Penang Transport Master Plan
8 April 2016
2
• In Aug 2014, Penang State Government requested proposals for the implementation of the Penang TMP through a PDP concept.
• Process was carried out via Open Tender:
6no. tenderers submitted bids
2no. tenderers were shortlisted
• KPMG was part of the tender evaluation team.
• SRS Consortium Sdn. Bhd. was awarded the PDP role in Aug 2015.
• SRS Consortium proposed an Alternative TMP.
PDP for Penang TMP
3
Proposed Alternative TMP
• Public Transport Network
• Highways and Roads
• PSR Master Plan
• Implementation Programme
4
North Coast
Pair Road
Simpang Ampat
Ayer Itam
Monorail
Tmn
Supreme
Penanti
Tram
Catamaran
Bdr
Perda
Taman
Indah
Bkt Minyak
Sunway Carnival
Mall
UiTM Pulau
Pinang
Bkt Minyak
Jln
Maju
Sea Tunnel
KTM Komuter
Airport
Bayan
Baru
Prai
Penang
Sentral
Pmtg Tinggi
Sungai Dua
Raja
Uda
P/Tinggi – Batu
Kawan BRT
Stadium Batu
Kawan
Alma
Kepala Batas
Raja Uda –
BM Monorail
KOMTAR
TgTokong
Monorail
Bkt
Tengah
Kulim
Bkt
Mertajam
PT Network
Skycab
George Town –
Butterworth
LRT
Bayan
Lepas LRT
Note: Transit alignment & system are subject to review prior to implementation
Island A
Island B
Island C
5
North Coast
Pair Road
Jln Tun
Sardon
Sea Tunnel
Relau
Airport
KOMTAR
Paya
Terubong IC
Awang IC
LCE IC
Gurney
IC
Utama IC
Relau IC
PIL 2
PIL 2A
BKE IC
Juru IC
Pan Island
Link 1
Perda
Pmtg
Pasir
Tmn Pauh
Indah
Tmn Bkt
Minyak
Tmn Kota
PermaiTmn Bkt
Minyak Utama
Tmn IKS Bkt
Minyak
Balik
Pulau
Highways
and Roads
Island AIsland B
Island C
6
PSR Master Plan
Note: Based on version 9e Master Plan
7
8
9
10
http://pgmasterplan.penang.gov.my
THANK YOU