Ministry of Transport Performance Report - 2011 No.01 D.R.Wijewardana Mawatha Colombo - 10
Transcript
Page 1: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

i

Ministry of Transport

Performance Report - 2011

No.01

D.R.Wijewardana Mawatha

Colombo - 10

Page 2: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

1

VISION

Our singular vision is to make Sri Lanka the Country with the most

comfortable and efficient Bus and Railway services in this region of the

world.

MISSION

Our ambition, based on the Mahinda Chintanaya, is to use state of the art

technology for the continuous improvement maintenance of all human

resources and infrastructure facilities, so as to improve of life within the

country by bringing a higher level of convenience and comfort to the

transportation services used daily by Sri Lankans.

Page 3: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

2

Contents

1. Introduction 3

2. Functions of the Establishment Branch 3

2.1 Human Resources Development 3

2.2 Submission of Cabinet Papers 7

2.3 Functions performed by the Establishment Branch pertaining to

Railway Activities. 8

2.4 Functions Performed by the Establishment Branch regarding the

Legal Branch Work. 9

2.5 Other Functions Performed by the Establishment Branch 9

3. Financial Management and Progress 12

3.1 Procurement Committees – 2011 12

3.2 Financial Management 12

4. Functions Performed by the Planning Division 23

5. Functions Performed by Internal Audit Branch 25

6. Performance of Activities under New Rail Road Development Project. 25

6.1 Matara-Kataragama New Rail Road 26

6.2 Extension of Kelani Valley Railway Line from

Avissawella to Hambantota 29

6.3 Kurunegala-Habarana New Railway Line 29

6.4 Horana-Panadura New Railway Line 29

6.5 Medawachchiya – Trincomalee New Railway Line 29

6.6 Wellawaya - Badulla New Railway Line 29

6.7 Trincomalee – Puttalam New Railway Line 30

7. Progress on Road Safety Activities 30

7.1 Road Safety Conference 30

7.2 Formulation of Ten Year Plan for Action Decade for Road Safety 30

7.3 Creating Awareness among General Public 30

7.4 Compensation Scheme 31

Page 4: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

3

1. Introduction

This report has been prepared as a summary of information on activities performed by our

Ministry during the year 2011 for the development of the field of transport in Sri Lanka.

In addition to progress reports prepared in detail annually by the Railway Department,

Sri Lanka Transport Board and Motor Traffic Department functioning under the Ministry,

information pertaining to functions delegated to the Ministry by the Ministry office and

policy decisions taken for the productive and efficient performance of such functions

developing human resources, physical resources and information on activities performed

by various branches of the Ministry and programs implemented are included in this report.

2. Functions of the Establishment Branch

2.1 Human Resources Development

Local Training 2011

Name of the Training

CourseInstitute Duration

No of

Participants

1

Training Program on

Pension Process – Sinhala

Medium

Public Service

Training Institute 2 Days 7

2

Advance Computer

Training Program

(Microsoft Excel) –

Sinhala Medium

Public Service

Training Institute4 Days 1

3

Training Program on

Project Management –

Sinhala Medium

Public Service

Training Institute 3 Days 4

4

Management Assistant

Carrier Beginning Training

Program – Sinhala Medium

Public Service

Training Institute 10 Days 3

5

Training Program on

Advance Accounts –

Sinhala Medium

Public Service

Training Institute 1 Day 2

6Training Program on Basic

Computer Skills

Public Service

Training Institute5 Days 2

Page 5: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

4

7

Training Program on Stores

& Procurement Procedure

– Sinhala Medium

Public Service

Training Institute 3 Days 2

8

Training Program on

Salary Conversions –

Sinhala Medium

Public Service

Training Institute 1 Day 8

9

Training Program on Basic

Computer Skills – Sinhala

Medium

Public Service

Training Institute 5 Days 1

10

Training Program on

Government Auditing–

Sinhala Medium

Public Service

Training Institute 2 Days 3

11

Training Program on Good

Governance & Human

Resource Management –

Sinhala Medium

Public Service

Training Institute5 Days 3

12

Training Program on Public

Finance Management –

Sinhala Medium

Public Service

Training Institute 5 Days 4

13

Training Program on

Disciplinary Procedure –

Sinhala Medium

Public Service

Training Institute 3 Days 1

14

Training Program on

E-Mail & Internet Usage -

Sinhala Medium

Public Service

Training Institute 1 Day 1

15

Training Program on

Scheme of Recruitments -

Sinhala Medium

Public Service

Training Institute 1 Day 3

Page 6: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

5

16

Training Program on

Maintenance of Computer

Hardware

Academy of Financial

Studies 5 Days 1

17

Training Program on

Office Automation Using

Information Technology

Academy of Financial

Studies 5 Days 1

18

Training Program on

Government Payroll

Management System

Academy of Financial

Studies 6 Days 1

19

Certificate Course in

English for Employment

Purposes (CEEP)

Sri Lanka Institute

of Development

Administration

12 Weeks 3

Other Training Programs and Workshops – 2011

Name of the Training

CourseInstitute Duration

No of

Participants

1

MBA International Trade

& Logistics Degree

Program 2010 - 11

Postgraduate Institute

of Management 1

2Traffic Management &

Safety

University of

Moratuwa4 Days 1

3

Office Management

Training Programme –

Three Days

National Institute of

Labour Studies 3 Days 2

4

Workshop on Operation

& Maintenance of

Southern Expressway

Road Development

Authority 1 Day 3

5

Computer aided Project

Management using

Microsoft Project 2010

Distance Learning

Center Ltd 2 Months 1

6

Workshop on Parliament

committees, Acts and

Regulations

Ministry of

Parliament Affairs 1 Day 1

7 Tamil ClassDepartment of

Official Language23

Page 7: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

6

Participation in Foreign Training/Seminars during the 2011

Name of the Training

CourseDuration Country

No of

Participants

1

Workshop on Managing

Urban air Quality ; Focus on

Clean and Fuel Efficiency

Vehicles

3 Days India 1

2Technical Workshop on the

Road Safety Engineering5 Days Thailand 1

3Multimodel Transport Project

Proposal Negotiations2 Days Philippine 1

4

Results Management for

Public Sector Excellence –

Transport Sector

4 Days Singapore 1

5Doctor of Project

Management (Research)4 Years Australia 1

6Environmentally Sustainable

Transportation2 months Japan 1

7

The Tour of Pre-Review the

preliminary designs for the

construction of Matara –

Beliatta New Railway Project

8 Days China 2

8

2ndMeeeting to the Export

Group to negotiate draft

Regional Agreements

on Motor Vehicles and

Railways, SAARC

Secretariat

4 DaysNepal

(SARRC)1

9

Training Programme of

Urban Transport Planning

and Management

11 Days Singapore 1

Page 8: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

7

10

Sub regional Meeting

on the Development of

Intergovermental Agreement

on Dry Ports for South and

South – West Asia

2 Days Bangladesh 1

11

Select Committee of

Parliament to look into the

alarming increase in traffic

accidents – Study Tour

7 DaysUnited

Kingdom1

12

Training Programme on

Comprehensive Urban

Transportation Planning and

Project

2 months Japan 1

13

Countermeasure Against

Automobile Pollution in

Urban Area

2 months Japan 1

14

MOT, SLR and CECB

officials to Technical Review

Meeting

4 Days Korea 1

2.2 Submission of Cabinet Papers

Cabinet Papers submitted during the year 2011

Institution No. of Cabinet Papers submitted Total

A B C D E F G H I J K L M N

Ministry 7 1 1 1 10

Railway

Department1 14 1 3 4 6 18 47

Department of

Motor Traffic4 1 1 1 6 13

Sri Lanka Transport

Board1 2 3 1 7

National Transport

Medical Institute2 2

New Rail Road

development Road3 1 4

Total 8 3 24 4 4 6 8 1 18 1 6 83

Page 9: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

8

A. - Building constructions, development of assets and improvementsto assets, studies

pertaining to constructions.

B. - Amendments including reports to be submitted to the Parliament.

C. - Appointments, promotions, extension of service, Re-employments, request for re-

instatement, confirmation in service.

D. - Preparing institutional structure

E. - Large scale purchases, payments to external parties

F. - Acquiring land/alienation to other parties.

G. - Removal of employees’ salary anomalies and granting other relief/requests

pertaining topolitical victimization, placement on salary points.

H. - Accounts, financial activities and other administrative matters.

I. - Sale of assets and removal etc.

J. - Renewal of service agreements, extension of project and contract time limit.

K. - Obtaining additional financial provision.

L. - Disciplinary matters.

M. - Sale of unserviceable articles/supplying

N. - Revenue received by the government pertaining to Motor Traffic Act.

2.3 Functions performed by the Establishment Branch pertaining to Railway

Activities.

• Attending to duties of all staff posts and services belonging to the Railway

Department from appointment to retirement including transfers, promotions,

disciplinary matters, extension of service and duties pertaining to recruitments on

contract basis and re- instatements.

• During the period prior to 19-05-2011, before the Public Service Commission was

re-established, the above functions performed after obtaining the Cabinet approval

in terms of powers delegated to the Secretary to the Ministry by the Secretary to

the Cabinet.

• Performing duties on leave abroad, accident leave,compensation for accidents.

• Performing duties on, release from service for Trade Union Work, Trade Union

requests and other complains.

• Attending to duties on land belonging to the Railway Department, rails and sleepers

issuing visa for foreigners serving in Railway Department.

• Performing duties pertaining to granting relief to Railway employees who were

politically victimized.

• Activities pertaining to preparing organizational structure of the Railway

Department.

Page 10: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

9

2.4 Functions Performed by the Establishment Branch regarding the Legal Branch

Work.

• Number of New Cases handled during the year 2011 – 11 Cases

• Human Rights complains – 03

• Number of Regulations imposed and published under the Motor Traffic Act – 07

2.5 Other Functions Performed by the Establishment Branch

Programme Activities

Tappol

1. Distribution of daily Tappol received in the

Ministry Systematically.

2. Finalizing the dispatch to the departments

and institutions outside the Ministry.

Maintenance of Personal Files

•Staff officers

1. Obtaining/approving performance appraisal

reports.

2. Granting salary increments.

3. Granting promotions.

4. Extension of service.

5. Retirements.

•Officers in Public Management

Assistants’ Service

1. Granting salary increments

2. Annual transfers and internal transfers

3. Promotions/Retirements

4. Preparation of scheme of retirement and

approving

•Officers Recruited on contract

basis

1. Granting salary increments.

2. Preparation of Cabinet Paper drafts to

extend re-employments/submission for

approval.

•Drivers and Office Employees’

Service

1. Granting salary increments.

2. Transfers (Annual/Internal)

3. Promotions/Retirements.

4. Preparation of Scheme of Recruitment.

Page 11: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

10

Maintaining Ministry Staff

Particulars.

1. Reporting particulars of vacancies to the

Director General Combined Services.

2. Replying letters and information received

from other institutions and obtaining

information.

3. Submission of information regarding

officers attached to the Ministry for training

and their attendance particulars to the

relevant institutions.

Loans and Advances

1. Property Loans.

2. Distress Loans.

3. Submission for approval Festival

Advances/Special Advances.

4. Revoking Power of attorney/Releasing

Security Deposits (Relating to Railway

Dept.)

Telephones/Water/Official

Quarters, Taxes

1. Hon. Minister’s office, Hon. Deputy

Minister’s office/Ministry

2. Settlement of telephone/water/tax and

electricity bills of official quarters and

Ministry officials.

3. Direct and internal telephone bills of the

Ministry Secretary and staff.

4. New telephone connections.

5. Settlement of Hon. Minister’s entertainment

bills.

Inventory Items

1. Additional Secretary (Admin) Office

2. S.A.S Office

3. Asst. Secretary (Admin) and Asst. Secretary

(Railway) Office

4. Administrative Officer’s Office

5. Inventories of Drivers’ Room – Maintaining

and updating

Page 12: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

11

Supply of Newspapers

•Official Identity Card/Bus Passes

and Railway Warrants

1. Supply of Newspapers to the Hon. Minister,

Deputy Minister and Staff Officers.

Duties Pertaining to matters

regarding leave

1. Obtaining a report on the attendance

of Ministry staff – Daily arrival and

departure.

2. Updating the leave records.

3. Overtime.

4. Travelling expenses.

5. Railway concessionary Season Tickets.

6. Holiday Warrants.

Duties Pertaining to Minister’s

Staff

1. All activities pertaining to Minister’s and

Deputy Minister’s Staff including their

appointments.

Circuit Bungalow

• Agrahara Insurance

• Election Duties

1. Booking of circuit Bungalows.

Reimbursement of relevant movies to the

Rly. Department/maintenance of Register.

2. Certifying and submission of Agrahara

benefit applications from Ministry Officials

and submitting them to the insurance

institutions.

3. Submission of necessary applications for

processing Electronic Cards under Medical

Insurance Scheme for Ministry Officials.

4. Submission of relevant information to

the Election Secretariat according to

instructions given.

5. Obtaining applications of postal voters and

referring them to the relevant Returning

Officers.

Page 13: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

12

6. Registrations/referring to relevant

Divisional Secretariat.

7. All activities pertaining to postal voting/

referring them to relevant Divisional

Secretariats.

3. Financial Management and Progress

3.1 Procurement Committees – 2011

#

No. of procurements

that activated on

2011

No. of procurement

that completed on

2011

1Cabinet Appointed

Procurement Committees05 02

2Ministry Procurement

Committee13 08

3.2 Financial Management

Provision allocated for the year 2012 and

actual expenditure -

Relevant Reports Attached

Expenditure Votes which incurred expenses

beyond the allocation

Nil

Activities conducted to improve efficiency Improving efficiency by issuing

instructions to all officers in the Accounts

Branch to solve the problems identified

regarding the activities finalized in the

year 2010, during the year 2011.

Preparation of accounts for the year 2011

and reconciliation with the Treasury

All reports have been prepared and

reconciled with the Treasury.

Page 14: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

13

EX

PE

ND

ITU

RE

RE

PO

RT

- A

S A

T 3

1.12

.201

1

Hea

d

-

1

14

-

M

inis

try

of T

rans

port

Pro

gram

me

-

0

1

-

Ope

rati

onal

Act

ivit

ies

Pro

ject

-

0

1

-

M

inis

ter'

s of

fice

Rs.

Sub Project

Object Code

Items

Finance code

Cat

egor

y/O

bjec

t Tit

leT

otal

Net

Pro

visi

on

Deb

its

to e

nd o

f

last

Mon

th

Deb

its

Dur

ing

Dec

embe

r 2

011

Tot

al A

ctua

l

Exp

endi

ture

Bal

ance

allo

cati

on%

0

Rec

urre

nt E

xpen

ditu

re44

,467

,000

37,8

77,6

11.3

14,

371,

776.

3342

,249

,387

.64

2,21

7,61

2.36

95.0

1

Per

sona

l Em

ulum

ents

13,1

96,0

0011

,902

,028

.88

1,06

8,38

3.83

12,9

70,4

12.7

122

5,58

7.29

98.2

9

10

01

Sa

lari

es &

Wag

es7,

867,

000

7,02

3,16

6.49

619,

300.

307,

642,

466.

7922

4,53

3.21

97.1

5

10

02

O

vert

ime

and

Hol

iday

pa

ymen

ts1,

983,

000

1,80

5,91

3.42

176,

193.

501,

982,

106.

9289

3.08

99.9

5

10

03

O

ther

Allo

wan

ces

3,34

6,00

03,

072,

948.

9727

2,89

0.03

3,34

5,83

9.00

161.

0010

0.00

Tra

velli

ng E

xpen

ces

1,60

0,00

01,

536,

414.

9037

,132

.30

1,57

3,54

7.20

26,4

52.8

098

.35

11

01

D

omes

tic1,

050,

000

1,01

2,86

7.70

37,1

32.3

01,

050,

000.

000.

0010

0.00

11

02

Fo

reig

n55

0,00

052

3,54

7.20

52

3,54

7.20

26,4

52.8

095

.19

Supp

liers

9,46

9,90

08,

188,

153.

351,

032,

612.

509,

220,

765.

8524

9,13

4.15

97.3

7

12

01

St

aion

ery

& O

ffice

R

equi

site

s1,

258,

000

931,

465.

4632

6,28

7.50

1,25

7,75

2.96

247.

0499

.98

12

02

Fu

el8,

161,

900

7,25

6,68

7.89

706,

325.

007,

963,

012.

8919

8,88

7.11

97.5

6

12

03

D

iets

& U

nifo

rm50

,000

0.00

0.

0050

,000

.00

0.00

Page 15: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

14

Mai

ntan

ance

E

xpen

ditu

re10

,402

,100

8,86

0,88

1.79

917,

739.

629,

778,

621.

4162

3,47

8.59

94.0

1

13

01

V

ehic

les

8,55

0,00

07,

008,

993.

8191

7,73

9.62

7,92

6,73

3.43

623,

266.

5792

.71

13

02

Pl

ant M

achi

nery

&

Equ

ipm

ent

1,55

2,10

01,

552,

076.

98

1,55

2,07

6.98

23.0

210

0.00

13

03

B

uild

ing

& S

truc

ture

s30

0,00

029

9,81

1.00

29

9,81

1.00

189.

0099

.94

Serv

ices

9,79

9,00

07,

390,

132.

391,

315,

908.

088,

706,

040.

471,

092,

959.

5388

.85

14

01

T

rans

port

3,75

4,00

03,

529,

567.

7522

3,82

2.96

3,75

3,39

0.71

609.

2999

.98

14

02

Po

stal

& C

omm

unic

atio

n2,

700,

000

2,16

3,21

1.36

503,

946.

422,

667,

157.

7832

,842

.22

98.7

8

14

03

E

lect

rici

ty &

Wat

er1,

600,

000

0.00

540,

616.

7054

0,61

6.70

1,05

9,38

3.30

33.7

9

14

05

O

ther

1,

745,

000

1,69

7,35

3.28

47,5

22.0

01,

744,

875.

2812

4.72

99.9

9

Cap

ital

Exp

endi

ture

34,1

50,0

0032

,387

,478

.85

124,

845.

8932

,512

,324

.74

1,63

7,67

5.26

95.2

0

Reh

abili

tati

on a

nd

Impr

ovem

ent

of C

apit

al

Ass

ets

2,05

0,00

080

7,38

4.63

94,8

19.2

090

2,20

3.83

1,14

7,79

6.17

44.0

1

20

01

B

uild

ing

& S

truc

ture

s70

0,00

00.

00

0.00

700,

000.

000.

00

20

02

Pl

ant M

achi

nery

&

Equ

ipm

ent

600,

000

78,3

04.6

394

,819

.20

173,

123.

8342

6,87

6.17

28.8

5

20

03

V

ehic

les

750,

000

729,

080.

00

729,

080.

0020

,920

.00

97.2

1

Acu

isit

ion

of C

apit

al

Ass

ets

32,1

00,0

0031

,580

,094

30,0

2731

,610

,121

489,

879

98.4

7

21

01

V

ehic

les

28,6

64,0

6829

,115

,386

.74

-451

,319

.31

28,6

64,0

67.4

30.

5710

0.00

21

02

Fu

nitu

re &

offi

ce

Equ

ipm

ent

198,

852

127,

783.

609,

296.

0013

7,07

9.60

61,7

72.4

068

.94

Page 16: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

15

21

03

Pl

ant M

achi

nery

&

Equ

ipm

ent

0.

00

0.00

1

Med

ia U

nit E

quip

men

t2,

437,

080

1,87

6,14

8.20

472,

050.

002,

348,

198.

2088

,881

.80

96.3

5

2

Oth

er M

achi

nary

800,

000

460,

775.

68

460,

775.

6833

9,22

4.32

57.6

0

Pro

ject

Tot

al78

,617

,000

70,2

65,0

90.1

64,

496,

622.

2274

,761

,712

.38

3,85

5,28

7.62

95.1

0

EX

PE

ND

ITU

RE

RE

PO

RT

- A

S A

T 3

1.12

.201

1H

ead

-

114

-

Min

istr

y of

Tra

nspo

rtP

rogr

amm

e

-

01

- O

pera

ttio

nal

Act

ivit

ies

P

roje

ct

-

2

-

Adm

inis

trat

ion

& E

stab

lishm

ent

Serv

ices

R

s.

Sub Project

Object Code

Items

Finance code

Cat

egor

y/O

bjec

t Tit

leT

otal

Net

P

rovi

sion

Deb

its

to e

nd o

f la

st M

onth

Deb

its

Dur

ing

Des

embe

r 2

011

Tot

al A

ctua

l E

xpen

ditu

reB

alan

ce

allo

cati

on%

0

Rec

urre

nt E

xpen

ditu

re84

,203

,000

72,8

24,0

277,

125,

131

79,9

49,1

584,

253,

842.

3694

.95

Per

sona

l Em

ulum

ents

48,4

74,0

0042

,475

,863

.00

4,18

4,58

5.62

46,6

60,4

48.6

21,

813,

551.

3896

.26

10

01

Sa

lari

es &

Wag

es33

,709

,000

29,4

28,7

31.3

32,

897,

593.

6932

,326

,325

.02

1,38

2,67

4.98

95.9

0

10

02

O

vert

ime

and

Hol

iday

pa

ymen

ts2,

465,

000

2,19

3,57

3.89

270,

733.

212,

464,

307.

1069

2.90

99.9

7

10

03

O

ther

Allo

wan

ces

12,3

00,0

0010

,853

,557

.78

1,01

6,25

8.72

11,8

69,8

16.5

043

0,18

3.50

96.5

0

Tra

velli

ng E

xpen

ses

1,84

9,00

01,

522,

348.

4399

,308

.70

1,62

1,65

7.13

227,

342.

8787

.70

11

01

D

omes

tic1,

050,

000

723,

461.

4299

,308

.70

822,

770.

1222

7,22

9.88

78.3

6

11

02

Fo

reig

n79

9,00

079

8,88

7.01

79

8,88

7.01

112.

9999

.99

Page 17: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

16

Supp

liers

8,75

0,00

07,

319,

256.

5489

4,07

8.23

8,21

3,33

4.77

536,

665.

2393

.87

12

01

St

atio

nery

& O

ffice

R

equi

site

s4,

400,

000

3,46

0,52

4.07

434,

742.

433,

895,

266.

5050

4,73

3.50

88.5

3

12

02

Fu

el4,

250,

000

3,76

5,20

3.57

459,

335.

804,

224,

539.

3725

,460

.63

99.4

0

12

03

D

iets

& U

nifo

rm10

0,00

093

,528

.90

93

,528

.90

6,47

1.10

93.5

3

Mai

nten

ance

E

xpen

ditu

re7,

232,

000

6,31

3,86

8.11

915,

512.

467,

229,

380.

572,

619.

4399

.96

13

01

V

ehic

les

4,85

0,00

04,

124,

793.

8572

4,11

0.10

4,84

8,90

3.95

1,09

6.05

99.9

8

13

02

Pl

ant M

achi

nery

&

Equ

ipm

ent

1,88

0,00

01,

739,

501.

8313

9,60

6.76

1,87

9,10

8.59

891.

4199

.95

13

03

B

uild

ing

& S

truc

ture

s50

2,00

044

9,57

2.43

51,7

95.6

050

1,36

8.03

631.

9799

.87

Serv

ices

16,1

25,0

0015

,006

,305

.47

1,00

3,11

0.53

16,0

09,4

16.0

011

5,58

4.00

99.2

8

14

01

T

rans

port

2,70

0,00

02,

484,

582.

9621

5,41

7.04

2,70

0,00

0.00

0.00

100.

00

14

02

Po

stal

& C

omm

unic

atio

n2,

700,

000

2,89

9,55

9.17

-199

,559

.17

2,70

0,00

0.00

0.00

100.

00

14

03

E

lect

rici

ty &

Wat

er5,

200,

000

5,20

8,64

2.34

-8,6

42.3

45,

200,

000.

000.

0010

0.00

14

04

R

ents

and

Loc

al T

axes

250,

000

136,

764.

52

136,

764.

5211

3,23

5.48

54.7

1

14

05

O

ther

0.00

0.

00

3

Oth

er (

Incl

udin

g C

lean

ing

Serv

ice)

5,27

5,00

04,

276,

756.

4899

5,89

5.00

5,27

2,65

1.48

2,34

8.52

99.9

6

Tra

nsfe

rs30

0,00

018

2,18

9.96

28,5

35.5

921

0,72

5.55

89,2

74.4

570

.24

15

06

Pr

oper

ty L

oan

Inte

rest

to

Publ

ic S

erve

nts

300,

000

182,

189.

9628

,535

.59

210,

725.

5589

,274

.45

70.2

4

Page 18: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

17

1

Uth

uru

Mit

hutu

D

evel

opm

ent

Pro

gram

me

1,47

3,00

04,

195.

000.

004,

195.

001,

468,

805.

000.

28

14

05

O

ther

1,

473,

000

4,19

5.00

4,

195.

001,

468,

805.

000.

28

Cap

ital

Exp

endi

ture

9,35

0,00

02,

866,

562.

1269

,050

.00

2,93

5,61

2.12

6,41

4,38

7.88

31.4

0

Reh

abili

tati

on a

nd

Impr

ovem

ent

of C

apit

al

Ass

ets

1,70

0,00

049

5,22

0.00

0.00

495,

220.

001,

204,

780.

0029

.13

20

01

B

uild

ing

& S

truc

ture

s50

0,00

00.

00

0.00

500,

000.

000.

00

20

02

Pl

ant M

achi

nery

&

Equ

ipm

ent

500,

000

495,

220.

00

495,

220.

004,

780.

0099

.04

20

03

V

ehic

les

700,

000

0.00

0.

0070

0,00

0.00

0.00

Acq

uisi

tion

of

Cap

ital

A

sset

s7,

300,

000

2,21

1,34

2.12

0.00

2,21

1,34

2.12

5,08

8,65

7.88

30.2

9

21

02

Fu

rnitu

re &

offi

ce

Equ

ipm

ent

600,

000

555,

709.

21

555,

709.

2144

,290

.79

92.6

2

21

03

Pl

ant M

achi

nery

&

Equ

ipm

ent

1,70

0,00

01,

655,

632.

91

1,65

5,63

2.91

44,3

67.0

997

.39

21

04

B

uild

ing

& S

truc

ture

s5,

000,

000

0.00

0.

005,

000,

000.

000.

00

Cap

acit

y B

uild

ing

250,

000

160,

000.

0069

,050

.00

229,

050.

0020

,950

.00

91.6

2

24

01

T

rain

ing

and

Cap

acity

B

uild

ing

01

Tra

inin

g an

d C

apac

ity

Bui

ldin

g25

0,00

016

0,00

0.00

69,0

50.0

022

9,05

0.00

20,9

50.0

091

.62

Page 19: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

18

1

Uth

uru

Mit

hutu

D

evel

opm

ent

Pro

gram

me

100,

000

0.00

0.00

0.00

100,

000.

000.

00

21

02

Fu

rnitu

re &

offi

ce

Equ

ipm

ent

100,

000

0.00

0.

0010

0,00

0.00

0.00

Pro

ject

Tot

al93

,553

,000

75,6

90,5

88.6

37,

194,

181.

1382

,884

,769

.76

10,6

68,2

30.2

488

.60

EX

PE

ND

ITU

RE

RE

PO

RT

- A

S A

T 3

1.12

.201

1H

ead

-

114

-

Min

istr

y of

Tra

nspo

rtP

rogr

amm

e

-

02

- D

evel

opm

ent

Act

ivit

ies

P

roje

ct

-

3

-

Dev

elop

men

t of

Roa

d T

rans

port

R

s.

Sub Project

Object Code

Items

Finance code

Cat

egor

y/O

bjec

t Tit

leT

otal

Net

P

rovi

sion

Deb

its

to e

nd o

f la

st

Mon

thD

ebit

s D

urin

g D

ecem

ber

201

1T

otal

Act

ual

Exp

endi

ture

Bal

ance

allo

cati

on%

Rec

urre

nt

Exp

endi

ture

4,

338,

000,

000

3,56

7,09

4,43

6.34

399,

751,

454.

903,

966,

845,

891.

2437

1,15

4,10

8.76

91.4

4

1

Sri L

anka

Tra

nspo

rt

Boa

rd

4,30

8,00

0,00

03,

545,

594,

436.

3439

3,05

1,45

4.90

3,93

8,64

5,89

1.24

369,

354,

108.

7691

.43

15

03

P

ublic

Ins

titu

tion

1

Scho

ol &

Hig

her

Edi

catio

n Se

ason

Tic

ket

Subs

idy

1,40

0,00

0,00

01,

229,

000,

000.

0013

0,00

0,00

0.00

1,35

9,00

0,00

0.00

41,0

00,0

00.0

097

.07

2

Arm

ed F

orce

s -

Bus

Pa

sses

30

0,00

0,00

012

7,29

4,43

6.34

55,0

51,4

54.9

018

2,34

5,89

1.24

117,

654,

108.

7660

.78

Page 20: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

19

3

Gra

nts

to S

LTB

-

Ope

ratin

g on

U

nrem

uner

ativ

e R

oute

s2,

120,

000,

000

1,76

2,50

0,00

0.00

160,

000,

000.

001,

922,

500,

000.

0019

7,50

0,00

0.00

90.6

8

4

Paym

ent o

f sa

lary

re

visi

ons

as p

er th

e 20

11 B

u.Pr

o.48

8,00

0,00

042

6,80

0,00

0.00

48,0

00,0

00.0

047

4,80

0,00

0.00

13,2

00,0

00.0

097

.30

3

Lak

diva

Eng

inee

ring

C

ompa

ny (

Pvt

.) L

td.

30,0

00,0

0021

,500

,000

.00

6,70

0,00

0.00

28,2

00,0

00.0

01,

800,

000.

0094

.00

15

03

Pu

blic

Ins

titut

ion

30,0

00,0

0021

,500

,000

.00

6,70

0,00

0.00

28,2

00,0

00.0

01,

800,

000.

0094

.00

C

apit

al E

xpen

ditu

re1,

950,

000,

000

680,

590,

417.

4856

2,72

6,84

0.00

1,24

3,31

7,25

7.48

706,

682,

742.

5263

.76

1

Sri L

anka

Tra

nspo

rt

Boa

rd

1,90

0,00

0,00

068

0,47

9,51

2.50

562,

726,

840.

001,

243,

206,

352.

5065

6,79

3,64

7.50

65.4

3

22

01

P

ublic

Ins

titu

tion

01

Purc

hase

of

New

Bus

es/

Eng

ine

kits

1,00

0,00

0,00

022

6,17

8,39

7.73

500,

000,

000.

0072

6,17

8,39

7.73

273,

821,

602.

2772

.62

02

Bus

Fle

et

Aug

men

tatio

n,

Inst

itutio

nal

Dev

elop

men

t and

C

apac

ity B

uild

ing

900,

000,

000

454,

301,

114.

7762

,726

,840

.00

517,

027,

954.

7738

2,97

2,04

5.23

57.4

5

5

Impl

emen

tati

on o

f St

rate

gic

Pla

n fo

r T

raffi

c M

anag

men

t (T

EC

is R

s: 1

0bn)

50,0

00,0

0011

0,90

4.98

0.00

110,

904.

9849

,889

,095

.02

0.22

25

02

O

ther

Inv

esm

ents

50,0

00,0

0011

0,90

4.98

11

0,90

4.98

49,8

89,0

95.0

20.

22

P

roje

ct T

otal

6,28

8,00

0,00

04,

247,

684,

853.

8296

2,47

8,29

4.90

5,21

0,16

3,14

8.72

1,07

7,83

6,85

1.28

82.8

6

Page 21: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

20

EX

PE

ND

ITU

RE

RE

PO

RT

- A

S A

T 3

1.12

.201

1H

ead

-

114

-

Min

istr

y of

Tra

nspo

rtP

rogr

amm

e

-

02

- D

evel

opm

ent

Act

ivit

ies

P

roje

ct

-

4

-

Dev

elop

men

t of

New

Rai

lroa

d -

R

s.

Sub Project

Object Code

Items

Finance codeC

ateg

ory/

Obj

ect

Tit

leT

otal

Net

P

rovi

sion

Deb

its

to e

nd o

f la

st M

onth

Deb

its

Dur

ing

Dec

embe

r 20

11

Tot

al A

ctua

l E

xpen

ditu

reB

alan

ce

allo

cati

on%

Cap

ital

E

xpen

ditu

re6,

630,

000,

000

173,

289,

611

5,84

5,35

717

9,13

4,96

86,

450,

865,

032

2.70

1

Mat

ara

- B

elia

tta-

Kat

arag

ama

New

R

ailli

ne

5,20

0,00

0,00

017

3,18

1,93

25,

953,

036

179,

134,

968

5,02

0,86

5,03

23.

44

21

04

B

uild

ing

&

Stru

ctur

es4,

450,

000,

000

00

04,

450,

000,

000

0.00

12

4,

000,

000,

000

0.00

4,00

0,00

0,00

0.00

0.00

17

45

0,00

0,00

00.

00

45

0,00

0,00

0.00

0.00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

750,

000,

000

173,

181,

931.

615,

953,

036.

4217

9,13

4,96

8.03

570,

865,

031.

9723

.88

7L

ands

Acq

uisi

tion

& P

aym

ent o

f C

ompe

nsat

ion

300,

000,

000

164,

407,

485.

455,

953,

036.

4217

0,36

0,52

1.87

129,

639,

478.

1356

.79

10

Det

ail d

isig

n in

vest

igat

ion

&

Col

lect

ion

of B

ase

Lin

e da

ta

200,

000,

000

0.00

0.

0020

0,00

0,00

0.00

0.00

Page 22: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

21

11

Rel

ocat

ion

of

Infr

astru

ctur

e fa

cilit

ies

& C

lear

ing

of R

ailw

ay T

race

250,

000,

000

8,77

4,44

6.16

8,

774,

446.

1624

1,22

5,55

3.84

3.51

4

Hor

ana

- P

anad

ura

Rai

ll L

ine

15,0

00,0

000.

000.

000.

0015

,000

,000

.00

0.00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

15,0

00,0

000.

00

0.00

15,0

00,0

00.0

00.

00

5

Kur

uneg

ala

- H

abar

ana

Rai

l tr

ack

proj

ect

15,0

00,0

000.

000.

000.

0015

,000

,000

.00

0.00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

15,0

00,0

000.

00

0.00

15,0

00,0

00.0

00.

00

6

Col

ombo

-

Ham

bant

ota

(kel

aniv

ally

) L

ine

Ext

enti

on p

rije

ct

14,0

00,0

000.

000.

000.

0014

,000

,000

.00

0.00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

14,0

00,0

000.

00

0.00

14,0

00,0

00.0

00.

00

7

Mad

awac

hchi

ya -

T

rinc

omal

ee R

ail

Lin

e F

easi

bilit

y St

udy

9,00

0,00

010

7,67

9.87

-107

,679

.87

0.00

9,00

0,00

0.00

0.00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

9,00

0,00

010

7,67

9.87

-107

,679

.87

0.00

9,00

0,00

0.00

0.00

8

Wel

lava

ya -

B

ibila

- B

adul

la

New

Rai

l Lin

e1,

000,

000

0.00

0.00

0.00

1,00

0,00

0.00

0.00

Page 23: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

22

21

05

L

ands

and

Lan

d Im

prov

emen

ts

1,00

0,00

00.

00

0.00

1,00

0,00

0.00

0.00

9

Tri

ncom

alee

-

Mah

o -

Put

tala

m

New

Rai

l Lin

e1,

000,

000

0.00

0.00

0.00

1,00

0,00

0.00

0.00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

1,00

0,00

00.

00

0.00

1,00

0,00

0.00

0.00

10

Rec

onst

ruct

ion

of R

allw

ay

Lin

e be

twee

n P

alal

and

K

anka

sant

urai

360,

000,

000

0.00

0.00

0.00

360,

000,

000.

000.

00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

360,

000,

000

0.00

0.

0036

0,00

0,00

0.00

0.00

11

Pre

para

tion

of

Rai

lway

Mas

ter

Pla

n15

,000

,000

0.00

0.00

0.00

15,0

00,0

00.0

00.

00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

15,0

00,0

000.

00

15

,000

,000

.00

0.00

12

1,

000,

000,

000

00

01,

000,

000,

000

0.00

21

05

L

ands

and

Lan

d Im

prov

emen

ts

1,00

0,00

0,00

00.

00

1,

000,

000,

000

0.00

Pro

ject

Tot

al6,

630,

000,

000

173,

289,

611.

485,

845,

356.

5517

9,13

4,96

8.03

6,45

0,86

5,03

1.97

2.70

HE

AD

R

EC

CU

RE

NT

T

OT

AL

4,46

6,67

0,00

03,

677,

796,

074.

1641

1,24

8,36

2.36

4,08

9,04

4,43

6.52

377,

625,

563.

4891

.55

HE

AD

CA

PIT

AL

T

OT

AL

8,62

3,50

0,00

088

9,13

4,06

9.93

568,

766,

092.

441,

457,

900,

162.

377,

165,

599,

837.

6316

.91

  

  

HEAD TOTA

L13,090,170,000

4,566,930,144.09

980,014,454.80

5,546,944,598.89

7,543,225,401.11

42.37

Page 24: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

23

4. Functions Performed by the Planning Division

1. Conducting, coordinating meetings pertaining to development activities with

institutions such as Railway Department, Sri Lanka Transport Board, Department

of Motor Traffic, National Transport Medical Institution, Lakdiva Engineering

Company, National Council for Road Safety.

2. Conducting workshops and coordinating such activities with the Ministry and other

relevant institutions to prepare the Action Plan for the year 2011.

3. Conducting workshops pertaining to development projects implemented by various

institution of the Transport Ministry for the year 2011, progress and evaluation of

the respective institutions based on the results of such progress and evaluation.

4. Preparation of implementation plan of the Transport Ministry Office for the year

2011.

5. Preparation of basic proposals to commence several new bus services in the Capital

City and Coordinating with the relevant institutions.

6. Conducting progress review meetings pertaining to institutions of the Ministry and

conducting progress review activities.

7. Establishment of Coordinating Committee for the Coast Line Development Project

and conducting Progress Review activities.

8. Attending the discussions pertaining to Rail Road development in Medawachchiya/

Talaimannar in the Northern Railway Line. Conducting, coordinating activities

necessary to commence construction work.

9. Attending District Progress Review Meetings held under the patronage of

His Excellency the President and implementing follow up action on decisions

pertaining to the Ministry of Transport.

10. Preparation of Budget Estimates for the year 2012, coordination and attending to

discussions in that respect.

11. Create awareness among general public payment of compensation for accidents by

the National Council for Road Safety, payment of compensation and attending to

related activities

12. Attending to Transport Ministry Tender/Technical Committee Meetings and

performing connected activities there on.

13. Conducting activities on coordinating DeyataKirula National Exhibition 2011,

processing exhibits and performing operating activities of the exhibition and

pertaining work for the DeyataKirula National Exhibition for the year 2012.

Page 25: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

24

14. Supervision of progress in projects pertaining to transportation division over 500

million, preparation and submission of relevant reports to the Ministry of Finance.

15. Taking steps to provide transport facilities to disabled persons and elderly persons,

jointly with the Social Service Ministry.

16. Formulating the Progress Report 2011 for submission to the Parliament for Budget

Stage Committee Meeting in 2012 and submission to the Parliament.

17. Preparation of Ministry Office Performance Report upto the end of year 2010 and

submitting it to the relevant authorities.

18. Attending to discussions on Unsolicited Project Proposals submitted by external

parties through Ministerial Committee and performing relevant coordinating

activities.

19. Representing the Ministry and attending the Food and Nutrition Committee

Meetings under the patronage of H.E. the President.

20. Coordinating the basic feasibility study work of the Multi-container Transport

Project and supplying necessary services.

21. In order to formulate a major transport plan relating to capital city and suburban

areas, conducting preliminary work with Japanese Institutional Cooperation

Association through the External Resources Department.

22. Updating the Transport Ministry Website from time to time.

23. Exchanging information belonging to the Ministry of Transport in collaboration

with National Information Centre (1919) and ICTA Institution.

24. Coordinating the preliminary work for the installation of protection systems for the

unprotected Railway Level Crossings in the Railway Department.

25. Participating in relevant meetings and workshops pertaining to development

activities conducted by other Line Ministries and different institutions.

Page 26: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

25

5. Functions Performed by Internal Audit Branch

Name of the Institutions Investigations Conducted

01 Ministry of Transport 11

02 Sri Lanka Transport Board 11

03 Railway Department 05

04 National Transport Medical Institute 07

05 Department of Motor Traffic 07

06 Lakdiva Engineering 04

07 National Council for Road Safety 01

6. Performance of Activities under New Rail Road Development Project.

Identifying the necessity of building up a Sustainable National Transport Policy giving

priority to public transport services in order to provide an efficient and economical

transport service to the general public and with the intention of attracting the passenger

and goods transport presently done mostly by the road transport system, to the Railway

Dept. The existing Railway Lines Network is being improved while the government has

already drawn up plans to develop new Rail Roads.

Information regarding proposed New Rail Road Constructions are given below.

Project

Estimated

Expenditure US

Dollars millions

Project

Period

01Matara-Kataragama New Rail Road (115

Km)300 2006-2011

02Kurunegala-Habarana New Rail Road (80

Km)225 2010-2016

03Avissawella-Hambantota New Rail Road

(225 Km)375 2009-2016

04 Panadura-Horana New Rail Road (18 Km) 53 2013-2017

In addition, in order to strengthen the Railway Lines Network necessary steps are being

taken to prepare a Road Development Plan while financial provision has been provided

as follows for conducting preliminary studies work relating to construction of New Rail

Roads, for the year 2011.

Page 27: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

26

Allocation

1. Medawachchiya-Trincomalee Rs. 09 million

2. Wellawaya-Badulla Via Bibile Rs. 01 million

3. Trincomalee-Maho Via Puttalam Rs. 01 million

6.1 Matara-Kataragama New Rail Road

The total extent of this Railway Line is 115 Km and the construction work is proposed to

be completed in three stages as shown below:-

Stage Distance, Kilometers

01 Matara to Beliatta 27

02 Beliatta to Hambantota 48

03 Hambantota to Kataragama 40

Activities completed up to now under this project.

• A bridge, 100 meters in length has been constructed across Nilwala River, Matara.

The under frame structure of this bridge was constructed by the State Engineering

Corporation while the upper structure was imported from Austria and fixed. The total

expenditure incurred Rs. 263 million.

• The report on Environment Impact Assessment (EIA) has been prepared and the

report relating to Matara-Beliatta section has been updated.

• Geological Surveys and archaeological evaluation activities have been finalized.

• Survey work on stage I too has been finalized.

• Under stage I, construction of Railway Line, resettlement activities and construction

of alternative approach roads are involved and 92.2 hectares of land in extent has been

acquired while the number of houses evacuated is 184.

Lands acquired (Number of Lots) 92.22 hectares

Lands acquired for resettlement 9.15 hectares

Lands acquired for construction of alternative roads 0.06 hectares

(DiyagahaMotagedara Road, Delgalla Road, Devananda Road)

Page 28: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

27

Ten (10) alternative lands have been acquired for re-settlement activities and these lands

have been allocated in lots to 167 persons. Construction work of 35 houses in these lands

has been finalized while ten (10) more houses are under construction.

Acquisition of alternative Lands, Development and Allocation.

Name of the LandNumber

of Lots

Lots

Allocated

Development

Work

Houses

Built

Houses

Under

ConstructionPalliyagurugeWatta 35 27 a 11 03

Silver Dale Watta 25 16 b 03 02

AcharigeWatta 43 15 b - -

Dangahawatta 12 12 b - -

Paluwatta 53 53 e 17 04

Sannasigewatta 25 20 d 01 -

Karagahahena 26 10 a 03 01

Pansalagawawatta - - - - -

Mahagedarawatta 09 09 b - -

RukattanagahaWatta 13 03 b - -

a - Roads constructed with concrete layer

b - Preliminary work of approach roads completed

c - Roads demarcated

d - Land cleared

e - Being developed

f - Development work not commenced

• Construction of alternative buildings for public buildings and religious institutions

displaced due to the construction of Railway Line.

SiripawaraWijayarama Temple - Rs. 8.5 million work completed

Walasgala Pottery Factory - Rs. 9.0 million work completed

Wewdatta Junior School Building

Wewrukannala Junior School Building

Samurdhi Bank Building Wewrukannala - Rs. 9.6 million under construction

} Rs. 8.0 million

Page 29: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

28

For stage I construction work, a commercial agreement has been entered into on 24.08.2010

with CMC Company of China while it is expected to obtain necessary financial provision

from EXIM Bank of China under preferential loan scheme.

For stage II, section from Betiatta to Hambantota, section II has been publicised for

preliminary work on acquiring land, preliminary surveying has been finalised and

engineering data has been provided. Accordingly, Railway Engineers have designed

the stretch of land required to construct the Rail track and given it over to the survey

Department and steps are being taken to acquire the land by the Ministry of Lands and

Land Development after marking the stretch of land in the field and preparing the advance

tracing plans. Ministry of Transport taking steps to request for an order under Section

38(a) to take over the prompt ownership of the land.

Activities presentlyconducted under the Project:

• Under stage I, approach roads development work is being done in Beliatta-Paluwatte

alternative land.

• Alternative land Sannasigewatta is being developed.

• In place of displaced business locations development of alternative locations has

commenced.

• Electric Lamp Posts and telephone posts within the acquired Rail track premises.

• Advance tracings are being sent to acquire the necessary land for the Rail track in the

section belonging to the second stage.

• Notices under section two are being published for acquiring the land required for the

section belonging to Third Stage. Action is being taken to obtain the approach of the

Central Environmental Authority.

Financial Progress

The amount received for this project for the year 2010 is Rs. 7482 million, while a sum of

Rs. 322 million has been spent during the year showing a financial progress of 43%. The

anticipated expenditure level could not be reached as the payment of compensation could

not be finalised due to the delays in acquiring the land.

Page 30: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

29

6.2 Extension of Kelani Valley Railway Line from Avissawella to Hambantota

The length of this line proposed to be constructed during the period 2009-2011 is 225

Km. Moratuwa University is engaged in conducting feasibility studies pertaining to the

proposed Railway Line. Estimated sum for this work is Rs. 10.83 million while a sum of

Rs. 5.41 million has been spent.

6.3 Kurunegala-Habarana New Railway Line

This project is 80 Kilometers in length while the feasibility studies pertaining to this

project has been conducted by the Central Engineering Construction Bureau (CECB)

and the final report has been handed over. The expenditure incurred for this purpose is

Rs. 15.39 million. Geological survey work in the proposed line has also been conducted

by the CECB while up to this time an expenditure of Rs. 14.09 million has been spent.

Archaeological impacts have been assessed by the Department of Archaeology under a

cost estimate of Rs. 2.5 million and the final report has been handed over. Open tenders

have been called for conducting the detailed environment assessment studies to obtain the

approval of the Environmental Authority.

6.4 Horana-Panadura New Railway Line

In relation to the express highways under construction, focusing on the development

activities anticipated in Kottawa town and adjoining area, this proposed Railway Line

has at present been changed to Horana-Kottawa Line instead of Horana-Panadura Line.

The cost estimate for feasibility studies conducted by the Moratuwa University amounts

to Rs. 7.3 million while the final report is scheduled to be handed over in due course.

6.5 Medawachchiya – Trincomalee New Railway Line

This project is 80 Kilometers in length and action has been taken to entrust the feasibility

study work of this project to the Human Resources Development Institute of University

of Colombo.

6.6 Wellawaya – Badulla New Railway Line

Construction of a Railway Line from Badulla to WellawayaViaMoneragala is not

practicable and as such it has been decided to conduct feasibility studies for the construction

of a Railway Line from Embilipitiya to Batticaloa Via Moneragala, Wellawaya and

Ampara (Since feasibility studies are being conducted to extend the proposed Kelani

Valley Railway Line up to Hambantota Via Embilipitiya)

Page 31: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

30

6.7 Trincomalee – Puttalam New Railway Line

Since there is a Railway Line from Trincomalee to Colombo ViaMaho, it would suffice

if a New Railway Line is constructed from Maho to Puttalam. As such a feasibility study

for a New Railway Line from Maho to Puttalam has been commenced.

Commencement of work on projects 5 to 7 has been delayed due to the shortage of staff.

7. Progress on Road Safety Activities

7.1 Road Safety Conference

National Road Safety Conference was held in Colombo on 11th May 2011 under the

patronage of H.E. the President with the participation of Hon. Minister of Transport and

other Ministers and MPP. At this conference 2011-2020 was declared as the Road Safety

Decade in Sri Lanka in concurrence with the Road Safety decade declared by the United

Nations Organization. Ten year plan for this decade as to how action should be taken to

minimize the vehicle accidents was also launched at this conference. In concurrence a

song on Road Safety and a Video Disk were displayed.

7.2 Formulation of Ten Year Plan for Action Decade for Road Safety

For the preliminary drafting of this plan a workshop was organizes in the Sri Lanka Institute

of Development Administration on 22.03.2011 while with the financial contribution of

the World Health Organization a workshop was organized at the Intercontinental Hotel,

Colombo on 25.04.2011 with the participation of institutions related to avoiding road

accidents and persons with expertise knowledge.

Final stage discussions are being held regarding the formulation of this Strategic

Action Plan while necessary consultancy services contribution is made by Professor

SamanBandara of University of Moratuwa and the necessary financial contributio0n has

been provided by the World Health Organization.

7.3 Creating Awareness among General Public

Mainly, DeyataKirula Exhibition is held for this purpose and at this exhibition programme

for the benefit of youth and school children are implemented. Among them,

• Implementing Quiz Programmes to create awareness among school children.

• Exhibition of video programmes which helps the promotion of attitudes of school

children.

Page 32: Performance Report - 2011 · The Tour of Pre-Review the preliminary designs for the construction of Matara – Beliatta New Railway Project 8 Days China 2 8 2ndMeeeting to the Export

31

• Distribution of a printed booklet among school children and youth pertaining to

prevention of vehicle accidents.

• Importance of seat belts to prevent vehicle accidents and create awareness of it among

the general public.

• Create awareness among members of the public about the payment of compensation

in hit and run vehicle accidents are of special importance.

7.4 Compensation Scheme

• This compensation scheme is being implemented from September 2007 while out

of the applications submitted from that date up to December 2011, a sum of Rs.

1,475,000.00 for fatal accidents in respect of 30 persons has been paid as compensation

while a sum of Rs. 360,000.00 has been paid as compensation for 12 applicants who

sustained injuries.

• In order to create awareness among the general public about the compensation scheme

for accidents caused by unidentified vehicles, posters and relevant application forms

have been distributed among the Divisional Secretariats and Police Stations Island

wide.

• Publication of notices in newspapers pertaining to the payment of compensation for

accidents caused by unidentified vehicles.

• Making representations to the “Parliamentary Special Committee for Investigations

Pertaining to Rapidly Increasing Vehicle Accidents”


Recommended