PECB Change Log Form GENERAL INFORMATION Owner / Department* Gonxhe Dobroshi Approver / Department* Enis Emini / Training Development Department Date of Approval* 2020-02-06 Course details* Course name: Language: New Version: Previous Version: ISO 50001 LI English 5.0 4.8 Summary of the Change: The ISO 50001 standard has been updated to the 2018 edition. The ISO 19011 standard has been updated to the 2018 edition. The ISO 31000 standard has been updated to the 2018 edition. The exercises have been updated and 4 new exercises have been added, now there are 16 Exercises. Overall changes on the design, improved the writing quality, and technical improvements in line with the PECB Editorial Guidelines. Added the “How to Prepare for an Audit” document and ”Energy poster”. Day 1: Added Section 6: Analysis of the existing system Updated the design Slide Number Slide Description: Modifications: Comments Current version Previous version No. 01- 06 No. 01-06 Introductory slides Minor changes made on the slide titles Changes made on the schedule and sections References and acronyms have been updated Updated slides
Transcript
Page 1: PECB Change Log Form

PECB Change Log Form

GENERAL INFORMATION

Owner / Department* Gonxhe Dobroshi

Approver / Department* Enis Emini / Training Development Department

Date of Approval* 2020-02-06

Course details*

Course name: Language: New Version: Previous Version:

ISO 50001 LI English 5.0 4.8

Summary of the Change:

The ISO 50001 standard has been updated to the 2018 edition.

The ISO 19011 standard has been updated to the 2018 edition.

The ISO 31000 standard has been updated to the 2018 edition.

The exercises have been updated and 4 new exercises have been added, now there are 16 Exercises.

Overall changes on the design, improved the writing quality, and technical improvements in line with the PECB Editorial Guidelines.

Added the “How to Prepare for an Audit” document and ”Energy poster”.

Day 1:

• Added Section 6: Analysis of the existing system

• Updated the design

Slide Number

Slide Description:

Modifications: Comments Current version

Previous version

No. 01-06

No. 01-06 Introductory slides

Minor changes made on the slide titles

Changes made on the schedule and sections

References and acronyms have been updated

Updated slides

Page 2: PECB Change Log Form

PECB Change Log Form

No.06-18

No.06-16

Section 1, section title changed from: Course objectives and structure

to:

Training course objectives and structure

Changes made:

On the design

On the learning objectives

Updated competency domains

Updated the certificate example

Added a slide “Why become a certified implementer”

Updated information with regard to PECB and the certification body

Updated slides and added a slide.

No.19-39

No.17-29

Section 2, section title changed from: Standard and regulatory framework to:

Management system standards

Changes made:

Updated the slide containing the information about ISO

Added a slide “Definition of a management system”

On slide places and minor modifications on their titles

Added a slide note extension from ISO/IEC Directives (Part

1)

Added a slide “ISO 50000 Family of Standards”

Updated the slides about the ISO 50001 history and

changed the title, also updated ISO 50001 and ISO 50004

slides

Added the ISO 50002, ISO 50001 and Sustainable

Development Goals, Typical Barriers to an Effective EnMS

slides.

Deleted “Relationship Between ISO 50001 and ISO 14001”

Updated slides, added 9 slides, and deleted 1.

No.40-51

No.30-46

Section 3, section title changed from: Energy, energy management and EnMS to: Fundamental concepts and principles of energy management

Changes made:

Modified the titles

Slides changed places

Updated all clauses

Added a slide “energy baseline”

Major changes made on the “Energy consumption” slide

Major changes made on the “Energy Performance Indicators” slides

Added “Energy performance approach” slide

The process model slide has been updated and named Plan-Do-Check-Act (PDCA) Cycle

Deleted the “Process approach” and “Choose a Methodological Framework to Manage the EnMS Implementation Project” slides

Updated clauses, added 2 slides, and deleted 4 slides.

Page 3: PECB Change Log Form

PECB Change Log Form

No. 52-61

No.47-60 Section 4 Initiate the EnMS implementation

Changes made:

Slide places changed and titles and made minor modifications

Added “Project management – definitions” slide

Deleted the “ISO 50001 Requirements”, “Initiate the EnMS Implementation”, “1.1.2. Alignment with Best Practices » and “Barriers to an Effective EnMS“ slides

Major improvements to the “Define the Approach to the EnMS Implementation” slide

The exercise has been deleted from this section.

Updated information, added a slide, deleted 4 slides, and the exercise has been deleted from this section.

No. 62-79

No. 61-78

Section 5, section name changed from: Understand the organization and its context to: The organization and its context

Changes made:

Added “ISO 50001 requirements” “Interested parties” “Identify and Analyze the Interested Parties” “Power/Interest Matrix” “Identification of Legal and Other Requirements” “Maintenance of Compliance to Legal and Other Requirements” slides

Deleted “1.2. Understand the Organization and its Context”, “External Barriers”, “Analyze the Internal Environment of the Organization” slides

1.2. Understand the Organization and its Context – list of activities has been modified

General improvements on slides and update of clauses and changed places of slides

Deleted from this section 3 slides and drafted a section on the analysis of the existing system

Deleted three activities from this section (around 11 slides):

Gather information

Conduct gap analysis

Establish objectives Updated the clause, modified the information and design.

No.80-97

No.79-90 Added Section 6 Analysis of the existing system

Changes made:

Added the framework slide, “The Gap Analysis Technique”,

“1.2 Analyze the Existing System – list of activities”,

“Questionnaires”, “1.2.4 Publish the Gap Analysis Report”

Slides have changed places and have been slightly

modified

Updated the Gap Analysis examples and split it into two

slides

Deleted “1.2.9. Determination of Objectives” slides

Added exercise 3

Information already existing on

section 5 has been updated,

improved and new information

has been added to make the

section on analysis of the existing

system.

Page 4: PECB Change Log Form

PECB Change Log Form

No. No.91-118

Section 6:Management responsibility, leadership and commitment Is now: Section 7 Leadership and commitment

Added on day 2

Day 2:

Section 6: Management responsibility, leadership and commitment now: Section 7 Leadership and commitment has been added in this day

Updated the design

Slide Number

Slide Description:

Modifications: Comments Current version

Previous version

No.02 No. Schedule of the day Added the schedule of the day

No.03 No.

Learning objectives of the day

Added the learning objectives of the day

Page 5: PECB Change Log Form

PECB Change Log Form

No.04-21

No.91-118

Section 6: Management responsibility, leadership and commitment Changed to: Section 7 Leadership and commitment

Changed made:

Added “Leadership and Commitment”, “1.3.1 Create a Business Case”, “Content of the Business Case”, “1.3.2 Define Roles, Responsibilities, and Authorities”,

Some slides have changed places and have been slightly modified

Deleted o “ISO 50001 Requirements”, o “Top Management Commitment”, o “1.3.2. Establish the Roles and Responsibilities”, o “Management Representative”, o “The Advantages of Team Approach”, o ”Roles and Responsibilities of Stakeholders”, o “Responsible for a Process or a Control – Key Roles

and Responsibilities” o “1.3.3. Define the Roles and Responsibilities of the

Key Committees”

Modification made on “1.3. Management Responsibility, Leadership and Commitment “ changed to “1.3 Leadership and Commitment” slide and the list of activities

Major modifications in the “Formation of an Energy Management Team” slide title changed to “1.3.3 Establish the EnMS Project Team”

Modified slides to make them more concise and updated all clauses

Added exercise 4

Several slides have been deleted and added new ones, the slides have been updated and modified to be more concise.

No. 22-34

No.02-18 Section 7 is now Section 8 EnMS scope

Changed made:

Updated all clauses, slightly modified the information on slides and added additional clauses

Deleted **Slide Notes Extension**(slide 6) “EnMS Boundaries”, “1.4.2. Define the Boundaries of Systems Included in the Scope”, “1.4.4. Define the EnMS Scope”,

Modified the activities

Added “1.4.1 Define the Scope and Boundaries of the EnMS”

Added exercise 5

Updated all clauses, and deleted outdated information

Page 6: PECB Change Log Form

PECB Change Log Form

No. 35-49

No. 19-34 Section 8 now Section 9 Energy policy

Changes made :

Updated all clauses, changes several titles

Deleted the “1.5.1. Structure of a policy”, and “Drafting the

Energy Policy” slides

Modifications made at the “Types of policies”, “1.5.2. Policy

drafting process”

Added “The Energy Policy” and Exercise 6 slides

Updated all clauses, and deleted outdated information

No. 50-76

No.35-82 Section 9 now Section 10 Energy planning

Changes made:

Updated all clauses, all figures and changes several titles,

and some slides have changed places within the section

Deleted

o “ISO 50001 Requirements”,

o “1.6.1. Legal Requirements and Other Requirements”,

o “Energy Law”,

o “Examples of Legal Requirements and Other

Requirements”,

o Deleted from the “A. Analysis of Energy Use and

Consumption” slide 46 to “Recommendations to

Management” slide 61 (a total of 16 slides)

o “Making Understandable EnPIs”

o “Defining the EnPI Boundaries”

o “EnPI Boundaries in an Example Production Process”

o “Ensuring Data Quality”

o “Determine and Test Energy Baselines”

o Deleted from “Types of Objectives” to “Relationship

Between Key Concepts” (a total of 7 slides)

Added “Objectives and Energy Targets”, “S.M.A.R.T.

Objectives and Energy Targets”, “Energy review process”,

“Energy Performance Indicators”, “1.6.5 Define and

Implement an Energy Data Collection Plan” “Data

Collection” slides

Added exercise 7 and exercise 8

Major modifications made in this section.

Page 7: PECB Change Log Form

PECB Change Log Form

No.77-112

No.83-128

Section 10 Risk Management now Section 11 Risk Management process

Changes made :

Updated all clauses of the ISO 31000

Added “ISO 50001 Requirements” , “ISO 31000: Risk

Management — Guidelines”, “Context Establishment”,

”Types of Assets”, “Identification of Business Processes”,

“Main Business Processes”, “Quantitative, Semi-

quantitative, and Qualitative Risk Analysis”, “Example of a

Risk Determination Calculation”, “1.7.7 Recording and

Reporting” slides

Deleted “Select a Risk Management Process”, “Determine

objectives”, ”Identification of Consequences-Examples”,

“Level of Risk - Definition”, “

Evaluation of Levels of Risk based on Risk Evaluation

Criteria”, “Risk Evaluation”, “Selection of Risk Treatment

Options”, “1.7.6. Risk Acceptance”, “Risk Treatment Plan

Acceptance”, “Residual Risk Acceptance”, “Management

of Residual Risk” “Internal Communication”, “External

Communication”, “Risk Monitoring and Review” slides

The section has been updated in line with the newest edition of ISO 31000.

Day 3:

Section 15: Procurement of energy services, products, equipment and energy

Changed to:

Section 16: Energy procurement

Slide Number

Slide Description:

Modifications: Comments Current Version

Previous version

No.02 No. Schedule of the day Added the schedule of the day

No.03 No. Learning objectives of the day Added the learning objectives of the day

No.04-24 No.02-20

Section 11 Resource Management now

The whole section has been restructured.

The section now has a list of three activities, which are:

Major modification have been made to the section.

Page 8: PECB Change Log Form

PECB Change Log Form

Section 12 Resource Management

Identification of resources

Estimation of resources

Monitoring of resources

Some slides however have been improved and kept in the section.

This section now contains the Exercise 9

No.25-45 No.21-45

Section 12 Awareness and communication

now Section 13 Awareness and communication

The section has been restructured, the slides places have been changed, and all clauses are updated.

Deleted “2.2.2. Identify Interested Parties” “ Energy Management Communication Process” slides

Added “2.2.1 Establish the Awareness Program” “Employee Awareness”, “Benefits of an Energy Efficiency Awareness Program” slides and two **Slide Notes Extension** on Communication approaches and tools

Minor modification have been made, all clauses have been changed, and slides have changed places and have been improved.

No.46-64 No.46-63

Section 13: Documentation management

Now

Section 14: Documented information management

Changes made:

All clauses have been updated

Some slides have changed places and have been slightly modified including their titles

Minor changes

No.65-84 No.64-87

Section 14: Operational control

Now

Section 15: Operations management

This section has been restructured

The section now has a list of three activities, which are:

Defining operational criteria

Determining energy significant operations

Designing activities related to energy performance

Some slides however have been improved and kept in the section.

This section now contains the Exercise 10

Major modification have been made to the section.

No.85-105

No.88-101

Section 15: Procurement of energy services, products, equipment and services

Now

Section 16: Energy procurement

Changes made:

All clauses have been updated.

Added exercise 11 and exercise 12

Deleted “Procurement Management Process” slide

Minor changes

Page 9: PECB Change Log Form

PECB Change Log Form

Added “Assessment of Equipment and Products’ Energy Use” and “Purchase Energy” slides

Day 4:

ISO 19011 has been updated

Slide Number

Slide Description:

Modifications: Comments Current Version

Previous version

No.02 No. Schedule of the day Added the schedule of the day

No.03 No. Learning objectives of the day Added the learning objectives of the day

No.04-19 No.02-22

Section 16: Monitoring, measurement and analysis

now

Section 17: Monitoring, measurement, analysis, and evaluation

In general minor modifications have been made, all clauses have been changed, the information has been modified to be more concise, and titles have been changed. Changes made:

Deleted “Check the Energy Management System”, “Energy Performance Indicators”, “Types of Monitoring Methods and Reports”, “Equipment Calibration”, “3.1.5. Compliance Evaluation”, and “Exercise 10” slides.

Minor changes made.

No. 20-46

No.23-49

Section 17: Internal audit Now Section 18: Internal audit

The whole section has been restructured, and the audit process now is based on ISO 19011, and the ISO 50002 clauses are added to complement the audit process.

The section now has a list of 7 activities, which are:

1. Create an internal audit program

2. Appoint a competent person

3. Establish independence, objectivity, and impartiality

4. Plan audit activities

5. Allocate and manage the resources of the audit program

6. Perform audit activities

7. Follow up on nonconformities

Major modification have been made to the section.

Page 10: PECB Change Log Form

PECB Change Log Form

Several slides have been deleted, some however have been improved and kept in the section.

This section now contains the Exercise 14

No. 48-59

No.50-58

Section 18: Management review Now Section 19: Management review

This section has been restructured.

All clauses of ISO 50001 have been updated.

The section now has a list of 4 activities, which are:

Prepare the management review

Conduct the management review

Determine the management review outputs

Follow up on the management review

Some slides however have been improved and kept in the section.

The section has been restructured.

No. 60-73

No.59-77

Section 19: Treatment of nonconformities Now Section 20: Treatment of nonconformities

This section has been restructured.

All clauses of ISO 50001 have been updated.

The section now has a list of 3 activities, which are:

Define a process to resolve problems and nonconformities

Determine the corrective actions

Draft an action plan

Deleted “**Slide Notes Extension**”, “Corrective Action”, “4.1.3. Preventive Action Procedure”, “Preventive Action”, and “4.1.5. Review the Effectiveness of the Actions Taken” slides. Added “Action Plans” slide. Added Exercise 15.

Minor modifications have been made.

No. 74-86

No.78-87

Section 20: Continual improvement Now Section 21: Continual improvement

Minor modifications have been made to make the section more comprehendible. All ISO 50001 clauses have been updated Added "The Benefits of Continual Improvement” slide Added Exercise 16.

Minor modifications have been made.

Page 11: PECB Change Log Form

PECB Change Log Form

Other Materials Task Description Comments Completed

Case Study Update the case study Case study should be aligned with the new version of the course

The case study has been updated in terms of design.

Exercises Update the exercises Exercises should be aligned with the new version of the course

Correction Keys Update the correction keys Correction keys should be aligned with the new version of the course

Exam 01 Update the exam The exam should be aligned with the new version of the course

Exam 02 Update the exam The exam should be aligned with the new version of the course

Exam Preparation Guide (EPG)

Update the EPG The EPG should be aligned with the new version of the course

Candidate Handbook (CH)

Update CH The CH should be aligned with the new version of the course

Course Description Update Course Description on the web

The CD should be aligned with the new version of the course

Other Supporting Materials (Ex. Videos, Samples)

Update other supporting materials of the course

Other supporting materials should be aligned with the new version of the course

Comments:

No. 87-106

No.88-106

Section 21: Prepare for the certification audit Now Section 22: Preparing for the certification audit

Minor modifications have been made. Changes made:

Added “Accreditation Body”, and “Certification and Attestation” slides.

Minor modifications have been made.

No. 107-128

No.107-128

Section 22: Certification process and closing the training Now Section 23: Certification process and closing of the training course

The certification process has been updated and clarified. Changes made:

Deleted “Definitions of Competence”, “Behavioral Skills”, “Generic Knowledge and Competencies” slides.

Added “PECB Certification of Persons” slides.

Minor modifications have been made.