Pilot Emissions Trading Schemefor Air Pollutants in India
A collaboration between:
Central Pollution Control Board
Maharashtra Pollution Control Board
Components of Emissions Trading
RegulatorA
lloc
atio
n
PermitAllocation
EmissionsMonitoring
Allocation
Monitoring M
onit
orin
g
1. Allocation.Regulator
4. Compliance.Regulator
Pollution Source
(Industry)
Pollution Source
(Industry)
Pollution Source
(Industry)PermitTrading
PermitTrading
All
ocat
ion
Allocation Monitoring
Allocation
Monitoring M
onit
orin
g
Regulatorsets overall cap and allocates permits.
2. Trading. Industry buys more permits or sells excess and adjusts emissions to be below permit holdings.
3. Monitoring. Regulator monitors total emissions of targeted pollutant.
Regulatorchecks that all sources have enough permits for emissions.
Next steps: Moving to an ETS
Regulator
Set Quantity Standard
&
Regulator
NormSetting
EmissionsMonitoring
(for compliance
EmissionsMonitoring
(for compliance to
Pollution Source
(Industry)PermitTrading
PermitTrading
& Permit
Allocation
Pollution Source
(Industry)
Setting (for complianceto fixed norms)
(for compliance topermit holdings)
Current Regulations Emissions trading pilot
4
Project Timeline• Regulatory design and CEMS planning
– January 2011 – June 2011. Enact regulatory changes, set monitoring standards, identify state samples.
• Baseline data collection and trading platform
– July 2011 – December 2011. Install CEMS, ensure data quality, set trading platform and finalize ETS design parameters.
• Randomized evaluation of trading pilot
– January 2012 – December 2012 and after. Allocate permits, begin trading and monitor emissions.
5
Immediate Timeline• May 13, Technical Workgroup Meeting• May 20, MPCB Industries-Vendors Meeting• May 25, Sample Identification and Criteria• Mid June, Governing Council Meeting • Mid June, Governing Council Meeting
– Draft Regulatory Notification– Draft Technical Specifications– Samples from all three states
6
GPCB: Progress and Requirements• Progress so far:
– Industry list received for Sachin, Narol Industries– Baseline surveys sent to Sachin, Narol Industries
• Requirements before May 25th:• Requirements before May 25 :– Start with Industry list for Surat and Ahmedabad districts – Finalize pilot industries based on clearly defined criteria– Send additional survey forms if needed– Receive filled baseline surveys before June 5
7