+ All Categories
Home > Documents > Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Date post: 20-Jan-2016
Category:
Upload: sierra
View: 28 times
Download: 0 times
Share this document with a friend
Description:
Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan. December 2011. Simon Charré The Regional Environmental Center for Central Asia - CAREC. The Chon Aksuu watershed. Downstream activities: Irrigated crop growing – Water Users Association. Upstream activities: - PowerPoint PPT Presentation
Popular Tags:
14
Pilot PES scheme in the Chon-Aksuu watershed, Kyrgyzstan Simon Charré The Regional Environmental Center for Central Asia - CAREC December 2011
Transcript
Page 1: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Pilot PES scheme in the Chon-Aksuu watershed, Kyrgyzstan

Simon CharréThe Regional Environmental Center for Central Asia - CAREC

December 2011

Page 2: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The Chon Aksuu watershed

Downstream activities: Irrigated crop growing – Water Users Association

Upstream activities:

Forestry – Forest administration

Livestock breeding – Pasture Committee Mushroom/medicinal plants picking – Individual businesses

Tourism – Individual businesses

Page 3: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Main issues in the watershed

1. Forest degradation:- Deforestation- Soil degradation in the

forest- Weak natural regeneration

2. Overgrazing of pastures

Water quality and quantity for irrigation use – high level of suspended sediments, water shortages

Erosion

Decrease of water storage

in the soil

Page 4: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Managing the problems through the PES tool

Ecosystem services flow

Payment flow

Water Users Association

Forest administration

Pasture committee

Tourists

Mushroom pickers

Page 5: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The PES scheme

• 4 contracts

One multilateral Three bilaterals

1. Forest administration/WUA

2. Pasture committee/WUA

3. Forest administration/Mushroom pickers

Page 6: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The payment

1. The Water Users Association pays in labour– The Forest Administration: 10 man/day a

year to help in tree plantation, fencing, etc;– The Pasture Committee: 20 man/day a

year for pasture quality improvement.

2. The Mushroom Pickers Association pays in labour the Forest Administration: 30 man/day a year to help in soil preparation, tree plantation, etc.

3. Tourists pay in cash the Forest Administration the entrance fee in the valley: 20soms/person, 50soms/car.

Page 7: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The conditionality

• The Forest administration must:- Allocate 10% of the fee collected among tourists to tree plantation;- Fence new plantations;- Fence important places for natural regeneration;- Work together with the Pasture Committee and the village

administration;

• The Pasture Committees must:- Prepare a Pasture Management plan;- Follow recommendations on maximum pasture load, repare key

infrastructures to enable the access to remote pastures, fence temporary some pastures for regeneration;

- Limit and control grazing in the forest areas

Page 8: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Monitoring of the scheme

Key point for the sustainability of the overall mechanism

Coordination Committee

Monitoring and Evaluation (M&E) plan/group

Monitoring of water quality by water users

Page 9: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Monitoring and Evaluation plan

The M&E plan was designed and approved in cooperation with all parties involved in the scheme

1.It concerns the two ecosystems included in the project: forests and pastures;

2.Will be implemented once a year by a multi-stakeholder group (12 people);

3.A short report will be written after implementation and sent to the Coordination Committee.

Page 10: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The overall mechanism is supervised by a multi-stakeholder Coordination Committee: 20 members from different backgrounds and sectors.

Missions:1. To meet once a year to evaluate the M&E

report;2. To extend or amend the PES contract;3. To organize discussions and solve

controversial issues between parties;4. To promote the PES tool.

Coordination committee

Page 11: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Monitoring of water quality by water

users

• Simple and cheap protocol

• To be regularly implemented to follow the evolution of suspended sediments load

• Will show the efficiency of the activities implemented upstream

Page 12: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Next steps

To improve the present scheme:

• To work on the possibility to include other users of the upstream ecosystems as buyers: medicinal plants pickers, bee keepers, etc;

• To conduct field work to identify within the targeted ecosystems the places with the highest potential to provide water related ecosystem services;

• To conduct a reflexion on how to integrate in the scheme the pastures owned by the forest administration.

Page 13: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

• To discuss with the National Agency for Environmental Protection the opportunity to use the REDD+ mechanism

• To evaluate the feasibility of involving national industries in forest regeneration and protection

Carbon storage

Page 14: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Learning from other experiences

Field trip to Vietnam to visit several PES projects also addressing water quality issues

1.How can a cash payment be managed in the frame of a PES scheme? Is it feasible in the Chon-Aksuu watershed?

2.How can a PES national strategy be created and implemented efficiently for environmental protection and the maintain of economic activities?


Recommended