Date post: | 02-Jun-2018 |
Category: |
Documents |
Upload: | udhaysuchi |
View: | 260 times |
Download: | 4 times |
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 1/10
10
S1.)23 IC
METHO
T TEMENT
Client:
Donside Limited
Date
Produced:
Sept 2 3
Project: Environmental
Improvement
Revision No:
Rev
‘A’
Works
Title:
Phase
2 Enabling
Works
Job
No:
SD2381C
Drawing
Ref: 2) 1
Scope of
work
Location:
No.
of operatives
involved:
Supervisor Name:
Start Date:
Duration:
Scope:
Donside,
Aberdeen
8 10
Andy
Smillie
TBC
10
weeks
tbc)
The installation
of the phase 2
haul road
as noted
on
SBA
drawing reference J2807
-100 including
retention
system,
soil
nailing as
hand picking
of
asbestos.
2.
Control Measures
>
Al l operatives
to
have
a
site
induction at
first
arrival
to
s it e and must s ign
in a nd out
every
day. Al l
site
operatives will
also
be
required to
undertake an Asbestos Awareness
Training
course
prior to working
on site, provided
by
at UKATA
approved training
provider.
Whilst the
works are not intended to
‘disturb’
asbestos,
the
widespread
presence
of asbestos
including asbestos
insulation) in
the
vicinity
of
the
work
zone
renders this a
prudent course
of
action.
Site
Rules
must
be
adhered
to.
The
works
will
be
under the
daily control of a
supervisor
who has successfully
completed
the Demolition
Supervisor course
devised
and
administered
jointly
by
the
National
Federation
of
Demolition
Contractors and
CITB.
The
supervisor will
be
the
holder
of a
recognised First
Aid training
certificate.
A suitably
qualified asbestos
analyst/project
manager from
a UKAS
accredited consultancy)
will
also be
present throughout
the
works
to carry
out a ir
testing
and to
advise
on
any
observed
presence
or disturbance
of
suspected asbestos
materials.
>
The
site supervisor will
monitor noise, dust
and
vibration and wil l implement additional
control
measures
if deemed
necessary.
The
PPE
required
for
noise
will
also
be dependent
on
the
task involved.
The asbestos
analyst will
also
carry
ou t an on -going
programme of
air
monitoring
for
asbestos fibres. This
will
include
reassurance
background)
monitoring
and
personal
monitoring.
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 2/10
g
2
nf
Should any
approach be made to
Safedem
Operatives
voicing complaint during
the
course
of
these works, please
ensure that you
immediately report
this to
Site
Management
in
order that
it can
be
investigated
further and
verified.
All site
operatives will hold
a valid
and
up to date CSCS card.
Daily
weather
reports
are
to
be
taken
to check for
periods of
heavy
rain
which
ma y cause
the
adjacent
watercourse
to flood causing
flood
which poses
a risk to
operatives I works
on
the
phase
2 site.
Weather
will
also
be
monitored to
ensure
adverse
conditions
in
respect
of
asbestos
fibre risk
are
not
encountered
without
the
provision
of
adequate risk
control
measures. Such
adverse
conditions
would typically be dry,
sunny
and windy.
Only
suitably licensed
and
experienced
persons
will
be
used for
any asbestos
work and
ALL
asbestos will
be
removed to
a suitably licensed
landfill. All
asbestos works,
whether
deemed
to
be
categorised
as ‘Minor’
or ‘Major’
will be subject
to
separate risk
assessments
and method
statements
RAMS .
A temporary herras fence l ine
should
be constructed
along the
route of the
river to ensure
no
operatives can
access the
watercourse
deliberately
or
accidentally from
the phase
2
site.
A
decontamination unit
will
be on site
for
the duration
of the
works
along
with all
relevant
coveralls and
face
masks
given
the
nature of the work.
All
personnel
will
have
been trained in
the
correct use of PPE including
face
-fit tests for
RPE and in the
decontamination procedures.
A
full
site
induction wil l be g iven
to
all site personnel explaining
the nature
of the works
and the use of
the
decontamination works.
During
periods of asbestos
work no
un licensed
operatives will
be working in
that area.
All
machines
will
be
checked
daily for evidence
of damage
which may
lead to any
spillages
which may
cause
harm to the
river;
if
anything is noted
this
will
be
recorded and
rectified
before works
progress.
Vehicle cabs
will
also
be
periodically
air
tested
for
the
presence
of asbestos fibres.
Sepa’s
emergency
pollution
line phone
number will
be
given
to all
personnel
on
site
so
that
in
the unlikely
event
of pollution
occurring thi s can be
reported
immediately;
if this
situation
occurs works
will cease immediately.
Daily
air
monitoring will
be
carried
out
during
this phase
of
the
works
to ensure that
no
air
borne asbestos
fibres
are being
generated above
0.0 If/cc i.e. the
‘clearance
indicator’ ;
if evidence
shows
that airborne fibres
are being
generated above
these levels,
works
will cease
immediately and the
area
will
be
fully
sealed
to allow
a
re
-evaluation by
the
specialist
contractor and
asbestos
analyst.
3.
Labour
Plant
The
following
is
the machines
etc
required to
safely
execute
the
works
covered under
this
Method Statement.
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 3/10
Puge 0)
SD23 1C
• Hand
tools
•
JCB.330
• Wheeled shovel
• Compactors
• Hiabs
•
Chain
saws
• iNo Project
Manager
• 8No
Operatives
• Harnesses
• Machine
operator
• Banksmen
•
Specialized
LincensedAsbestos ontractor
The
machine
operator will be suitably ticketed for the
operation of the relevant machines.
The machines hand
tools
on
site wil l be
fully maintained
and
in good working order.
All banksmen
will have the relevant t ickets for
the
tasks
being
undertaken.
All personnel
involved in
any
asbestos
removal
will
be
from
an HSE licensed asbestos
removal contractor and a
TJKAS
accredited
asbestos consultancy will
be
involved
in
scoping,
supervising
and testing
all
such works. As noted previously, all
such
work
will
be
subject to
separate RAMS.
All
personnel
using
chain
saws
will have the
relevant
tickets.
All machines are
to
be
hosed down clean at the
end of each
day.
All
harnesses have
to
be ful ly tes ted
and
passed
as
safe to use.
4.
Supervision
A
competent
Safedem
Project
Manager
wil l be allocated
on
site
for
the delivery
of
materials.
A
competent Safedem Site
Manager Andy
Smillie) will supervise the
works
on a full
time
basis.
A competent
and
suitably licensed Asbestos
ontractorwill have senior
management on
site
managing the asbestos aspects of the
works.
A suitably
qualified
asbestos
analyst/project
manager
from a UK S
accredited consultancy)
will also be
present
throughout
the
works to
carry out
air testing and t o advi se
on any
observed
presence or
disturbance
of
suspected asbestos materials.
A
resident Engineer from SBA
Scott
Bennett Associates) will
be
based on site at
appropriate
stages
during
the
works.
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 4/10
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 5/10
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 6/10
la
ge
1
SD23
IC
On
com
pleti
on
o
f
this
exer
cise tes
ting wi
ll be
c
arrie
d
out
on “
gate ” to a
llow
sui ta
ble
con f
irma
tion
to
b
e
prov
ided
tha
t
the
re
are
n
o asb e
stos
con
taini
ng ma te
rials
pr
esen
t.
A
fter
thi
s
the
soil
nail
s
over this g
ate wi
ll
be
s
et out
and m
rked
an
d ins
talled by
a
s
peci
alist
contract
a
detailed
meth
od
state
men
t
w
ill
b
e
pro
vided
for
th
is e lem
ent of
the
w
ork s
in
du
e
co
urse
.
On
com
plet
ion
of
th
e
g
ate s
oil na il
s
the
ex
cava
tion
for the
te
rr m
esh
wa
ll
ba
se uni
t will be
car
ried
out ;
al
l ma
teria
l
ex
cav
ated
o
ut w
ill be
rem
oved of
sit
e to
a sui ta
bly
lice
nse d
tip
depe
ndin
g
on the
p
re de
term
ined
cla
ssifi
catio
n
of the s
e
s
oils.
The
pr
efihl
ed
t
err m
esh units
wi
ll
the
n
be
lift
ed into p
ositi
on
an
d th
e r
eleva
nt b
ackf
ill
but
in p
lace
a
nd
com
pact
ed
to
loc
k
th
e te
rr m
esh
tails
in
posit
ion;
this
pr
oces
s
will
repe
at
u
nti l the
ter
rame
sh
wall is
con
stru
cted
3
ba
sket
s
h
igh
o
ver
gat
e
An
y
lev
el dif
feren
ce bet
ween the pha
se
haul roa
d nd th
e
g
te
pla
tform is to
be sw
eete
ned
o
ut
us ing
the
sam
e
b ck
fill m
ateria
l wi t
h
t
his
“swe
eten
ing
ou t” o
ccur
ring
o
ver ha
lf the
leng th
of
g
ate T
his all
ows the
m
achi
ne
to
saf
ely
track
along
gate
to
ga
in
ac
ces s
to
gat
e 2
Th
e abo
ve
sec
tion
w
ill
repe
at
t
hrou
gh
all
o
f th
e gat
es u
ntil
t
he
fu
ll le
ng th
of
ha
ul r
oad is
con
struc
ted
to
a l
evel th
at coi
ncide
s
wi th
3
ba
sket
s
hi
gh
on
the
t
erram
esh
wa
ll.
T
he m a
chin
e
w
ill th
en tra
ck b
ck
ont
o
th
e
pha
se
hau
l
r
oad
are
a;
from
th
ere
t
he
rem
ainde
r
of
the
te
rr m
esh
un
its wil
l
be
pl
ced
emp
ty
a
nd fi
lled wi
th clean stone i
nsitu
.
T
he
a
rea
behin
d
the
wa ll w
ill
al
so be
ba
ckfil
led
an
d
com
pacte
d
to
loc
k
th
e tail
s i
n
p
ositio
n;
this pr
oces
s
w
ill
repea
t
unti
l
th
e fu
ll heig
ht wa ll is c
omp
lete
on
ga
te
w
ith
the h
aul ro
ad in
po s
ition
at
tha t l
evel
.
The timb er
ba
rrier
rails will the n be construc ted over gate
to
complete th is
gat e.
Th
is pro
cess will ag
ain repe
at unti
l
the
fu
ll
lengt
h
of
haul ro
ad
is
c
omp
leted at i
ts
fini
shed le
vel.
The
tem
por
ary helTas fenc
e co
nstru
cted
alon
g the
riv
er
w
ill then
be
un
clipp
ed
b
y
o
pera
tives at
the
low
er
lev
el wh
o wil
l have su
itable
harne
sses
fi
xed
bac
k
in t
o
t
he
ter
ram
esh wall ; the fen
ce
pa
nels
will
t
hen b
e
l
ifted ove
r
n
d o
nto
t
he ha
ul road are
a
w
here
they
w
ill
be
r
emov
ed
6
Smo
king
Are
as
S
mok
ing
w
ill not
be p
erm
itted
on
the
site
nd wi
ll b
e
cont
ained to
the
d
esign
ated
smo
king
a
reas.
7
Fir
e
Poin
ts
Fi
re po
ints will
b
e
as d
etail
ed
in th
e s ite in
ducti
on .
8
PAT
Testing
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 7/10
nf
10
All
electrical equipment on s it e wil l have an
up
to
date pat test,
with certification available
for
view
in the
site
office.
9.
Site Parking
Site
parking will
be
in the a rea
noted on
the
attached drawing number
SK.OOl.
10. ccess to the site
Access
to s it e wil l be
controlled
by
a gate man
situated
in
a
small gate
house cabin
located at
the site
entrance.
All
facilities will
be
available for the
gate
man to access
and use.
11. Site
Security
A sub
contract security f irm wil l be
used
for
over
night and weekend
security.
All
sub contract security
guards
used wil l be inducted to the site
rules
Welfare facilities
will
be
available for the
security
to
use.
12. Emergency arrangements
Method statements
to
be briefed
to all
operatives
and
once understood
a
method statement
briefing
sheet to be s igned
Emergency phone numbers
and the
address
of
the nearest hospital
are
obtained from the
site
notice
board
Aberdeen
Royal
Infirmary
In case
of injury,
initial treatment should be
provided
by
site first
-aiders.
Injured
persons
requiring
further tre tment
should
be
taken to
Hospital,
by
either
site
transport, or
ambulance
dial 999 .
Follow
Company Policy
requirements for
accident
reporting
Procedure.
High
standards of
housekeeping
and
site tidiness
must
be
maintained to ensure clear
access/egress
at
all
times, should the emergency services be required.
Unforeseen
exposure
to
asbestos
materials
will
be
controlled
by t he
asbestos training,
decont min tion arrangements
and presence of the UKAS
accredited consultancy
personnel,
who wil l adv ise on the
appropriate actions to
be taken.
13. First
id
‘When the welfare is segregated from
the site, Information boards
and
first
aid boxes wil l be
placed
in
prominent positions
on
the
site.
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 8/10
Page
8
of
1
SD238
IC
• Site office
• Site
canteen
• First aid and eye
wash station
• Site
location
First
aid
signage
with relevant
information will
also be placed on
information boards and
site
canteen
>
A weekly
check sheet
will
be
placed
in the
first aid
boxes
and
fil led in
by the Safedem
site
management
>
The
site
address
wil l be
clearly marked
on the
front
each
first
aid box.
14.PPE
All
operatives
will be
in
possession
or have
access to
the
Following
• Hard Hats
• High Vis
Vests
or
Coats
•
Gloves suitable
for the
task
• Safety Boots
• Coveralls
Tyvek
type
5 6
or other
impervious
material
•
On-nasal
masks P3 or
respirators
P3 , as
deemed
appropriate
Written By
Name
Barry
Ward
Position
Technical
Manager
Signature
Date
Checked
By
Name
Andy
Smillie
Position
Contracts
Manager
Signature
Date
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 9/10
Si 3S
Sinned
off
y
Name
ndy
Smillie
Position
Contracts
Manager
Signature
Date
I the
undersigned have had
the
attached
Method
Statement
pertaining to the
above
contract explained
to
me
Name
Operative Signed
Date
8/10/2019 Piles Method Statement
http://slidepdf.com/reader/full/piles-method-statement 10/10