Project Status Report Runway 10R-28L Replacement Program
Port Columbus International Airport Presented to MORPC CAC
Tim Mentel, PMP February 4, 2013
Status Report Agenda
Risk Identification & Strategies Project Details Status Photos
Port Columbus International Airport (CMH) - 2008
Runway 10R/28L Replacement Why Move the Runway?
More room was needed for a redesigned terminal after the 9/11 attacks
Additional room between runways to allow simultaneous IFR approaches
A team of consultants reviewed numerous options and held peer reviews
Determined the best option was to move the south runway farther south
Replacement Runway Projects
4
Port Columbus International Airport (CMH) - 2012
Port Columbus International Airport (CMH) July 2014
7
Projects in the Program
Construct New Runway New Parallel South Taxiway High Speed Runway Exits In-Pavement Lighting New Navigational Aids Lighting Improvements Up-To-Date on FAA Requirements
Construct Turkey Run Stormwater Basin
Projects In The Program II
Demolish On-Airport Structures Reconfiguration of Airport Golf Course Acquire & Demolish Homes (13th Avenue) Replacement Runway Obstruction Mitigation Convert Old Runway to New Taxiway
8
Program Costs
Turkey Run Storm Water Basin - $2,992,770 Property Acquisitions - $5,704,513 Obstruction Mitigation - $843,905 Airport Golf Course Modifications - $4,611,814 Replacement Runway - $100,586,517 Convert Runway to Taxiway - $15,594,236 (est) Demolish On-Airport Structures - $1,857,235 Demolish Homes on 13th Avenue - $1,340,417
Grand Total - $133,531,407*
Program Funding
FAA Grant Funding $87.6 million Funds to reimbursed to CRAA annually
through 2018 Passenger Facility Charges
$46 million
Status Report Agenda
Program Overview
Project Details Status Photos
Airfield Operations Fenceline 252 South of Runway CL
Adjacent Active Runway Current Status of Runway 10R Approach
Adjacent Active Runway Maximize Runway Closure Devices
Adjacent Active Runway Pilot RW 28L Approach Shortened
Status Report Agenda
Program Overview Risk Identification & Strategies
Status Photos
Pavement Section - Runway
17 Asphalt Mix Design Based on FAA P-401 Specification
Runway Program Facts
The runway project will place enough asphalt pavement to build a standard 2-lane road from Columbus to Zanesville (about 50 mi) or to resurface I-670 between I-270 and the west side approximately 10 miles of eight-lane highway
Move enough earth to fill Crew Stadium approximately 400,000 cubic yards
18
More Facts
Plant enough grass to seed Ohio Stadium 130 times
Install enough storm culverts and piping to run a direct line from the Airport to downtown Columbus approximately 5 miles
Install enough electrical wiring to wrap around the airport 4 times approximately 28 miles of various electrical cables
19
Program Status Update Updated Bar Chart Schedule
Progress Bar
Progress Bar
Status Report Agenda
Program Overview Risk Identification & Strategies Project Details
Program Status Update Runway 10R Approach
September 2010
November 2012
Program Status Update Turkey Run Basin
September 2010 November 2012
Program Status Update East Airfield Area
September 2010 November 2012
Program Status Update Runway 28L Approach
September 2010 November 2012
Questions? Tim Mentel, PMP
614-239-5011
Slide Number 1Status Report AgendaPort Columbus International Airport (CMH) - 2008Runway 10R/28L Replacement Why Move the Runway?Replacement Runway ProjectsPort Columbus International Airport (CMH) - 2012Port Columbus International Airport (CMH) July 2014Projects in the ProgramProjects In The Program IIProgram CostsProgram FundingStatus Report AgendaAirfield OperationsFenceline 252 South of Runway CLAdjacent Active RunwayCurrent Status of Runway 10R ApproachAdjacent Active RunwayMaximize Runway Closure DevicesAdjacent Active RunwayPilot RW 28L Approach ShortenedStatus Report AgendaPavement Section - RunwayRunway Program FactsMore FactsProgram Status UpdateUpdated Bar Chart ScheduleStatus Report AgendaProgram Status UpdateRunway 10R ApproachProgram Status UpdateTurkey Run BasinProgram Status UpdateEast Airfield AreaProgram Status UpdateRunway 28L ApproachSlide Number 27