    Well Test ObjectivesWell Test Objectives1. Identify and Obtain reservoir fluids; oil, gas

    & water

    2. Determine basic reservoir parametes;

    productivity (PI), permeability(k), skin (S),initial Resv. Pressure (P*) & Resv. Temp.

    3. Well potential & deliverability (gas well) : It

    may be mandatory to proof fieldcommerciality

    4. Boundary & irregular conditions Reservoir(GOC, OWC & Reservoir Limit)

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    3/23

    WELL TESTING METHODSWELL TESTING METHODS

    HOLE CONDITION:

    OPEN HOLE

    CASED HOLE

    TOOLS RUN IN HOLE :

    WIRELINE TESTING : RFT, MDT & DST (IT WAS)

    PRODUCTION TEST WITH COMPLETION STRING

    IN PLACE : DST

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    4/23

    Surface Test Equipment

    Downhole Test

    Equipment & Tool

    DST & TCP

    WELL TESTING SCHEMATIC

    at

    Cased Hole

    Subsea Safety

    Equipment

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    5/23

    DOWNHOLE TESTING EQUIPMENT

    Open-Hole Sampling EquipmentRDT & RCI are equivalent with RFT/MDT

    Baker RCI

    Halliburton RDT

    Formation Test Tool (FTT) sample

    chambers hold 420cc to 3 gallons of

    reservoir f luid depending on make and

    model.

    Open hole samples aid production and

    facili ty designs and are sometimes used

    for PVT studies.

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    6/23

    1ST GENERATION

    RFTREPEATED FORMATION TESTER

    - unlimited pressure survey

    - 1 to 2 fluid sampling

    2ND GENERATION

    MDTMODULAR FORMATION DINAMIC

    TESTER

    - unlimited pressure survey- many f luid sampling (unlimited?)

    - able to identify fluid type

    - able to replace(pump out)

    unrequired fluid sampleSCHLUMBERGER

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    7/23

    DOWNHOLE TESTINGEQUIPMENT

    RFT / MDT

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    8/23

    Mud pressure

    Reservoir pressure

    Build-up pressure

    Example RFT Record

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    9/23

    Wirelinepen Hole Testing

    FT/MDT/RDT/RCI/etc. To identify the reservoir

    pressure

    To identify the fluid content

    To estimate the permeability

    To estimate the productifity To define the fluid contact (OWC,

    OGC and GWC if any)

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    10/23

    Fluid Contact Determination

    with fluid gradient from RFT

    oil

    water

    RFT depth

    WaterG

    radient0.433ps

    i/ft

    pressure

    de

    pth

    OilG

    radient0

    .367psi/ft

    OWC

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    11/23

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    12/23

    Performing Well Testith DST Clean up (flow)

    Shut-in

    Main flow (one period orflow-after-flow, flowingtest with 4 to 5 different

    choke size) Main Build up (shut-in)

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    13/23

    Selective Layer Testing

    8 1/2 7 @ 17690

    12 1/4

    17 1/2

    9 5/8 @ 15500

    26

    Layer B

    Layer A

    20 ft @ 500

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    14/23

    Example :TEST STRINGDST TCP

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    15/23

    Example : Pressure Testing Result

    Build up data analysis

    K = 375 mD

    S = 21 P = 4200 psia4050[psia]

    40 60 80 100 120

    45000

    [Ms

    cf/D]

    Production Period

    Build up period

    Pressure, psia

    rates

    Sanding Control

    Test

    Testing time, hrs

    [Ms

    cf/D]

    45000

    4050

    [psia]

    40 60 80 100 120

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    16/23

    Well Productivity

    AOFP = 344 MMscf/d

    CGR = 24.5 STB/MMscf/d

    Tested gas and condensate rates can be

    increased to 125 MMscf/D and 3100 BPD

    2.5E+5

    IPR plot3500

    50000

    1500

    1.5E+5 3.5E+52.5E+5

    Gas Rate, Mscf/d

    Pre

    ssure,psi

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    17/23

    Testing Risk Factors Layers communication due to

    poor cement bond

    High pressure and temperatures

    (over 350F)

    Pressure and fluid loss through

    packers

    Annulus-tubing fluid

    communication

    Water coning or sanding

    Layers crossflow

    THE ROLE f

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    18/23

    THE ROLE of WELLSITE/DEVELOPMENT GEOLOGIST (DG)in WELL TESTING

    OPEN HOLE TESTINGwith RFT/MDT

    CASED HOLE TESTINGwith DST

    DG Propose/selects the testing/perforation sand, interval and depth

    Estimate the reservoir fluid contents and its static pressure

    Provide the reservoir rock parameter for testing analysis such as l ithology, porosity

    and permeabil ity i f any (from log, or qualitative)

    Stop the testing when unsafe operation Testing Engineer (TE) decision

    Decide testing duration TE decide flow & shut-in periods. TE also

    selects choke size for flow testing.

    Select taken fluid sample TE decide fluid sampling methods. And

    responsible for fluid sample handling

    As Operation Witness will validate &

    analyse the result

    TE is prime Operation Witness and wil l

    validate & analyse the testing result.

    DG & TE will be along selecting the

    perforation method

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    19/23

    PERFORATION1. THROUGH CASING GUN

    Hyperjet/HSD(high shot density)

    2. THROUGH TUBING GUN Enerjet

    3. TCP (Tubing Conveyed Perforation)

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    20/23

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    21/23

    GUN TYPES

  • 8/13/2019 Petroleum Development Geology 040_ Well Test

    22/23

    DG and/or Wellsite eologist Responsibilitiesn Perforation Job

    1. Define the perforation intervals at

    porous zone & hydrocarbon zone(pay zone.

    2. Evaluate and prepare the perforationdesign such as gun type, size, SPF

    (shot per ft), Spacing (angle betweentwo shots), charge/explosive type;penetration deep and entrance hole.

    3. Perforation environment (fluid typein the hole); using mud or brinewater or special completion fluid,under/over balance.

    4. Witness the gun loading, correlation,shooting result (whether all chargesexploded or not) SAFETY FIRST

    PERF. At Net pay