Chamber Progress Summary
• Built chamber as parts were machined and welded. (and re-machined and re-welded). • Leak checked, found and patched leak on the water input weld. • Brought downstairs, rebuilt and attached to existing chamber set up
in room 105. • Pumped down, leak checked again and wrap up and going to bake
out. • Later going to machine mask and add it on top of claw.