Information Dominance Anytime, Anywhere… PEOC4I.NAVY.MIL 23 April 2009 Jason Livingston Director, NCIIPT (SSC- LANT) 843.218.5409 [email protected] Program Executive Office Command, Control, Communications, Computers and Intelligence (PEO C4I) Consolidated Afloat Networks and Enterprise Services (CANES) Program and Acquisition Overview DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology content November 2008. Other requests shall be referred to the PEO C4I and Space (Program Office PMW 160) or SPAWAR Office of Congressional and Public Affairs (SPAWAR 00P).
Transcript
Page 1: PEO C4I/IT Seminar Brief - CANES - Aug 08

Information Dominance Anytime, Anywhere…

PEOC4I.NAVY.MIL

23 April 2009Jason Livingston

Director, NCIIPT (SSC-LANT)843.218.5409

[email protected]

Program Executive OfficeCommand, Control, Communications, Computers and Intelligence (PEO C4I)

Consolidated Afloat Networks and Enterprise Services (CANES)Program and Acquisition Overview

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to critical technology content November 2008. Other requests shall be referred to the PEO C4I and Space (Program Office PMW 160) or SPAWAR Office of Congressional and Public Affairs (SPAWAR 00P).

Page 2: PEO C4I/IT Seminar Brief - CANES - Aug 08

2

Agenda

• Program Overview and Status • Program Schedule• Program Contracting Strategy• ACS Overview• ACS Contracting Strategy• Seam Management

Disclosure: Unfortunately, due the acquisition sensitive phase CANES is now it, questions will not be taken but can be submitted via email to the SSC-LANT contracts office.

Disclosure: Unfortunately, due the acquisition sensitive phase CANES is now it, questions will not be taken but can be submitted via email to the SSC-LANT contracts office.

Page 3: PEO C4I/IT Seminar Brief - CANES - Aug 08

3CANES concept and investment strategy validated by Navy, DoD leadership CANES concept and investment strategy validated by Navy, DoD leadership

Navy Mandate in PR09

CANES Concept – OPNAV N6/DoN CIO, NNWC, and PEO C4ICNO-directed approach to consolidate multiple afloat networks, provide secure, reliable common hosting for multiple C4I applications (Dec 05)

Technical and programmatic realignment of legacyinfrastructure and services-more efficient, additional capabilityFundamental change in C4I acquisition approach

CANES POR (FY11 LRIP)Consolidated afloat network, providing

CCE, Afloat Core Services, CDS, and integrated Voice, Video, and Data network infrastructurePre–MDAP/MAIS, projected ACAT 1D

CANES Migration (FY08-11)Prototype CCE & Afloat Core Services technologies – accelerate capability delivery, mitigate technical risks

Existing Network POR Modifications to support early application migration

LINCOLN SG and CPF MHQ/MOC in 09

Today: By FY11:

Page 4: PEO C4I/IT Seminar Brief - CANES - Aug 08

4

CANES Status Under NewDoDI 5000.02

• New DoDI 5000.2 signed 2 Dec 08• CANES completed MDD review 14 Nov 08, ADM signed 12 Dec 08

• Proceed to MS B in FY10 after completion of PDR and 2366b certification; MS A not necessary as CANES is network consolidation effort with no new technology development

• CCE and ACS to be established as sub-programs at MS B

• CCE RFP released following SPAWAR/PEO peer review

• ACS RFP will be released upon DoD CIO review of Net-Ready KPP

Page 5: PEO C4I/IT Seminar Brief - CANES - Aug 08

5

FY08 FY09 FY10 FY11 FY12 FY13 FY14

Increment 1: Subprogram 1A

Common Computing Environment/Cross Domain Solution

Capabilities and Technologies

• Voice, Video on SR and SCI enclaves• MAC1 for system critical services (Secret enclave only)

• Satisfies NNWC Drop Count Reqmnts• Hosting Up To Near-Real Time Combat Support applications

• Internal Shipboard Wireless – 50% coverage

Platforms (151) • CVN, LCC-19/20, LHA/D, CG, DDG, LSD, MHQ/MOC, SSN, SSBN/GN

• CVN 78, LHA 7 initial SCN platforms

Increment 2 Enhanced Network

Capabilities and

Technologies

• Voice on all enclaves• MAC1 for system critical services (Secret/SCI/UNCLAS enclave)

• Will satisfy NNWC ORT Objective Requirements

• Hosting up to Real Time Weapon-In-The-Loop Applications

• HM&E Applications/Subsystems• Internal Shipboard Wireless – 100% coverage

Platforms (275+) • Increment 1 plus DDG1000, CGX, LCS, JCCX, LHA (R) MALS, LPD-17, JHSV, NECC, PC , MPA/Other Aircraft

FY15MDD MS B MS C LRIP FRP

MS B MS CMDD SDD

Overall Program Approach

Increment 1: Subprogram 1B

Afloat Core Services

Capabilities and Technologies

• Build on existing ISNS Afloat Core Services delivering in 2009

• Incremental acquisition• Federate NCES Core Services to tactical user

Page 6: PEO C4I/IT Seminar Brief - CANES - Aug 08

6

Nov 06 - ISNS Inc 2 ADM (Pre-Acq Activities)

Nov 06 - ISNS Inc 2 ADM (Pre-Acq Activities)

Dec 07 – CANES: pre-MDAP/M

AIS

Dec 07 – CANES: pre-MDAP/M

AIS

Jan 08 – Gate 3 Review w/ CNO

/VCNO

Jan 08 – Gate 3 Review w/ CNO

/VCNO

Aug 08 – CANES OSD FIG

#1

Aug 08 – CANES OSD FIG

#1

Sep 08 – CANES OSD FIG

#2

Sep 08 – CANES OSD FIG

#2

Oct 08 – AoA Com

pletion / Acquisition OIPT

Oct 08 – AoA Com

pletion / Acquisition OIPT

Dec 08 – MDD ADM

/ CCE Draft RFP

Dec 08 – MDD ADM

/ CCE Draft RFP

Nov 08 – Gate 4/5 Review / M

DD w/ USD (AT&L) / ASD (NII)`

Nov 08 – Gate 4/5 Review / M

DD w/ USD (AT&L) / ASD (NII)`

Apr 09 – CCE RFP Released

Apr 09 – CCE RFP Released

Jun 09 – ACS RFP Released

Jun 09 – ACS RFP Released

Nov 09 – CCE Contract Award

Nov 09 – CCE Contract Award

May 10 – M

S B

May 10 – M

S BProgram Status

CANES is meeting all program milestonesCANES is meeting all program milestones

Inte

gra

tor

Dec 09 – ACS Contract Award

Dec 09 – ACS Contract Award

Page 7: PEO C4I/IT Seminar Brief - CANES - Aug 08

CANES Program Summary Schedule

FY08 FY09 FY10 FY11 FY12 FY13 FY14Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F

4/7/09

TASK

Major Milestones & Gates

Engineering & Test

Baseline Contract Timeline

ISNS Inc 1 Core Services

Major Install Activities

Afloat Core Services

CCE FRP

Gate 4/5

MDD

IBR

Gate 6

MS B

Gate 6

MS C

IOC

FRPD

SRR

SFR

SFS

SDS

PDR

UNSTRUCTEST

CDR

STRUCTEST

TRR

CSIT

CBTF

CBTF RPT

OTRR

OAOA RPT SIT

Afloat Prep/ LOO

OTRR

IOT&EIOT&ERPT

BLRIPRPT

DraftRFP

FinalRFP

SourceSelection

System Developer (2)

System Developer (1)DownSelect

LRIP

CDR

SIT 1 SIT 2 SIT 3

CS v1.0 CS v1.1

SCD

ShipCheck

LLTMOrdered A-0

DevelopSolicitation

DraftRFP Edit

FinalRFP

Source Selection ACS v1.0 ACS v1.1 ACS v2.0

DevelopSolicitation

DraftRFPEdit

FinalRFP

SourceSelection

AS

RFP Developement

7

Page 8: PEO C4I/IT Seminar Brief - CANES - Aug 08

8

CANES Contract Strategy

FY08 FY09 FY10 FY11

PCs & S/W Licenses procured using Navy and DoD enterprise contracts

Afloat Core Services

Afloat CS development: ISNS INCR 1 Mod 5 CS v1.0 CS v1.1 CANES ACS v1.0

MS CMS B

Source

Selection

4 mo

CS RFP aligned to System Developer RFP.

RFP Process

3 mo

MDD

CompleteComplete

Developed Functional Baseline & SDS

1 mo

Develop

Solicitation

Draft RFP

3 mo

Source

Selection

6mo

CCE System Developer 2

CCE System Developer 1

14 mo

Down-Select

2 mo

LRIP

GovernmentOversight

GovernmentOversight

11 Dec 08Release draft RFP, technical

components of PR

EDM DropCA + 4 mo

EDM DropCA + 8 mo

EDM DropCA + 12 mo

US TestX2 S Test X2SIT 1 X2

OA X2

SRR

Preliminary Design Review

Final RFP Build

PropPrep

2 mo

Vendor provided Allocated Baseline and Prototype

Develop

SolicitationReview

2 mo

GovernmentOversight

GovernmentOversight

Page 9: PEO C4I/IT Seminar Brief - CANES - Aug 08

9

Afloat Core Services (ACS)

• The ACS contract is decoupled from System Development contract• Due to nature of SOA as an emergent concept and architecture within the

DoD

• Large number of PEO C4I and other COI applications and hardware interfaces that ACS is anticipated to support

• Leverage lessons learned from the NCES SOA contract

• The Core Services (CS) are a component of the overall system architecture and fundamentally a system application/enhancement• CS v1.0/1.1 provides an initial, technically mature core services stack

• The Government ACS Trusted Agent will provide CS to the CCE developer for incorporation into the network

• The ACS contractors will be responsible for developing open standards compliant products and supporting the integration of those products into the CANES ACS stack

Overall CANES network not dependent on ACS for deliveryOverall CANES network not dependent on ACS for delivery

Page 10: PEO C4I/IT Seminar Brief - CANES - Aug 08

Services Layers

Service-oriented infrastructure results from applying the principles of service-orientation to the enterprise architecture pillar

Service-oriented infrastructure results from applying the principles of service-orientation to the enterprise architecture pillar 10

Page 11: PEO C4I/IT Seminar Brief - CANES - Aug 08

11

ACS Contracting Strategy

• The ACS contract will be released and managed from SSC Atlantic with daily interaction with the CANES PMO

• The ACS contract will be an IDIQ MAC with up to five primes who will be responsible for 50% of the work performed

• The contract activities will be broken out into the following areas• Development and Application Integration• Fielding and Procurement • Sustainment

• The ACS RFP is currently planned to be released in June 09 with a contract award in Dec 09

• The seams between ACS and the CCE will be managed via strict government oversight and continuous engagement between the CANES SE, the CCE SD vendors, the ACS Trusted Agent, and the ACS vendors

Page 12: PEO C4I/IT Seminar Brief - CANES - Aug 08

12

What are we buying?

Integrate Core Services

Procure Core Services

Develop Core Services

Establish multiple SOA/ESB RI sites

Develop and provide SDKs

Develop SOA Allocated Baseline

Develop SOA Product Baseline - CI Specifications / CI Tree - Creation of Dependency TreeDevelop SOA Product Specifications

Develop SOA Unit Test Plans

Support / Implement SOA Testing Process - Procure and provide testing toolsExecute Information Assurance / Accreditation Requirements

Productionize - Provide ILS - Create Load Plans and Procedures - Develop Training - Create documentation- Redundancy/backupConduct Software Support Activity- Licenses / Maintenance- Version control- Trouble ticket tracking and resolution (IAVAs, STRs)- Help DeskProvide Configuration Management -Maintain CM of CIs-Support overall CANES CM

Provide Systems Engineering / Software Engineering Process expertise / artifacts

The Government will serve as the Lead IntegratorThe Government will serve as the Lead Integrator

Page 13: PEO C4I/IT Seminar Brief - CANES - Aug 08

13

Seam Management

• A governance board will be established within the CANES program office

• An ACS-IPT will be formed• Biweekly meetings to discuss engineering challenges and

disseminate necessary information regarding CS v1.0 or CS v1.1

• Reviews will be conducted regularly with both SD vendors

• Online collaboration sites via the ACS Integrated Development Environment (IDE) will be established• Each SD will have ability for daily interaction with the ACS Trusted

Agent

Interaction and Collaboration are KEY to Seams ManagementInteraction and Collaboration are KEY to Seams Management

Page 14: PEO C4I/IT Seminar Brief - CANES - Aug 08

Integrated Development Environment

Page 15: PEO C4I/IT Seminar Brief - CANES - Aug 08

15

Thank You

“The CANES system achieves an open, agile, flexible and affordable network architecture that will move us forward. CANES embraces cross domain solutions

that enable enhanced movement of data. It is a revolutionary change in our information technology infrastructure and it is absolutely vital for us to excel

in 21st century warfare”

ADM Roughead’s CNO testimony to Senate Armed Services Committee on

2009 Budget Priorities28 Feb 08

ADM Roughead’s CNO testimony to Senate Armed Services Committee on

2009 Budget Priorities28 Feb 08


Recommended