Date post: | 27-Dec-2015 |
Category: |
Documents |
Upload: | trevor-wilson |
View: | 225 times |
Download: | 0 times |
Ph:08933 229556, Email: [email protected]
1
2
3
Lo
ca
tio
n
4
J962
I
229
H 935 G 350F 385
M
63
0
302
502
E
AB 151
198
Q3712
200P9
6020
1466
1920
948
C2
420
148
225
215
N158 O
2963
225
789
489
489
585
P1 S1
203
L349M3
166
K3 423
J3
206 235
I3H3 733 G3
394 210F3 E3
314
D3470
C3
A3305 425 26
1
1038
Z2 Y2X2
W2505 V2
300
M2N2
O2
P2
H2J2
K2L2
55
3
444
SCALE: 1 CM = 2 ½ CHAINS5
SIT
E D
RA
WIN
GS
ite
Dra
win
g
6
Ph
oto
gra
ph
s
7
Ph
oto
gra
ph
s
8
Ph
oto
gra
ph
s
9
Ph
oto
gra
ph
s
10
10
11
La
nd
Av
ail
ab
ilit
y
12
12
13
La
yo
ut
Re
qu
ire
me
nts
14
14
- Adequate
- Clean and Clear
- Potable
- 24 Hours Supply
- Tap Running Water
WATER SUPPLY
15
Am
en
itie
s
- Ground water
- Municipal water
- Independent near by Water source
- Desalination of sea water
exploration OF WATER SOURCE
Desalination of sea water Ground waterGround water16
Am
en
itie
s
- 24 Hours Uninterrupted Supply
- Three Phased
- Stable
- Underground Cable Supply
POWER SUPPLY
17
Am
en
itie
s
SOURCES OF POWER- State Electric Supply- Wind Power- Solar Based- Diesel Generated- Wastage Based- Stand by System
Wind PowerWind Power Solar basedSolar based Wastage basedWastage based18
Am
en
itie
s
SEWAGE- Underground
- Update
Technology
- Recycling
19
Am
en
itie
s
Garbage and WastageDisposal System
20
Am
en
itie
s
Telecommunications
21
Am
en
itie
s
Security
22
Am
en
itie
s
Open Spaces
23
Am
en
itie
s
Crz area development
24
Am
en
itie
s
25
26
Civ
il I
nfr
as
tru
ctu
re
27
*
***********
****
28
Infr
as
tru
ctu
re F
ac
ilit
ies
29
30
Ho
us
ing
31
32
Es
tim
ate
d C
os
t
33
Sl.No
Item Description
Expected Dev. charges per Sq.yard (in Rs.)
Minimum Maximum
1 Land conversion fee to the Govt. 20 20
2 CRZ Study and Approval 20 20
3 Land Survey and Site Plan 20 40
4 Layout Plan Study and Preparation 20 60
5 VUDA Approval for the Layout 60 60
6 Compound Wall 100 100
7 Civil Works (Leveling, Roads, Drains etc.) 500 700
8 Water Supply 250 250
9 Power Supply 250 250
10 Sewage System 375 375
11 Essential Amenities (Telecommunications, Security, Horticulture)
100 100
12 Infrastructure Facilities (Community Hall, Office Building, Recreation Centre etc.)
500 740
13 Temple 60 60
14 Maintenance Fund (Refundable) 200 200
15 Contingency provision 25 25
Total 2500 3000
Members pay only the actual cost incurred in proportion to the Plot size. The indications are rough estimates to be firmed up by the Consultants first and Work Order thereon. The indications are at current price level and applicable to old Members only.
34
Co
st
Da
ta S
he
et
35
Re
lati
ve
Co
sts
36
37
Me
tho
do
log
y
38
Me
tho
do
log
y
39
40
Mo
nit
ori
ng
41
42
Fin
an
ce
Co
mm
itte
e
43
Fin
an
ce
Co
mm
itte
e
44
Ap
pro
va
ls
Ph:08933 229556, Email: [email protected]