+ All Categories
Home > Documents > PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION:...

PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION:...

Date post: 18-Jan-2016
Category:
Upload: phillip-evans
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
22
PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all (CICSBDWN) (HEPPS Application closed) months except June, July and August. 09-22-93 Solid line = Trigger Dashed line = logical link ( ) Parentheses=requirement or dependenc (? ) conditional dependency (/ ) negative dependency Flow Key
Transcript
Page 1: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERBSEP

NEW

REVISED

PER843(JCL)

PERBSEP

09-26-91

SCHID: 40

CALENDAR: PW

DESCRIPTION:

Runs 2 nights after RG1 and RG2 Payroll Calc. for all

(CICSBDWN)(HEPPS Application closed)

months except June, July and August.

09-22-93

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Page 2: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERDBP

NEW

REVISED

03-29-1989

PER840 PER891

PER841

(/ARM803)(/ARM814)(/LIB810)(/LIB811)(/ADABUTIL)(APPOINTMENT File closed)

(/ADW830)(/ARM803)(/ARM814)(/ARM825)(/CPT816)(/CPY812)(/DWS811)(/LIB810)(/LIB811)(/PER807)(/PER865)(/PER879)(/PER891)(/PER896)(/ADABUTIL)

PERDBP

06-18-2006

SCHID: 10CALENDAR: PW

DESCRIPTION:Runs 1 day before each Payroll Calc.

PER842

(PER808)

(PER842)(/PER879)(/PER896)

(/PER879)(/PER896)(/ADABUTIL)(EMPLOYEE File closed)

/ADBUTIL = Mutually Exclusive Jobs

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Page 3: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERCLS

11-04-1999 NEW 10-30-2006 REVISED

SCHID: 2

CALENDAR:

DESCRIPTION: Usually runs on the 1st working day of June

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Runs at the request of SP/P

PERCLS

PER824

PER887

(USR=SP/P will release)(JCL)

USR=TECH: IS MASS SALARY READY?

TRIGID= 2

TRIGID= 2

Page 4: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERCLS1

11-04-1999 NEW08-28-2008 REVISED

SCHID: 2, 3

CALENDAR:

DESCRIPTION: Usually runs 3 days before JUNE RG2 payroll

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

or as part of MSI. Runs at the request of SP/P

PERCLS1

PER821

PER888

PER823

(USR= Job Class Adjustment?)(HEPDDONE)

USR=TECH: IS MASS SALARY READY?

(HEPDDONE)(JCL)

TRIGID= 2

TRIGID= 2

TRIGID= 2

TRIGID= 3

PER821(HEPDDONE)(JCL)

SCHID = 3 SCHID = 2

Page 5: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERCLS2

11-04-1999 NEW

05-08-2007 REVISED

PERCLS2

PER887

PER846 (JCL)

SCHID: 2

CALENDAR:

DESCRIPTION: Usually runs 2 day before JUNE RG2 payroll

PER851 (JCL)

PER844

PER819NU

(USR= Have rpts from PER821 been approved?)

PER889TRIGID 5

NOTE: HEP800 SCHID=6 must run before PERFAC2 and PERCLS2. If these jobs are rescheduled, it may be necessary to update the schedule for HEP800 SCHID=6.

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Runs at the request of SP/P

(USR= Has MSI HEP800 ran?)

(PER821)

CPY836 SCHID 11 will need to run the same day.

NOTE:

PER819UN PER819PGTRIGID 12TRIGID 11TRIGID 10

SP/P: HAVE ALL PER819 JOBS FINISHED?

(PER887)(/PER819UN)(/PER819PG)(/PER819GR)SP/P: FLIP?

(PER887)(/PER819NU)(/PER819PG)(/PER819GR)SP/P: FLIP?

(PER887)(/PER819UN)(/PER819NU)(/PER819GR)SP/P: FLIP?

Page 6: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERFAC1

11-04-1999 NEW

08-14-2007 REVISED

PERFAC1

SCHID: 1, 2

CALENDAR:

DESCRIPTION:

PER826 (HEPDDONE)(USR= FAC upload file OK?)(/PER821)#JI/JO(JCL)

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Usually runs 3 day before June RG2Runs at the request of SP/PSCHID 1 = .Part1SCHID 2 = .Part2

PER826 (HEPDDONE)(USR= FAC upload file OK?)(/PER821)#JI/JO(JCL)

TRIGID 1 TRIGID 2

Page 7: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERFAC2

11-04-1999 NEW

08-29-2008 REVISED

PERFAC2

PER889

PER849

(USR= Has MSI HEP800 run?)(USR=Have rpts from PER826 been appoved?)

SCHID: 2

CALENDAR:

DESCRIPTION: Usually runs 2 days before June RG2

PER848

TRIGID 7

CPY836 SCHID 12 will need to run the same day.

NOTE the following may or may not apply: HEP800 SCHID=6 must run before PERFAC2 and PERCLS2. If these jobs are rescheduled, it may be necessary to update the schedule for HEP800 SCHID=6.

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Runs at the request of SP/P

NOTE:

(JCL)

Page 8: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

08-24-2007 NEW

SCHID: 1

CALENDAR:

DESCRIPTION: Runs at the request of SP/P

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Runs at the request of SP/P

PERGRD1

PER825 (JCL)

PER SystemPERGRD1

Page 9: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERGRD2

08-24-2007 NEW

PERGRD2

PER819GR

PER862

SCHID: 13

CALENDAR:

DESCRIPTION:

PER861

(JCL)

TRIGID 13

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

Runs at the request of SP/P

PER889

(#JI/JO)

10-25-2007 REVISED

Page 10: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPERPID

NEW

REVISED

3-23-89

PERPID

10-04-11

PER856 (HEP861EX SCHID 1-5 as part of HEPDLY1 NOT the HEP861EX triggered by HEP806 )

PER802 PER804

SCHID: 30

CALENDAR: PW

DESCRIPTION:Runs 1 day after Payroll Calc. RG2.

Solid line = Trigger

Dashed line = logical link

( ) Parentheses=requirement or dependency(? ) conditional dependency(/ ) negative dependency

Flow Key

NOTE: When running as part of a Mass Salary Increase, please seeHEP806.

(HEP800)

Page 11: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER800 - PER805

NEW

01-26-2011 REVISED

SCHID: 40CALENDAR: PW

DESCRIPTION:

SCHID: 55

CALENDAR: PW

DESCRIPTION:SCHID:

CALENDAR:

DESCRIPTION:

SCHID:CALENDAR:

PER803

PER805

Runs day of Payroll Calc. RG2.

(JCL)

Runs 4 days after Payroll Calc. RG2

03-27-1989

SCHID:CALENDAR:

DESCRIPTION:

SCHID: 25

CALENDAR: PW

DESCRIPTION:

PER802

PER804

SCHID 30: PERPID

SCHID 30: PERPID

PER800

Runs 2 days after each Payroll Calc. exceptthe months of June, July, August.NXTCYC,SET=OFF 2-8-2000

POSSIBLE OBSOLETION

SCHID:CALENDAR:

DESCRIPTION:DESCRIPTION:

Page 12: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER806 - PER810

NEW

02-14-2011 REVISED

PER807

03-27-1989

SCHID: 2

CALENDAR: 7D

DESCRIPTION:SCHID 2: Runs Fridays

SCHID:CALENDAR:

DESCRIPTION:

POSSIBLE OBSOLETION

PER806

SCHID: 10CALENDAR: PW

DESCRIPTION:Runs day before Payroll Calc.RG1 and RG2.

PER808 (JCL)

SCHID:

CALENDAR:

DESCRIPTION:

SCHID: 2

CALENDAR: PW

DESCRIPTION:Runs day of Payroll Processing

SCHID:

CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:SCHID:

CALENDAR:

DESCRIPTION:

PER810

(/PER841)

(CPY860)

Page 13: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER812 - PER819X

NEW

REVISED

SCHID: 30CALENDAR: PW

DESCRIPTION:

SCHID: 1,2,3,4,5CALENDAR: PM

DESCRIPTION:

03-27-1989

08-25-2008

SCHID: 1,2,3,4,5,100CALENDAR: PW Roll = D

DESCRIPTION:SCHID: 40CALENDAR: PW

DESCRIPTION:

PER812

PER814 (JCL)

Runs day after each Payroll Calc.

PER813B

PER813

SCHID 2: Runs every Tuesday.SCHID 3: Runs every Wednesday.SCHID 4: Runs every Thursday.SCHID 5: Runs every Friday.

SCHID 1: Runs every Monday.

(HEPDDONE)

SCHID 2: Runs every Tue. except 2DBP and DOP.SCHID 3: Runs every Wed. except 2DBP and DOP.SCHID 4: Runs every Thu. except 2DBP and DOP.SCHID 5: Runs every Fri. except 2DBP and DOP.

SCHID 1: Runs every Mon. except 2DBP and DOP.

(HEPDDONE)

(JCL)

Runs 2 days afterPayroll Calc RG2.

SCHID: 45

CALENDAR: PW

DESCRIPTION:

Runs 1 day after each Payroll Calc.

PER815 (HEPDDONE)

SCHID: 1

CALENDAR: 7D Roll = N

DESCRIPTION:

PER818

Runs on the 28th calendar day of each month.

SCHID:CALENDAR:

DESCRIPTION:Runs part of PERCLS2 Trigid= 10

SCHID: 6CALENDAR: WD

DESCRIPTION:Runs the 1st day of August

PER819(PER887)

(PER887)(/PER819UN)(/PER819PG)(/PER819GR)SP/P: FLIP?

PER819NU

SCHID 100: BPSPEC.

Page 14: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER820 - PER824X

NEW

10-25-2007 REVISED

03-27-1989

SCHID:

CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:SCHID:CALENDAR:

DESCRIPTION:

PER820 (JCL)

POSSIBLE OBSOLETION

PER821

PER823

Runs part of PERCLS1 TRIGID=2

PER822

POSSIBLE OBSOLETIONRuns part of PERCLS1 TRIGID=2, 3

(JCL)(HEPDDONE)

SCHID:

CALENDAR:

DESCRIPTION:

PER824

Runs part of PERCLS TRIGID=2

(JCL)

SCHID:CALENDAR:

DESCRIPTION:Runs part of PERCLS2 Trigid= 12

(PER887)(/PER819UN)(/PER819NU)(/PER819GR)SP/P: FLIP?

PER819PG

SCHID:CALENDAR:

DESCRIPTION:Runs part of PERCLS2 Trigid= 11

(PER887)(/PER819NU)(/PER819PG)(/PER819GR)SP/P: FLIP?

PER819UN

SCHID:CALENDAR:

DESCRIPTION: Part of PERGRD2Trigid= 13

(PER887)(/PER819UN)(/PER819PG)(/PER819NU)SP/P: FLIP?

PER819GR (#JI/JO)

(#JI/JO)(#JI/JO)

Page 15: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER825 - PER832

NEW

05-02-2005 REVISED

SCHID:

CALENDAR:

DESCRIPTION:

10-26-1990

SCHID:

CALENDAR:

DESCRIPTION:

PER825

Run by SP/P on Request.Runs in PERGRD1

(JCL) PER826

Runs in PERFAC1

(JCL)#JI/JO

SCHID:CALENDAR:

DESCRIPTION: SCHID:

CALENDAR:

DESCRIPTION:

SCHID: 5CALENDAR: 7D

DESCRIPTION:Runs every Sunday.

PER829 (HEPDDONE)

PER828

Run by SP/P

(JCL)

SCHID: 1CALENDAR: 7D Roll = N

DESCRIPTION:

PER830

Runs on the 21st calendar dayof each month.

SCHID:

CALENDAR:

DESCRIPTION:Run by SP/P

PER831

SCHID: 40

CALENDAR: PW

DESCRIPTION:

PER832

Runs 2 days after each Payroll Calc.

(HEPDDONE)

PER835

Possible Obsoletion nxtcyc=off 5/02/05

Page 16: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER833 - PER844X

NEW

REVISED

SCHID:

CALENDAR:

DESCRIPTION:

03-27-1989

04-03-2008

SCHID:

CALENDAR:

DESCRIPTION:

PER835

SCHID 40: See PER832

DESCRIPTION:

DESCRIPTION:

CALENDAR:

CALENDAR:

SCHID:

SCHID:

SCHID:

SCHID:CALENDAR:

CALENDAR:

DESCRIPTION:

DESCRIPTION:

PER840

SCHID 10: PERDBPPER841

SCHID 10: PERDBP

PER843

PER842

SCHID 10: PERDBP

SCHID 40: PERBSEP

(JCL)

SCHID:

CALENDAR:

DESCRIPTION:

PER844

Runs part of PERCLS2

SCHID:1, 2

CALENDAR: WD

DESCRIPTION:SCHID 1: Runs on requestSCHID 2: Runs the 1st working dayof January, April, July, and October.POSSIBLE OBSOLETION

PER833

(/ARM803)(/ARM814)(/LIB810)(/LIB811)(/ADABUTIL)(APPOINTMENT File closed)

(/ADW830)(/ARM803)(/ARM814)(/ARM825)(/CPT816)(/CPY812)(/DWS811)(/LIB810)(/LIB811)(/PER807)(/PER865)(/PER879)(/PER891)(/PER896)(/ADABUTIL)

(/PER879)(/PER896)(/ADABUTIL)(EMPLOYEE File closed)

SP/P: HAVE ALL PER819 JOBS FINISHED?

Page 17: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER845 - PER849

NEW

12-19-2003 REVISED

SCHID:

CALENDAR:

DESCRIPTION:

01-26-1990

SCHID:

CALENDAR:

DESCRIPTION:

PER846

Runs part of PERCLS2

Setup by PER852

SCHID:CALENDAR:

DESCRIPTION:

PER845

SCHID 30: PERPID

SCHID:

CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:Runs in PERFAC2

PER848

SCHID:

CALENDAR:

DESCRIPTION:Runs in PERFAC2

SCHID:

CALENDAR:

DESCRIPTION:

PER849

SCHID:CALENDAR:

DESCRIPTION:

POSSIBLE OBSOLETION

Page 18: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER851 - PER856

NEW

10-30-2006 REVISED

SCHID:CALENDAR:

DESCRIPTION:

SCHID: 1CALENDAR: 5D Roll = B

DESCRIPTION:

SCHID: 25

CALENDAR: PW

DESCRIPTION:

SCHID: 1CALENDAR: 5D Roll = N

DESCRIPTION:Runs the 10th of December

SCHID:

CALENDAR:

DESCRIPTION:Runs the 15th calendar dayof each month

PER852

PER853PER854

03-27-1989

(JCL)(HEPDDONE)

SCHID:

CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:

PER855

Runs on the day of Payroll Calc. RG2.

PER856

SCHID 30: PERPID

SCHID:CALENDAR:

DESCRIPTION:

PER851

Runs part of PERCLS2

Setup by PER852

(CPY860) (HEP800)

Also runs on request of SP/P.

Obsolete per HR 8/27/09 Obsolete per HR 12/2009

Page 19: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER861 - PER862

NEW

REVISED

SCHID:CALENDAR:

DESCRIPTION:

SCHID:CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:

SCHID: CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:

PER862

12-19-2003

SCHID:

CALENDAR:

DESCRIPTION:

SCHID:CALENDAR:

DESCRIPTION:

SCHID:CALENDAR:

DESCRIPTION:

PER861

Runs on request of SP/P.Runs as part of PERGRD2

Runs on request of SP/P.Runs as part of PERGRD2

(JCL)

Page 20: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER863- PER871 NEW

04-24-2009 REVISED03-31-1989

SCHID: 2

CALENDAR: 7D

DESCRIPTION:

SCHID 2: Runs on the 10th of October.

PER863 (JCL)

SCHID: 2CALENDAR: WD

DESCRIPTION:SCHID 2: Runs on the first working day in October.

PER864 (JCL)

SCHID: 25CALENDAR: PW

DESCRIPTION:Schid 25: Runs one day before RG2 payroll calc.

PER865

SCHID:CALENDAR:

DESCRIPTION:

SCHID:CALENDAR:

DESCRIPTION:

(/PER841)

DESCRIPTION:Schid 1: Runs every month after the RG2 payroll processing.

CALENDAR: PW

SCHID: 1

PER870

PER871

DESCRIPTION:Triggered by PER870

CALENDAR:

SCHID:

PER871

CALENDAR: PWSCHID: 30DESCRIPTION: Runs the day afterPayroll calc.

OBSOLETE nxtcyc on 09/17/2007OBSOLETE nxtcyc on 09/17/2007

PER866

Page 21: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER878- PER888 NEW

04-05-2013 REVISED

03-31-1989

SCHID: 1CALENDAR: RG

DESCRIPTION:Runs on the 1st day of class for Fall & Spring semester.

PER879

Also runs on Request. (JCL) SBTM = 1710

(/PER841)

(/PER891)(/PER896)

(/PER842)

(/PER840)

SCHID:CALENDAR:

DESCRIPTION:

PER878

Runs on Request.SBTM = 2115

SCHID: 1CALENDAR: WD

DESCRIPTION:Runs on the 5th working day of March & October.

(JCL)(HEPDDONE)PER886

SCHID: 7

CALENDAR: WD

DESCRIPTION:SCHID 7: Runs the 1st working day of August.Runs part of PERCLS Trigid= 2, &PERCLS2 Trigid= 5

PER887

SCHID:

CALENDAR:

DESCRIPTION:

(HEPDDONE)PER888

Runs as part of PERCLS1 TRIGID=2

SCHID:CALENDAR:

DESCRIPTION:

SCHID:CALENDAR:

DESCRIPTION:

SCHID:CALENDAR:

DESCRIPTION: 002_AFTER runs day after RG1 &RG2 payroll.004_BEFORE runs 3 days before RG1 & RG2 payroll.

PER880

PW002_AFTER

004_BEFORE

CONTROL-M

Page 22: PER System PERBSEP NEW REVISED PER843 (JCL) PERBSEP 09-26-91 SCHID: 40 CALENDAR: PW DESCRIPTION: Runs 2 nights after RG1 and RG2 Payroll Calc. for all.

PER SystemPER889 - PER899 NEW

04-03-2008 REVISED

SCHID: 2

CALENDAR: 7D

DESCRIPTION:SCHID 2: Runs the 1st calendar day of every month.POSSIBLE OBSOLETION

SCHID: 1CALENDAR: WD

DESCRIPTION:SCHID:CALENDAR:

DESCRIPTION:Runs on Request

SCHID:

CALENDAR:

DESCRIPTION:

SCHID:

CALENDAR:

DESCRIPTION:

PER894

PER896

03-27-1989

Runs every Friday.

Runs on the 1st working dayof each month.

(JCL)

SCHID: 5

CALENDAR: 5D Roll = N

DESCRIPTION:

PER891

SCHID 10: PERDBP

(/PER841)

(/PER879)(/PER891)

(/PER842)

(/PER840)

SCHID:CALENDAR:

DESCRIPTION:Submitted via Nat-Processby SP/P.

PER899

PER892

SCHID:

CALENDAR:

DESCRIPTION:

PER889

Runs part of PERCLS2Runs as part of PERGRD2Runs as part of PERFAC2

PER895 (JCL)

(PER842)(/PER879)(/PER896)

POSSIBLE OBSOLETION

POSSIBLE OBSOLETION


Recommended