Date post: | 29-Jun-2015 |
Category: |
Business |
Upload: | informa-australia |
View: | 533 times |
Download: | 2 times |
Phil Mumford
CEO GoldLinQ
General project update
Integration and operations
Local industry participation
The long term value for the
Gold Coast
Project Update
A reminder of the route
Project Update
Tram Delivery
Project Update
Construction
Project Update
Construction
Project Update
Construction
Project Update
Construction
Project Update
Testing and Commissioning
Project Update
Testing and Commissioning
Testing and Commissioning
Safety and awareness campaign
• Trams will be moving into Southport in
October
• Expanding tram movements as the rail
expands
Safety and Awareness Campaign
• Look up and see the danger
• Overhead wires are live
• Tracks are for Trams
• New road signs
• New road users
• Stay Alert – trams are quiet
• Take the time
• Use designated crossing points
• Trams travel in both directions
• Wait patiently on the platforms
Integration with the existing public
transport network
The importance of integration: • Integrated service planning • Integrated ticketing products and fares • Integrated customer experience
Operations and timetable: • 7.5 minute headways;
• between 7:00am and 7:00pm • Mondays to Fridays
• 24 hr operations from; • Friday morning first service to; • Sunday night last services
• 15 and 30 minute services on weekends
Integration with the existing public
transport network
Commuters want public transport that is: • Convenient • Reliable • Good Value
High frequency bus integration with the light rail will provide the convenience of changing modes
704
Broadbeach – Tweed Heads Helensvale – Sea World
Nerang – Surfers Paradise
Robina – Broadbeach
Gold Coast University Hospital – Helensvale
Urban bus services
Gold Coast University Hospital – Broadbeach
Centre to centre connections
Gold Coast Rapid Transit
Varsity Lakes – Brisbane Airport
Gold Coast train line
KEY
New System Brand
“the G:”
New System Brand
Brand Event
Local Industry Participation
Long Term Value of Infrastructure for the
Gold Coast
Keep in Touch with the Project
GoldLinQ Website – www.goldlinq.com.au • Construction updates
• News feeds
• Images and video links
• Email subscription
YouTube – search for the GoldLinQ channel • Safety video
• Brand video
• School episodes
• Time lapse videos
Flickr - www.flickr.com/photos/gclightrail • Project photos and updates
Twitter – www.twitter.com/gclightrail • Regular construction updates and links
18