+ All Categories
Home > Documents > Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Date post: 17-Jan-2016
Category:
Upload: byron-webster
View: 222 times
Download: 0 times
Share this document with a friend
Popular Tags:
8
Peru Creek 319 Grant Update May 29, 2013
Transcript
Page 1: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Peru Creek 319 GrantUpdate

May 29, 2013

Page 2: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.
Page 3: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Silver Spoon Mine

Before

After

Page 4: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Delaware Mine

Before

After

Page 5: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Delaware Mine

Before

After

Page 6: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Brittle Silver Mine

Before

After

Page 7: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Brittle Silver Mine

Page 8: Peru Creek 319 Grant Update May 29, 2013. Silver Spoon Mine Before After.

Other Project Goals:• Estimate load reductions and downstream water quality

improvement from the proposed project.– Technical Memo explaining baseline conditions as post-2006 for

evaluating improvements complete– Memo summarizing theoretical potential of metals removal from

BMPs near complete

• Evaluate the effectiveness of implemented BMPs– Water quality data from EPA and others organized in spreadsheet– Data analysis of baseline and post-project conditions pending

• Keep stakeholders and the public informed on the need for and progress of remediation projects in the watershed.– SRTF meetings, Rotary tour, Keystone Science School, BRWG

watershed plan and website, Summit Daily News


Recommended