Oilbarrel Conference 12 th May 2009 www.petroceltic.com
Transcript
Page 1: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Oilbarrel Conference

12th May 2009

Oilbarrel 12th May 2009www.petroceltic.com

Page 2: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Forward looking statements

This presentation may contain forward-looking statements and information that both t t’ t t ti b li f i f t t drepresents management’s current expectations or beliefs concerning future events and

are subject to known and unknown risks and uncertainties.

A number of factors could cause actual results, performance or events to differ materially f th d i li d b th f d l ki t t tfrom those expressed or implied by these forward-looking statements.

Oilbarrel 12th May 2009 Slide 1Slide 1

Page 3: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Outline

• Company Overview• Algeria Isarene Blockg• Italy• Tunisia• Fundingg• Conclusions

Oilbarrel 12th May 2009 Slide 2

Page 4: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Company background and strategy

Background• Founded in 2002 and quoted on AIM and ISEq• 25 full time employees supported by a network of over fifty

experienced consultants • Operated assets in Algeria, Italy and Tunisia• Headquartered in Dublin, Ireland with offices in Rome, Italy and

Algiers, Algeria

Strategy• Maghreb/Southern Europe Exploration focus• Low cost drilling close to infrastructure, Operatorship preferred• High initial equity with operator status preferred• Early stage work programmes funded internally or by farming out• Longer term growth through Acquisition / Merger and drillbit

Oilbarrel 12th May 2009

success

Slide 3

Page 5: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Senior Management Team

Andrew BostockNon-Executive ChairmanMr Bostock is a Petroleum Engineer with over 20 years experience in upstream oil and gas. He began his career with ShellInternational, and progressed through increasingly senior technical and commercial roles in a number of independent oil and

Brian O’CathainChief Executive M O’C th i i l i t d t l i ith 25 ’ i i i t h i l d i l l i

gas companies, including Enterprise Oil, Talisman Energy and Venture Production. He was appointed to the Board of Danain 2001. He is currently Chairman of Purepower Group Limited, a privately owned renewable energy company.

Mr O’Cathain is a geologist and petroleum engineer with 25 years’ experience in senior technical and commercial roles in upstream oil and gas exploration and production companies, including Shell International, Enterprise Oil and Tullow Oil plc. He has experience in working in West Africa, North Africa, onshore Europe, the North Sea, the gulf of Mexico, South Asia and offshore Ireland. He was formerly Chief Executive of AIM-listed Afren plc.

Alan McGettigangFinance DirectorMr McGettigan has over twenty years of experience in upstream oil and gas. Prior to joining Petroceltic, he worked for BGInternational where he held senior roles in Commercial and Group Business Development. His other experience includesroles at Shell International and BP as well as four years as a management consultant at McKinsey & Company.

Oilbarrel 12th May 2009 Slide 4

Page 6: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Organisation

Brian O'Cathain

Chief Executive

Head of Operations

S b S f E l tiAl i O ti R Offi

Head of Exploration

Dermot Corcoran

Finance Director

Alan McGettigan

L l Ad i

Pasquale Quatrone

Al i Offi

Head of Engineering

Fabrice Toussaint

Offi M t

Dave Scott

GM Algeria

David Slaven

GM Italy

Sub Surface Evaluation

 Richard Baker

 Bernard Andre

Rick Ogloff

Joe English

Kara English

Dublin

Algeria Operations

See Hassi Chart

Group Financial Controller

Sarah Sweeney

Rome OfficeSee Algiers Chart

Accountant

Legal Advisor

Hind Yassine

Algiers Office

See Rome Chart

Office Management 

Ann O'Brien

Emilie Roger

Pascale GiordanoVirginie Carrier

Admin. Support

DublinSubSurface Algiers

Hassi See Algiers Chart

Algiers

RomeSee Rome Chart

Finance Mgr Algiers

Wellsite Geology

See Hassi Chart

See Algiers Chart

Finance Mgr Rome

London

Wellsite

Oilbarrel 12th May 2009 Slide 5

Page 7: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Technical Team

Dermot Corcoran –Head of ExplorationGeophysicist. Dermot holds a B.Sc. in Geology and an M.Sc in Applied Geophysics from the University of Galway, and aPh.D from Trinity College Dublin, with international experience with Exxon, Fina, Statoil, Amerada Hess and Enterprise Oil.

Fabrice Toussaint – Head of Petroleum Engineering

Richard Baker – Geophysics ConsultantGeophysicist with over 40 years of Experience in International Operations. Worked with Burmah, Unocal, Dana & JKX.

Bernard Andre – Geophysics Consultant

Fabrice Toussaint Head of Petroleum EngineeringPetroleum Engineer with 17 years International experience, Ex-GM Congo for Perenco, Mauritania for Woodside. Ex Elf,Perenco, Tullow, Woodside., worked in Mauritania, Congo, Cote d’Ivoire, Colombia, France & Tunisia.

Rick Ogloff- Exploration Team Leader Italy18 years International Experience Geophysicist, with Encana, Veritas, Gaffney Cline Associates

Bernard Andre – Geophysics ConsultantOver 30 years of experience with Exxon, Total, Repsol and Petronas. Bernard is an experienced Geophysicist with worldwide experience, and detailed knowledge of Algeria and Gabon.

Joe English – Senior GeologistJoe holds a B.Sc from Trinity College Dublin, and a Ph.D. From the University of Victoria in Canada. He formerly workedwith Encana and Nexen in Canada.

Kara English – Operations GeologistKara joined Petroceltic from Encana, where she had 4 years of Operational Geology experience

Oilbarrel 12th May 2009 Slide 6

Page 8: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Operations & Finance Team

David Slaven GM Algeria

Dave Scott - Head of OperationsEx COO Regal Oil, Head of Operations Burlington, Drilling Manager Italy for Enterprise Oil. Experienced drilling and Production Operations Manager, drilling experience in Italy (Onshore & Offshore) & Algeria.

David Slaven – GM AlgeriaDavid was formerly GM Algeria for Burlington Resources and LLE, and prior to that was Finance Manager Algeria for LLE,Anadarko, and El Paso. He has worked in Algeria from the early 1980s.

Hassan Yassine – Legal Advisor, AlgeriaHassan was formerly head of Legal at Sonatrach

Q G

Tony Engleton – Drilling SupervisorFormer Drilling Manager for Ascent (Italy & Hungary). Drilling Manager at Burlington Resources. Extensive offshore drillingexperience in Italy, North Sea and Denmark for Maersk, Shell International & Enterprise.

Pasquale Quattrone – GM ItalyExperienced ex-ENI Explorationist. Extensive experience onshore & offshore Italy and North Africa. Ex-GM Italy for JKX.

Mustapha Zemiti – Operational SupportOver 30 years experience in Sonatrach Drilling group Former Head of Well Services in Sonatrach

Lance Robinson– Senior Drilling EngineerOnshore & offshore drilling experience with BP, Burlington, Hardy, Ranger, Amoco and Enterprise Oil. Worked in UKCS,Algeria, Italy, Australia, Azerbaijan, and Kazakhstan.

Brahim Zanoun – Finance & Administration ManagerAccountant formerly head of Administration and Accounting in Sonatrach’s well services division

Over 30 years experience in Sonatrach Drilling group. Former Head of Well Services in Sonatrach.

Sarah Sweeney – Group Financial ControllerSarah is a Chartered Accountant who trained with KPMG in Dublin and subsequently worked with an Australian publiclisted company before joining Petroceltic.

Oilbarrel 12th May 2009 Slide 7

Accountant, formerly head of Administration and Accounting in Sonatrach s well services division

Page 9: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Development of Natural Gas Supplies in the EU

10%

12%9%

23%525-560

478

590-640560-605

supply gapBillion m³

11%

24%

7% 13%

9%11%

8%

12%

10%

7%

11%

478

Al i

other non-EU imports*

advanced projects

n 24%

15%

6%14%

22%

12%

21%20%

7%

4%

Algeria

Russia

U P

rodu

ctio

n

9%

28%

8%

21% 19%

10%

17%

4%5%

indigenous productionfor domestic use

Norway

Netherlandsother internal EU trade

EU

2005 2010 2015 2020

* of which: Nigeria 3%, Qatar 3%

LNG-share (in imports)10% 20% 20% 22%

Oilbarrel 12th May 2009

Basis for imports: Contracted volumes and prospective contract prolongationsRussia without volumes via North European Gas Pipeline (NEGP) which are included in advanced projects Source: Eurogas

Page 10: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Proved Gas Reserves, Algeria & Comparisons

180

200

F 20

07

159

187

140

160

180

Rese

rves

TCF

100 10580

100

120

Prov

en R

73

53

20

40

60

0

20

Algeria Egypt Libya Nigeria EU Norway

Oilbarrel 12th May 2009 Slide 9

Source: BP Statistical Review of World Energy 2008

Page 11: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Petroceltic : North African Assets

Oilbarrel 12th May 2009 Slide 10

Page 12: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Ordovician Basins of Middle East / North Africa

Oilbarrel 12th May 2009

Source: IHS 2008

Page 13: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Isarene Drilling History

4

DryShows

Appraisal wells in italics

3

s

ShowsOilGas

French exploration

2

Num

ber o

f wel

ls

1 N-1

2

TXB

-1

Sonatrach exploration Repsol appraisal PetrocelticAppraisal

-1

1

N

TTY-

TXA

N-11

NC

L-2

bis

TXA

-1N

CL-

1

T-2

ISA

S-

0

1958

1960

1962

1964

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

CLR

-1IN

E-1

INW

-1

TMZ -

HTT

N-1

TSI-1

bG

TT-2

GTT

-1

IR-1

HTT

-1

HTT

-

Oilbarrel 12th May 2009

Year

Slide 12

Source: Sonatrach, Petroceltic analysis

Page 14: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Total’s TFT 8 TCF gas, 840 MMBBLS liquids recoverableCirca 80 km from BP’s In Amenas ClusterCirca 80 km from Isarene

Repsol’s Tifernine oiloil15 k GTT 1

BP’s In Amenas Cluster of Fields5.2 TCF gas & 264 MMBBLS liquids recoverable

15 km GTT-1

HTT & ISASDiscovery Areas

Ain Ain TsilaTsila Ridge Ridge ProspectProspect

BP’s Tin Zaouatene-1Illizi Basin.BP 49% and Operator.

S IHS

Oilbarrel 12th May 2009 Slide 13

ProspectProspect1.51.5--6 TCF 6 TCF potentialpotential Slide 13

Flowed 9.5 mmscf/d Source: IHS, Petroceltic analysis

Page 15: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Asset Overview – Isarene PermitWhat’s happened to date?pp

• 2 gas discoveries drilled & tested in 2006

• >5000 kms 2D seismic reprocessed 2006 2008 • >5000 kms 2D seismic reprocessed 2006-2008

• 900 km2 Wide Azimuth 3D Seismic acquired & processed 2008

• Drilling contract to KCA Deutag for 5/7 well campaign

• Well Services contract to Schlumberger/Sonatrach JV Well Services contract to Schlumberger/Sonatrach JV

• Rig in Algeria – drilling start expected mid-May 2009

• Drilling locations agreed and approved

• Capture resources under PSC Rules for appraisal/development in

Oilbarrel 12th May 2009 Slide 14

p pp / p2010-2012

Page 16: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

PSC key dates and objectives

•26th April 2008 – 30% Relinquishment

• 26th April 2010 – Expiry of 2nd Exploration Period

• 26th April 2012 – Expiry of any Extension Period

•Delineate & Capture Resources in 4 areas

Ain Tsila Ridge- Ain Tsila Ridge - ISAS area- Hassi TabTab (Already proved in 2006)- El Biod (Exploration)El Biod (Exploration)

Oilbarrel 12th May 2009 Slide 15

Page 17: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Algeria strategy and objectives to April 2010

• 5/7 wells planned in 2009-2010 to:

S i ti di i f f t d ti– Secure existing discoveries for future production– Prove large gas resources (>2TCF) on Ain Tsilla Ridge 3D

area– Obtain early oil production at GTT– Secure existing gas discoveries for exploitation via

adjacent planned infrastructure– Drill remaining exploration prospects – Capture 2P reserves

– Drilling Rig Contract signed for KCA Deutag Nomad Class Rig T-212

– Drilling starts mid-May 2009 9-12 month programme

Oilbarrel 12th May 2009 Slide 16

Drilling starts mid-May 2009, 9-12 month programme

Page 18: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

PCI OBJECTIVE – CAPTURE 4 APPRAISAL/DEVELOPMENT AREAS BY Q1 2010

Ai T il RidAinTsila Ridge3 wells

ISAS Area2/3 Shallow wells

AT-1

INE-2INW-2

GTT-3

AT-2

AT-3

INE-2

HTT-2 flowed 15.3 mmscf/d

EB-1

ISAS-1 flowed 1.1 mmscf/d

Oilbarrel 12th May 2009

El Biod exploration Isarene - Top Ordovician Structure Map

Page 19: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Ordovician Ain Tsila Prospect-Unrisked Potential Contingent Resources

Mean CaseLowest Closing Contour

GWC 1903mGWC 1903m2550 BCF

Crest1800 m

P10 CaseGDT in TXA-1

GWC 1951mPoss. Reserves 5860 BCF

Deterministic CaseLowest Closing Contour

GWC 1903m1550 BCF

Oilbarrel 12th May 2009February 2009

Page 20: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

AinTsila Ridge Ordovician Prospect

• Key Success FactorsNo charge risk lots of gas (based on wells drilled to date)– No charge risk, lots of gas (based on wells drilled to date)

– Good structural closure– Need good porosity 6-12%– Need open fractures– Internal estimate of good well >5 mmscf/d– Development well could potentially do x5 to x10 timesp p y– Will decide on test / frac program post logging– Test results will be kept tight until Regulatory approval

Oilbarrel 12th May 2009 Slide 19

Page 21: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Location Selection Criteria - Ordovician

• Objective – optimise location for best well test- discovery declarationdiscovery declaration- demonstrate ‘commercial’ flow rates

• Structural elevation – maximise gas column penetrationSt uctu a e e at o a se gas co u pe et at o

• Depositional criteria – setting & attributes – highest probability of coalesced turbidite sands and/or channel/ribbon p y / /sandstones

• Fracture potential – amplitude, curvature, velocity anisotropy, p p , , y py,faulting – focus around NW-SE trending lineaments

Oilbarrel 12th May 2009 Slide 20

Page 22: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

BP published Geological Model for Cambro-Ordovician Glacial play in Libya & Algeria

Oilbarrel 12th May 2009 Slide 21

Source: BP, Dixon et al, 2008

Page 23: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Proposed Ordovician AinTsila Ridge locations

Incised ValleyBoundary

Top Ordovician time surface

Incised ValleyyBoundary

Oilbarrel 12th May 2009

Page 24: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Isarene Planned Drilling and Testing Sequence

CIVIL WORK

In Country MobilisationRig Up on Location

Feb-09 Mar-09 Apr-09 May-09 Jun-09 Jan-10Jul-09 Aug-09Jan-09 Sep-09 Oct-09 Nov-09 Dec-09 Mar-10Feb-10

INE-2 (Drill/Test)AT-1 (Move/Drill/Test)AT-2 (Move/Drill/Test)

El Biod (Move/Drill/Test)INW-2 (Move/Drill/Test)GTT-3 (Move/Drill/Test)

AT 3 (M /D ill/T t)

Key

AT-3 (Move/Drill/Test)Rig Demobilisation

Feb-09 Mar-09 Apr-09 May-09 Jun-09 Sep-09 Oct-09 Nov-09 Dec-09 Jan-10 Feb-10 Mar-10Jul-09 Aug-09Jan-09

KeyMobilisation

Drilling

Rig Move

Ri l W ll T /F i

Oilbarrel 12th May 2009 Slide 23

Rigless Well Test/Fracing

Page 25: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Unrisked potential contingent reserves*

Timing WellsP90 P50 P10 Pmean P90 P50 P10 Pmean P90 P50 P10 Pmean

Total Gross Prospective Resources (MMboe)Reservoir Prospect

Gross Prospective Resources (Bcf)

Gross Prospective Resources (MMbbls)

Ain Tsila 300 1,381 6,013 2,616 15 69 301 131 69 316 1,375 598Q3/Q4 2009 3

El Biod 7 44 249 106 0 2 12 5 2 10 57 24 Q1/2010 1SubTotal 307 1,425 6,262 2,722 15 71 313 136 70 326 1,432 622ISAS Area 310 27 83 Q2 2009 2

Ordovician

Devonian/Hassi Tabtab 146 6 32El Biod Area 138 332 641 368 138 332 641 368 Q1/2010 1SubTotal 456 138 332 641 401 25 59 114 528TOTAL 3,178 537 1,150 7

Devonian/ Carboniferous

*Current Petroceltic estimates, post new 3D interpretation

All numbers gross prospect, unrisked

Oilbarrel 12th May 2009 Slide 24

Page 26: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

KCA Deutag Rig T-212 at INE-2 wellsite

Oilbarrel 12th May 2009 Slide 25

Page 27: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Petroceltic Italy Assets

7 Permits (3 operated)

11 Offshore Exclusive Applications

1 Onshore Exclusive Application

2-3 wells planned for2 3 wells planned for 2010/2011

High Equity Interests

Oil & Gas

Oilbarrel 12th May 2009 Asset Review20th October 2008Slide 26

Page 28: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Italian Oil Production Growth

140 

160 

Kbopd Italy is the 3rd largest producer in the EU

100 

120 

Italy

60

80 

Italy

Netherlands

Romania

Tunisia

40 

60  Tunisia

France

20 

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007

Source: ENI World Oil & Gas Review 2008

Oilbarrel 12th May 2009 Slide 27

Page 29: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Oil Production by Country normalised to 2000 productionp

Kbopd Italy is the 3rd largest producer in the EU180%

140%

160%

100%

120%

60%

80%

40%

2000 2001 2002 2003 2004 2005 2006 2007

Source: ENI World Oil & Gas Review 2008

Oilbarrel 12th May 2009 Slide 28

Italy Netherlands Romania Tunisia France UK Norway Demark

Page 30: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Potential remains for large oil discoveries

Discovery Curve – Driven by complex geology & new plays

MIGLIANICO-ELSAAPULIAN MARGIN PLAY

Oilbarrel 12th May 2009 Slide 29

Page 31: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Central Adriatic AreaPetroceltic Acreage Position

PCI 100% EquityPCI 100% Equity

Oilbarrel 12th May 2009 Slide 30

Page 32: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Cretaceous Slope Play Elsa Area

• Cretaceous dolomitized deposits resedimented from the Apulian Platform edge and sealed by overlying pelagic sediment

Oilbarrel 12th May 2009

Maiolica

Massiccio

Source:Vega Oil

Page 33: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Elsa-1, Elsa West & Miglianico Area

High-side case assumes continuous pool and similar OWC to Miglianico (>-4780m).. API = 15 – 34 ˚

Elsa -1 – (1992) Logged 75m oil zone, good porosity. 15 API Oil on poor

Elsa WestDHI:

Flat Spot

p y pquality DST. P&A.Top reservoir –4475 msslTD 4841m

Elsa

Miglianico 1 (2001) tested 2500 bopd (34 api) TD 4966m

Oilbarrel 12th May 2009

Miglianico 2 (2003) tested 1750 bopd (37 api) TD 4925m

Page 34: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Italy: Po Valley licenses & prospects

TriassicVillafortuna-Trecate Fields265 MMbbls + 250 BCF

Gaggiano Field100 MMbbls

Zeme Lomellina Triassic Gas Prospect: Potential Contingent

Resources 600 BCF

Rovasenda Triassic Oil Prospect: Potential Contingent Resources

200 MMbbl200 MMbbls

Oilbarrel 12th May 2009 Slide 33Slide 33

Page 35: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Carisio Permit: Rovasenda ProspectPCI 47.5%; ENI 47.5%; Condotte 5%

Depth Structure Map: ~Base JurassicProspect Type ‘Trap Door’ Fault Block

Target Depth ~3000-4000m

Reservoir Jurassic/Trias Lst.

HC Type Oil

HC Column 250-1500m

V i l Cl 2500Vertical Closure 2500m

ML Area 32 km2

Max Area 32 km2

STOOIP 680 MMbblsSTOOIP (Mean) 680 MMbbls

Reservoir Parameters

Gross Reservoir 40-60%

Net/Gross 40-60%

Porosity 3-12% (Avg. 6%)

Sw 20-60%

Oilbarrel 12th May 2009

Recovery Factor 40%

Page 36: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Strategy and objectives for Italy 2009 - 2011

• Drill 1 to 3 Wells:

D ill El A i l ll i 2010/11• Drill Elsa Appraisal well in 2010/11P2 potential resources 80mmbbls, upside 180 mmbbls

• Seismic and drilling on Carisio Rovasenda Triassic oil play g p y(Villafortuna trend) 2010/2011P2 potential resources 200 mmbbls

• New Seismic on Adriatic 100% acreage fund drilling via • New Seismic on Adriatic 100% acreage, fund drilling via farm-out

Oilbarrel 12th May 2009 Slide 35Slide 35

Page 37: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Petroceltic Tunisia – Ksar Hadada license

Petroceltic 57%Independent 40%Derwent & GA I A

Oryx Structure

Derwent & GA.I.A.

New seismic interpretationComplete – additionalProspects identified

Area 5600 km2Verenex Accacus successesIn western Libya >5000 bopd/well

Storm Ventures success In TT-2, tested 300 bopd from the Ordovician, 170 MMbblsSTOIIP di d i A il 2009

Oilbarrel 12th May 2009 Slide 36

STOIIP discovered in April 2009Source: Madalena Ventures

Page 38: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Tunisia

• Licence in 2nd Period April 2008-April 2011

ll l d / f• 2 wells planned in 2009/10, contingent on farm-out to:

– Fulfill outstanding commitmentsTest Oryx and South Salah prospects– Test Oryx and South Salah prospects

– Wells costs approximately $5mm each

h bl k l d l b &• The block is currently under evaluation by a private E&P company

• Petroceltic 57%, paying 60%

• Fiscal terms good, 45% cost oil and 40% profit oil, no other taxes

Oilbarrel 12th May 2009 Slide 37

Page 39: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Iberdrola transaction overview

• Strategic alliance with Spanish Energy Group Iberdrola to facilitate development of Petroceltic’s attractive portfolio and underpin the inherent value of our oil and gas asset base

– Iberdrola invested $55m in Petroceltic through placing of approximately 216m shares at £0.13 / share. Three year standstill in place, and non-blocking provisions

– Iberdrola has paid $7.3m for option to invest a further $47.7m to acquire 49% financing interest in Algerian asset (subject to regulatory & partner approval)

– 1 non-executive director on board

• Subscription price underlines significant upside potential in Petroceltic’s share price

• Joint business committee to look at further upstream co-operation in a focused area • Joint business committee to look at further upstream co-operation in a focused area of North Africa / Mediterranean

• Represents Iberdrola’s first upstream investment

• Petroceltic gains access to gas marketing expertise

Strategic alliance highlights intrinsic value in Petroceltic’s attractive exploration and appraisal portfolio

Oilbarrel 12th May 2009 Slide 38

exploration and appraisal portfolio

Page 40: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

2009 Cash: Sources & Uses, pre-funding

Sources US $ Uses US $Million Million

Cash 1st January 2009 43.4 Algeria 7 well programme -57.0Net Business Running Costs -4.0

Iberdrola Ad ance Fee 7 3 Other Cape 3 0Iberdrola Advance Fee 7.3 Other Capex -3.0Drilling 2008 prepayments 5.6

Iberdrola Farm-in funds 55.0

Total Opening Cash 56.3 Closing Cash 47.3

Oilbarrel 12th May 2009 Slide 39

Source: Petroceltic Management Accounts & 2009 Budget

Page 41: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

2009 Cash: Sources & Uses, pre-funding(without Iberdrola farm-in, capex reduced)( , p )

Sources US $ Uses US $Million MillionMillion Million

Cash 1st January 2009 43.4 Algeria 5 well programme -45.0Net Business Running Costs -4.0

Iberdrola Advance Fee 7.3 Other Capex -1.0Drilling 2008 prepayments 5.6

Iberdrola Farm-in funds 0.0

Total Opening Cash 56.3 Closing Cash 6.3

Oilbarrel 12th May 2009 Slide 40

Source: Petroceltic Management Accounts & 2009 Budget

Page 42: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Placing – Use of Funds

Placing of USD$40 million

Existing and New Investors USD$31.1Iberdrola provision @ 22.34%* USD$ 8.9

USD$40.00

Use of funds• Secures Algerian drilling programme in case of delay to Iberdrola

farm-in approval• Allows continuation of Algerian appraisal in a success caseAllows continuation of Algerian appraisal in a success case• Accelerates drilling and seismic programmes in Italy• Allows development of Italian portfolio

Oilbarrel 12th May 2009 Slide 41

* Note: Iberdrola has an option to take 22.34 % of placing. If not exercised, these shares will go to existing and new investors

Page 43: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Placing Statistics

Current Shares in issue 965,797,049       %£mm US$mm

Tranche1 ‐ Unconditional 190,619,082       19.7% 13.3 19.4Tranche 2 ‐ AGM on 3/6/09 114,164,330       11.8% 8.0 11.6Tranche 3 ‐ Iberdrola Option* 87,680,588          9.1% 6.1 8.9Total Placing 392 464 000 40 64% 27 5 40 0Total Placing 392,464,000       40.64% 27.5 40.0

New Shares in issue post Funding

1,358,261,049     

Issue Price (27/9/08) 7p/share30 day Average price 6.997p/share

Post placing Market Capitalisation $185 million (9p/share 11/5/09)

Oilbarrel 12th May 2009 Slide 42

* Note: Iberdrola has an option to take 22.34 % of placing. If not exercised, these shares will go to existing and new investors

Page 44: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Placing Summary

• Protects investment in Algeria

– Currently not fully funded for success case drilling programme– Finance in place for drilling in 2009/10, but cannot complete desired

programme without Iberdrola farm-in– Difficult/impossible to fund while drilling ongoing– Provides protection in case of drilling project cost overruns

• Allows development of Italian business

– Italian Portfolio requires funding for 3D seismic and drillingq g g– Rig commitments must be entered into in 2009 for drilling in 2010– New seismic required for Rovasenda prospect in Po Valley

• Improves strength of institutional followingp g g

– New investors are backing the vision of management to grow across the portfolio, in Algeria, Italy and Mediterranean / Maghreb

– Quality of new and existing investors is high, long term holders

Oilbarrel 12th May 2009 Slide 43

Q y g g , g

Page 45: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Recent Investment Research Valuations

CountryDavy Mirabaud Davy Mirabaud

Risked Unrisked Upside

11/05/2009 12/05/2009 11/05/2009 12/05/2009

Algeria 6.1 7.4 43 34 Italy 10 1 24 7 141 188Italy 10.1 24.7 141 188 Tunisia 3.2 1.6 40 10 Corporate 5.0 6.6 5 7

Value 24.4 40.3 229 239

Target 24.2 15.0

All values in p/share

Oilbarrel 12th May 2009 Slide 44

Source: Investment Research Reports published by Davy & Mirabaud, May 2009

Page 46: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Petroceltic Summary

• Foundations for Growth in Place

– Rig in country 5/7 well programme about to startRig in country, 5/7 well programme about to start– Finance in place for drilling in 2009/10, additional farm-in

funds expected– Strong Technical & Operational Team

Robust Strategic Partner Iberdrola– Robust Strategic Partner – Iberdrola– Italy Adriatic/Po Valley permits secured with drill ready

prospects

• Newsflow

– Drilling expected start date 17th May 20095/7 wells planned for Algeria 2009/10– 5/7 wells planned for Algeria 2009/10

– Up to 3 wells planned for Italy 2010/11– Possible drilling in Tunisia 2009/10– Iberdrola Farm-in expected Q3/Q4, further $55 mm cash

Oilbarrel 12th May 2009 Slide 45

Page 47: Petroceltic Oilbarrel Presentation 12th May 2009files.investis.com/.../petroceltic-oilbarrel-presentation.pdf · This presentation may contain forward-l ooking statements and ...

Oilbarrel 12th May 2009 Slide 46