NEW RIVERSIDE PARK MASTER PLANPREPARED FOR:
BEAUFORT COUNTY, SOUTH CAROLINAAPRIL 2, 2019
PLANNING AND LANDSCAPE ARCHITECTURE BY:ENGINEERING BY:
PERIMETER SECURITY FENCE (WILDLIFE FRIENDLY)
NEW
RIVER
PRIMARY PARK ENTRANCE - N.T.S.
N E W R I V E R
GARVEY HALL KAYAK, DAY-USE, & PRIMITIVE CAMPING AREA ENLARGEMENT
KEY
EXISTING JASPER COUNTY BOAT RAMP
A
WAL CAM LAND GROUP LLC.
(OWNER)
RETREAT AT THE HAVEN
(RESIDENTIAL DEVELOPMENT)
ALSTON PARK(RESIDENTIAL DEVELOPMENT)
BEAUFORT CO.(OWNER)
BEAUFORT CO.(OWNER)
TOWN OF BLUFFTON OWNED PARCEL
NEW RIVERSIDE(RESIDENTIAL DEVELOPMENT)
PRIMARY ENTRY DRIVE (GRAVEL)UTILIZE EXISTING ROAD WHERE POSSIBLE
B
1.3 mi
DC
NEW RIVERSIDE RD
E
E
F
G
H
H
I
J
J
KL
H
TRAILHEAD & PARKING • TRAILHEADWITHINFOKIOSK• TEMPORARYRESTROOMFACILITY• FIRST-AIDSTATION• TRAILERPARKINGAREA(KAYAKS)DAY USE PAVILION WITH
KAYAK STORAGEHIKING TRAIL (UNIMPROVED)
KAYAK LAUNCH WITH FINGER DOCK (KAYAK ONLY)
POTENTIAL NEED FOR WETLAND CROSSING
PROVIDE GATED ACCESS TO ADJACENT PROPERTY
COMPOSTING RESTROOM & COMFORT STATION
100’ RIVER BUFFER
PRIMITIVE CAMPING AREAS• (3)TOTALSITES• GROUPCAMPINGSPOTSWITH(1)
SHELTER&(3)TENTPADSWITHFIRE
POTENTIAL RIVER OVERLOOK AND PIER
OVERFLOW AND PRIMITIVE CAMPING PARKING
IMPROVED TRAIL SYSTEM (INNER LOOP) FOR ADA ACCESS (±0.5 mi)
[PHASE 1]
[PHASE 2]
[PHASE 3]
[PHASE 1]
BIKE PATH WITH ACCESS TO NEW RIVERSIDE DRIVE & PARK
ENTRY DRIVE• GRAVELROADWITHSIDESWALEPROFILE• UTILIZEEXISTINGAPPROVEDWETLANDCROSSING
[PHASE 1]
GATED ACCESS WITH SLIDING GATE (GATEONTIMERFORPARKCLOSURE)
SPLIT RAIL STYLE FENCE TO CONTROL VEHICLE ACCESS TO PARK. CONTROL BOLLARDS WHEN REQUIRED
ADA PARKING ADJACENT TO COMPOSTING RESTROOM FACILITY
POTENTIAL WETLAND VIEWING AREAFIELDLOCATEBASEDONBESTVEGETATIONANDVIEWS
WETLAND CROSSING (NEWPOTENTIALBOARDWALK)
PRIMARY IMPROVED TRAIL FOR ADA ACCESS (INNER LOOP - 0.6 mi)
SPUR TRAIL (UNIMPROVED FOR EXTENDED TRAIL EXPERIENCE AND ACCESS TO OUTER TRAILS)
[PHASE 1]
UTILIZE EXISTING APPROVED WETLAND CROSSING
DAY USE / PICNIC AREA• SIMPLEPAVILION
EMERGENCY VEHICLE TURNAROUNDPARK I.D. SIGNSPLIT RAIL FENCE FOR VEHICLE CONTROLPRIMARY PARKING AREA• ONE-WAYLOOP• ANGLEDPARKING• LAYOUTTOSAVEEXISTINGTREES• GRAVEL
PRIMARY TRAILHEAD• INFORMATIONKIOSK• FIRSTAIDSTATION• CONTROLBOLLARD
TRAIL SPUR WITH POTENTIAL ACCESS TO BLUFFTON LINEAR TRAIL (0.4 mi)
[PHASE 1]
[PHASE 2]
[PHASE 1]
MAINTENANCE & EMERGENCY ACCESS TO PRIMITIVE CAMPSITE(CONTROLLEDACCESS)
[PHASE 1]
[PHASE 3]
NOTE: TRAIL LOCATIONS SHOWN ARE CONCEPTUAL IN NATURE. FINAL TRAIL LOCATIONS AND SPECIAL DESTINATIONS SHALL BE FIELD LOCATED BASED ON TOPOGRAPHY, VEGETATION, AND SPECIAL FEATURES OF THE LAND NEW ENTRY ROAD
• ALIGN WITH EXISTING CURB CUT ACROSS THE STREET• NEW PARK I.D. SIGN• NEW STREETSCAPE WITH FENCING TO CREATE AN EN-
HANCED ARRIVAL• GRAVEL DIRT ROAD WITH SIDE SWALE PROFILE• TURN AROUND AND SECURITY GATING FOR PARK• UTILIZE EXISTING DIRT ROAD BED WHERE FEASIBLE
WETLANDS
HW
Y 46
POTENTIAL COLLABORATION WITH TOWN OF BLUFFTON TO LINK HWY 46 AND NEW RIVERSIDE PARK WITH TRAIL ACCESS
EXISTING BLUFFTON LINEAR TRAIL
0.4 mi
0.6 mi
572’
±100’
LEGEND:
MAINTENANCE&EMERGENCYACCESS
KEY
KAYAK/CANOE
CAMPING
PICNICSHELTER
RESTROOM
HIKING
PROPOSEDWET-LANDCROSSING(NOEXISTINGPERMIT)
BLUEWAYS
WETLANDS&BUFFER
RICEFIELDS
UPLANDS
WETLANDCROSSING
PHASE ONE A PRIMARYPARKENTRANCE&VEHICULARACCESS B MAINPARKINGLOT,TRAILHEAD,&RESTROOMS C GARVEYHALLENTRANCE&VEHICULARACCESSD G.HALLPARKINGLOT,TRAILHEAD&RESTROOMSE HIKINGTRAILSTOTALING±6.15MILESOFVARYING SURFACES&DIFFICULTY
PHASE TWO F DAYUSE/PICNICAREA G KAYAKLAUNCHWITHDAYUSE/PICNICAREA H KAYAK&CANOEBLUETRAILTHROUGHRICEFIELDS I WETLANDVIEWINGAREA/PLATFORM
PHASE THREE J PRIMITIVECAMPSITE(WATERACCESSONLY) K PRIMITIVECAMPSITESWITHCOMFORTSTATION L RIVEROVERLOOK&PIER
WAL CAM LAND GROUP LLC.
(OWNER)
I