Responses to compensa,on affected by Son La hydropower rese6lement in
Northwestern Vietnam
By: Pham Van Dung 10 November 2016
Objec,ves
1. Evaluate stated objec,ves or commitment of ‘equal or be6er life aNer rese6lement’ and actual circumstances as perceived by rese6led people • issue of ,ming, dimension and fairness of compensa,on
for rese6lement; • sufficiency of compensa,on for loss, removal,
stabiliza,on and opportuni,es for future development; • opportuni,es to improve rese6led people’s life.
2. Examine the degree of community involvement in planning, decision and suitability of support
Research methods • Primary data
– Combine semi-‐structured ques,onnaires and in-‐depth interview (33 informants, 18 villages)
– Focus group discussion (22 respondents) • Secondary data collec,on:
– District & communal social-‐economic reports – Rese6lement evalua,on reports – Publica,ons and newspaper ar,cles (19 villages)
• Analy,cal technique: – Create and describe tables on the basis of primary and secondary data
– Compare relevant publica,ons and newspaper ar,cles to the primary data
Research ques,ons • People’s judgment on fairness of compensa,on
– Different land right systems (statutory vs. customary) and exclusion of tradi,onal shiNing cul,va,on
– Was compensa,on matched with the authori,es’ announcement (,me, dimension)
– Was compensa,on equal between early and late rese6led groups
– Recommenda,ons to the government and electricity sector • Local authori,es/ rese6lement officers/ hydro dam
operators’ view on the affected communi,es – Comment on changes and adapta,on of rese6led communi,es – Jus,fy the jus,ce of compensa,on – What should be done to improve situa,on
Research results (1) • Issue of calcula,on and
covering full cost for the rese6led people’s loss
• The loss of tradi,onal cul,va,on land is not fully calculated and compensated
• Unequal compensa,on for different sec,ons of rese6led people
• Undue disbursement of compensa,on fund
• Suitability of compensa,on and support
Research results (2): Issues raised in researched villages # Village Commune, district Shortage of land Shortage of water Unfair compensa:on
1. Na Nát Na Lay, Mường Lay (Điện Biên) Yes n/a Yes
2. Hé 2 (bản Hé) Mường Chiên, Quỳnh Nhai Yes Yes Yes
3. Hé 1 (Tông Tở) Mường Chiên, Quỳnh Nhai Yes n/a Yes
4 Húa Lấu Mường Giôn, Quỳnh Nhai Yes Yes n/a
5. Chẩu Quân Mường Giàng, Quỳnh Nhai Yes Yes Yes
6. Nha Tổng Mường Giàng, Quỳnh Nhai Yes Yes Yes
7. Phiêng Lèn 1 Mường Giàng, Quỳnh Nhai Yes Yes Yes
8. Phiêng Lèn 2 Mường Giàng, Quỳnh Nhai Yes Yes Yes
9. Phiêng Lèn 3 Mường Giàng, Quỳnh Nhai Yes Yes Yes
10. Co Chặm Chiềng Bằng, Quỳnh Nhai Yes Yes n/a
11. Mai Quỳnh Mường Bon, Mai Sơn Yes Yes Yes
12. Củ Pe Mường Bon, Mai Sơn Yes Yes Yes
13. Noong Luông Cò Nòi, Mai Sơn Yes Yes Yes
14. Hoa Quỳnh (Rese6lement No. 428) Hát Lót, Mai Sơn Yes Yes Yes
15. Chiềng Yên Chiềng Cọ, Sơn La city Yes n/a Yes
16. Pá Uân Mường Giàng, Quỳnh Nhai Yes Yes Yes
17. Ná Mường Mường Trai, Mường La Yes Yes Yes
18. Nà Tân Tân Lập, Mộc Châu Yes Yes Yes
Total say ‘Yes’ 18 15 16
Research results (3): Issues found from the media # Village Commune, district Shortage of land Shortage of water Unfair
compensa:on 1 Hoa 2 Tân Lập commune, Mộc Châu district n/a n/a yes
2 Hua Tát Cò Nòi commune, Mai Sơn district yes yes yes
3. Residen,al area No. 7 Na Lay ward, Muong Lay town yes n/a yes
4. Huoi Luc 1 Muong Bang, Tua Chua yes n/a n/a 5. Quỳnh Lỷ Chiềng Sung commune, Mai Sơn district yes n/a yes
6. Lóng Chiềng Bằng commune, Quỳnh Nhai district yes yes n/a
7. Nam Voi Nam Pi commune, Nam Nhun district, Lai Chau yes n/a yes
8. Bó Na Lay ward, Muong Lay town yes yes yes
9. Hốc Na Lay ward, Muong Lay town yes n/a n/a
10 Nặm Khao Tân Lập commune, Moc Chau district yes n/a yes
11. Dọi 2 Tân Lập commune, Moc Chau district yes n/a n/a
12. Pa So Phong Thổ town of Lai Chau province yes n/a n/a
13. Hữu Nghị Phong Thổ town of Lai Chau province yes n/a n/a
14. Quan Chiêng Mường Lay town of Điện Biên province yes n/a n/a
15. Lốm Lầu Chiềng Ơn commune, Quỳnh Nhai district n/a n/a n/a
16. Co Đớ Mường Lay town yes n/a n/a
17. Hé Pác Ma -‐ Pha Khinh commune, Quỳnh Nhai district yes n/a n/a
18. Na Nát Na Lay commune, Mường Lay district yes n/a n/a
19 Củ Pe Mường Bon commune, Mai Sơn district yes n/a n/a
Total confirmed 17 3 7
Discussion & conclusion • Correla:on between primary and secondary data • Shortage of prepara:on, consulta:on in compensa,on process and support projects
• Sufficient compensa:on should be made on basis of fuller calcula,on of loss
• Thorough social and environmental impact assessment and prepara,on before rese6lement
• Respect consulta:on and decision by rese6led community in development schemes
• Benefit sharing between electricity operators and affected people