+ All Categories
Home > Business > Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House...

Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House...

Date post: 25-May-2015
Category:
Upload: informa-australia
View: 353 times
Download: 2 times
Share this document with a friend
Description:
Peter Brighton, Australasian Manager GTS, Donaldson Australasia Pty Ltd delivered this presentation at the 2013 Gas Turbines conference. The event is designed as a platform for discussion on the latest technologies & developments in gas power generation. For more information on the annual event, please visit the conference website: http://www.informa.com.au/gasturbinesconference
Popular Tags:
32
DONALDSON AUSTRALASIA PTY LTD Valley Power Upgrade Air Inlet Filter House and Defective Cooling with Peter Brighton 14 th Annual Gas Turbine Systems Conference Hilton Hotel Brisbane 30 th October, 2013
Transcript
Page 1: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

DONALDSON AUSTRALASIA PTY LTD

Valley Power Upgrade – Air Inlet Filter House and Defective Cooling with Peter Brighton

14th Annual Gas Turbine Systems Conference – Hilton Hotel Brisbane 30th October, 2013

Page 2: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INTRODUCTION

• Replace the air inlets and defective fog cooling system of

an existing 300 MW gas turbine plant at Valley Power Vic

• Review the logistics behind the design, manufacture,

quality, delivery and site supervision of the filter houses,

evaporative coolers with structures for 12 Pratt and

Whitney 25 MW gas turbines

• Review the increased summer capacity from evaporative

coolers and the benefits in meeting the guaranteed

performance

Source: www.gsabusiness.com, “GE develops new gas turbine in Greenville” Oct. 30, 2009

Page 3: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

Site Issues

• Non OEM fogging system

• Blade corrosion/erosion concerns “ineffective fogging”

• Engine output (Warmer weather conditions)

Source: www.gsabusiness.com, “GE develops new gas turbine in Greenville” Oct. 30, 2009

Page 4: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

“A” Station Filter Houses x 6

• Static Filter House

Page 5: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

“A” Station Filter Houses x 6

• Static Filter system – 2 stages

- Pocket pre-filter

- Static panel filter

- Fogging “Downstream”

Page 6: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

“B” Station Filter Houses x 6

• Static Filter House

Page 7: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

• Condition of the Inlet silencer

downstream the filter house.

DOWNSTREAM ISSUES

Page 8: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

CUSTOMER REQUIREMENTS

• Expectations

o Guaranteed

pressure drop

o Guaranteed

cooling efficiency

o Deliver and

Commission on

time

Improve Power

Plant Capacity

Page 9: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

CUSTOMER REQUIREMENTS

• Design, manufacture,

supply, commission and

performance test.

o 6 x A Station Static

Filter Houses with

support structure

o 6 x B Station Static

Filter Houses with

support structure

o 12 x Evaporative

coolers

o 12 x Transition ducts

o 12 x Stairs and

access platforms

Page 10: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

CUSTOMER REQUIREMENTS

• Considerations

o 2 separate

designs

o Existing site

services

o Engine removal

beam to support

structure for B

Station units.

Page 11: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

CUSTOMER REQUIREMENTS

• Guarantees

o Cooling

efficiency - 88%

o Pressure Drop

1.5” w.g.

o Delivery 4 x “A”

Station and 2 x

“B” Station Sept

2009

o Delivery 2 x “A”

Station and 4 x

“B” Station March

2010

Page 12: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

The Program

Main Task Sub Task Due Date Who

Sign Contract Day 0 Customer

Site Survey 17-03-2009 to 24-03-2009 DAPL

Equipment Design Preliminary GA Station A&B 6/04/2009 DAPL Preliminary P&I D 6/04/2009

Review +5 days after submission by Don. Customer/OE

HAZOP Study Participate 23-03-2009 Customer/DAPL/OE3

Report 27/03/2009 OE

Installation Manual High Level Preliminary 01-04-2009 DAPL

Equipment Design Final GA Station A&B +7 days after review of preliminary

by customer

DAPL

Review and accept +5 days after submission by Don. Customer/OE Foundation and loadings 18/05/2009 DAPL

Control Box Diagram 1/06/2009 DAPL

Quality QCIP/ITP 20/04/2009 DAPL

Review and accept +5 days after submission by Don. Customer/OE

Installation Manual Final 15/07/2009 DAPL

Review +5 days Customer/OE

O&M Manual Preliminary 29/06/2009 DAPL

Review +5 days Customer/OE

Final 11-11-2009 DAPL

Review +5 days Customer/OE

Delivery5

Program U5 Filter Houses (2-off) 1/09/2009 DAPL

U1 Filter Houses (2-off) 1/10/2009 DAPL

U2 Filter Houses (2-off) 1/10/2009 DAPL

U3 Filter Houses (2-off) 1/03/2010 DAPL

U6 Filter Houses (2-off) 1/03/2010 DAPL

U4 Filter Houses (2-off) 1/03/2010 DAPL

Commissioning and Testing U5 Filter Houses (2-off) not later than 27/10/2009 DAPL

U1 Filter Houses (2-off) not later than 26/11/2009 DAPL

U2 Filter Houses (2-off) not later than 26/11/2009 DAPL

U3 Filter Houses (2-off) not later than 26/04/2010 DAPL

U6 Filter Houses (2-off) not later than 26/04/2010 DAPL

U4 Filter Houses (2-off) not later than 26/04/2010 DAPL

Page 13: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

Design

• Donaldson Europe Belgium.

o Complete design of the filterhouse and evaporative cooler system

Page 14: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

Position of Manufacture

• Donaldson China Shekou

o GDS Filter House

o Evaporative Cooler structure and sump

o Hoppers

Donaldson China Chengdu

o Transition Ducts

o Support Structure

o Access Stairway and Platforms

Page 15: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

Position of Manufacture

• Europe (Belgium)

o Control Panel

o Flow gages, sensors, ball valves,

EVAP plumbing

o Electricals, lighting etc, cable trays

o Junction Box

o Pump

o Bellows TD – Inlet.

o EVAP Distribution Panels

Page 16: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

Position of Manufacture

• Australia (Wyong NSW)

o Filter Elements

Page 17: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

QUALITY INSPECTION

• POM Inspections by Customer – Shekou and

Chengdu

o Material specifications and certificates ITP

o Dimensional Measurements

o Welding

o Paint

o Packing

o Contract

Ensure fit per designed tolerances keeping

any rectification work to a minimum

Page 18: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

PRE “TRIAL” ASSEMBLY

• Shekou China

o GDS Filterhouse

o EVAP Section

o EVAP Sump

• Chengdu China

o Transition Duct

o Support Structure

Page 19: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

DDP FREIGHT TO SITE

• All China freight consolidated in Shekou

o 72 x Open Top 40ft containers

o 36 x 40ft GP

• Belgium Critical components

o 6 x 40ft GP

Total 72 Open Top and 42 Gp’s delivered by side

loaders to site. Additionally 6 x 40ft GP’s from

DAPL for the filter elements and Evap media

Pads

Page 20: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

DEMOLITION AND CIVILS

• Removal of old equipment was

contracted to others

• All Civil works were carried out by the

customer prior to installation of the

support structure

Page 21: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

DELIVERED

• Components delivered at laydown area

near Valley Power.

• Some pre assy was required at the

location

Page 22: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INSTALLATION

Support Structure

• The support structure was erected prior to

removing the old units

• Stair and platform access was then lifted

in place allowing for service areas during

lifting of the modules

Page 23: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INSTALLATION

Support Beam

• Note the Beam on the

support structure for

the “B” Station units -

this allowed for the

removal of the engine

utilizing the Donaldson

support structure.

• All load ratings

calculated by

Donaldson Europe to

accommodate

additional weight to

remove the GT.

Page 24: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INSTALLATION

Module Assemblies

Each section was lifted separately

• Sump

• 3 x Evap Sections lifted separately on to

the sump

• Inlet Silencer by others

• Bellows (TD – Silencer)

• Transition Duct (After pre assy at ground

level)

Page 25: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INSTALLATION

Filter Section and Weather

Hoods

• Pre Assy of weather hoods

and bolted to Filter section at

ground level

• As with the EVAP there were

three lifts for the Filter Module

sections

• Note EVAP media and drift

panels not installed.

Page 26: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INSTALLATION

Plumbing

• Installation of the

pipework, pumps,

flow valves etc for

EVAP cooler

• Installation of pump

and connection of

services.

Page 27: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INSTALLATION

Electrical Kit

• Control panel

• Junction Box

• ΔP Filter Section

• ΔP Evap Section (Absolute)

• ΔT Inlet air temp

• Conductivity (Water Quality)

• Internal Lighting

Page 28: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

INSTALLATION

Filter Elements

• Upstream Filter elements Installed

Evap Drift Pads and Media

• Evap media installed last ensuring no

damage is caused during the installation

stage

Page 29: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

WHAT WENT WRONG

NOT A LOT

• Stairway Handrails not to Australian

standard

• Reduced wall height of Evap dam

walls due to turbulence.

• Access door locks

Page 30: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

WHAT WENT RIGHT

A LOT

• Cooling efficiency -

88%

• Donaldson met the

required efficiency

• Pressure Drop 1.5”

w.g.

• Pressure Drop was

measured below the

required 1.5” w.g.

• Delivery was to the

program

Page 31: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

PERFORMANCE

Summer Capacity

• Increases confirmed to be approx 4-5MW per GT

• Total 50-60MW across the plant.

Page 32: Peter Brighton, Donaldson Australasia: CASE STUDY: Valley Power upgrade of Air Inlet Filter House and defective cooling

QUESTIONS?


Recommended