+ All Categories
Home > Documents > Personnel

Personnel

Date post: 07-Jan-2016
Category:
Upload: miracle
View: 18 times
Download: 0 times
Share this document with a friend
Description:
Personnel. Marc Leroy, asst. telescope engineer Instrument specialist search. Activities. Primary mirror actuator control cards Originals have a high failure rate New circuit designed and built in Pasadena - PowerPoint PPT Presentation
Popular Tags:
18
Personnel • Marc Leroy, asst. telescope engineer • Instrument specialist search
Transcript
Page 1: Personnel

Personnel

• Marc Leroy, asst. telescope engineer

• Instrument specialist search

Page 2: Personnel

Activities

• Primary mirror actuator control cards– Originals have a high failure rate– New circuit designed and built in Pasadena– Engineering team (Bagish & Jones) conferred

with Dusty Clark, Tom Trebisky (MMT), and Ken Duffek (Steward) on MMT experience

– New cards currently installed and testing at Baade

Page 3: Personnel

Actuator card in telescope

Page 4: Personnel

New actuator control card

Page 5: Personnel

Activities (continued)

• F/5 secondary mirror– Zerodur 1.7 m diameter– Blank shipped to Pasadena from SOML– Support fixtures glued onto the blank– Blank shipped to ITT (Kodak) for aspherizing– Finish date at SOML is April 2006

Page 6: Personnel

F/5 secondary

Page 7: Personnel

Axial and transverse supports

Page 8: Personnel

At Kodak for machining

Page 9: Personnel

At Kodak

Page 10: Personnel

Chip on the edge

Page 11: Personnel

Chip on the edge

Page 12: Personnel

Activities (continued)

• Bibliography– User submissions & John Grula’s (Carnegie

librarian) searches– 113 referred papers– 67 abstracts & circulars– www.lco.cl/lco/magellan/science/papers– See the 2004 Magellan mailing list archives

for instructions

Page 13: Personnel

Activities (continued)1. Firpo, V., Bosch, G., & Morrell, N. 2005, MNRAS, 356, 1357 New giant HII regions in the southern sky

2. Barrientos, L. F., Gladders, M. D., Yee, H. K. C., Infante, L., Ellingson, E., Hall, P. B., & Hertling, G. 2004, ApJ, 617, L17 RCS 043938-2904.9: A New Rich Cluster of Galaxies at z=0.951

3. Luhman, K. L. 2004, ApJ, 617, 1216 New Brown Dwarfs and an Updated Initial Mass Function in Taurus

4. Woo, J., Urry, C. M., Lira, P., van der Marel, R. P., & Maza, J. 2004, ApJ, 617, 903 The Fundamental Plane Evolution of Active Galactic Nucleus Host Galaxies

5. Wang, Z., & Chakrabarty, D. 2004, ApJ, 616, L139 The Orbital Period of the Ultracompact Low-Mass X-Ray Binary 4U 1543-624

6. Shahbaz, T., Casares, J., Watson, C. A., Charles, P. A., Hynes, R. I., Shih, S. C., & Steeghs, D. 2004, ApJ, 616, L123 The Massive Neutron Star or Low-Mass Black Hole in 2S 0921-630

7. Luhman, K. L. 2004, ApJ, 616, 1033 A Survey for Low-Mass Stars and Brown Dwarfs in the eta Chamaeleontis and É› Chamaeleontis Young Associations

8. Jonker, P. G., Galloway, D. K., McClintock, J. E., Buxton, M., Garcia, M., & Murray, S. 2004, MNRAS, 354, 666 Optical and X-ray observations of the neutron star soft X-ray transient XTE J1709-267

9. Sánchez Contreras, C., Gil de Paz, A., & Sahai, R. 2004, ApJ, 616, 519 The Companion to the Central Mira Star of the Protoplanetary Nebula OH 231.8+4.2

10. Orosz, J. A., McClintock, J. E., Remillard, R. A., & Corbel, S. 2004, ApJ, 616, 376 Orbital Parameters for the Black Hole Binary XTE J1650-500

11. Barrado y Navascués, D., & Jayawardhana, R. 2004, ApJ, 615, 840 A New Classical T Tauri Object at the Substellar Boundary in Chamaeleon II

12. Ellison, S. L., Churchill, C. W., Rix, S. A., & Pettini, M. 2004, ApJ, 615, 118 The Number Density of 0.6 < z < 1.7 Mg II Systems from CORALS: Observational Biases at Intermediate Redshift

Page 14: Personnel

Activities (continued)

• FourStar engineering visit to Magellan

• Wide Field Corrector fit-checks (SAO)

• Lasercutter software mods for LDSS (Clardy)

• Alignment software improvements (Kelson & Phillips)

• CorMASS user instrument (UVA)

Page 15: Personnel

CorMASS at Clay(John Wilson photo)

Page 16: Personnel

Activities (more reports later)

• B&C decommissioning• MOE installation• Baade aluminizing• IMACS optical performance analysis• Clay tertiary control• LDSS upgrade• Mirror air cylinder leak fixes• MIKE iodine cell control

Page 17: Personnel

Near-term work

• F/5 operations preparations

• Flat field screen

• F/5 baffles

• IMACS imaging analysis

• LDSS3 commissioning

• Continue primary mirror support repairs

Page 18: Personnel

Magellan mailing lists

• http://mailman.ociw.edu• [email protected][email protected]• Imacs, LDSS3, Magic for instrument

engineering


Recommended