8/13/2019 Petroleum Development Geology 040_ Well Test
1/23
8/13/2019 Petroleum Development Geology 040_ Well Test
2/23
Well Test ObjectivesWell Test Objectives1. Identify and Obtain reservoir fluids; oil, gas
& water
2. Determine basic reservoir parametes;
productivity (PI), permeability(k), skin (S),initial Resv. Pressure (P*) & Resv. Temp.
3. Well potential & deliverability (gas well) : It
may be mandatory to proof fieldcommerciality
4. Boundary & irregular conditions Reservoir(GOC, OWC & Reservoir Limit)
8/13/2019 Petroleum Development Geology 040_ Well Test
3/23
WELL TESTING METHODSWELL TESTING METHODS
HOLE CONDITION:
OPEN HOLE
CASED HOLE
TOOLS RUN IN HOLE :
WIRELINE TESTING : RFT, MDT & DST (IT WAS)
PRODUCTION TEST WITH COMPLETION STRING
IN PLACE : DST
8/13/2019 Petroleum Development Geology 040_ Well Test
4/23
Surface Test Equipment
Downhole Test
Equipment & Tool
DST & TCP
WELL TESTING SCHEMATIC
at
Cased Hole
Subsea Safety
Equipment
8/13/2019 Petroleum Development Geology 040_ Well Test
5/23
DOWNHOLE TESTING EQUIPMENT
Open-Hole Sampling EquipmentRDT & RCI are equivalent with RFT/MDT
Baker RCI
Halliburton RDT
Formation Test Tool (FTT) sample
chambers hold 420cc to 3 gallons of
reservoir f luid depending on make and
model.
Open hole samples aid production and
facili ty designs and are sometimes used
for PVT studies.
8/13/2019 Petroleum Development Geology 040_ Well Test
6/23
1ST GENERATION
RFTREPEATED FORMATION TESTER
- unlimited pressure survey
- 1 to 2 fluid sampling
2ND GENERATION
MDTMODULAR FORMATION DINAMIC
TESTER
- unlimited pressure survey- many f luid sampling (unlimited?)
- able to identify fluid type
- able to replace(pump out)
unrequired fluid sampleSCHLUMBERGER
8/13/2019 Petroleum Development Geology 040_ Well Test
7/23
DOWNHOLE TESTINGEQUIPMENT
RFT / MDT
8/13/2019 Petroleum Development Geology 040_ Well Test
8/23
Mud pressure
Reservoir pressure
Build-up pressure
Example RFT Record
8/13/2019 Petroleum Development Geology 040_ Well Test
9/23
Wirelinepen Hole Testing
FT/MDT/RDT/RCI/etc. To identify the reservoir
pressure
To identify the fluid content
To estimate the permeability
To estimate the productifity To define the fluid contact (OWC,
OGC and GWC if any)
8/13/2019 Petroleum Development Geology 040_ Well Test
10/23
Fluid Contact Determination
with fluid gradient from RFT
oil
water
RFT depth
WaterG
radient0.433ps
i/ft
pressure
de
pth
OilG
radient0
.367psi/ft
OWC
8/13/2019 Petroleum Development Geology 040_ Well Test
11/23
8/13/2019 Petroleum Development Geology 040_ Well Test
12/23
Performing Well Testith DST Clean up (flow)
Shut-in
Main flow (one period orflow-after-flow, flowingtest with 4 to 5 different
choke size) Main Build up (shut-in)
8/13/2019 Petroleum Development Geology 040_ Well Test
13/23
Selective Layer Testing
8 1/2 7 @ 17690
12 1/4
17 1/2
9 5/8 @ 15500
26
Layer B
Layer A
20 ft @ 500
8/13/2019 Petroleum Development Geology 040_ Well Test
14/23
Example :TEST STRINGDST TCP
8/13/2019 Petroleum Development Geology 040_ Well Test
15/23
Example : Pressure Testing Result
Build up data analysis
K = 375 mD
S = 21 P = 4200 psia4050[psia]
40 60 80 100 120
45000
[Ms
cf/D]
Production Period
Build up period
Pressure, psia
rates
Sanding Control
Test
Testing time, hrs
[Ms
cf/D]
45000
4050
[psia]
40 60 80 100 120
8/13/2019 Petroleum Development Geology 040_ Well Test
16/23
Well Productivity
AOFP = 344 MMscf/d
CGR = 24.5 STB/MMscf/d
Tested gas and condensate rates can be
increased to 125 MMscf/D and 3100 BPD
2.5E+5
IPR plot3500
50000
1500
1.5E+5 3.5E+52.5E+5
Gas Rate, Mscf/d
Pre
ssure,psi
8/13/2019 Petroleum Development Geology 040_ Well Test
17/23
Testing Risk Factors Layers communication due to
poor cement bond
High pressure and temperatures
(over 350F)
Pressure and fluid loss through
packers
Annulus-tubing fluid
communication
Water coning or sanding
Layers crossflow
THE ROLE f
8/13/2019 Petroleum Development Geology 040_ Well Test
18/23
THE ROLE of WELLSITE/DEVELOPMENT GEOLOGIST (DG)in WELL TESTING
OPEN HOLE TESTINGwith RFT/MDT
CASED HOLE TESTINGwith DST
DG Propose/selects the testing/perforation sand, interval and depth
Estimate the reservoir fluid contents and its static pressure
Provide the reservoir rock parameter for testing analysis such as l ithology, porosity
and permeabil ity i f any (from log, or qualitative)
Stop the testing when unsafe operation Testing Engineer (TE) decision
Decide testing duration TE decide flow & shut-in periods. TE also
selects choke size for flow testing.
Select taken fluid sample TE decide fluid sampling methods. And
responsible for fluid sample handling
As Operation Witness will validate &
analyse the result
TE is prime Operation Witness and wil l
validate & analyse the testing result.
DG & TE will be along selecting the
perforation method
8/13/2019 Petroleum Development Geology 040_ Well Test
19/23
PERFORATION1. THROUGH CASING GUN
Hyperjet/HSD(high shot density)
2. THROUGH TUBING GUN Enerjet
3. TCP (Tubing Conveyed Perforation)
8/13/2019 Petroleum Development Geology 040_ Well Test
20/23
8/13/2019 Petroleum Development Geology 040_ Well Test
21/23
GUN TYPES
8/13/2019 Petroleum Development Geology 040_ Well Test
22/23
DG and/or Wellsite eologist Responsibilitiesn Perforation Job
1. Define the perforation intervals at
porous zone & hydrocarbon zone(pay zone.
2. Evaluate and prepare the perforationdesign such as gun type, size, SPF
(shot per ft), Spacing (angle betweentwo shots), charge/explosive type;penetration deep and entrance hole.
3. Perforation environment (fluid typein the hole); using mud or brinewater or special completion fluid,under/over balance.
4. Witness the gun loading, correlation,shooting result (whether all chargesexploded or not) SAFETY FIRST
PERF. At Net pay
8/13/2019 Petroleum Development Geology 040_ Well Test
23/23