+ All Categories
Home > Documents > Pier Foundation Details ARE 11mTower Kingspan...

Pier Foundation Details ARE 11mTower Kingspan...

Date post: 18-Apr-2020
Category:
Upload: others
View: 17 times
Download: 0 times
Share this document with a friend
3
Unit 1, St. Therese’s Place Flowerhill, Navan, Co. Meath +353 (0)46 907 7032 Email: [email protected] Web: www.jor.ie FOUNDATION DESIGN NTS J12-036 A Joseph O’Reilly Consulting Civil & Structural Engineers www.arewindtowers.com JOB. No. SCALE REV DATE DESCRIPTION DRAWING No. DATE REV PROJECT Unit 1, St. Therese’s Place Flowerhill, Navan, Co. Meath +353 (0)46 907 7032 Email: [email protected] Web: www.jor.ie FOUNDATION DESIGN NTS APRIL 2013 J12-036 ARE-12-001 ARE 11m Tower Kingspan 6kW Turbine Pier Foundation Details ARE 11mTower Kingspan 6kW Turbine A 22/04/13 ISSUED FOR APPROVAL
Transcript
Page 1: Pier Foundation Details ARE 11mTower Kingspan …pdf.capenergie.fr/doc-eolienne/Kingspan-11m-6kW-sable.pdfCUT AND BENT IN ACCORDANCE WITH BS 8666:2005 COVER TO REINFORCEMENT TO BE

Unit 1, St. Therese’s Place Flowerhill,Navan, Co. Meath

+353 (0)46 907 7032Email: [email protected] Web: www.jor.ie

FOUNDATION DESIGN

NTS

J12-036 A

Joseph O’Reilly

Consulting Civil & Structural Engineers

www.arewindtowers.com

JOB. No.

SCALE

REV DATE DESCRIPTION

DRAWING No.

DATE

REV

PROJECT

Unit 1, St. Therese’s Place Flowerhill,Navan, Co. Meath

+353 (0)46 907 7032Email: [email protected] Web: www.jor.ie

FOUNDATION DESIGN

NTS APRIL 2013

J12-036 ARE-12-001

ARE 11m TowerKingspan 6kW Turbine

Pier Foundation Details

ARE 11mTower

Kingspan 6kW Turbine

A 22/04/13 ISSUED FOR APPROVAL

Page 2: Pier Foundation Details ARE 11mTower Kingspan …pdf.capenergie.fr/doc-eolienne/Kingspan-11m-6kW-sable.pdfCUT AND BENT IN ACCORDANCE WITH BS 8666:2005 COVER TO REINFORCEMENT TO BE

Joseph O’Reilly

Consulting Civil & Structural Engineers

www.arewindtowers.com

JOB. No.

SCALE

REV DATE DESCRIPTION

DRAWING No.

DATE

REV

PROJECT

Unit 1, St. Therese’s Place Flowerhill,Navan, Co. Meath

+353 (0)46 907 7032Email: [email protected] Web: www.jor.ie

FOUNDATION DESIGN

NTS APRILl 2013

J12-036 A

Unit 1, St. Therese’s Place Flowerhill,Navan, Co. Meath

+353 (0)46 907 7032Email: [email protected] Web: www.jor.ie

ARE 11m TowerKingspan 6kW Turbine

Pier FoundationARE-12-002

A 22/04/13 ISSUED FOR APPROVAL

Reinforcement Schedule

1200

2800

1000

1200

1730

M33 65 M

AX

12

70

610 BCD

190

10

8-H25-01

21-H10-02-200 LINKS

1730

1000

675 280

380

610 BCD

6-H20-03 BOTTOM 6-H20-03 TOP

12-M33

4-H10-04-200 LINKS

6-H20-03-200 BOTTOM

6-H20-03-200 TOP

4-H10-04-200 LINKS

21-H10-02-200 LINKS

8-H25-01

12-M33

EMBEDDED TEMPLATE NOT SHOWN

A * B * C * D * E/R *Rev

letter

mm mm mm mm mm

01 H 25 1 8 8 3875 00 3875

02 H 10 1 21 21 2900 75 850 240

03 H 16 1 12 12 1925 11 1050 900

04 H 16 1 4 4 4225 51 900 1075

Member Length

of each

bar †

mm

Bar

mark

No.

of

mbrs

Total no.No. of

bars

in

each

Type and

size

Shape

code

type size

Pier Foundation3Concrete Volume: 4.27m

Reinforcement Weight: 220kg

Page 3: Pier Foundation Details ARE 11mTower Kingspan …pdf.capenergie.fr/doc-eolienne/Kingspan-11m-6kW-sable.pdfCUT AND BENT IN ACCORDANCE WITH BS 8666:2005 COVER TO REINFORCEMENT TO BE

Joseph O’Reilly

Consulting Civil & Structural Engineers

www.arewindtowers.com

JOB. No.

SCALE

REV DATE DESCRIPTION

DRAWING No.

DATE

REV

PROJECT

Unit 1, St. Therese’s Place Flowerhill,Navan, Co. Meath

+353 (0)46 907 7032Email: [email protected] Web: www.jor.ie

FOUNDATION DESIGN

NTS APRIL 2013

J12-036 A

Unit 1, St. Therese’s Place Flowerhill,Navan, Co. Meath

+353 (0)46 907 7032Email: [email protected] Web: www.jor.ie

ARE 11m TowerKingspan 6kW Turbine

Pier FoundationARE-12-003

A 22/04/13 ISSUED FOR APPROVAL

CONCRETE

CONCRETE TO BE GRADE C25/30 TO BS EN 206-1 AND BS 8550-2

CONCRETE HARDENING TIME - THE FOUNDATION SHOULD BE POURED TWO WEEKS

PRIOR TO ERECTION OF THE TOWER

REINFORCEMENT

REINFORCEMENT TO BE HIGH YIELD TYPE 2 TO BS 4449:1998, TO BE

CUT AND BENT IN ACCORDANCE WITH BS 8666:2005

COVER TO REINFORCEMENT TO BE 50mm TOP AND 75mm BOTTOM AND SIDES

ANCHOR BOLTS

PLEASE REFER TO ARE DRAWING FOR SPECIFICATION AND INSTRUCTIONS ON CORRECT

INSTALLATION OF HOLDING DOWN BOLTS

NOTES:

THE FOUNDATION HAS BEEN DESIGNED IN ACCORDANCE WITH EN 1997-1:2004 & BS 8110-1:1997.

& DESIGNED TO RESIST THE MAXIMUM TOWER ULTIMATE REACTIONS PROVIDED BY ARE.

BASE PLATE AND HOLDING DOWN BOLT DESIGN CARRIED OUT BE ARE.

MAXIMUM TOWER ULTIMATE REACTIONS

VERTICAL REACTION - (Fz) = 24kN

HORIZONTAL REACTION - (Fx) =29kN

MOMENT REACTION - (My) = 235kNm

GEOTECHNICAL DATA

THE FOUNDATION DESIGN IS BASED ON PRESUMPTIVE SOIL PARAMETERS

A MINIMUM ALLOWABLE SOIL BEARING PRESSURE OF 100kN/m2 IS REQUIRED FOR PAD FOUNDATIONS.

A FIRM CLAY WITH A MINIMUM UNDRAINED SHEAR STRENGTH, CU=50kN/M2 IS REQUIRED FOR

PIER / ROOT FOUNDATIONS.

IT IS ASSUMED THAT GROUND WATER IS NOT PRESENT WITHIN THE DEPTH OF THE FOUNDATION.

EARTHWORKS

THE FOUNDATION EXCAVATION SHALL BE FREE OF ALL SURFACE ORGANIC MATERIAL


Recommended