PEB Steel Alliance Ltd.
PRIDE OF OUR NATION...
MISSION
For PEB Steel Alliance to be
recognized as the benchmark in
the steel buildings industry. This
will be accomplished through
product perfection, engineering
Excellence and the Best customer
services in the industry.
VISSION To bring the PEB technology to where
it is most needed in the world and help others
"build a better life", through industrialization.
To (jointly) build high capacity, efficient & cost effective steel factories for
speedy delivery and for benefiting from “economies of large scale”.
To design and fabricate safe and technologically advanced buildings.
To offer customers versatility in design & fabrication to meet their exact
building requirements.
To offer customer services second to none in the industry.
VALUES
Be a leader and not a follower.
Share knowledge and success with others.
Forge local alliance wherever you go.
Apply only the latest design and buildings
codes.
Continually improve our products.
Customer services make all the difference;
customers are lifetime partners, always seek a
win-win solution.
The longest journey begins with the smallest
step, so begin with the end in mind and focus
on the long term, not just the short term.
Factory Location & General Info Location:
Chouddogram, Comilla
Distance:
112 km from Dhaka,
Beside Highway
Total Land Ar.: 35,000 m2
Factory Area:
Main frame Sectn.7650 m2
Cold form Sectn: 863 m2
Total Factory Ar. :9513 m2
Production Capacity: Over all
production capacity is 3000
MT per month.
Starting Date of production:
October 08
Factory Facilities BUILT UP & COLD FORMED SECTION NOS.
OVERHEAD CRANES:
Capacity: 10 tons
Capacity: 05 tons
Capacity: 2.5 tons
03
06
02
Fork Lift (Capacity: 5 tons) 01
CNC FABRICATION EQUIPMENT:
Band Saw
Punch & Shear Machines
Gas CNC Profile Cutting Machine
CNC Drilling Line
Plate Drill
Straightening Machine
Fit up Machine
Air Compressor
Radial Drilling Machine
01
01
01
01
02
01
01
01
06
02
EQUIPMENT NOS.
Angle Line
12 mm Shearing Machine
Bending Machine
Beveling Machine
01
01
01
02
WELDING EQUIPMENT:
Gas Shield Arc Welder 500 APS
Full Automatic Built-up Welding Line
AC Arc Welder
Fitting jig for welding line
50
02
01
BLASTING EQUIPMENT:
Shot Blast
INSPECTION EQUIPMENT:
Magnetic Particle Testing Machine
Painting Thickness Gauging
01
01
01
01
02
Factory Facilities
EQUIPMENT NOS.
3-12 mm Shear
Press Break
Bending Machine
PE 1000 Roll Former
PW 900 Roll Former
“Z” Purlin Roll Former
“C” Purlin Roll Former ( 2 nos for different sizes)
01
01
01
01
01
01
02
Factory Facilities
PEBSAL FaCTORY AT A GLANCE
PEBSAL FaCTORY office
Reception
Office
PEBSAL FaCTORY mANAGEMENT
Engr. Parvez Mahmud Plant Manager
Engr. Abdus Sahil Production In-Charge
Scope of work
Built-Up Sections Preparation •Column
•Rafter
•Joist
•Beam etc
Cold-Form Preparation •Purlin
•Sheeting
•Triming etc
BUILT UP fabrication process
BUILT UP fabrication process
Hot- Rolled Plates are Conveyed to the machine to make desired sized Plate
BUILT UP fabrication process
Materials Collection. Highest 12mm thick Plates can be cut by this Machine
BUILT UP fabrication process
This Machine is used to cut 12-75 mm thick Plate
BUILT UP fabrication process
The Nobs are Adjustable. 7 nos Plates become ready in one time
BUILT UP fabrication process
Circular Holes are easily made by this full automated machine
BUILT UP fabrication process
The Required sized plate is now being prepared to make built-up sections
BUILT UP fabrication process
Flanges & Webs are placed in place on the Assembly Line
BUILT UP fabrication process
Assembly Line rolls the Material to Fit Jig Machine.
BUILT UP fabrication process
The Flanges are Automatically being in place and Web goes between two Flanges
BUILT UP fabrication process
Fit Jig Machine holds the web in place and some tag welding is done to prepare material ready to go to the Submerged Arc Welding Machine
BUILT UP fabrication process
The best Quality Welding is Ensured by this machine
BUILT UP fabrication process
The welding depth is regulated by computer programming
BUILT UP fabrication process
The Welding Property is Verified. Welding in one side is completed
BUILT UP fabrication process
BUILT UP fabrication process
BUILT UP fabrication process
BUILT UP fabrication process
COLD FORMED fabrication process
Cold form fabrication process
Cold form fabrication process
Best quality accessories
Best quality accessories