Project Status Report Runway 10R-28L Replacement Program Port Columbus International Airport Presented to MORPC CAC Tim Mentel, PMP February 4, 2013
Transcript
  • Project Status Report Runway 10R-28L Replacement Program

    Port Columbus International Airport Presented to MORPC CAC

    Tim Mentel, PMP February 4, 2013

  • Status Report Agenda

    Risk Identification & Strategies Project Details Status Photos

  • Port Columbus International Airport (CMH) - 2008

  • Runway 10R/28L Replacement Why Move the Runway?

    More room was needed for a redesigned terminal after the 9/11 attacks

    Additional room between runways to allow simultaneous IFR approaches

    A team of consultants reviewed numerous options and held peer reviews

    Determined the best option was to move the south runway farther south

  • Replacement Runway Projects

    4

  • Port Columbus International Airport (CMH) - 2012

  • Port Columbus International Airport (CMH) July 2014

  • 7

    Projects in the Program

    Construct New Runway New Parallel South Taxiway High Speed Runway Exits In-Pavement Lighting New Navigational Aids Lighting Improvements Up-To-Date on FAA Requirements

    Construct Turkey Run Stormwater Basin

  • Projects In The Program II

    Demolish On-Airport Structures Reconfiguration of Airport Golf Course Acquire & Demolish Homes (13th Avenue) Replacement Runway Obstruction Mitigation Convert Old Runway to New Taxiway

    8

  • Program Costs

    Turkey Run Storm Water Basin - $2,992,770 Property Acquisitions - $5,704,513 Obstruction Mitigation - $843,905 Airport Golf Course Modifications - $4,611,814 Replacement Runway - $100,586,517 Convert Runway to Taxiway - $15,594,236 (est) Demolish On-Airport Structures - $1,857,235 Demolish Homes on 13th Avenue - $1,340,417

    Grand Total - $133,531,407*

  • Program Funding

    FAA Grant Funding $87.6 million Funds to reimbursed to CRAA annually

    through 2018 Passenger Facility Charges

    $46 million

  • Status Report Agenda

    Program Overview

    Project Details Status Photos

  • Airfield Operations Fenceline 252 South of Runway CL

  • Adjacent Active Runway Current Status of Runway 10R Approach

  • Adjacent Active Runway Maximize Runway Closure Devices

  • Adjacent Active Runway Pilot RW 28L Approach Shortened

  • Status Report Agenda

    Program Overview Risk Identification & Strategies

    Status Photos

  • Pavement Section - Runway

    17 Asphalt Mix Design Based on FAA P-401 Specification

  • Runway Program Facts

    The runway project will place enough asphalt pavement to build a standard 2-lane road from Columbus to Zanesville (about 50 mi) or to resurface I-670 between I-270 and the west side approximately 10 miles of eight-lane highway

    Move enough earth to fill Crew Stadium approximately 400,000 cubic yards

    18

  • More Facts

    Plant enough grass to seed Ohio Stadium 130 times

    Install enough storm culverts and piping to run a direct line from the Airport to downtown Columbus approximately 5 miles

    Install enough electrical wiring to wrap around the airport 4 times approximately 28 miles of various electrical cables

    19

  • Program Status Update Updated Bar Chart Schedule

    Progress Bar

    Progress Bar

  • Status Report Agenda

    Program Overview Risk Identification & Strategies Project Details

  • Program Status Update Runway 10R Approach

    September 2010

    November 2012

  • Program Status Update Turkey Run Basin

    September 2010 November 2012

  • Program Status Update East Airfield Area

    September 2010 November 2012

  • Program Status Update Runway 28L Approach

    September 2010 November 2012

  • Questions? Tim Mentel, PMP

    [email protected]

    614-239-5011

    Slide Number 1Status Report AgendaPort Columbus International Airport (CMH) - 2008Runway 10R/28L Replacement Why Move the Runway?Replacement Runway ProjectsPort Columbus International Airport (CMH) - 2012Port Columbus International Airport (CMH) July 2014Projects in the ProgramProjects In The Program IIProgram CostsProgram FundingStatus Report AgendaAirfield OperationsFenceline 252 South of Runway CLAdjacent Active RunwayCurrent Status of Runway 10R ApproachAdjacent Active RunwayMaximize Runway Closure DevicesAdjacent Active RunwayPilot RW 28L Approach ShortenedStatus Report AgendaPavement Section - RunwayRunway Program FactsMore FactsProgram Status UpdateUpdated Bar Chart ScheduleStatus Report AgendaProgram Status UpdateRunway 10R ApproachProgram Status UpdateTurkey Run BasinProgram Status UpdateEast Airfield AreaProgram Status UpdateRunway 28L ApproachSlide Number 27