NABARD – WDFSeventhipatty & vadavathur watershed
Namakkal - District
Full implementation phase
Watershed Code No:4B1B3b3a1 &4B1B3b3a2
PFA - HEALDS
WATER ABSORPTION TRENCH Total cum : 1440
Total amount :Rs 60746Work completed : 1050 cum
Balance work :390 cum
WATER ABSORPTION TRENCH (BEFORE) WATER ABSORPTION TRENCH (AFTER)
WATER ABSORPTION TRENCH
WATER ABSORPTION TRENCH (BEFORE) WATER ABSORPTION TRENCH (AFTER)
CONTOUR TRENCH Total cum :1203
Total amount : 50749Contour trench work is completed
CONTOUR TRENCH (BEFORE) CONTOUR TRENCH (AFTER)
CONTOUR TRENCH
CONTOUR TRENCH (BEFORE) CONTOUR TRENCH (AFTER)
STONE GULLY PLUGSTotal Rm : 66
Total amount : 21204Stone Gully plugs work is completed
STONE GULLY PLUGS (BEFORE) STONE GULLY PLUGS (AFTER)
STONE GULLY PLUGS
STONE GULLY PLUGS (BEFORE) STONE GULLY PLUGS (AFTER)
LOOSE BOULDER STRUCTURE
LOOSE BOULDERS STRUCTURE (BEFORE) LOOSE BOULDERS STRUCTURE (AFTER)
LOOSE BOULDER STRUCTURE Total cum : 90
Total amount : 29645Loose boulder structure is completed
LOOSE BOULDER STRUCTURE (BEFORE) LOOSE BOULDER STRUCTURE (AFTER)
NABARD- WDF