VENTILLATION FAN

MG550 HOT BLOWER (CCR Blower)

MG590 OTHERS

MG600STEAM TURBINE & GENERATORS(Steam Turbine Driven Compressor-To Follow Compressor Code)

MG610 STM TURBINE GENERATOR

MG620 STM TURBINE (Drive Only)

MG690 OTHERS

MG700 GAS TURBINE & GENERATORS

MG710 GAS TURBINE GENERATOR

MG720 GAS TURBINE (Drive Only)

MG730 TURBO-EXPANDER GENERATOR

MG740 TURBO-EXPANDER (Drive Only)

MG790 OTHERS

MG800 ENGINE GENERATORS

MG810 ENGINE GENERATOR(for Cogeneration)

MG820 EMERGENCY ENGINE GENERATOR(by Elec. Team)

MG890 OTHERS

MG900 OTHERS

MH SPECIAL MH000 SPECIAL PACKAGE GROUP

Page 35: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 35/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

12 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

PACKAGEGROUP MH100 MIXING UNIT

MH110 TOP/BOTTOM ENTRY AGITATOR

MH120 SIDE ENTRY AGITATOR

MH130 STATIC MIXER

MH140

JET MIXER (Including Mixing

Eductor, Sparger, Aeration Nozzleetc.)

MH190 OTHERS

MH200 SEPARATION SYSTEM

MH210 INST. AIR DRYER PKG

MH220 GAS & LIQUID DEHYDRATION UNIT(including Liquid Propane Drier)

MH230 GAS & AIR SEPARATION UNIT (P.S.A)

MH240 GAS & AIR SEPARATION UNIT(Cryogenic Type)

MH250 FLARE GAS RECOVERYPACKAGE

MH260 ELECTRO-STATIC DESALTER

MH270 MERCURY REMOVAL UNIT

MH290 MEG RECLAMATION PKG

MH300 SOLID PRODUCTION & SEPARATIONSYSTEM

MH310 EXTRUDER

MH320 PELLETIZER

MH330 FLAKER

MH350 CYCLONE SEPARATOR

MH360 CENTRIFUGE / DECANTER

MH390 OTHERS

MH400 REFRIGERATION SYSTEM

MH410 COMPRESSOR TYPE

MH420 ABSORPTION TYPE

MH490 OTHERS

MH500 CHEMICAL INJECTION SYSTEM

Page 36: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 36/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

13 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MH510 CHEMICAL INJECTION PKG

MH520GAS CHLORINATION SYSTEM(Hypo-chlorination-4751,Electrochlorination-4842)

MH590 OTHERS

MH600 DESUPERHEATER / PRESSURE LET-DOWN SYSTEM

MH610 DESUPER HEATER

MH620PRESS. LET-DOWN &DESUPERHEATING SYSTEM(including Turbine Bypass System)

MH690 OTHERS

MH700 VACUUM SYSTEM, EJECTOR,EDUCTOR

MH710 EJECTOR

MH720 VACUUM SYSTEM - EJECTOR

MH730 VACUUM SYSTEM - VACUUM PUMP

MH740 VACUUM SYSTEM - HYBRID TYPE

MH790 OTHERS

MH800 FILTER & COALSCER

MH810 FILTER

MH820 COALESCER

MH830 SELF-CLEANING FILTER (Auto-Strainer)

MH840 CARBON FILTER

MH890 OTHERS

MH900 OTHERS

MH910 NITROGEN GENERATION/VAPORIZATION PKGS

MH920 CONDENSER TUBE CLEANINGSYSTEM (Ball Re-circulation Type)

MH990 PROPANE REFRIGERANTPURGER(SAMPLER)

MJ WATERTREATMENT &ENVIRON-

MENTALEQUIPMENTGROUP

MJ000 WATER TREATMENT & ENVIRON-MENTAL EQUIPMENT GROUP

MJ100 WATER TREATMENT SYS.

MJ110 CLARIFIER / THICKENER

Page 37: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 37/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

14 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MJ120 SOFTENER

MJ130 DEMI-WATER SYSTEM IONEXCHANGER TYPE

MJ140 DEMI-WATER SYSTEM ( RO TYPE)

MJ150 CONDENSATE TREATMENT SYSTEM

MJ160 RO WATER TREAT. PKG

MJ190 MBD WATER POL. PKG

MJ200 SEWAGE TREAT. PKG

MJ210 API SEPARATOR

MJ220 CPI PACKAGE

MJ230 DAF

MJ240 BIOLOGICAL TREATMENT

MJ250 OIL SKIMMER

MJ290 R.W./ H2S STRIP. PKG

MJ300 FLUE GAS TREATMENT / ANTI-AIRPOLUTION

MJ310 BAG FILTER

MJ320 ELECTRO-STATIC PRECIPITATOR(EP)

MJ330 SELECTIVE CATALYST REACTOR(SCR-NOx Removal)

MJ340 SELECTIVE NON-CATALYSTREACTOR (SNCR-NOx Removal)

MJ350 WET SCRUBBER (Wet Type SOx

Removal)MJ360 DRY INJECTOR (Dry Type SOx

Removal)

MJ390 OTHERS

MJ400 SEA WATER TREATMENT

MJ410SEA WATER INTAKE SYSTEM(Traveling Screen / Coarse Screen /Stop Gate)

MJ420 ELECTRO-CHLORINATION SYSTEM

MJ490 OTHERS

MJ500 DE-WATERING

MJ510 FILTER PRESS

Page 38: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 38/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

15 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MJ520 BELT FILTER PRESS

MJ530 VACUUM PRECOAT FILTER

MJ590 OTHERS

MJ600 ODOR REMOVAL SYSTEM

MJ610ODOR REMOVAL SYSTEM (Absorber& Adsorber Type including WasteTreatment Vapor Removal System)

MJ690 OTHERS

MJ700 NOISE / VIBRATION PROTECTION

MJ710 SILENCER

MJ720 ACOUSTIC ENCLOSURE

MJ790 OTHERS

MJ800 (BLANK)

MJ900DRINKING WATER CHEMICAL TREAT.PKG.

MK MATERIALHANDLINGEQUIPMENTGROUP

MK000 MATERIAL HANDLING EQUIPMENTGROUP

MK100 O/H CRANE & HOIST

MK110 OTC (DOUBLE GIRDER)

MK120 OTC (SINGLE GIRDER)

MK130 MONORAIL HOIST

MK140 AIR HOIST

MK150 MOBILE CRANE

MK160 CHAIN HOIST & TROLLEY

MK190 OTHERS

MK200 ELEVATOR & LIFTER, CRUSHER &SCREEN

MK210 ELEVATOR

MK220 LIFTER

MK250 MILL / CRUSHER / GRINDER /SHREDDER

MK260 VIBRATING SCREEN

MK290 OTHERS

Page 39: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 39/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

16 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

MK300 CONVEYOR & FEEDER

MK310 BELT CONVEYOR

MK320 SCREW CONVEYOR

MK330 CHAIN CONVEYOR

MK340 BUCKET ELEVATOR

MK350 VIBRATING CONVEYOR

MK360 ROTARY FEEDER

MK370 SLIDE GATE

MK390 OTHERS

MK400 PNEUMATIC TRANSFER SYSTEM

MK410 PNEUMATIC CONV. SYSTEM

MK420 ACCESSORIES

MK480 SLIDE VALVE

MK490 OTHERS

MK500 WEIGHING, BAGGING & PALLETIZINGSYSTEM

MK510 TRUCK SCALE

MK520 BAGGING MACHINE

MK530 PACKING MACHINE

MK540 PALLETIZING MACHINE

MK550 MAGNETIC SEPARATOR

MK590 OTHERS

MK600 STORAGE AUTOMATION & LOADINGARM

MK610 LOADING RACK C/W L.A

MK620 MARINE LOADING ARM

MK630 STORAGE AUTOMATION

MK690 OTHERS

MK700 COAL HANDLING SYS.

MK800 ASH HANDLING SYS.

Page 40: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 40/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

17 of 37

# 5 PIPING

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

PIPING PA PIPESPA000 PIPE GROUP

PA110 CS SMLS PIPE

PA120 CS WELED(EFW & SAW) PIPE

PA130 CS WELDED(ERW) PIPE)

PA210LOW & INTERMEDIATE ALLOY STEELSMLS PIPE

PA220 LOW & INTERMEDIATE ALLOY STEELWELDED PIPE

PA310 SS SMLS PIPE

PA320 SS WELDED PIPE

PA410 NICKEL ALLOY PIPE

PA500 COPPER & COPPER ALLOY PIPING

PA600 CAST & DUCTILE IRON PIPING

PA900 PIPE OTHERS

PA910 CLAD PIPE

PB FITTINGS PB000 FITTING GROUP

PB100 FORGED FITTINGS

PB200 WROUGHT FITTINGS

PB300 PIPE BEND

PB400 NICKEL ALLOY FITTINGS

PB900 FITTING OTHERS

PC FLANGES PC000 FLANGE GROUP

PC100 FLANGES

PC400 NICKEL ALLOY FLANGES

PC900 FLANGE OTHERS

PD VALVES PD000 VALVE GROUP

PD100 FORGED STEEL VALVES

PD200 CAST STEEL VALVES

PD210 KNIFE GATE VALVES

PD300 BALL VALVES

PD400 PLUG VALVES

PD500 BUTTERFLY VALVES

Page 41: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 41/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

18 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

PD600 WAFER CHECK VALVES

PD700 COPPER ALLOY BRONZE VALVES

PD800 CAST & DUCTILE IRON VALVES

PD900 NON-METALLIC VALVES

PE SPECIALVALVES PE000 SPECIAL VALVE GROUP

PE100 BLOW-DOWN VALVEPE200 SPECIAL CHECK VALVE

PE210 NON-SLAM CHECK VALVE

PE220 CIRCLE SEAL CHECK VALVE

PE230 PISTON LIFT CHECK VALVE

PE240 FOOT VALVE

PE300 STOP VALVES

PE400 SPECIAL NEEDLE VALVE

PE500 SPECIAL BALL VALVE

PE600 DIAPHRAGM VALVE

PE700 RAM PISTON VALVE

PE800 AUTOMATIC RECIRCULATION VALVE

PE900 VALVE OTHERS

PF GASKET, BOLT& NUTS

PF000 GASKET GROUP

PF100 GASKETS

PF200 ISOLATION KITS

PF500 BOLT & NUTS

PL LINED PIPING PL000 LINED PIPING GROUP

PL110 CS INTERNAL RUBBER LINED PIPING

PL120 CS INTERNAL PE LINED PIPING

PL130 CS INTERNAL PP LINED PIPING

PL140 CS INTERNAL CEMENT MORTARLINING PIPING

PL150 FBE COATING (EXCLUDING SUPPLY,FABRICATION)

PL160 CS INTERNAL LIQUID EPOXYCOATED PIPING

PL170 CS INTERNAL TEFLON LINED PIPING

Page 42: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 42/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

19 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

PL190 LINED OTHERS

PN NON-METALPIPING PN000 NON-METAL PIPING GROUP

PN100 GRP PIPING

PN200 PE PIPING

PN300 PP PIPING

PN400 PVC PIPINGPN500 CPVC PIPING

PN900 NON-METAL OTHERS

PS SPECIAL ITEMS PS000 SPECIAL ITEM GROUP

PS100 STRAINERS

PS200 STEAM TRAP & STEAM MANIFOLD

PS300 SAMPLE COOLER & CLOSEDSAMPLING SYSTEM

PS350 CCR CATALYST SAMPLER SYSTEM(UOP)

PS400 SAFETY SHOWER & EYE WASH

PS500 FLEXIBLE HOSE & QUICKCOUPLINGS

PS550 DUR-O-LOK COUPLINGS (UOP)

PS600 MECHANICAL KEY INTERLOCKSYSTEM

PS650 CHAIN WHEELS

PS700 SPRAY NOZZLES

PS710 STEAM SAMPLING NOZZLES

PS720 STEAM LANCERS

PS750 DRIP FUNNELS

PS760 AERATION DIFFUSER

PS800 INSULATOR & END SEAL

PS900 SPECIALTY OTHERS

PT TUBING PT100 TUBE

PT200 TUBE FITTING

PT300 PRE-INSULATED TUBE & TUBEFITTING

PU UG PIPING PU000 U/G PIPING GROUP

PU100 U/G CS EXTERNAL COATED PIPING

Page 43: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 43/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

20 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

PU200 FBE COATING (EXCLUDING SUPPLY,FABRICATION)

PU300 U/G CS EXTERNAL COATEDWROUGHT FITTING

PU400 U/G POST INDICATOR VALVE

PU500 U/G COATING & WRAPPINGMATERIAL

PU900 U/G OTHERS

PX SPECIALSUPPORTS

PX000 SPECIAL SUPPORT GROUP

PX100 COLD SUPPORT

PX200 SPRING HANGER SUPPORT

PX300 METAL EXPANSION JOINT

PX400 NON-METAL EXPANSION JOINT

PX500 RUBBER EXPANSION JOINT

PX600 HOLD DOWN SUPPORT

PX700 SNUBBER

PX900 SUPPORT OTHERS

Page 44: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 44/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

21 of 37

# 6 ELECTRICAL

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

ELECTRICAL EA POWERINCOMIMGSYSTEM

EA000 POWER INCOMING SYSTEM

EA100 PYLON / TOWER

EA200 CONCRETE POLE & ACCESSORIES

EA300 INSULATOR

EA400 CABLE & ACCESSORIES

EA500 EQUIPMENT (M.O.F)

EB ELECTRICALEQUIPMENT EB000 ELECTRICAL EQUIPMENT

EB100 PACKAGED TYPE SUBSTATION

EB200 EHV SYSTEM

EB210 GIS & OTHERS

EB220 EHV CONVENTIONAL TYPE SYSTEM

EB300 SWGR & MCC

EB310 H.V SWGR

EB320 M.V SWGR & MCC

EB330 L.V SWGR & MCC

EB340 DIST. PANEL BOARD & OTHERS

EB350 BUS DUCT

EB360 POWER CAPACITOR

EB370 NEUTRAL GROUND RESISTER (NGR)

EB380 VSD / AVR & SOFT STARTER

EB390 SCADA SYSTEM (ECP, ECMS,CONTROL DESK, ETC.)

EB400 AC & DC SYSTEM

EB410 UPS

EB420 BATTERY CHARGER

EB430 BATTERIES

EB500 TRANSFORMER

Page 45: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 45/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

22 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

EB600 EMERGENCY DIESEL ENGINEGENERATOR

EC CONDUIT &FITTING EC000 CONDUIT & FITTING

EC100 STEEL CONDUIT PIPE

EC200 PVC CONDUIT PIPE

EC300 ALUMINIUM CONDUIT PIPE

EC400 PVC COATING CONDUIT & ELPCONDUIT

EC500 CABLE GLAND

EC600 WEATHER PROOF & EXPLOSIONPROOF & BULK MATERIAL

EC700

GENERAL PURPOSE TYPE BULKMATERIAL FOR INDOOR USE(CONVENIENCE RCPT, BOX, SWITCH,ETC.)

ED CABLE TRAY &FITTING

ED000 CABLE TRAY & FITTING

ED100 LADDER TYPE

ED200 SOLID TYPE

ED300 DUCT TYPE

ED400 PERPORATE TYPE

EE CABLE & WIRE EE000 CABLE & WIRE

EE100 HV CABLE, NON-ARMOURED TYPE

EE150 HV CABLE, ARMOURED TYPE

EE200 MV CABLE, NON-ARMOURED TYPE

EE250 MV CABLE, ARMOURED TYPE

EE300 LV CABLE, NON-ARMOURED TYPE

EE350 LV CABLE, ARMOURED TYPE

EE400 CONTROL CABLE, NON-ARMOUREDTYPE

EE450 CONTROL CABLE, ARMOURED TYPE

EE500 WIRE (IV, GV, BC, HIV)

EE600 SPECIAL CABLE & COMMUNICATIONCABLE(FIBER OPTICAL, COAXIAL)

EE700 TERMINATION & SPLICING KIT

EF LIGHTINGFIXTURE, EF000

LIGHTING FIXTURE, RECEPTACLE &PBS ETC.

Page 46: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 46/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

23 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

RECEPTACLE &PBS ETC. EF100 WEATHER PROOF & EX-P TYPE

LIGHTING FIXTURE

EF200 ELECTRICAL DEVICE (PBS, WELDINGRECEPTACLE, & ETC.)

EF300 WELDING RECEPTACLE

EF400 CONVENIENCE RCPT (EXCEPTINDOOR USE)

EF500 CONTROL SWITCH STATION (PBS)EF600 TUMBLER SWITCH (EXCEPT INDOOR

USE)

EF700 PANEL BOARD

EF710 PANEL BOARD GENERAL TYPE

EF720 PANEL BOARD EXPLOSION-PROOFTYPE

EG COMMUNI-CATION SYSTEM EG000 COMMUNICATION SYSTEM

EG100

Public Address and General AlarmSystem

- In-Plant Communication System

EG310CCTV SYSTEM

- Process CCTV System

EG500 TELEPHONE Network SYSTEM

EG600

Data Communication System– Data Network System

- Wireless LAN

- Network Management System

EG700 Mobile RADIO SYSTEM

EH GROUNDING EH000 GROUNDINGEH100 GROUNDING MATERIAL

EH200 LIGHTNING PROTECTION MATERIAL

EJ SUPPORTMATERIAL

EJ000 SUPPORT MATERIAL

EJ100 UNISTRUT CHANNEL

EJ200 STEEL ANGLE

EJ300 C-CHANNEL

EJ400 STEEL PLATE

EXELECTRICALHEAT TRACINGSYSTEM

EX100 ELECTRICAL HEAT TRACINGSYSTEM

Page 47: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 47/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

24 of 37

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

EX200 EHT PANEL

EX210 GENERAL TYPE

EX220 EXPLOSION-PROOF TYPE

EYCATHODICPROTECTIONSYSTEM

EY100 CATHODIC PROTECTION SYSTEM

Page 48: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 48/72

Page 49: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 49/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

26 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NA590 OTHERS

NA610SCADA (Supervisory Control and Data

Acquisition)

NA620MTU / RTU (Master Terminal Unit /

Remote Terminal Unit)

NA690 OTHERS

NA710 LCP (Local Control Panel)

NA790 OTHERS

NA810CRCS (Catalyst Regeneration Control

System)

NA820ACCS (Adsorbent Chamber Control

System)

NA890 OTHERS

NA910 CORROSION MONITORING SYSTEM

NA920 BLENDING SYSTEM

NA930 OPTIMIZER SYSTEM

NA940 BAS (Berth Aid System)

NA990 STEAM TRAP MONITORING SYSTEM

NB FLOW

INSTRUMENTS NB000 FLOW INSTRUMENT GROUP

NB110 ORIFICE

NB120 INTEGRAL ORIFICE

NB130 FLOW NOZZLE

NB140 VENTURI TUBE

NB150 ANNUBAR & PITOT TUBE

NB190 OTHERS

Page 50: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 50/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

27 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NB210 FLUMES

NB220 WEIR

NB230 WEDGE

NB240 ELBOW TAP

NB250 V-CONE METER

NB290 OTHERS

NB310 TURBINE FLOWMETER

NB320 P/D METER

NB330 MAGNETIC FLOWMETER

NB340 VORTEX FLOWMETER

NB350 ULTRASONIC FLOWMETER

NB360 MASS FLOWMETER (CORIOLIS)

NB370 THERMAL MASS FLOWMETER

NB390 OTHERS

NB410 ROTAMETER

NB420 PURGE SET

NB430 SIGHT FLOW GLASS

NB490 OTHERS

NB510 FLOW SWITCH (PADDLE TYPE)

NB520 FLOW SWITCH (THERMAL TYPE)

NB590 OTHERS

NB610 CUSTODY METERING

Page 51: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 51/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

28 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NB690 OTHERS

NB790 OTHERS

NC LEVEL

INSTRUMENTSNC000 LEVEL INSTRUMENT GROUP

NC110 TANK GAUGING SYSTEM

NC190 OTHERS

NC210LEVEL INSTRUMENT (DISPLACEMENT

TYPE)

NC220LEVEL INSTRUMENT (GUIDED WAVE

RADAR TYPE)

NC230LEVEL INSTRUMENT (ULTRASONIC

TYPE)

NC240LEVEL INSTRUMENT (RADIATION

TYPE)NC250 LEVEL INSTRUMENT (RADAR TYPE)

NC260LEVEL INSTRUMENT (SERVO-BLANCE

TYPE)

NC270LEVEL INSTRUMENT (TANK FLOAT

TYPE)

NC280LEVEL INSTRUMENT (MAGNETIC

TYPE)

NC290LEVEL INSTRUMENT (CAPACITANCE

TYPE)

NC300LEVEL INSTRUMENT (RF ADMITTANCE

TYPE)

NC310MICROWAVE LEVEL INSTRUMENT

(AGAR PROBE)

NC390 OTHERS

NC410 LEVEL SWITCH (FLOAT TYPE)

NC420LEVEL SWITCH (VIBRATION /

CAPACITANCE / CONDUCTIVITY

Page 52: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 52/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

29 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NC430LEVEL SWITCH (RF ADMITTANCE

TYPE)

NC440 LEVEL SWITCH (THERMAL TYPE)

NC490 OTHERS

NC510

LEVEL GAUGE (REFLEX,

TRANSPARENT, MAGNETIC TYPE)

NC520 LEVEL GAUGE (TANK FLOAT TYPE)

NC590 OTHERS

NC690 OTHERS

ND PRESSURE

INSTRUMENTSND000 PRESSURE INSTRUMENT GROUP

ND110PRESSURE AND D/P TRANSMETER /

ELECTRICAL LOCAL INDICATOR

ND190 OTHERS

ND210PRESSURE GAUGE, DRAFT GAUGE,

D/P GAUGE, & MANOMETER

ND290 OTHERS

ND310 PRESSURE SWITCH

ND390 OTHERS

ND410 LOCAL PNEUMATIC CONTROLLER

ND490 OTHERS

ND590 OTHERS

NE TEMPERATURE

INSTRUMENTSNE000 TEMPERATURE INSTRUMENT GROUP

NE110THERMOMETER (BIMETALLIC TYPE)

WITH THERMOWELL

NE120THERMOMETER (CAPILLARY TYPE)

WITH THERMOWELL

Page 53: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 53/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

30 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NE190 OTHERS

NE210THERMOCOUPLE & RTD WITH

THERMOWELL

NE220 SPECIAL THERMOCOUPLE

NE290 OTHERS

NE310TEMPERATURE TRANSMITTER WITH

ELEMENT

NE390 OTHERS

NE410TEMPERATURE SWITCH WITH

THERMOWELL

NE490 OTHERS

NE510 PYROMETER

NE590 OTHERS

NE690 OTHERS

NF INSTRUMENT

VALVESNF000 INSTRUMENT VALVE GROUP

NF110 CONTROL VALVE

NF190 OTHERS

NF210 CONTROL VALVE (GLOBE TYPE)

NF220 CONTROL VALVE (BUTTERFLY TYPE)

NF230 CONTROL VALVE (V-BALL TYPE)

NF240 CONTROL VALVE (PLUG TYPE)

NF250 CONTROL VALVE (PINCH TYPE)

NF260CONTROL VALVE (SAUNDERS

DIPHRAGM TYPE)

NF270 CONTROL VALVE (SLIDING GATE

Page 54: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 54/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

31 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

TYPE)

NF290 OTHERS

NF310ON-OFF VALVE (ON-OFF, SHUTDOWN,

BLOWDOWN)

NF320 ON-OFF VALVE (BALL TYPE)

NF330 ON-OFF VALVE (BUTTERFLY TYPE)

NF340 ON-OFF VALVE (SLIDING TYPE)

NF350 ON-OFF VALVE (PISTON RAM TYPE)

NF360 ON-OFF VALVE (GATE TYPE)

NF390 OTHERS

NF410 MOTOR OPERATED VALVE

NF420MOTOR OPERATED VALVE (BALL

TYPE)

NF430MOTOR OPERATED VALVE (BUTTERFLY

TYPE)

NF440MOTOR OPERATED VALVE (GATE

TYPE)

NF490 OTHERS

NF510 PRESSURE REGULATING VALVE

NF520 TANK BLANKETING VALVE

NF590 OTHERS

NF610 AIR OPERATED VALVE (AOV)

NF690 OTHERS

NF710GAS/HYDRAULIC OPERATED VALVE

(GOV)

NF790 OTHERS

Page 55: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 55/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

32 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NF810 DIVERT VALVE

NF820 3-WAY VALVE

NF830 AUTO RECIRCULATION VALVE (ARCV)

NF890 OTHERS

NF910 SOLENOID VALVE

NF920 PISTON ACTUATOR

NF990 OTHERS

NG SAFETY

INSTRUMENTSNG000 SAFETY INSTRUMENT GROUP

NG110 PRESSURE SAFETY RELIEF VALVE

NG120 PILOT-OPERATED RELIEF VALVE

NG130PRESSURE-VACUUM RELIEF VALVE

(BREATHER VALVE)

NG140 RUPTURE DISC

NG190 OTHERS

NG210 DELUGE VALVE

NG290 OTHERS

NG310 FIRE & GAS DETECTOR

NG320 GAS DETECTOR

NG330 FIRE DETECTOR

NG390 OTHERS

NG490 OTHERS

NH ANALYZERS NH000 ANALYZER GROUP

Page 56: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 56/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

33 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NH110 ANALYZER PACKAGE SYSTEM

NH190 OTHERS

NH210 GC ANALYZER

NH220 RVP ANALYZER

NH230 HC ANALYZER

NH240 H2 ANALYZER

NH250 AIR DEMAND ANALYZER

NH260 H2S ANALYZER

NH270 TOTAL SULFUR ANALYZER

NH280 FLASH POINT ANALYZER

NH290 Hg ANALYZER

NH300 O2 ANALYZER

NH310 Ph/CONDUCTIVITY METER

NH320 MOISTURE ANALYZER

NH330 DENSITY ANALYZER

NH340 SP.GR ANALYZER

NH350 VISCOCITY ANALYZER

NH360 COLOR ANALYZER

NH370 H2SO4 ANALYZER

NH380 DISTILLATION ANALYZER

NH390 OTHERS

NH410 CEMS ANALYZER SYSTEM

Page 57: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 57/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

34 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NH420 DUST ANALYZER

NH430 SOx ANALYZER

NH440 NOx ANALYZER

NH450 CO ANALYZER

NH460 CO2 ANALYZER

NH490 OTHERS

NH510 COD ANALYZER

NH520 BOD ANALYZER

NH530 MLSS ANALYZER

NH540 DO ANALYZER

NH550 CL ANALYZER

NH590 OTHERS

NH610 AUTO SAMPLER

NH690 OTHERS

NH790 OTHERS

NJ MISCELLANEOUS

INSTRUMENTS NJ000MISCELLANEOUS INSTRUMENT

GROUP

NJ110 FIELD SIGNAL INDICATOR

NJ120 I/P TRANSDUCER

NJ130 LIMIT SWITCH

NJ140 LOCAL HAND SWITCH

NJ150 PNEUMATIC MANUAL LOADER

NJ160 PROXIMITY SENSOR

Page 58: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 58/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

35 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NJ170 TEST EQUIPMENT

NJ190 LOCAL PUSHBUTTON

NK INSTRUMENT

CABLESNK000 INSTRUMENT CABLE GROUP

NK110 INSTRUMENT CABLE

NK120 T/C EXTENSION CABLE

NK130 FIBER OPTIC CABLE

NK190 OTHERS

NL INSTRUMENT

CABLE TRAY &

FITTINGS

NL000INSTRUMENT CABLE TRAY & FITTING

GROUP

NL110 INSTRUMENT CABLE TRAY & FITTING

NL190 OTHERS

NM INSTRUMENT

JUNCTION BOXSNM000 INSTRUMENT JUNCTION BOX GROUP

NM110 INSTRUMENT JUNCTION BOX

NM190 OTHERS

NN INSTRUMENT

CONDUIT &

FITTINGS

NN000INSTRUMENT CONDUIT & FITTING

GROUP

NN110 CONDUIT PIPE FOR INSTRUMENT

NN120 CONDUTI FITTING FOR INSTRUMENT

NN130 CABLE GLAND FOR INSTRUMENT

NN140U-PVC PIPE & FITTING FOR

INSTRUMENT

NN190 OTHERS

NP INSTRUMENT NP000 INSTRUMENT PIPE & FITTING GROUP

Page 59: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 59/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

36 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

PIPE & FITTINGS NP110 PIPE (C.S) FOR INSTRUMENT

NP120 PIPE FOR INSTRUMENT

NP130 PIPE FITTING FOR INSTRUMENT

NP140 MANUAL VALVE FOR INSTRUMENT

NP150 FLANGE FOR INSTRUMENT

NP160 GASKET FOR INSTRUMENT

NP170 BOLT & NUTS FOR INSTRUMENT

NP190 OTHERS

NQ INSTRUMENT

TUBE &

FITTINGS

NQ000INSTRUMENT TUBE & FITTING

GROUP

NQ110INSTRUMENT TUBE AND TUBE

FITTING / TUBE VALVE

NQ120INSTRUMENT TUBE FITTING & TUBE

VALVE

NQ130 SEAL POT / AIR MANIFOLD

NQ190 OTHERS

NR SUPPORT

MATERIALSNR000 SUPPORT MATERIAL GROUP

NR110 STANCHION

NR120 STEEL ANGLE / CHANNEL / PLATE

NR190 OTHERS

NS OTHER MISC.

MATERIALSNS000 OTHER MISC. MATERIAL GROUP

NS110 MULTI CABLE TRANSIT

NS120 SUNSHADE

NS130 INSULATING KIT

Page 60: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 60/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

37 of 37

Discipline Material Category REQ.NO Req. Description Unit of

Measure

NS190 OTHERS

# 8 FIRE FIGHTING

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

FIRE FIGHTING- GENERAL

FA FIRE FIGHTINGSYSTEM FA000 FIRE FIGHTING SYSTEM FOR YARD

FA400FIRE FIGHITNG SYSTEM FORBUILDINGS

FA500 POST INDICATOR VALVES(UL LISTEDor FM APPROVED)

FA600 DELUGE VALVE (SKID TYPE)

# 9 HVAC

Discipline Material Category REQ. NO Req. Description Unit ofMeasure

HVAC HV HV000 HVAC

HV100 CHILLER, CONDENSING UNITS

HV200 AIR HANDLING UNITS

HV300 FANS

HV400 PUMPS

HV500 HEATERS

HV600 FILTER UNITS

HV700 HVAC CONTROL UNITS

HV800 TESTING, AIR BALANCING

HV900 HVAC OTHERS

Page 61: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 61/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A ANN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT EE PP CC 99Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential 1 of 3

Appendix 3. COMPANY ’ s Material Class CodeCLASS DESCRIPTION REMARK

01 PIPE (OTHER THAN DRILLING)

02 PIPE FITTING - FLANGED

03 PIPE FITTING - NON - FLANGED

04 VALVES

05 PLUMBLING / HEATING06 PACKING / GASKETS

07 CHAIN AND ROPES

08 HARDWARE ITEMS AND HOSES

09 BUILDING MATERIALS

10 FASTENERS, NAILS

11 FASTENERS, NAILS

12 METALS (MILL FORM) & MISCELLANEOUS METALS

13 MECHANICAL POWER TRANSMISSON

14 ELECTRICAL POWER DISTRIBUTION INSULATION15 ELECTRICAL CONDUCTORS, CONDUIT, FITTINGS

16 CIRCUIT BREAKERS, PROTECTION EQUIP, SWITCHES & WIRING

17 LIGHTING EQUIPMENT, MOTORS, GENERATORS & BATTERIES

18 COMMUNICATIONS EQUIPMENT

19 EMERGENCY STANDBY EQUIPMENT

20 WELDING EQUIPMENT

21 SAFETY, SECURITY, FIRE FIGHTING EQUIPMENT

22 MARINE & DIVING EQUIPMENT

23 COMPUTERS

24 AUTOMOTIVE EQUIPMENT

25 LABORATORY EQUIPMENT

26 (1) CHEMICALS, INHIBITORS, DEFOAMING AGENTS,LUBE & OILS

27 (2) LUBE & OILS, GASES, WATER TREATMENT (LAB/MISC/CHEMICALS)

27 REFRIGERATION, AC & VENTILATING EQUIPMENT

28 SAMAREC MATERIALS

28 EX-SAMAREC STOCK (JEDDAH)

28 EX-SAMAREC STOCK (RIYADH)

28 EX-SAMAREC STOCK (YANBU)

29 COMMUNITY & HOUSING INSECTERCIDES

30 INTERNAL COMB, ENGINE & ACC.BRAKES, LUB, TRANS, EQUIP .

31 (1) EXPLOSIVES

Page 62: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 62/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

2 of 3

CLASS DESCRIPTION REMARK

31 (2) CONSTRUCTION EQUIPMENT, HOISTS

PUMPS, COMPRESSORS

32 BOLIERS, FURN, TANKS, TURB, HEAT EXCH, SEWAGE EQUIP

33 MACHINE CARPENTER SHOP EQUIPMENT

34 (1) INSTRUMENTATION

34 (2) INSTRUMENTATION VALVES

35 - 38 TOOLS, POWER TOOLS & PARTS39 OFFICE & SCHOOL SUPPLIES

40 PARTS FOR SCHOOL AND OFFICE EQUIPMENT

41 PHARMACEUTICALS

42 MEDICAL SUPPLIES

43 DENTAL SUPPLIES

44 PARTS FOR MEDICAL EQUIPMENT

45 (1) DRILLIMG & PRODUCING EQUIPMENT

45 (2) OCTB DRILLING & CHEMICAL / MUD / CEMENT

46 DRILLING SPARE PARTS

47 - 48 AVIATION EQUIPMENT SUPPLIES & SPARRE PARTS

49 - 50 PROCESSING PLANTS EQUIPMENT & SUPPLIES

THE FOLLOWING CLASSES ARE SPARE PARTS

51 CATERPILLAR COMPANY

52 AVIATION EQUIPMENT & SPARE PARTS

53 LIGHT VEHICLE SPARE PARTS

54 KENWORTH SPARE PARTS

55 LIGHT VEHICLE SPARE PARTS

56 CONSTRUCTION CAMP SPARES

57 TRAILER CUSHMAN

59 ENGINES, GM CONTINENTAL CUMMINS

60 SUPERIOR, WAUKESHA

62 OTHER ENGINES BRAKE SYSTEM, AXLES & TRANSMISSON PARTS

64 HEAVY VEHICLE SPARE PARTS

65 ELECTRICAL SYSTEM EQIPMENT FOR INTERNAL COMBUSTION ENGINE

66 FUEL & LUBRICATING EQUIPMENT

67 VEHICLE & INTERNAL CUMBUSTION ENG ACCESSORIES

68 OIL FILTERS & CARTRIDGES69 MAIN ROAD BLDG, EQUIP . (EXCEPT POWER SHOVELS & CRANES)

Page 63: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 63/72

PROJECT COORDINATIONPROCEDURE

Contractor Job No. : 12170D

JJ A A ZZ A A NN RR EE FF IINNEE RRYY && TTEE RR MMIINN A A LL PP RR OO JJ EE CCTT

EE PP CC 99

Document No. : PE-001

Rev. No.: 00 Rev. Date: 09 Apr 2013

General Business Confidential

3 of 3

CLASS DESCRIPTION REMARK

70 POWE CRANES & SHOVELS

71 HEAVY LIFTING POWER CRANES & SHOVELS

72 MATERIAL HANGING EQUIPMENT 31 SPARE PARTS

73 TURBINES,. GAS STEAM

74 BOILER FURNACE HEAT EXCHANGERS

75 STEAM ENGINE LUBE OIL FILTER EQUIPMENT FOR CLASS 30

76 SHOP & WELDING EQUIPMENT - CLASS 3377 SEALS

78 PACKING FOR COMPRESSORS & TURBINES FOR CLASS 31

79 PUMPS (EXE. VACUUM & WELL - CLASS 31 - 35)

80 HEAVY DUTY PUMP SPARE PARTS

82 AC & REFRIGERATION SPARE PARTS - CLASS27

83 ELECTRICAL EQUIPMENT - CLASS 14, 15, 16 & 17

84 ELECTRICAL EQUIPMENT - CLASS 14, 15, 16 & 17

85 ELECTRICAL EQUIPMENT - CLASS 14, 15, 16 & 17

86 COMPUTER SPARE PARTS - CLASS 23

87 COMMUNICATION EQUIPMENT - CALSS 18

88 ELECTRONIC PARTS - CLASS 34 ( REGULATOR & ACTUATOR)

89-90 (1) VALVE SPARE PARTS ( EXCEPT CONTROL VALVES)

89-90 (2) SPARE PARTS FOR CLASS 34 (CNTL VALVES, RGLTR & ACTUATOR)

91-92 INSTRUMENT & MEASURING DEVICES - CLASS 34

93 PARTS FOR LABORATORY EQUIPMENT CLASS 25

94 MARINE EQUIPMENT FOR CLASS 22

95 PARTS FOR SAFETY, SECURITY, FIRE EQUIPMENT & COMMUNITY

99 IPSA ll SPARE PARTS

Page 64: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 64/72

Jazan Refinery & Terminal Project (PKG9)

SK Engineering & Construction Co.Ltd. SK G-Plant Building, 100 Euljiro, Jung-gu, Seoul 100-847, Korea.Telephone: 82-2-3700-8129, Fax: 82-2-3771-5537

To : Mr. Sulaiman M. Al-Rubaian / Project Manager Date: 14 November 2012Aramco Overseas Company B.V. Total Sheets: 1+1

SK Engineering & Construction Co., Ltd.SK G-Plant Building, 100 EuljiroJung-gu, Seoul, 100-847, Korea

CC:

Letter No: SK/AOC-L-0001Your Ref:

PROJECT: JAZAN REFINERY & TERMINAL PROJECT (EPC9)Contract No. : 6600029570 (OOK)

SUBJECT: PAYMENT REQUEST No.1 : Advancement Payment of OOK

Dear Sir,

Yours faithfully,

___________________________Eui Sim (Edward) JeongProject Manager

Attachment:

Response Required YesResponse Due Date ASAPCommon Yes

Attachment #1-1

Page 65: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 65/72

Page 66: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 66/72

TRANSMITTAL

Mr. Sulaiman M. Al-Rubaian / Project Manager DATE : 14 November 2012

Aramco Overseas Company B.V. TR. NO. : SK/AOC-T-XXXX

SK G-Plant Building, 100 Euljiro CONTRACT NO. : 6600029570 (OOK)

Jung-gu, Seoul, 100-847, Korea REFERENCE : -

THE FOLLOWING DRAWINGS SPECIFICATION PROCEDURE / PLAN

DATA SHEETS CALCULATION MATERIAL REQUISITION

TBE VENDOR DOCUMENT MOM

ARE TRANSMITTED APPROVAL REVIEW INFORMATIONRECORD QUOTATION CONSTRUCTION

THIS IS ORIGINAL REVISION FINAL

SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE

Signed :

Eui Sim (Edward) Jeong / Project Manager

NOTE :

RECEIPT NOT REQUIRED

RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)

THE ABOVE DOCUMENT RECEIVED BY :

SIGNATURE TITLE DATE

DRAWINGS OR DOCUMENT NO.

Jazan Refinery & Terminal Project (PKG9)

Attachment #2-1

Page 67: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 67/72

TRANSMITTAL

Mr. Sulaiman M. Al-Rubaian / Project Manager DATE : 14 November 2012

Aramco Overseas Company B.V. TR. NO. : SK/SA-T-XXXX

SK G-Plant Building, 100 Euljiro CONTRACT NO. : 6600029571 (IK)

Jung-gu, Seoul, 100-847, Korea REFERENCE : -

THE FOLLOWING DRAWINGS SPECIFICATION PROCEDURE / PLAN

DATA SHEETS CALCULATION MATERIAL REQUISITION

TBE VENDOR DOCUMENT MOM

ARE TRANSMITTED APPROVAL REVIEW INFORMATIONRECORD QUOTATION CONSTRUCTION

THIS IS ORIGINAL REVISION FINAL

SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE

Signed :

Eui Sim (Edward) Jeong / Project Manager

NOTE :

RECEIPT NOT REQUIRED

RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)

THE ABOVE DOCUMENT RECEIVED BY :

SIGNATURE TITLE DATE

Jazan Refinery & Terminal Project (PKG9)

DRAWINGS OR DOCUMENT NO.

Attachment #2-2

Page 68: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 68/72

1 of 2

MINUTES OF MEETINGSubject : Sample MOM No.: MOM-SK/AOC-xxx-xxx

Date & Time : 14 November 2012 Project : Jazan Refinery & TerminalProject Package 9

Place : Contractor ’ s Seoul Office File :Originated By : SKEC Recorded By :

Participants Distribution

COMPANY : : All attendees

:

SKEC :

:

NO. DATEISSUED

ITEMS DISCUSSED ACTIONBY

DATENEEDED

Attachment #3

Page 69: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 69/72

MINUTES OF MEETING (CONTINUATION) No. : MOM-SK/AOC-xxx-xxx JOB NO :

DATE : 14 November 2012

NO.DATE

ISSUED ITEMS DISCUSSED ACTIONBY

DATENEEDED

2 of 2

Approved by Issued by

COMPANY Project Manager SKEC Project Manager

Date: Date:

Page 70: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 70/72

JAZAN REFINERY & TERMINAL PROJECT (PKG9)ACTION ITEMS LIST

RemarksAction ByNo Subject / Issue Issue Date Due Date Forecast DateIssued ByReferenceddocuments

Open/Closed

A t t a ch m

en

t # 4

Page 71: PE-001_R00

8/10/2019 PE-001_R00

http://slidepdf.com/reader/full/pe-001r00 71/72

TECHNICAL QUERY

Page 1 of 2

JAZAN REFINERY & TERMINAL PROJECT (EPC 9) Contract No. 6600029571 (IK) & 6600029570(OOK)

TQ No. TQ-Date:

Subject: Reference:

Disciplineo Processo Mechanicalo HVACo Rotating

o Pipingo Materialso Civilo Building/Structure

o Electricalo Instrumentationo Communicationo HSE

o Fire Fighting

o Procurement

o Quality

o Other _____________

Cost impact? Yes No Applicable to other packages? Yes No

Schedule impact? Yes No Waiver required? Yes No

PART 1 – SKE&C Query

Attachments: Yes No, If yes, provide reference numbers

Response required by (tentative date): Oct.15 ,2012

Raised by: Name: Sign: Date:Approved by: Name: Sign: Date: