Pico Hydro Power Generation Syeda Nishat Naila Department of Soil, Water & Environment University Of Dhaka Mentor, *Climate Reality Project* 1 An Overview of Geographic presentation in Bangladesh (GIS Based approach to identify scope of Pico Hydro)
Transcript

Pico Hydro Power Generation

Syeda Nishat NailaDepartment of Soil, Water & Environment

University Of Dhaka

Mentor, *Climate Reality Project*

1

An Overview of Geographic presentation

in Bangladesh

(GIS Based approach to identify scope of

Pico Hydro)

2

Daily 110

million tons of

Global warming

causing more

Climate Crisis

93% power of

Bangladesh is produced

by Coal, oil and gas

7% is hydro power

in the electrical

power mix

Renewable

Non- Renewable

Energy Dependency & Carbon Emission

Global Surface Temperature – Departure from Average• January – October 1880 – 2015

Data: NOAA

-1.0°

-0.5°

0.0°

0.5°

1.0°

1.5°

1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010

An

om

aly

(°F)

2015

1.5°

1.0°

0.5°

0.0°

-0.5°

0

5

10

15

Top 10 Cities at Risk from Sea Level Rise in 2070

• By Population at Risk

20

70

Po

pu

lati

on

at

Ris

k (i

n M

illio

ns)

Ko

lkat

a

Mu

mb

ai

Dh

aka

Gu

angz

ho

u

Ho

Ch

i Min

h C

ity

Shan

ghai

Ban

gko

k

Ran

goo

n

Mia

mi

Hai

Pho

ng

5

What is Pico Hydro?• Smallest form of hydro power

• Is a proven renewable, predictable, highest conversion efficiency and

cost competitive renewable energy source

• Usually less than 1kW

• Supply electricity for one or few families

• Rural off grid electrification system

6

Potential

Energy

Kinetic Energy

Mechanical Power

7

At the penstock end

At the Forebay tank

At the Turbine

Electrical Energy At the Generator

Pico Hydro Mechanism

8

md,l WmlrKh

(Control Unit)

ELC / IGC

(Turbine)

(Generator)(Ballast)

Excess power

How they work?

(Electricity to

the village)

9

Flowing river nearby or stream or irrigation

channel. diversion from the source

Site Assessment

Village map

MH Potential identification

Data gathering for demand calculation

Other energy sources using in the village

Source Selection Placing To Site

10

Major component of Pico-hydro scheme

Weir

Intake

Settling Tank

Channel

Penstock Pipe

Trash rack

Runner- turbine

Controlling & safety

Equipments

Water stock and intake tank

Penstock

Power house

11

P α H ,

P = p x g x H x Q x e

Power calculation P=Output Power (watt)Q=Flow Rate (m3/s)H= Water Head(m)g= 9.8 kg/m2

ɛ= efficiency (for Pico hydro overall efficiency is

about 40% and for micro hydro it is about 50%)

P α Q

Head Measurement:

1.Altimeter (90% efficient)

2.Level tube and staff gauge

3.Pressure gauge and staff tube

Flow Measurement:1. Area rainfall method (analyzing the rainfall data for a particular site we can get the flow for

the project) 2. Bucket Method (it is good and easy method especially for pico hydro)3. Floating Method (this method is not an efficient one)

12

Possibilities of Pico Hydro in Bangladesh

13

Costfor one Pico hydroelectricity

project is around 3000USD (2.5

lac BDT) which can produce

about 4kw power (let 2.5kw

efficient).

Climate-resilient Bangladesh

14

Sustainable Renewable Energy

Development Authority planned to

generate 5% of total generation from RE

by 2015 and 10% of total electricity

generation by 2020.

But only 200 MW which is about 2%

total Generation 10,000 MW is coming

from RE.

Establishing 3-4 Pico Hydro project can

produce around 10kw power using this

methodology in remote areas then huge

power is produced at low cost which can be

added to national grid

The solar home systems in Bangladesh have

eliminated the need for 180,000 metric tons

of kerosene fuel, saving an estimated USD

$225 million annually.*

Electricity deficiency is an acute phenomenon

in a developing country like Bangladesh due

to the rapid rise of population. The

nonrenewable sources of energy like coal,

petroleum, CNG, LPG is depleting day by

day, which is creating many obstacles such as

high cost of fuel, high demand and low supply

of fuel which decreases the consumption of

electricity for common peoples.

The MessageThe Pico hydro power generation can be a solution at rural

and hilly tribal areas in Bangladesh.

As the power generation is un interrupted and reliable with

very high potential. The user has control to the power

generation. It’s one time installment there is no regular

electricity bills. It also reduces risks of using kerosene

lamps. It is environmental friendly as no recurring of fuel

and toxic gas emission. It will also reduce the dependency

on Greenhouse gases and make

Bangladesh follow up with Paris Agreement.

15

The aim of this research paper is to show the suitable location availability of

natural Pico hydro system in the perspective of Bangladesh & to build such a system which gives

electricity at low cost, which must be eco-friendly, easy to use and to store the generated power by

means of battery charging for future use particularly during electricity blackouts.