PEER REVIEW EXERCISE ON CYCLING
February 26th, 2015
Málaga
Cycling Policies and Infrastructure in Málaga
M. Carmen Abad Alejo, City of Málaga
ESTUDIO 7 Engineering Consultancy
22
Cycling Policies and Infrastructure in Málaga
Table of Contents
• Construction techniques and materials used in bicycle lanes
• Junctions and sensitive spots
• Cycling parking facilities (safety and security measures)
• Coexistence bicycles-pedestrians
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
33
Construction Techniques and Materials used in Bicycle Lanes
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Cycling Policies and Infrastructure in Málaga
44
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Route deign
– Bus stops
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
55
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Route deign
– Traffic lights
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
66
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Construction process
– On the roadway
– Asphalt (existing)
– Surface treatment: Coloured bituminous slurry:• Resin-based Mortar containing synthetic resins
• Resin-based Paint containing acrylic resins
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
77
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Construction process
– On the sidewalk:
– Earth-moving and demolition
– Compacting
– Spreading out of the aggregate layer
– Laying of the waterproof sheet
– Laying of the kerb to delimit the bike lane
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
88
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Construction process
– On the sidewalk:
– Concrete (new), including troweling
– Surface treatment: Coloured bituminous slurry:• Resin-based Mortar containing epoxy resins (as tack coat)
• Resin-based Mortar containing synthetic resins
• Resin-based Paint containing acrylic resins
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
99
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Maintenance
– Standard cleaning method – mechanical sweeping - Deterioration of the Pavement and Horizontal Signing.
– Specific cleaning method not established
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
1010
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Separators
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
1111
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Signposting:
– Horizontal signing
– Road signs
– Traffic lights
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
1212
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Signposting:
– Standard signposting
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
1313
Cycling Policies and Infrastructure in Málaga
Construction Techniques and Materials used in Bicycle Lanes
• Signposting:
– Andalusian Bicycle Plan: distances and travel times to places of interest
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
PILLAR DIAGRAM OF THE ITINERARY INTERSECTIONS AND ROUNDABOUTS
1414
Junctions and sensitive spots
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Cycling Policies and Infrastructure in Málaga
1515
Cycling Policies and Infrastructure in Málaga
Junctions and sensitive spots
• Junctions design
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
1616
Cycling Policies and Infrastructure in Málaga
Junctions and sensitive spots
• Junctions design
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Intersections Roundabout
1717
Cycling Policies and Infrastructure in Málaga
Junctions and sensitive spots
• Sensitive spots
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Madre de Dios Street
1818
Cycling Policies and Infrastructure in Málaga
Junctions and sensitive spots
• Sensitive spots
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Pablo Ruiz Picasso Promenade
1919
Cycling Policies and Infrastructure in Málaga
Junctions and sensitive spots
• Sensitive spots
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Bolivia Street
2020
Cycling parking facilities (safety and security measures)
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Cycling Policies and Infrastructure in Málaga
2121
Cycling Policies and Infrastructure in Málaga
Cycling parking facilities (safety and security measures)
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
On street Public bicycle scheme
2222
Coexistence between bicycles and pedestrians
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Cycling Policies and Infrastructure in Málaga
2323
Cycling Policies and Infrastructure in Málaga
Coexistence between bicycles and pedestrians
• Solutions:
– Road signs
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
2424
Cycling Policies and Infrastructure in Málaga
Coexistence between bicycles and pedestrians
• Solutions:
– Badges on the pavement
Peer Review Exercise on Cycling• February 26th, 2015 • Málaga• M. Carmen Abad Alejo
Thank you!
María del Carmen Abad Alejo
Contact DetailsContact Details
Málaga City Council
C/Concejal Muñoz Cerván, 3
Edificio Tabacalera
29003 Málaga
Spain
http://www.civitas.eu