An EDISON ENERGY SM Company PHARMA HIGHLIGHTS
Transcript

An EDISON ENERGYSM Company

PHARMA HIGHLIGHTS

www.eneractivesolutions.com | [email protected]

Energy Solutions... Efficient Results

Due to the nature of research, manufacturing, and production, working in the pharma industry demands skilled engineers who understand how to ensure the energy and HVAC

systems operate in a manner that meets with federal regulations, global standards, and public expectations. ENERActive Solutions is an industry leader in working in this critical environment and holds the necessary expertise to work with facility teams to develop tailored energy conservation programs.

Founded in 2006, ENERActive Solutions is an independent, energy consulting and project development firm specializing in the analysis, development, and implementation of energy conservation projects.

Headquartered in Asbury Park, New Jersey, with regional offices in Boston, New York City, Chicago, Philadelphia, Beltsville, Maryland, and Harrisonburg, Virginia, Eneractive brings real energy savings and performance enhancement to clients both nationwide and internationally. This reflects our conviction that great projects cannot happen without passion, intelligence, and personal commitment, which is demonstrated by our portfolio of work.

Eneractive leverages both traditional demand side strategies and newly available supply side initiatives to ensure optimum facility performance and lower operating costs. Our experience ranges from large-scale power generation to traditional building and energy systems. Our solutions focus on the domains of building HVAC and controls, new energy technologies,renewable energy, power plant environmental systems (SCR), and energy awareness and education.

Through our core services, we are able to work with our clients and develop projects that are thoughtful, prudent, and valuable in their cost effectiveness, as well as their appropriateness with the long range planning for facilities and operations.

CORE SERVICESENERGY SERVICES

AUDITS & ENERGY MODELINGCENTRAL PLANT OPTIMIZATIONDIAGNOSTIC TROUBLESHOOTINGENERGY MASTER PLANNINGNYC LOCAL LAW 87 COMPLIANCE

BENCHMARKINGPROJECT DESIGN, DEVELOPMENT & IMPLEMENTATION

TESTING & BALANCING NEBB CERTIFIED

CX SERVICESNEW CONSTRUCTIONEXISTING BUILDINGFEASIBILITY STUDIESOWNER’S PROJECT REP.DESIGN & CONSTRUCTION REVIEW

VIRTUAL ENERGY MONITORING

SOLAR & RENEWABLE ENERGYPOWER PLANT SOLUTIONS

PFIZER WORLD HEADQUARTERS ASHRAE LEVEL II ENERGY AUDIT & RETRO-CXManhattan, NYC

• OVER 27 ECMS IDENTIFIED FOR IMPLEMENTATION

• $966,599 SAVINGS IN ANNUAL UTILITY EXPENSES• 21% REDUCTION IN ANNUAL UTILITY COSTS

COMPARED TO BASELINE UTILITY TOTALS• ESTIMATED SAVINGS OF 1,593,967 KWH AND

21,055 MLBS OF STEAM ANNUALLY• PAYBACK PERIOD OF 4.1 YEARS

MERCKBOILER ENERGY ASSESSMENTDANVILLE, PA

In compliance with US

EPA’s MACT Regulation

PROJECT HIGHLIGHTS• Identified 4 quantifiable Energy Conservation Measures

◦ Identified another 6 ECMs included as part of a best practices approach to saving energy

• 3 quantifiable ECMs impact steam & electric consumption of the central plant & overall campus

◦ Implementation of these ECMs is anticipated to reduce expenses by $59,892.52 annually

• Payback period: 2.25 years

MERCKBOILER ENERGY ASSESSMENTS

PUERTO RICO Arecibo

BarcelonetaLas Piedras

NEW JERSEYKenilworth

SummitWhitehouse Station

Arecibo• 11 executed ECMs• $606,000 in annual savings• Payback period of 1.2 years• Projected cost of implementation: $736,000

Barceloneta• 12 executed ECMs• $1.06 M in annual savings• Payback period of 1.4 years• Projected cost of implementation: $1.47 M

Las Piedras• 8 executed ECMs• $445,000 in annual savings• Payback period of 2.2 years• Projected cost of implementation: $966,000

PUERTO RICO SITE HIGHLIGHTS

Kenilworth• 3 identified ECMs• $66,249 in annual savings• Payback period of .68 years• Projected cost of implementation: $45,000

Summit• 10 identified ECMs• $173,000 in annual savings• Payback period of 1.2 years• Projected cost of implementation: $206,000

Whitehouse Station• 3 identified ECMs• $21,484 in annual savings• Payback period of 2.8 years• Projected cost of implementation: $60,500

NEW JERSEY SITE HIGHLIGHTS

In compliance

with US EPA’s 6J GACT Regulation

JOHNSON & JOHNSONWORLD HEADQUARTERS New Brunswick, NJ

ENERGY MASTER PLANEneractive was commissioned to conduct an energy audit for the J&J World HQ in an effort to help them reach their Healthy Planet 2015 Goals.

over $581,000 IN ANNUAL ENERGY SAVINGS

RESULTS• 22% ENERGY COST REDUCTION• IDENTIFIED $390,000 IN O&M MEASURES• TOTAL PROGRAM COST: $345,000• 11 MONTH PAYBACK PERIOD

NEUTROGENA CORPORATION

Los Angeles, CA

ASHRAE Level I & II Energy Audits

• 7 CAMPUS BUILDINGS• 388,155 SQ. FT.• IDENTIFIED 39 ENERGY CONSERVATION MEASURES• AVERAGE SIMPLE PAYBACK: 2.3 YEARS• ANNUAL SAVINGS:

◦ $299,322 ◦ 1,995,648 kWh of electricity ◦ 26% reduction in gas consumption ◦ 21% reduction in electricity consumption

JOHNSON & JOHNSONRetro-Commissioning ProjectsHORSHAM, PA

ENERActive was contracted to perform a detailed retro-cx study on 3 buildings in the Johnson & Johnson Horsham, PA campus.

• Over 291,000 square feet assessed• Implementation of measures would equate to

894,184 kWh of electricity and 7,791 therms of natural gas in annual energy savings

HEALTHCAREK-12

MULTI-FAMILY HOUSINGMUSEUMS

PHARMACEUTICAL

HIGHER EDUCATIONCOMMERCIAL

GOVERNMENTHIGH TECH/DATA CENTERS

INDUSTRIAL

OUR CORE MARKETS

GLAXOSMITHKLINEClifton, NJ

Solar Consulting

Eneractive assessed the solar opportunity in the form of a solar study for the GlaxoSmithKline facility located in Clifton, New Jersey. A full assessment of the structural capacity was performed to determine that the building could support the additional load required by the photovoltaic system. Multiple financing options were provided to allow GlaxoSmithKline to make a fully informed decision on the opportunity.

PROPOSED A 350 kWdc ROOFTOP SOLAR SYSTEM

LYONDELLBASELL INDUSTRIESENERGY REDUCTION PLAN

Edison, NJ

• 1 MILLION SQ. FT. INDUSTRIAL FACILITY• PLAN HIGHLIGHTS:

◦ Large scale boiler changeout ◦ Chilled water pump optimization ◦ Operational & maintenance improvements ◦ + additional ECMs

• SYSTEM ANALYSIS INCLUDED: ◦ Chilled water plant and distribution ◦ Steam system plant ◦ Steam to hot water converters ◦ Exhaust fans ◦ Fume hoods ◦ Steam trap testing ◦ Electrical infrastructure analysis

WHY ENERACTIVE?ENERActive is an experienced, independent energy consulting and engineering firm specializing in the analysis, development, and implementation of energy conservation projects. Staffed with highly tenured professionals from the energy engineering and energy project development fields, we have the capability to not only identify energy conservation measures, but our history of bringing these projects full circle to completion has given us a track record of performance that ensures all projects are assessed, developed, and implemented in a manner which consistently exceeds the expectations of our clients.

L’OREAL DISTRIBUTION & CENTRAL HQEnergy Reduction Plan | Cranbury, NJ

60,000 sq. ft. OF OFFICE SPACE

& OVER 150k sq. ft. OF WAREHOUSE, PACKAGING, AND DISTRIBUTION AREAS

• Identified both Capital & Operational ECMs

• Payback Period: < 4 years• Provided 3 days of energy awareness

training to facility staff• Hosted sustainability forum during

“bring your child to work day”

VIVARIUM TESTING, ADJUSTING, AND BALANCING PROJECTS

MULTIPLE FACILITIES

Eneractive was contracted to perform Testing, Adjusting, and balancing work at the following

locations:• Columbia university

• PrinCeton university iCahn laboratory (pictured)

• Columbia university mediCal Center

• memorial sloan-Kettering CanCer Center

• Continuum health Partners - st. luKe’s hosPital

TO BE THE BEST AT WHAT YOU DO, YOU HAVE TO KNOW THE STANDARDS OF YOUR FIELD.

AT ENERACTIVE, OUR TALENTED

TEAM PRIDES ITSELF IN BEING

CERTIFIED IN THE FOLLOWING AREAS:

CERTIFICATIONS NEBB Commissioning Technician

NEBB Commissioning ProfessionalNEEB HVAC, Plumbing, and Fire Protection

NEBB Certified Retro-Commissioning Professional

Licensed Refrigeration HandlingStar Certification in HVAC

Certified Building Systems ProfessionalSiemens Master Operator

Siemens Master Programmer Labs 21EPA Refrigerant License

BPI Building AnalystBPI Building Envelope Professional

Professional Engineer

Certified Energy Manager

Certified Energy Auditor

Certified Building Commissioning Professional

LEED Accredited Professional

LEED Green Associate

Existing Building Commissioning Professional

Demand Side Management Professional

Multi-Family Building Analyst

Red Seal Boiler Operators License

www.eneractivesolutions.com | [email protected]

An EDISON ENERGYSM Company

Energy Solutions... Efficient Results

HEADQUARTERS700 Mattison Ave., Suite A

Asbury Park, NJ 07712P: (732) 988-8850

MARYLAND 7001 Muirkirk Meadows Dr., Suite E

Beltsville, MD 20705P: (301) 210-9560

NEW YORK150 Broadway, Suite 802

New York, NY 10038P: (212) 269-2302

VIRGINIA370 Neff Avenue, Suite EHarrisonburg, VA 22801

P: (540) 434-1178


Recommended