+ All Categories
Home > Documents > Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle...

Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle...

Date post: 09-Feb-2020
Category:
Upload: others
View: 5 times
Download: 3 times
Share this document with a friend
12
Piling rig with fixed leader system LRH 600 LRH 0108.03 EN-US
Transcript
Page 1: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

Piling rig with fixed leader system

LRH 600LRH 0108.03

EN-US

Page 2: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

Concept and characteristics LRH 600

• Depending on the requirements basic machines of the crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance construction machinery convinces with its high level of efficiency and flexibility.

• Thanks to the special leader kinematics a radius of max. 49.2 ft (fixed leader) as well as a continuous inclination adjustment are achieved.

• Hydraulic supply through carrier machine

• All adjustment functions and their control completely integrated in the carrier machine

• Equipment design according to latest European regulations and standards

• High stability through lattice structure

Kicker

Hydraulic hammer

Universal leader top for all applications

Basic machine LR 1300 or HS 895 HD

Lattice leader

Swinging leader

Suspension

Top winch

Vertical travel

Rotation devicePile guide

2 LRH 600 – 0108.03

Page 3: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

Special features

• Structure and connection of leader sections: Easy and quick assembly thanks to pin connection, high stability through lattice structure.

• Vertical travel: In order to provide maximum stability, the kicker is connected to the boom head via supporting tubes. This allows to change the leader height without influencing the leader inclination.

• Kicker: Two compensation cylinders always keep the leader parallel to the uppercarriage. This allows for maximum torque transmission. Radius and inclination are adjusted using only one pair of cylinders.

Leader inclination device

Vertical travelConnection of leader sections

Automatic rotation device

LRH 600 – 0108.03 3

Page 4: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

47.2´´

26´3´´

Max. 49´6´´

Min. 20´5´´

22´

169´

16´5

´´16

´5´´

172´

8´´

31´8´´

R 22´11´´

9.5° 14° 3° 3°

Technical data – fixed leader

Leader length 128/147.7/167.3 ft

Weight without carrier machine 66,139/71,650/77,162 lbs

Min. radius 20.4 ft Max. radius 49.5 ft

Leader inclination continuously variable* Lateral inclination ± 3.0° Forward inclination 1:6 9.5° Backward inclination 1:4 14.0°

Max. pile weight 88,185 lbs Max. hammer weight 77,162 lbs

Pull force max. 269,771 lbf

Max. torque (effective over complete leader length) 236,020 lbf-ft

Vertical travel ± 16.4 ft

*) Other inclinations on request

Dimensions and weights LRH 600 fixed leader

4 LRH 600 – 0108.03

Page 5: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

47.2´´

26´3´´

R 49´3´´ 22´

xxxx

x

31´8´´

157´6

´´ - 19

6´10´´

R 22´

11´´

Technical data – swinging leader

Leader length 157.5/196.9 ft

Weight without carrier machine 55,116/63,934 lbs

Leader inclination* 1:1

Max. pile weight 44,093 lbsMax. hammer weight 44,093 lbs

*) Other inclinations on request

LRH 600 swinging leader

LRH 600 – 0108.03 5

Page 6: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

Kicker

Width 7.9 ft

Weight 10,098 lbs

Hose guide

Width 42.1 inch

Weight 375 lbs

Pile guide

Width 66.1 inch

Weight 1,588 lbs

Support plate

Width 19.1 inch

Weight 1,367 lbs

Supporting tubes

Supporting tubes 167.3 ft 2 x 750 lbs

Supporting tubes 147.7 ft 2 x 353 lbs

Supporting tubes 128 ft 2 x 188 lbs

Leader extension incl. sledge 10 ft + 20 ft + 20 ft

Width 7.2 ft

Weight 15,190 lbs

Leader extension incl. vertical travel sledge 40 ft

Width 62.4 inch

Weight 10,968 lbs

Leader extension 40 ft

Width 39.4 inch

Weight 7,783 lbs

Leader extension incl. guiding sledge 40 ft

Width 57.1 inch

Weight 13,052 lbs

Leader top with pulley kit hammer

Width 58.3 inch

Weight 7,022 lbs

16´9´´ 38.2´´

26´´

39´10´´

7´9´´

39´10´´

6´10´´

39´10´´

50´5´´

5´9´´

16´6´´

53.7´´

49.2´´

6´11´´

6´8´´

46.5´´

47.6´´

46.3´´

44´4´´ 6.7´´

Transport dimensions and weights LRH 600 fixed leader

6 LRH 600 – 0108.03

Page 7: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

Turnbuckle 8x

Width 9.1 inch

Weight 287 lbs

Suspension rope 14x

Weight 3750 lbs

Walkway 10x

Width 5´6´´

Weight 730 lbs

Leader foot

Width 17.5 inch

Weight 885 lbs

A-frame spacer

Width 9.5 inch

Weight 665 lbs

A-frame bar 2x

Width 23.2 inch

Weight 885 lbs

Traverse 4x

Width 29.3 inch

Weight 1370 lbs

Brace 2x

Width 7.5 inch

Weight 210 lbs

Top winch

Width 52.7 inch

Weight 2515 lbs

46.8´´

12.6´´

7´5´´ 7.5´´

23´8´´

13.8´´

6´3´´

15.4´´

29.3´´ 11´

29.3´´

4´11´´

47.2´´

38.8´´ 17.5´´

47.2´´

19´2´´ 33.5´´

48´´

Additional equipment for swinging leader

LRH 600 – 0108.03 7

Page 8: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

11:182 13 2

10.00m0 m/min 1

1 15.00m0 m/min 1

2

020406080100

%

5008001100140017002000

rpm

020406080100

% Nm

7 m/s

5.3 °

22/min

306090120kNm83

0100200300400bar °0

121.0 kN 164.5 kN

0.1°

°-2.3

2.3°

42.4 m

0

50

100

150

200

0

50

100

150

2001 2

MODE

°80

0

Display for impact driving

Hydraulic hammer H 15 L

Technical data

Drop weight 22,046 + 5,512 + 5,512 lbs Max. rated energy 165,952 lbf-ft

Blow rate max. energy 30 blows/min Max. blow rate 80 blows/min

Total weight 50,707 lbs

Performance data for 167.3 ft leader

Max. pile length 164 ft

8 LRH 600 – 0108.03

Page 9: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

10:582 13 2

MODE

10.00m/min 1

1 15.000m/min 1

2

7m/s

5.3

8.4 rpm

0100200

% Nm

300400bar °0

102.2 kN 164.5 kN

0.1 °

-2.3

2.3°

°80

42.4 m

020406080100

%

5008001100140017002000

rpm

020406080100

0

50

100

150

200

0

50

100

150

2001 2

°

°

0m m

Display for continuous flight auger drilling

Continuous flight auger drilling BAT 320

Technical data

Rotary drive - torque 0 – 236,020 lbf-ftRotary drive - speed 0 – 47 rpm

Performance data for 167.3 ft leader and auger cleaner

Drilling depth 167.3 ft

Max. drilling diameter* 47.2 inch*) Other drilling diameters available on request

LRH 600 – 0108.03 9

Page 10: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

Hydraulic hammer Swinging leader

Technical data – swinging leader

Leader length 157.5/196.9 ft

Weight without carrier machine 55,116/63,934 lbs

Leader inclination* 1:1

Max. pile weight 44,093 lbsMax. hammer weight 44,093 lbs

*) Other inclinations on request

10 LRH 600 – 0108.03

Page 11: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

job site:machine ID:

start date:

stop time:start time:

duration:

05.11.200812:16:4812:48:4800:32:00

motorway1155xx

CFA Drilling

pile number:maximum depth:total concrete vol.:concrete volume pile:overconsumption:maximum incline:

E022227 cm15,123 m³14,531 m³29,8 %0,4 °

PDE® colour monitorfor visualization of the PDE® data

in the operator's cabProcess data report

software PDRPC provided

by the customer

CompactFlashmemory card

External sensors

Printer

StandardOptional

PDE®

pile number Liebherr 123

m1.20

l/mm0.3

m0.4

m0.5

m0.6

m0.7

m0.8

m0.9

m1.0

m1.1

m1.3

m1.4

m1.5

m1.6

m1.7

m1.8

m1.9

m2.0

m2.1m2.2

r

ABC

67%

0 10 20 30

m1.20

m0.3

m0.4

m0.5

m0.6

m0.7

m0.8

m0.9

m1.0

m1.1

m1.3

m1.4

m1.5

m1.6

m1.7

m1.8

m1.9

m2.0

m2.1m2.2

0 25 50 75 100 125

Process data reporting - PDR (additional equipment) Comprehensive data evaluation and generation of reports on a PC is possible using the software PDR.

Depending on the application the recorded and processed data are displayed on the PDE® touchscreen in the operator’s cab, e.g. in the form of an online cast-in-place pile. At the same time the PDE® is operated using this touchscreen. The operator can enter various details (e.g. jobsite name, pile number, etc.) and start and stop recordings. A recording of every start-stop cycle carried out in the PDE® is establis-hed on a CompactFlash memory card.

The PDE® can be configured in a number of ways, e.g. for the connection of external sensors, for the generation of a simple protocol as graphic file and/or for a printout directly in the operator’s cab.

Process data recording system - PDE® (additional equipment)

The Liebherr process data recording system PDE® constantly records the relevant process data during the working process.

Recordings management - The recordings generated by the PDE® system can be imported and managed in PDR. The data can be imported directly from the CompactFlash card or via the Liebherr telematics system LiDAT. Certain recordings, e.g. for a particular day or jobsite, can be found using filter functions. Viewing data - The data in each record is displayed tabularly. Combining several recordings provides results, for example, regarding the total concrete consumption or the average depth. Furthermore, a diagram editor is available for quick analysis. Generating reports - A vital element of PDR is the report generator, which allows for the generation of individual reports. These can be printed out directly or stored as pdf files. In the process the size, colour, line thickness or even the desired logo can be configured. Moreover, the reports can be displayed in different languages, e.g. in English and in the national language.

LRH 600 – 0108.03 11

Page 12: Piling rig with fixed leader system LRH 600 EN-US · crawler crane series (LR 1300) or duty cycle crawler crane series (HS 895 HD) are used. Combined with solid leaders this high-performance

LRH

600

010

8.03

- r

B -

EN

-US

v01

.122

019

- 11

9466

12 S

ubje

ct t

o ch

ange

with

out

notic

e.

Liebherr-Werk Nenzing GmbH Dr. Hans Liebherr Str. 1, 6710 Nenzing/Austria Tel.: +43 50809 41–473, Fax: +43 50809 41–499 [email protected], www.liebherr.com facebook.com/LiebherrConstruction


Recommended