PETROBRAS LNG Project
Antonio Luiz Fernandes dos SantosGeneral Manager
Gas&PowerPETROBRAS
2
Project Conception
3
Gasbol
In construction
built
At the beginning, the only complementary supply source to the
national production was Bolivian Gas
Urucu
Manaus
NG Sources E&P
National Gas Production
The Bolivian
supply
dependency
compromises
national Natural
Gas consumption
4
High variable demand
of Power market
dispatch
Flexible LNG Terminal
Low fix cost
required
Electric Power
High increase in
natural gas demand
Short term solution
required
Potential Demand
Restricted Supply
sources to domestic
market
Alternative sources
required
Offer
National NG market conditions leads to a flexibility concept
5
30 33 36 40 41 41 42 43 44 45 46 47
1927
3439
45 47 47 46 48 48 47 47
19
36
42
44
50 5056
6774 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Industrial Demand Others Gas Fired Power Demand
Natural Gas: Supply x Demand Balance2009 - 2020
millions m3/d @ 9.400 kcal/m3
Su
pp
ly x
Dem
and
Bal
ance
PN 2009 - 2013
Ind
ust
rial
Oth
ers
Ele
ctri
c G
ener
atio
n
6
30 33 36 40 41 41 42 43 44 45 46 47
1927
3439
45 47 47 46 48 48 47 47
19
36
42
44
50 5056
6774 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Industrial Demand Others Gas Fired Power Demand
Nat
ion
al S
up
ply
millions m3/d @ 9.400 kcal/m3
Pre-Salt
PN 2009 - 2013
Ind
ust
rial
Oth
ers
Ele
ctri
c G
ener
atio
n
Natural Gas: Supply x Demand Balance2009 - 2020
Su
pp
ly x
Dem
and
Bal
ance
7
30 33 36 40 41 41 42 43 44 45 46 47
1927
3439
45 47 47 46 48 48 47 47
19
36
42
44
50 5056
6774 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Bolivian Supply LNG Additional LNG
Industrial Demand Others Gas Fired Powerplants
Nat
ion
al S
up
ply
Bo
lívia
Pre-Salt
PN 2009 - 2013
Ind
ust
rial
Oth
ers
Gas
Fir
ed P
ow
er
Natural Gas: Supply x Demand Balance2009 - 2020
Su
pp
ly x
Dem
and
Bal
ance
millions m3/d @ 9.400 kcal/m3
8
30 33 36 40 41 41 42 43 44 45 46 47
1927
3439
45 47 47 46 48 48 47 47
19
36
42
44
50 5056
6774 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Bolivian Supply LNG Industrial Demand Others Gas Fired Power Demand
Nat
ion
al S
up
ply
Bo
lívia
LN
G
Pre-Salt
PN 2009 - 2013
Ind
ust
rial
Oth
ers
Ele
ctri
c G
ener
atio
n
Su
pp
ly x
Dem
and
Bal
ance
millions m3/d @ 9.400 kcal/m3
Natural Gas: Supply x Demand Balance2009 - 2020
9
30 33 36 40 41 41 42 43 44 45 46 47
1927
3439
45 47 47 46 48 48 47 47
19
36
42
44
50 5056
6774 74 74 74
0
20
40
60
80
100
120
140
160
180
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
National Supply Bolivian Supply LNG Aditional LNG
Industrial Demand Others Gas Fire Power Demand
Ind
ust
rial
Oth
ers
Ele
ctri
c P
ow
er
Nat
ion
al S
up
py
Bo
lívia
LN
GA
dit
ion
al
LN
G
Pré-Sal
PN 2009 - 2013
Su
pp
ly x
Dem
and
Bal
ance
millions m3/d @ 9.400 kcal/m3
Natural Gas: Supply x Demand Balance2009 - 2020
10
The Flexibility Concept
� Supply adjustment following Gas-Fired Power Generation
seasonality : flexible offer adjusted to a flexible demand;
� Terminal and Regas ship interchangeability;
� Regular LNG shipping using Regas ships;
� Storage Capacity acceptance for LNG Carriers from 75.000 to
218.000 m³.
11
Flexible and innovative Solution
LNG Carrier
FSRUJetty
Innovation:
• LNG Transfer between ships by a jetty
• First converted ship on the world.
12
Gasbol
In construction
Built
After the LNG terminals construction and the pipeline network growth,
the Brazilian natural gas logistic system becomes integrated.
Urucu
Manaus
NG supply Guanabara
Bay LNG
Pecém LNG
E&P
National Production
Transport Pipeline network expansion
in 2010: + 3.817 Km
Total = 9.288 Km
On 2006 Brazilian
Government
classified LNG
terminal projects
as Priority.
13
Termopernambuco
Gover. Leonel
BrizolaTermoceará
Terminal BGB
Fonte: Petrobras G&E
Regás BGB
Regás Pecém
16 a 26/01/2009 26 a 31/03/2009 14/04/2009 28 a 30/04/2009 16 a 30/06/2009
JAN MAR ABR ABR JUN JUL
UTE CE 633 290
ENDESA 821 440 1484 1403 1550
UTE PE 1155
UTE GLB 2503
UTE AC 980
JAN MAR ABR ABR JUN JUL
RegásPECEM 1355 780 880 2514 1872
Regás BGB 2955
Consumption Thermoelectrical mil m³/d CNG
Regasification mil m³/d CNG
MAR 09 ABR 09 JUL 09 JUL 09
Excellence → Golar Spirit 51946 50538
Golar Winter → Golar Spirit 18000
Shell Gemmata → Golar Spirit 124.340
LNG Transference m³
17/03/2009 21/04/2009
04 a 07/07/2009
Flexibility: All Operations until July 2009
Aureliano
Chaves
Transference
Regasification
Endesa
Fortaleza
Terminal Pecém
12 a16/07/2009
Regas + Transfer
14
Analysis for all project phases, focused in terminal operational safety
Conceptual
DesignBasic
Design
Detailed
Design Assembly
Preliminary
Analysis
Hazop Hazid
Fluid Dynamics
Procedures
Operation Manual
TRANSPETRO
LNG Flexible Terminal
Jetty Risk analysisRisk
Analisys
Project
Evolution
15
The Project was certified in all phases
Basic and Detailed Design
DNV Certification
Normas e padrões de entidades regulatórias
e da legislação brasileira
Jetty Construction
Commissioning and Tests
16
Gas&Energy Executive Director
Critical analysis meetings
General Coordination of
Project Interfaces
Gas&Energy MARKETING Supply and Charting Contracts
ENGINEERING
Design
Construction
Commissioning
TAG
Business Model
TRANSPETRO
Pre-Operation and Operation
Gas & Energy LOGISTICS
Scheduling and Quality Control
Gas&Energy CORPORATIVE
Regulation, Licensing,
Organization and Managing,
SAP, Communication
LAW and TAXES
Project Leaders BGB and PECEM
DISTRIBUTION
Tug Boat and Maneuvering
Multidisciplinary and matrix task-force mobilization
17
Main MilestonesConstructionCommissioningPre-Operation
18
Pecém LNG TerminalRemoval of liquid transfer loading arms for jetty conversion
27/01/2008
19
Pecém LNG TerminalNew lifted platform
24/04/2008
20
Pecém LNG Terminal20 km length pipeline interconnection
30/4/2008
21
Pecém LNG TerminalControl Room up-grade
10/05/2008
22
Pecém LNG TerminalLNG Loading and CNG sendout arms and other facilities installed
22/7/2008
23
Pecém LNG TerminalControl Room finished
28/07/2008
24
Pecém LNG Terminal1st LNG regasification terminal: finished on October 2008, (spent 10 months)
02/04/2009
25
Pecém LNG TerminalFRSU Golar Spirit and LNG Carrier Excellence docked
6/4/2009
26
Pecém LNG TerminalFRSU Golar Spirit connected and Golar Winter as a Carrier, docking
4/7/2009
27
Pecém LNG Terminal1st simultaneous operation of LNG Transference and Regasification
4/7/2009
28
Guanabara Bay LNG TerminalEmbedding of the first pile
28/1/2008
29
Guanabara Bay LNG TerminalFirst piles installed. Terminal constructed over 266 piles
19/2/2008
30
Guanabara Bay LNG TerminalTerminal platform construction
08/5/2008
31
Guanabara Bay LNG TerminalStretch of submersed gas pipeline: 10 km length
11/4/2008
32
Guanabara Bay LNG TerminalTerminal Platform concreted
08/8/2008
33
Guanabara Bay LNG TerminalLNG Loading and CNG sendout arms and other facilities installed
19/9/2008
34
Guanabara Bay LNG TerminalControl Room : explosion proof building
28/1/2009
35
Guanabara Bay LNG TerminalConcluded on January 2009, spending 12 months
28/1/2009
36
Guanabara Bay LNG TerminalFRSU Golar Spirit docking for commissioning
11/3/2009
37
Guanabara Bay LNG TerminalFRSU Golar Spirit and LNG Carrier Excellence docked on terminal
16/3/2009
38
Guanabara Bay LNG Terminal1st LNG Transference between LNG Carrier Excellence and FRSU Golar Spirit
18/3/2009
39
Guanabara Bay LNG Terminal1st Regasification using FRSU Golar Spirit
26/3/2009
40
Thank you !
PETROBRAS LNG Project